125QJB Deep Well Submersible Pump

Nindakake pangolahan OEM! Miturut syarat pangguna, desain lan pabrik macem-macem jinis syarat khusus motor lan pompa submersible non-standar. Standar implementasi produk: GB / T2816-2014 "pompa submersible sumur", GB / T2818-2014 "motor asinkron sumur submersible". WhatsApp: 17855846335
PDF DOWNLOAD
Rincian
Tag
 
Ringkesan produk

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Katentuan Pangginaan supados langkung

1, sumber daya: telung fase AC 380V (toleransi + / - 5%), 50HZ (toleransi + / - 1%).

2, kualitas banyu:

(1) suhu banyu ora luwih saka 20 °C;

(2) isi impurities padhet (rasio massa) ora luwih saka 0,01%;

(3) Nilai PH (pH) 6,5-8,5;

(4) isi hidrogen sulfida ora luwih saka 1,5mg / L;

(5) isi ion klorida ora luwih saka 400mg/L.

3, motor ditutup utawa struktur udan sing diisi banyu, sadurunge nggunakake rongga motor submersible kudu kebak banyu sing resik, kanggo nyegah kebak palsu, banjur kenceng injeksi banyu, baut pelepasan udara, yen ora diijini nggunakake

4, pump submersible kudu rampung submerged ing banyu, ambane nyilem ora luwih saka 70m, ngisor pump submersible saka ngisor sumur ora kurang saka 3m.

5, aliran banyu sumur kudu bisa ketemu output banyu pump submersible lan operasi terus, output banyu pump submersible kudu kontrol ing 0,7 - 1,2 kaping aliran dirating.

6, sumur kudu lurus, pompa submersible ora bisa digunakake utawa dibuwang, mung nggunakake vertikal.

7, pompa submersible kudu cocog karo kabel miturut syarat, lan piranti pangayoman kakehan external. 8, pump wis strictly dilarang tanpa banyu tanpa mbukak mesin test

 

 
Arti Model

 
Referensi Model parsial
Model Aliran (m3/jam)  sirah
(m)
 Rotating speed(change/point)  Pompa banyu (%)  Outlet
diameteripun
(mm)
Ditrapake kanthi apik
diameteripun (mm) 
Dirating
daya (KW)
Rated voltage(V) Ratedcurrent(A)  Efisiensi motor (%)  faktor daya φ  Unit
Ukuran maksimal Radial (mm)
Tetembungane
125QJ5-34 5 34 2850 53 40  125ndhuwur 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125ndhuwur 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125ndhuwur 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125ndhuwur 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125ndhuwur 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125ndhuwur 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125ndhuwur 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125ndhuwur 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125ndhuwur 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125ndhuwur 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125ndhuwur 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125ndhuwur 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125ndhuwur 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125ndhuwur 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Pancegahan Safety

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Pambuka kanggo Struktur
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Fitur utama produk kalebu:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

 

 
Instal

(1) Preparation sadurunge instalasi:
1. Priksa manawa pompa submersible cocog karo kahanan panggunaan lan ruang lingkup sing ditemtokake ing manual.
2. Nggunakake obiect abot karo diameteripun witjaksono menyang diameteripun njaba maksimum pump submersible, ngukur apa inneldiameter saka wellbore bisa pas pump submersible, lan ngukur apa ambane sumur meets syarat instalasi.

3. Priksa manawa sumur sumur resik lan banyu sumur keruh. Aja nggunakake pompa listrik submersible kanggo ngumbah lendhut pompa welor lan banyu pasir supaya ora rusak sadurunge pompa listrik submersible.

4. Priksa manawa posisi clamp instalasi welhead cocok lan apa bisa tahan kualitas kabeh unit

5. Priksa manawa komponen pompa submersible wis lengkap lan dipasang kanthi bener miturut diagram perakitan ing manual Copot layar panyaring lan puterake kopling kanggo ndeleng apa rotasi kanthi fleksibel

6. Copot sekrup banyu lan isi rongga motor kanthi banyu sing resik lan ora korosif (cathetan, manawa kanggo ngisi), banjur kencengake sekrup banyu. Sawise 12 jam injeksi banyu, ing resistance jampel saka motor ngirim ora kurang saka 150M Q nalika diukur karo 500V goyang meja.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagram proses pengkabelan kabel minangka nderek:

8. Gunakake multimeter kanggo mriksa apa kabel telung phase disambungake lan apa resistance DC kira-kira imbang.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Peralatan lan piranti instalasi:
1. Siji pasang rentengan ngangkat luwih saka rong ton.
2. Tripod kanthi dhuwur vertikal ora kurang saka patang meter.
3. Rong tali gantung (tali kawat) sing bisa nanggung bobot luwih saka siji ton (bisa nanggung bobot saka set lengkap pompa banyu).
4. Pasang rong pasang clamps (splints).
5. Kunci pas, palu, obeng, piranti lan piranti listrik, lsp.

 

(3) Instalasi pompa listrik:
1. Diagram instalasi pompa listrik submersible ditampilake ing Gambar 2. Dimensi instalasi spesifik ditampilake ing Tabel 3 "Dhaptar Dimensi Instalasi Pompa Listrik Submersible".


2. Pompa listrik submersible kanthi sirah kurang saka 30 meter bisa diangkat langsung menyang sumur nggunakake selang lan tali kawat utawa tali rami liyane sing bisa nanggung bobot kabeh mesin, pipa banyu, lan banyu ing pipa.

3. Pumps kanthi sirah luwih saka 30 meter nggunakake pipa baja, lan urutan instalasi kaya ing ngisor iki:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Angkat pompa submersible rada, copot clamp ing mburi ndhuwur pump banyu, dasi kabel kuwat menyang pipa banyu karo plastik tape, lan alon dasi mudhun nganti Clamp diselehake ing wellhead.
④Gunakake cara sing padha kanggo naleni kabeh pipa banyu menyang sumur.
⑤Sawise kabel timbal-metu disambungake menyang saklar kontrol, disambungake menyang sumber daya telung fase.

 

(4) Bab sing kudu digatekake sajrone instalasi:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Sajrone instalasi, pad karet kudu diselehake ing flange saben pipa lan tightened roto-roto.
3. Nalika pompa banyu diturunake menyang sumur, kudu diselehake ing tengah pipa sumur supaya pompa ora mlaku ing tembok sumur nganti suwe, nyebabake pompa kedher lan motor nyapu lan diobong. .
4. Nemtokake ambane pompa banyu ing ngisor sumur miturut kondisi pasir lan lempung sing mili. Aja ngubur pompa ing lendhut. Jarak saka pompa banyu menyang dhasar sumur umume ora kurang saka 3 meter (pirsani Gambar 2).
5. Ambane entri banyu saka pompa banyu kudu ora kurang saka 1-1,5 meter saka tingkat banyu dinamis menyang simpul inlet banyu (pirsani Gambar 2). Yen ora, bantalan pompa banyu bisa gampang rusak.
6. Angkat pompa banyu ora bisa sithik banget. Yen ora, katup gapura kudu dipasang ing pipa banyu sumur kanggo ngontrol aliran pompa ing titik aliran sing dirating kanggo nyegah motor kakehan lan kobong amarga tingkat aliran gedhe.
7. Nalika pompa banyu mlaku, output banyu kudu terus-terusan lan malah, arus kudu stabil (ing kondisi kerja sing dirating, umume ora luwih saka 10% saka arus sing dirating), lan ora ana getaran utawa gangguan. Yen ana kelainan, mesin kudu mandheg kanggo ngerteni sababe lan ngilangi.
8. Nalika nginstal, mbayar manungsa waé menyang setelan saka kabel grounding motor (ndeleng Figure 2). Nalika pipa banyu minangka pipa baja, mimpin saka clamp wellhead; nalika pipa banyu minangka pipa plastik, mimpin saka tandha grounding pompa listrik.

 

 
Maintenance lan Maintenance
  • 1. Sawise pompa submersible dipasang, priksa resistensi insulasi lan konduksi telung fase saka saklar maneh, priksa manawa instrumen lan sambungan peralatan wiwitan salah, yen ora ana masalah, mesin uji coba bisa diwiwiti, lan mirsani apa maca Indikator saka instrument ngluwihi voltase dirating lan saiki kasebut ing nameplate sawise wiwitan, lan mirsani apa pump wis gangguan lan kedadean geter, lan sijine menyang operasi yen kabeh iku normal.
  • 2.Sawise operasi pisanan saka pump kanggo patang jam, motor kudu mati kanggo nyoba resistance jampel termal cepet, lan regane ngirim ora kurang saka 0,5 megaohm.
  • 3.After pump dipateni, iku kudu diwiwiti sawise limang menit kanggo nyegah kolom banyu ing pipo saka kang rampung reflowed lan nyebabake motor gedhe banget saiki lan burnout.
  • 4.After pump wis sijine menyang operasi normal, supaya ndawakake umur layanan, iku perlu kanggo mriksa apa voltase sumber, saiki apa lan resistance jampel normal ajeg. Yen kahanan ing ngisor iki ditemokake, pompa kudu langsung mati kanggo ngatasi masalah.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Tingkat banyu dinamis mudhun menyang bagean mlebu banyu, nyebabake banyu intermiten.
  • 3 Pompa submersible duwe geter utawa swara sing abot.
  • 4 Tegangan suplai luwih murah tinimbang 340 volt.
  • 5 Sekring mati.
  • 6 Pipa pasokan banyu rusak.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Panyimpenan lan Kustodian

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Nganggo Parts
    • Impeller
    • Lengan poros
    • Lengan poros karet
    •  Ring segel

 
Skenario Aplikasi

01 Intake banyu sumur jero

02 Sumber banyu dhuwur

03 banyu gunung 

04 banyu menara

05 Irigasi Pertanian

06 irigasi kebon

07 intake banyu kali

08 banyu omah

 

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


Tulis pesen ing kene lan kirimake menyang kita

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


jvJavanese