The product adopts special water-resistant wire for motor winding, with excellent characteristics such as high frequency shock resistance, pulse peak voltage shock resistance and high temperature aging resistance. The frequency conversion winding design ensures the motor to operate smoothly between 1Hz and 50Hz for a long time, making the frequency conversion deep well pump more energy saving and longer service life.
We are honored to introduce our products, this product provides three-phase AC 380V power supply (tolerance of ± 5%), 50HZ voltage (tolerance of ± 1%). At the same time, our products require strict water quality requirements: water temperature is not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor adopts closed or water-filled wet structure, which must be filled with clean water before use to prevent empty. Tighten the water charging and deflating bolts before use, otherwise, it is not allowed to use. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The well water flow shall meet the output and continuous operation requirements of the submersible pump, and the output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or inverted, but only vertically. The submersible pump must be equipped with cables according to requirements, and is equipped with external overload protection devices. It is strictly prohibited to conduct no-load tests on the pump without water. Our products guarantee to provide you with high quality and stable performance, while meeting your needs to ensure safe and reliable.
Modelo | Agos (m3/h) | Ulo (m) |
Katulin sa pagtuyok (bag-o/punto) |
bomba sa tubig(%) | Outlet diametro (mm) |
Applicable nga maayo diametro (mm) |
Gi-rate power(KW) |
Gi-rate boltahe(V) |
Gi-rate kasamtangan (A) |
Episyente sa motor (%) | power factorcosφ | Yunit Radial Maximu nga gidak-on (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175sa ibabaw | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175sa ibabaw | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175sa ibabaw | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175sa ibabaw | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175sa ibabaw | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175sa ibabaw | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175sa ibabaw | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175sa ibabaw | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175sa ibabaw | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
This well submersible pump is a pump suitable for clean water. Digging new wells and pumping sediment and turbid water are strictly prohibited. The voltage grade of the well pump is 380V/50HZ. Submersible motors with other voltage grades need to be customized. Underground cables must use waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as overload short circuit protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be tripped in time. During installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be injected with distilled water or non-corrosive clear cold water in the inner cavity, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. The same as the steering instructions. Pay attention to safety when the pump is upright to prevent tilting and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump flow at low lift or in high lift pull too large, resulting in extreme wear of thrust bearings and other components, the motor due to overload and burn. After put into the well, the measurement of the motor and the ground insulation resistance value, not less than 100M. After the start, regular observation of voltage and current, and check the motor winding insulation is in line with the requirements of the provisions. If the temperature of the storage site is below the freezing point, the water in the pump chamber should be drained to prevent the water in the motor chamber from freezing and damaging the motor due to low temperature.
Mubo nga pasiuna sa istruktura: ang bahin sa bomba nag-una nga gilangkoban sa pump shaft, impeller, diversion shell, rubber bearing, check valve body (opsyonal nga mga bahin) ug uban pang mga sangkap. Ang bahin sa motor nag-una nga gilangkoban sa base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable ug uban pang mga sangkap.
Ang mga nag-unang bahin sa produkto naglakip sa:
1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.
2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6.The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Pagpangandam sa dili pa i-install:
1. Susiha kung ang submersible pump nakatagbo sa mga kondisyon sa paggamit ug sakup nga gitakda sa manwal.
2. Gamit ang usa ka bug-at nga obiect nga adunay diyametro nga katumbas sa labing taas nga gawas nga diametro sa submersible pump, sukda kung ang inneldiameter sa wellbore mahimong mohaum sa submersible pump, ug sukda kung ang giladmon sa atabay nagtagbo sa mga kinahanglanon sa pag-instalar.
3. Susiha kung limpyo ba ang atabay ug kung ang tubig sa atabay lapok. Ayaw paggamit ug submersible electric pump sa paghugas sa welor pump nga lapok ug balas nga tubig aron malikayan ang ahat nga kadaot sa submersible electric pump.
4. Susiha kon ang posisyon sa welhead installation clamp haom ug kon kini makasugakod sa kalidad sa tibuok unit
5. Susiha kon ang mga sangkap sa submersible pump kompleto ug na-install sa husto sumala sa assembly diagram sa manwalKuhaa ang filter screen ug i-rotate ang coupling aron makita kung kini nagtuyok nga flexible
6. Ablihi ang tornilyo sa tubig ug pun-a ang lungag sa motor sa limpyo, dili makadaot nga tubig (timan-i. siguroha nga sal-an kini), unya hugti ang waterscrew. Pagkahuman sa 12 ka oras nga pag-injection sa tubig, ang resistensya sa pagkakabukod sa motor kinahanglan dili moubos sa 150M Q kung gisukod sa usa ka 500V nga pag-uyog nga lamesa.
7. Cable joint, putla ang 120mm rubber sleeve gikan sa usa ka tumoy sa outgoing cable ug ang katugbang nga cable nga adunay kutsilyo sa elektrisyano unya i-stagger ang gitas-on sa tulo ka core wires sa usa ka stepped shape, kuhaa ang 20mm copper core, scrape sa oxide layer sa gawas sa tumbaga wire sa usa ka kutsilyo o balas nga panapton, ug sal-ot sa duha ka konektado wire matapos sa palirs.Human paghigot sa layer hugot nga uban sa lino nga fino nga tumbaga wire, solder kini sa hingpit ug lig-on, ug balas sa bisan unsa. burrs sa ibabaw. Dayon, alang sa tulo ka mga lutahan, gamita ang polyvester insulation tape aron ibalot kini sa semi stacked nga paagi alang sa tulo ka lavers. I-wrap ang duha ka tumoy sa layer sa wrapping nga hugot sa hilo sa nyion, ug dayon gamita ang semi stacked nga pamaagi aron ibalot ang tape sa tulo ka layer. I-wrap ang outellayer gamit ang high-pressure insulation tape para sa tulo ka layer. Sa katapusan, pil-a ang tulo ka strand ug balik-balik nga ibalot kini alang sa lima ka mga layer gamit ang high-pressure tape. Ang matag layer kinahanglan nga hugot nga gihigot, ug ang interlayer joints kinahanglan nga hugot ug fimm aron mapugngan ang tubig nga makalusot ug makadaut sa insulasyon, Human sa pagputos, ihumol sa tubig sa temperatura sa lawak nga 20 'c sulod sa 12 ka oras, ug sukda ang pagsukol sa insulasyon gamit ang usa ka lamesa nga nag-uyog. , nga kinahanglan dili moubos sa 100M Ω
Ang gilakip nga cable wiring process diagram mao ang mosunod:
8. Gamit ug multimeter aron masusi kung konektado ba ang tulo ka hugna nga mga wire ug kung ang resistensya sa DC gibana-bana nga balanse.
9. Susiha kung ang kapasidad sa sirkito ug transpormer sobra na ang gibug-aton, ug dayon ikonektar ang overload protection switch o kagamitan sa pagsugod. Tan-awa ang Talaan 2 para sa piho nga mga modelo, ug dayon Ibubo ang usa ka balde nga tubig ngadto sa water pump gikan sa water pump outlet aron lubricate ang rubber bearings sa pump, ug dayon ibutang ang submersible electric pump nga tul-id ug makanunayon. Pagsugod (dili molapas sa usa ka segundo) ug susiha kung ang direksyon sa pagmaneho nahiuyon sa timaan sa pagmaneho. Kung dili, ibaylo ang bisan unsang duha ka konektor sa tulo ka hugna nga kable. Unya i-install ang filter ug pangandam sa pagkanaog sa atabay. Kung gigamit sa mga espesyal nga okasyon (sama sa mga kanal, kanal, suba, lim-aw, lim-aw, ug uban pa), ang electric pump kinahanglan nga kasaligan nga gisaligan.
(2) Mga kagamitan sa pag-instalar ug mga himan:
1. Usa ka parisan sa pag-alsa sa mga kadena nga sobra sa duha ka tonelada.
2. Usa ka tripod nga adunay bertikal nga gitas-on nga dili moubos sa upat ka metros.
3. Duha ka nagbitay nga mga pisi (wire ropes) nga makadala sa gibug-aton nga sobra sa usa ka tonelada (makadala sa gibug-aton sa usa ka kompleto nga hugpong sa mga bomba sa tubig).
4. Pagbutang ug duha ka parisan sa mga clamp (splints).
5. Mga wrenches, martilyo, screwdriver, electrical nga mga himan ug instrumento, ug uban pa.
(3) Pag-instalar sa electric pump:
1. Ang diagram sa pag-instalar sa submersible electric pump gipakita sa Figure 2. Ang espesipikong mga sukod sa pag-instalar gipakita sa Table 3 "Listahan sa Mga Dimensyon sa Pag-instalar sa Submersible Electric Pump".
2. Ang mga submersible electric pump nga adunay ulo nga ubos sa 30 metros mahimong ipataas direkta ngadto sa atabay gamit ang mga hose ug wire rope o uban pang mga pisi nga abaka nga makadala sa tibuok nga gibug-aton sa tibuok makina, mga tubo sa tubig, ug tubig sa mga tubo.
3. Ang mga bomba nga adunay ulo nga labaw sa 30 metros naggamit sa mga tubo nga puthaw, ug ang pagkasunod-sunod sa pag-instalar mao ang mosunod:
①Paggamit ug clamp aron i-clamp ang ibabaw nga tumoy sa bahin sa water pump (ang motor ug water pump konektado na karong panahona), iisa kini gamit ang nagbitay nga kadena, ug hinayhinay nga ihigot kini sa atabay hangtod Ibutang ang clamp sa wellhead ug kuhaa ang nagbitay nga kadena.
② Gamit ug laing pares nga clamp para i-clamp ang tubo, iisa kini gamit ang nagbitay nga kadena nga 15 cm ang gilay-on gikan sa flange, ug hinayhinay nga ipaubos. Sa tunga-tunga sa pipe flange ug pump flangeIbutang ang rubber pad sa lugar ug hugti ang tubo ug i-bomba nga parehas gamit ang bolts, nuts ug spring washers.
③ Ipataas gamay ang submersible pump, kuhaa ang clamp sa ibabaw nga tumoy sa water pump, ihigot pag-ayo ang kable sa tubo sa tubig gamit ang plastic tape, ug hinayhinay nga ihigot hangtod ang clamp ibutang sa wellhead.
④ Gamita ang samang paagi sa paghigot sa tanang tubo sa tubig ngadto sa atabay.
⑤Human makonektar ang lead-out cable sa control switch, konektado kini sa three-phase power supply.
(4) Mga butang nga matikdan sa panahon sa pag-instalar:
1. Kung adunay makit-an nga panghitabo sa jamming sa panahon sa proseso sa pumping, liko o ibira ang tubo sa tubig aron mabuntog ang jamming point. Kung ang lainlaing mga lakang dili gihapon molihok, palihug Ayaw pugsa ang bomba aron malikayan ang kadaot sa submersible electric pump ug sa atabay.
2. Atol sa pag-instalar, ang usa ka rubber pad kinahanglan ibutang sa flange sa matag tubo ug higpitan nga parehas.
3. Sa diha nga ang bomba sa tubig ipaubos ngadto sa atabay, kini kinahanglan nga ibutang sa tunga-tunga sa tubo sa atabay aron mapugngan ang bomba nga modagan batok sa bungbong sa atabay sa dugay nga panahon, hinungdan nga ang bomba mag-vibrate ug ang motor masilhig ug masunog. .
4. Tinoa ang giladmon sa bomba sa tubig hangtod sa ilawom sa atabay sumala sa nag-agos nga balas ug silt nga kahimtang sa atabay. Ayaw ilubong ang bomba sa lapok. Ang gilay-on gikan sa water pump hangtod sa ilawom sa atabay kasagaran dili moubos sa 3 metros (tan-awa ang Figure 2).
5. Ang giladmon sa pagsulod sa tubig sa water pump kinahanglang dili moubos sa 1-1.5 metros gikan sa dinamikong lebel sa tubig ngadto sa water inlet node (tan-awa ang Figure 2). Kay kon dili, ang water pump bearings mahimong daling madaot.
6. Ang pagbayaw sa water pump dili mahimong ubos kaayo. Kung dili, kinahanglan nga i-install ang usa ka balbula sa ganghaan sa pipeline sa tubig sa wellhead aron makontrol ang pag-agos sa bomba sa rate nga punto sa pag-agos aron mapugngan ang motor nga ma-overload ug masunog tungod sa daghang mga rate sa pag-agos.
7. Sa diha nga ang water pump nagdagan, ang tubig nga output kinahanglan nga padayon ug bisan pa, ang kasamtangan kinahanglan nga lig-on (ubos sa rated nga kahimtang sa pagtrabaho, sa kasagaran dili labaw pa kay sa 10% sa rated kasamtangan), ug kinahanglan nga walay vibration o kasaba. Kung adunay bisan unsang abnormalidad, kinahanglan nga hunongon ang makina aron mahibal-an ang hinungdan ug mawagtang kini.
8. Sa diha nga ang pag-instalar, pagtagad sa setting sa motor grounding wire (tan-awa ang Figure 2). Sa diha nga ang tubo sa tubig kay puthaw nga tubo, dad-a kini gikan sa wellhead clamp; kung ang tubo sa tubig kay plastik nga tubo, dad-a kini gikan sa grounding mark sa electric pump.
- 1.After installing the submersible pump, recheck the insulation resistance and three-phase continuity switch, check whether there is any error in the connection between the instrument and the starting equipment.If there is no problem, you can start to test the machine. After starting, observe whether the indication reading of each instrument is correct.If the rated voltage and current specified on the nameplate are exceeded, please observe whether the pump has noise or vibration.If everything is normal, it can be put into operation. After the pump runs for the first time for four hours, the motor thermal insulation resistance should be closed and tested quickly. Its value should not be less than 0.5 megaohm. After the pump stops, it should be restarted after five minutes to prevent the water column in the pipeline from completely reversing, which will cause the motor to burn out due to excessive current.
- 2.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
- 1.Under the rated working condition, the current exceeds 20%.
- 2.The dynamic water level drops to the water inlet section, resulting in intermittent water.
- 3.The submersible pump has severe vibration or noise.
- 4.The supply voltage is lower than 340 volts.
- 5.A fuse is burned out.
- 6.The water pipeline is damaged.
- 7.The motor's insulation resistance to the geothermal state is lower than 0.5 megaohm.
- 3.Unit disassembly:
- - Kuhaa ang higot sa kable, kuhaa ang bahin sa pipeline, ug kuhaa ang wire plate.
- - screw down the water bolt, put out the water in the motor chamber.
- - kuhaa ang filter, loose ang fixed screw sa coupling aron ayuhon ang motor shaft.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
1, ibutang ang tubig sa lungag sa motor (ilabi na sa tingtugnaw aron mapugngan ang motor gikan sa pagyelo), ug ihigot og maayo ang kable.
2, tipigi sa sulod nga lawak nga walay makadaot nga mga butang ug mga gas, nga adunay temperatura nga ubos sa 40 °C.
3, ang dugay nga paggamit kinahanglan nga hatagan pagtagad ang pagpugong sa taya sa mga submersible pump.
- Impeller
- Shaft sleeve
- Goma shaft manggas
-
Singsing sa pagsilyo
01 Pag-inom og tubig sa lawom nga atabay
02 Taas nga suplay sa tubig
03 suplay sa tubig sa kabukiran
04 nga tubig sa torre
05 Agrikultura nga irigasyon
06 irigasyon sa tanaman
07 pag-inom sa tubig sa suba
08 tubig sa panimalay