Deep well pump is a kind of equipment used to extract groundwater, usually used in agricultural irrigation, urban water supply, industrial production and other fields.The correct installation method can ensure the normal operation and long-term use of deep well pump.The following are the general steps of deep well pump installation:
1) assembly order of motor: stator assembly → lower guide bearing assembly → rotor assembly → thrust plate → left buckle nut → thrust bearing assembly → base assembly → upper guide bearing seat assembly → skeleton oil seal → connecting seat.Adjust the studs to make the motor shaft extension meet the requirements specified.Then put on the pressure regulating film, pressure regulating spring and cover.
(2) assembly of pump: fix the shaft and inlet section on the mounting seat I can, use the dismounting cylinder to fix the impeller and conical sleeve on the shaft, and then install the guide shell, impeller, etc., so that the flow shell, check valve, etc. are installed in turn.
When the motor pump department below grade eight is assembled, first, the tension nut is evenly installed between the inlet section and the contact plane of the bearing seat, the coupling, the pump shaft, the fixed stud and the locking ring are installed, and the impeller and the conical sleeve are fixed on the pump shaft with the damp packing cylinder, and the guide shell, the impeller, etc. are installed in turn. After the pump is installed, pull the pull nut, take out the gasket, tighten the tension nut evenly, and then rotate the pump from the coupling, the rotation must be uniform. It should be noted that in the process of installing the deep well pump, strictly abide by the operating procedures and safety measures to ensure safety and reliability.At the same time, it is necessary to choose the appropriate model and specification of the deep well pump according to the specific situation to meet the needs of different fields.