Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.
1, suplay sa kuryente: tulo ka hugna nga AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).
2, kalidad sa tubig:
(1) ang temperatura sa tubig dili mas taas kay sa 20 °C;
(2) solid nga impurities content (mass ratio) dili labaw sa 0.01%;
(3) PH value (pH) 6.5-8.5;
(4) hydrogen sulfide sulod mao ang dili labaw pa kay sa 1.5mg/L;
(5) chloride ion sulod mao ang dili labaw pa kay sa 400mg/L.
3, ang motor sirado o puno sa tubig nga basa nga istruktura, sa wala pa gamiton ang submersible motor nga lungag kinahanglan nga puno sa limpyo nga tubig, aron malikayan ang bakak nga puno, ug unya higpitan ang water injection, air release bolts, kung dili tugutan nga gamiton
4, ang submersible pump kinahanglan nga bug-os nga malubog sa tubig, ang diving giladmon dili labaw pa kay sa 70m, ang ubos sa submersible pump gikan sa ubos sa atabay dili ubos pa kay sa 3m.
5, ang atabay nga pag-agos sa tubig kinahanglan nga makatagbo sa submersible pump water output ug padayon nga operasyon, ang submersible pump water output kinahanglan nga kontrolado sa 0.7 - 1.2 nga mga panahon sa rated nga dagan.
6, ang atabay kinahanglan nga tul-id, ang submersible pump dili magamit o ilabay, bertikal lamang nga paggamit.
7, ang submersible pump kinahanglan nga ipaangay sa cable sumala sa mga kinahanglanon, ug ang external overload protection device. 8, ang bomba hugot nga gidili nga walay tubig nga walay load nga test machine
Modelo | Agos (m3/h) | Ulo (m) |
Rotating speed(change/point) | bomba sa tubig(%) | Outlet diametro (mm) |
Applicable nga maayo diametro (mm) |
Gi-rate gahum (KW) |
Rated voltage(V) | Ratedcurrent(A) | Episyente sa motor (%) | power factorcosφ | Yunit Radial Maximu nga gidak-on (mm) |
Sulti | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125sa ibabaw | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125sa ibabaw | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125sa ibabaw | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125sa ibabaw | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125sa ibabaw | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125sa ibabaw | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125sa ibabaw | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125sa ibabaw | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.
Ang mga nag-unang bahin sa produkto naglakip sa:
1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

(1) Pagpangandam sa dili pa i-install:
1. Susiha kung ang submersible pump nakatagbo sa mga kondisyon sa paggamit ug sakup nga gitakda sa manwal.
2. Gamit ang usa ka bug-at nga obiect nga adunay diyametro nga katumbas sa labing taas nga gawas nga diametro sa submersible pump, sukda kung ang inneldiameter sa wellbore mahimong mohaum sa submersible pump, ug sukda kung ang giladmon sa atabay nagtagbo sa mga kinahanglanon sa pag-instalar.
3. Susiha kung limpyo ba ang atabay ug kung ang tubig sa atabay lapok. Ayaw paggamit ug submersible electric pump sa paghugas sa welor pump nga lapok ug balas nga tubig aron malikayan ang ahat nga kadaot sa submersible electric pump.
4. Susiha kon ang posisyon sa welhead installation clamp haom ug kon kini makasugakod sa kalidad sa tibuok unit
5. Susiha kon ang mga sangkap sa submersible pump kompleto ug na-install sa husto sumala sa assembly diagram sa manwalKuhaa ang filter screen ug i-rotate ang coupling aron makita kung kini nagtuyok nga flexible
6. Ablihi ang tornilyo sa tubig ug pun-a ang lungag sa motor sa limpyo, dili makadaot nga tubig (timan-i. siguroha nga sal-an kini), unya hugti ang waterscrew. Pagkahuman sa 12 ka oras nga pag-injection sa tubig, ang resistensya sa pagkakabukod sa motor kinahanglan dili moubos sa 150M Q kung gisukod sa usa ka 500V nga pag-uyog nga lamesa.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.
After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Ang gilakip nga cable wiring process diagram mao ang mosunod:
8. Gamit ug multimeter aron masusi kung konektado ba ang tulo ka hugna nga mga wire ug kung ang resistensya sa DC gibana-bana nga balanse.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.
(2) Mga kagamitan sa pag-instalar ug mga himan:
1. Usa ka parisan sa pag-alsa sa mga kadena nga sobra sa duha ka tonelada.
2. Usa ka tripod nga adunay bertikal nga gitas-on nga dili moubos sa upat ka metros.
3. Duha ka nagbitay nga mga pisi (wire ropes) nga makadala sa gibug-aton nga sobra sa usa ka tonelada (makadala sa gibug-aton sa usa ka kompleto nga hugpong sa mga bomba sa tubig).
4. Pagbutang ug duha ka parisan sa mga clamp (splints).
5. Mga wrenches, martilyo, screwdriver, electrical nga mga himan ug instrumento, ug uban pa.
(3) Pag-instalar sa electric pump:
1. Ang diagram sa pag-instalar sa submersible electric pump gipakita sa Figure 2. Ang espesipikong mga sukod sa pag-instalar gipakita sa Table 3 "Listahan sa Mga Dimensyon sa Pag-instalar sa Submersible Electric Pump".
2. Ang mga submersible electric pump nga adunay ulo nga ubos sa 30 metros mahimong ipataas direkta ngadto sa atabay gamit ang mga hose ug wire rope o uban pang mga pisi nga abaka nga makadala sa tibuok nga gibug-aton sa tibuok makina, mga tubo sa tubig, ug tubig sa mga tubo.
3. Ang mga bomba nga adunay ulo nga labaw sa 30 metros naggamit sa mga tubo nga puthaw, ug ang pagkasunod-sunod sa pag-instalar mao ang mosunod:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Ipataas gamay ang submersible pump, kuhaa ang clamp sa ibabaw nga tumoy sa water pump, ihigot pag-ayo ang kable sa tubo sa tubig gamit ang plastic tape, ug hinayhinay nga ihigot hangtod ang clamp ibutang sa wellhead.
④ Gamita ang samang paagi sa paghigot sa tanang tubo sa tubig ngadto sa atabay.
⑤Human makonektar ang lead-out cable sa control switch, konektado kini sa three-phase power supply.
(4) Mga butang nga matikdan sa panahon sa pag-instalar:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Atol sa pag-instalar, ang usa ka rubber pad kinahanglan ibutang sa flange sa matag tubo ug higpitan nga parehas.
3. Sa diha nga ang bomba sa tubig ipaubos ngadto sa atabay, kini kinahanglan nga ibutang sa tunga-tunga sa tubo sa atabay aron mapugngan ang bomba nga modagan batok sa bungbong sa atabay sa dugay nga panahon, hinungdan nga ang bomba mag-vibrate ug ang motor masilhig ug masunog. .
4. Tinoa ang giladmon sa bomba sa tubig hangtod sa ilawom sa atabay sumala sa nag-agos nga balas ug silt nga kahimtang sa atabay. Ayaw ilubong ang bomba sa lapok. Ang gilay-on gikan sa water pump hangtod sa ilawom sa atabay kasagaran dili moubos sa 3 metros (tan-awa ang Figure 2).
5. Ang giladmon sa pagsulod sa tubig sa water pump kinahanglang dili moubos sa 1-1.5 metros gikan sa dinamikong lebel sa tubig ngadto sa water inlet node (tan-awa ang Figure 2). Kay kon dili, ang water pump bearings mahimong daling madaot.
6. Ang pagbayaw sa water pump dili mahimong ubos kaayo. Kung dili, kinahanglan nga i-install ang usa ka balbula sa ganghaan sa pipeline sa tubig sa wellhead aron makontrol ang pag-agos sa bomba sa rate nga punto sa pag-agos aron mapugngan ang motor nga ma-overload ug masunog tungod sa daghang mga rate sa pag-agos.
7. Sa diha nga ang water pump nagdagan, ang tubig nga output kinahanglan nga padayon ug bisan pa, ang kasamtangan kinahanglan nga lig-on (ubos sa rated nga kahimtang sa pagtrabaho, sa kasagaran dili labaw pa kay sa 10% sa rated kasamtangan), ug kinahanglan nga walay vibration o kasaba. Kung adunay bisan unsang abnormalidad, kinahanglan nga hunongon ang makina aron mahibal-an ang hinungdan ug mawagtang kini.
8. Sa diha nga ang pag-instalar, pagtagad sa setting sa motor grounding wire (tan-awa ang Figure 2). Sa diha nga ang tubo sa tubig kay puthaw nga tubo, dad-a kini gikan sa wellhead clamp; kung ang tubo sa tubig kay plastik nga tubo, dad-a kini gikan sa grounding mark sa electric pump.
- 1.Human ma-install ang submersible pump, susiha ang insulation resistance ug three-phase conduction gikan sa switch pag-usab, susiha kung ang instrumento ug ang koneksyon sa mga kagamitan sa pagsugod sayup, kung walay problema, ang pagsulay nga makina mahimong masugdan, ug tan-awa kung ang mga timailhan sa pagbasa sa instrumento molapas sa rated nga boltahe ug kasamtangan nga gitakda sa nameplate pagkahuman sa pagsugod, ug tan-awa kung ang bomba adunay kasaba ug vibration phenomenon, ug ibutang sa operasyon kung normal ang tanan.
- 2.Human sa unang operasyon sa bomba sulod sa upat ka oras, ang motor kinahanglan nga isira aron masulayan ang thermal insulation resistance sa madali, ug ang bili niini dili moubos sa 0.5 megaohm.
- 3. Human masira ang bomba, kinahanglan nga magsugod kini pagkahuman sa lima ka minuto aron mapugngan ang kolum sa tubig sa tubo nga hingpit nga ma-reflow ug hinungdan sa sobra nga motor karon ug pagkasunog.
- 4.Human ang bomba gibutang sa normal nga operasyon, aron mapalugwayan ang kinabuhi sa serbisyo niini, gikinahanglan nga susihon kung ang suplay nga boltahe, nagtrabaho nga kasamtangan ug pagsukol sa insulasyon normal ba kanunay. Kung makit-an ang mosunod nga mga kondisyon, ang bomba kinahanglan nga isira dayon aron masulbad ang problema.
- 1 In the rated condition, the current exceeds 20%.
- 2 Ang dinamikong lebel sa tubig mius-os ngadto sa bahin sa pagsulod sa tubig, nga maoy hinungdan sa nag-agay nga tubig.
- 3 Ang submersible pump adunay grabe nga vibration o kasaba.
- 4 Ang suplay nga boltahe mas ubos kaysa 340 volts.
- 5 Ang fuse nasunog.
- 6 Nadaot ang tubo sa suplay sa tubig.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.
-
- Impeller
- Shaft sleeve
- Goma shaft manggas
-
Singsing sa pagsilyo
01 Pag-inom og tubig sa lawom nga atabay
02 Taas nga suplay sa tubig
03 suplay sa tubig sa kabukiran
04 nga tubig sa torre
05 Agrikultura nga irigasyon
06 irigasyon sa tanaman
07 pag-inom sa tubig sa suba
08 tubig sa panimalay