QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Modelo | Agos (m3/h) | Ulo (m) |
Rotatingspeed(change/point) | bomba sa tubig(%) | Outlet diametro (mm) |
Applicable nga maayo diametro (mm) |
Gi-rate power(KW) |
Gi-rate boltahe(V) |
Gi-rate kasamtangan (A) |
Episyente sa motor (%) | power factorcosφ | Yunit Radial Maximu nga gidak-on (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175sa ibabaw | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175sa ibabaw | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175sa ibabaw | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175sa ibabaw | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175sa ibabaw | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175sa ibabaw | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175sa ibabaw | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175sa ibabaw | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175sa ibabaw | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175sa ibabaw | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, maayo nga submersible pump alang sa limpyo nga tubig pump, nagdili sa paghugas sa bag-ong atabay, pumping linugdang ug lapok nga tubig,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, hugot nga sumala sa mga probisyon sa pump lift, dagan range sa paggamit, sa pagpugong sa ubos nga dagan o taas nga pagbayaw pumping puwersa, ang thrust bearing ug uban pang mga bahin sa pagsul-ob, ang motor overload gisunog
6, pagkahuman sa bomba sa atabay, ang pagsukod sa motor sa pagbatok sa insulasyon sa yuta kinahanglan nga dili moubos sa 100M, pagkahuman sa pagsugod sa pag-obserbar sa boltahe ug karon, susihon ang motor winding insulation, kung subay sa mga kinahanglanon; Ang temperatura sa lokasyon sa pagtipig sa bomba kung ubos sa nagyelo nga punto, kinahanglan nga uga ang tubig sa lungag sa motor, malikayan ang kadaot sa yelo sa tubig sa motor nga gipahinabo sa ubos nga temperatura.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Ang mga nag-unang bahin sa produkto naglakip sa:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Pagpangandam sa dili pa i-install:
1. Susiha kung ang submersible pump nakatagbo sa mga kondisyon sa paggamit ug sakup nga gitakda sa manwal.
2. Gamit ang usa ka bug-at nga obiect nga adunay diyametro nga katumbas sa labing taas nga gawas nga diametro sa submersible pump, sukda kung ang inneldiameter sa wellbore mahimong mohaum sa submersible pump, ug sukda kung ang giladmon sa atabay nagtagbo sa mga kinahanglanon sa pag-instalar.
3. Susiha kung limpyo ba ang atabay ug kung ang tubig sa atabay lapok. Ayaw paggamit ug submersible electric pump sa paghugas sa welor pump nga lapok ug balas nga tubig aron malikayan ang ahat nga kadaot sa submersible electric pump.
4. Susiha kon ang posisyon sa welhead installation clamp haom ug kon kini makasugakod sa kalidad sa tibuok unit
5. Susiha kon ang mga sangkap sa submersible pump kompleto ug na-install sa husto sumala sa assembly diagram sa manwalKuhaa ang filter screen ug i-rotate ang coupling aron makita kung kini nagtuyok nga flexible
6. Ablihi ang tornilyo sa tubig ug pun-a ang lungag sa motor sa limpyo, dili makadaot nga tubig (timan-i. siguroha nga sal-an kini), unya hugti ang waterscrew. Pagkahuman sa 12 ka oras nga pag-injection sa tubig, ang resistensya sa pagkakabukod sa motor kinahanglan dili moubos sa 150M Q kung gisukod sa usa ka 500V nga pag-uyog nga lamesa.
7. Cable joint, putla ang 120mm rubber sleeve gikan sa usa ka tumoy sa outgoing cable ug ang katugbang nga cable nga adunay kutsilyo sa elektrisyano unya i-stagger ang gitas-on sa tulo ka core wires sa usa ka stepped shape, kuhaa ang 20mm copper core, scrape sa oxide layer sa gawas sa tumbaga wire sa usa ka kutsilyo o balas nga panapton, ug sal-ot sa duha ka konektado wire matapos sa palirs.Human paghigot sa layer hugot nga uban sa lino nga fino nga tumbaga wire, solder kini sa hingpit ug lig-on, ug balas sa bisan unsa. burrs sa ibabaw. Dayon, alang sa tulo ka mga lutahan, gamita ang polyvester insulation tape aron ibalot kini sa semi stacked nga paagi alang sa tulo ka lavers. I-wrap ang duha ka tumoy sa layer sa wrapping nga hugot sa hilo sa nyion, ug dayon gamita ang semi stacked nga pamaagi aron ibalot ang tape sa tulo ka layer. I-wrap ang outellayer gamit ang high-pressure insulation tape para sa tulo ka layer. Sa katapusan, pil-a ang tulo ka strand ug balik-balik nga ibalot kini alang sa lima ka mga layer gamit ang high-pressure tape. Ang matag layer kinahanglan nga hugot nga gihigot, ug ang interlayer joints kinahanglan nga hugot ug fimm aron mapugngan ang tubig nga makalusot ug makadaut sa insulasyon, Human sa pagputos, ihumol sa tubig sa temperatura sa lawak nga 20 'c sulod sa 12 ka oras, ug sukda ang pagsukol sa insulasyon gamit ang usa ka lamesa nga nag-uyog. , nga kinahanglan dili moubos sa 100M Ω
Ang gilakip nga cable wiring process diagram mao ang mosunod:
8. Gamit ug multimeter aron masusi kung konektado ba ang tulo ka hugna nga mga wire ug kung ang resistensya sa DC gibana-bana nga balanse.
9. Susiha kung ang kapasidad sa sirkito ug transpormer sobra na ang gibug-aton, ug dayon ikonektar ang overload protection switch o kagamitan sa pagsugod. Tan-awa ang Talaan 2 para sa piho nga mga modelo, ug dayon Ibubo ang usa ka balde nga tubig ngadto sa water pump gikan sa water pump outlet aron lubricate ang rubber bearings sa pump, ug dayon ibutang ang submersible electric pump nga tul-id ug makanunayon. Pagsugod (dili molapas sa usa ka segundo) ug susiha kung ang direksyon sa pagmaneho nahiuyon sa timaan sa pagmaneho. Kung dili, ibaylo ang bisan unsang duha ka konektor sa tulo ka hugna nga kable. Unya i-install ang filter ug pangandam sa pagkanaog sa atabay. Kung gigamit sa mga espesyal nga okasyon (sama sa mga kanal, kanal, suba, lim-aw, lim-aw, ug uban pa), ang electric pump kinahanglan nga kasaligan nga gisaligan.
(2) Mga kagamitan sa pag-instalar ug mga himan:
1. Usa ka parisan sa pag-alsa sa mga kadena nga sobra sa duha ka tonelada.
2. Usa ka tripod nga adunay bertikal nga gitas-on nga dili moubos sa upat ka metros.
3. Duha ka nagbitay nga mga pisi (wire ropes) nga makadala sa gibug-aton nga sobra sa usa ka tonelada (makadala sa gibug-aton sa usa ka kompleto nga hugpong sa mga bomba sa tubig).
4. Pagbutang ug duha ka parisan sa mga clamp (splints).
5. Mga wrenches, martilyo, screwdriver, electrical nga mga himan ug instrumento, ug uban pa.
(3) Pag-instalar sa electric pump:
1. Ang diagram sa pag-instalar sa submersible electric pump gipakita sa Figure 2. Ang espesipikong mga sukod sa pag-instalar gipakita sa Table 3 "Listahan sa Mga Dimensyon sa Pag-instalar sa Submersible Electric Pump".
2. Ang mga submersible electric pump nga adunay ulo nga ubos sa 30 metros mahimong ipataas direkta ngadto sa atabay gamit ang mga hose ug wire rope o uban pang mga pisi nga abaka nga makadala sa tibuok nga gibug-aton sa tibuok makina, mga tubo sa tubig, ug tubig sa mga tubo.
3. Ang mga bomba nga adunay ulo nga labaw sa 30 metros naggamit sa mga tubo nga puthaw, ug ang pagkasunod-sunod sa pag-instalar mao ang mosunod:
①Paggamit ug clamp aron i-clamp ang ibabaw nga tumoy sa bahin sa water pump (ang motor ug water pump konektado na karong panahona), iisa kini gamit ang nagbitay nga kadena, ug hinayhinay nga ihigot kini sa atabay hangtod Ibutang ang clamp sa wellhead ug kuhaa ang nagbitay nga kadena.
② Gamit ug laing pares nga clamp para i-clamp ang tubo, iisa kini gamit ang nagbitay nga kadena nga 15 cm ang gilay-on gikan sa flange, ug hinayhinay nga ipaubos. Sa tunga-tunga sa pipe flange ug pump flangeIbutang ang rubber pad sa lugar ug hugti ang tubo ug i-bomba nga parehas gamit ang bolts, nuts ug spring washers.
③ Ipataas gamay ang submersible pump, kuhaa ang clamp sa ibabaw nga tumoy sa water pump, ihigot pag-ayo ang kable sa tubo sa tubig gamit ang plastic tape, ug hinayhinay nga ihigot hangtod ang clamp ibutang sa wellhead.
④ Gamita ang samang paagi sa paghigot sa tanang tubo sa tubig ngadto sa atabay.
⑤Human makonektar ang lead-out cable sa control switch, konektado kini sa three-phase power supply.
(4) Mga butang nga matikdan sa panahon sa pag-instalar:
1. Kung adunay makit-an nga panghitabo sa jamming sa panahon sa proseso sa pumping, liko o ibira ang tubo sa tubig aron mabuntog ang jamming point. Kung ang lainlaing mga lakang dili gihapon molihok, palihug Ayaw pugsa ang bomba aron malikayan ang kadaot sa submersible electric pump ug sa atabay.
2. Atol sa pag-instalar, ang usa ka rubber pad kinahanglan ibutang sa flange sa matag tubo ug higpitan nga parehas.
3. Sa diha nga ang bomba sa tubig ipaubos ngadto sa atabay, kini kinahanglan nga ibutang sa tunga-tunga sa tubo sa atabay aron mapugngan ang bomba nga modagan batok sa bungbong sa atabay sa dugay nga panahon, hinungdan nga ang bomba mag-vibrate ug ang motor masilhig ug masunog. .
4. Tinoa ang giladmon sa bomba sa tubig hangtod sa ilawom sa atabay sumala sa nag-agos nga balas ug silt nga kahimtang sa atabay. Ayaw ilubong ang bomba sa lapok. Ang gilay-on gikan sa water pump hangtod sa ilawom sa atabay kasagaran dili moubos sa 3 metros (tan-awa ang Figure 2).
5. Ang giladmon sa pagsulod sa tubig sa water pump kinahanglang dili moubos sa 1-1.5 metros gikan sa dinamikong lebel sa tubig ngadto sa water inlet node (tan-awa ang Figure 2). Kay kon dili, ang water pump bearings mahimong daling madaot.
6. Ang pagbayaw sa water pump dili mahimong ubos kaayo. Kung dili, kinahanglan nga i-install ang usa ka balbula sa ganghaan sa pipeline sa tubig sa wellhead aron makontrol ang pag-agos sa bomba sa rate nga punto sa pag-agos aron mapugngan ang motor nga ma-overload ug masunog tungod sa daghang mga rate sa pag-agos.
7. Sa diha nga ang water pump nagdagan, ang tubig nga output kinahanglan nga padayon ug bisan pa, ang kasamtangan kinahanglan nga lig-on (ubos sa rated nga kahimtang sa pagtrabaho, sa kasagaran dili labaw pa kay sa 10% sa rated kasamtangan), ug kinahanglan nga walay vibration o kasaba. Kung adunay bisan unsang abnormalidad, kinahanglan nga hunongon ang makina aron mahibal-an ang hinungdan ug mawagtang kini.
8. Sa diha nga ang pag-instalar, pagtagad sa setting sa motor grounding wire (tan-awa ang Figure 2). Sa diha nga ang tubo sa tubig kay puthaw nga tubo, dad-a kini gikan sa wellhead clamp; kung ang tubo sa tubig kay plastik nga tubo, dad-a kini gikan sa grounding mark sa electric pump.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 sa rated nga kondisyon, ang kasamtangan labaw pa sa 20%.
2 dinamikong lebel sa tubig ngadto sa seksyon sa pagsulod sa tubig, hinungdan sa nagsabwag nga tubig.
3 submersible pump grabe nga vibration o kasaba.
Ang 4 nga suplay sa boltahe mas ubos kaysa 340 volts.
Ang 5 fuse nasunog ang usa ka hugna.
6 kadaut sa tubo sa tubig.
7 motor sa thermal insulation pagsukol mao ang ubos pa kay sa 0.5 megaohm.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, ibutang ang tubig sa lungag sa motor (ilabi na sa tingtugnaw aron mapugngan ang motor gikan sa pagyelo), ug ihigot og maayo ang kable.
2, tipigi sa sulod nga lawak nga walay makadaot nga mga butang ug mga gas, nga adunay temperatura nga ubos sa 40 °C.
3, ang dugay nga paggamit kinahanglan nga hatagan pagtagad ang pagpugong sa taya sa mga submersible pump.
- Impeller
- Shaft sleeve
- Goma shaft manggas
-
Singsing sa pagsilyo
01 Pag-inom og tubig sa lawom nga atabay
02 Taas nga suplay sa tubig
03 suplay sa tubig sa kabukiran
04 nga tubig sa torre
05 Agrikultura nga irigasyon
06 irigasyon sa tanaman
07 pag-inom sa tubig sa suba
08 tubig sa panimalay