This product is designed for underground hot water mining with a water temperature below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. Whether used in underground mining or other hot water environments, it can effectively resist the challenges of harsh conditions. Its excellent performance and stable quality make it an ideal choice in the mining field.
The product power requirements for three-phase AC 380V (± 5%), 50HZ (± 1%); water quality requirements include water temperature not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, the inner cavity of the submersible motor must be filled with water to prevent false filling, and then tighten the water injection and air exhaust bolts, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70m, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the displacement and continuous operation requirements of the submersible pump, and the displacement of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to conduct no-water no-load test on the pump.
Model | Aliran (m3/jam) | sirah (m) |
Kacepetan puteran (ganti/titik) |
Pompa banyu (%) | Outlet diameteripun (mm) |
Ditrapake kanthi apik diameteripun (mm) |
Dirating daya (KW) |
Dirating tegangan (V) |
Dirating saiki (A) |
Efisiensi motor (%) | faktor daya φ | Unit Ukuran maksimal Radial (mm) |
Tetembungane | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135ndhuwur | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135ndhuwur | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135ndhuwur | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135ndhuwur | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135ndhuwur | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135ndhuwur | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135ndhuwur | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strictly miturut pranata angkat pump, sawetara aliran nggunakake, kanggo nyegah aliran kurang utawa angkat dhuwur pumping pasukan, bantalan tikaman lan bagean liyane saka nyandhang, kakehan motor burned
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part mainly includes pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components.
The motor part mainly includes base, pressure regulating diaphragm, bearing, bearing seat, stator, rotor, water mouth part, lead cable and other components.
Fitur utama produk kalebu:
- 1.The motor is a water-cooled submersible three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing.
- 2. In order to prevent the sand in the well water from entering the motor, the motor shaft extension is installed with two oil seals, and the sand throw ring is installed to form a sand prevention structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the thrust bearing is installed under the motor.
- 4. The lubrication of the motor and the pump bearing is water lubrication.
- 5. The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
- 6. The pump designed by computer CAD has simple structure and excellent technical performance.

(1) Preparation sadurunge instalasi:
1. Priksa manawa pompa submersible cocog karo kahanan panggunaan lan ruang lingkup sing ditemtokake ing manual.
2. Nggunakake obiect abot karo diameteripun witjaksono menyang diameteripun njaba maksimum pump submersible, ngukur apa inneldiameter saka wellbore bisa pas pump submersible, lan ngukur apa ambane sumur meets syarat instalasi.
3. Priksa manawa sumur sumur resik lan banyu sumur keruh. Aja nggunakake pompa listrik submersible kanggo ngumbah lendhut pompa welor lan banyu pasir supaya ora rusak sadurunge pompa listrik submersible.
4. Priksa manawa posisi clamp instalasi welhead cocok lan apa bisa tahan kualitas kabeh unit
5. Priksa manawa komponen pompa submersible wis lengkap lan dipasang kanthi bener miturut diagram perakitan ing manual Copot layar panyaring lan puterake kopling kanggo ndeleng apa rotasi kanthi fleksibel
6. Copot sekrup banyu lan isi rongga motor kanthi banyu sing resik lan ora korosif (cathetan, manawa kanggo ngisi), banjur kencengake sekrup banyu. Sawise 12 jam injeksi banyu, ing resistance jampel saka motor ngirim ora kurang saka 150M Q nalika diukur karo 500V goyang meja.
7. Sambungan kabel, ngethok lengen karet 120mm saka siji ujung kabel sing metu lan kabel sing cocog karo piso tukang listrik banjur stagger dawa telung kabel inti ing wangun stepped, copot inti tembaga 20mm, scrape saka oksida lapisan ing njaba kabel tembaga karo piso utawa kain wedhi, lan masang loro kabel disambungake ends ing palirs.Sawise naleni lapisan tightly karo kabel tembaga nggoleki, solder iku sak tenane lan kuwat, lan wedhi sembarang. burrs ing lumahing. Banjur, kanggo telung joints, gunakake tape insulasi polyvester kanggo mbungkus kanthi cara setengah ditumpuk kanggo telung laver. Bungkus rong ujung lapisan bungkus kanthi kenceng karo benang nyion, banjur gunakake cara setengah ditumpuk kanggo mbungkus tape kanggo telung lapisan. Bungkus outellayer kanthi tape insulasi tekanan dhuwur kanggo telung lapisan. Pungkasan, lempitan telung untaian lan bola-bali bungkus limang lapisan kanthi tape tekanan dhuwur. Saben lapisan kudu tightly disambungake, lan joints interlayer kudu nyenyet lan fimm kanggo nyegah banyu saka penetrating lan ngrusak jampel, Sawise mbungkus, rendhem ing banyu ing suhu kamar saka 20 'c kanggo 12 jam, lan ngukur resistance jampel karo goyang meja. , sing ngirim ora kurang saka 100M Ω
Diagram proses pengkabelan kabel minangka nderek:
8. Gunakake multimeter kanggo mriksa apa kabel telung phase disambungake lan apa resistance DC kira-kira imbang.
9. Priksa manawa sirkuit lan trafo kapasitas overloaded, lan banjur nyambungake ngalih pangayoman kakehan utawa miwiti peralatan. Waca Tabel 2 kanggo model tartamtu, banjurPour ember banyu menyang kumpa banyu saka stopkontak pump banyu kanggo lubricate bantalan karet ing kumpa, lan banjur sijine pump listrik submersible mujur lan ajeg.Mulai (ora luwih saka siji detik) lan priksa manawa arah setir cocog karo tandha setir. Yen ora, ganti loro konektor kabel telung fase. Banjur pasang filter lan siyap mudhun sumur. Yen digunakake ing acara khusus (kayata selokan, selokan, kali, blumbang, blumbang, lan sapiturute), pompa listrik kudu dilebokake kanthi andal.
(2) Peralatan lan piranti instalasi:
1. Siji pasang rentengan ngangkat luwih saka rong ton.
2. Tripod kanthi dhuwur vertikal ora kurang saka patang meter.
3. Rong tali gantung (tali kawat) sing bisa nanggung bobot luwih saka siji ton (bisa nanggung bobot saka set lengkap pompa banyu).
4. Pasang rong pasang clamps (splints).
5. Kunci pas, palu, obeng, piranti lan piranti listrik, lsp.
(3) Instalasi pompa listrik:
1. Diagram instalasi pompa listrik submersible ditampilake ing Gambar 2. Dimensi instalasi spesifik ditampilake ing Tabel 3 "Dhaptar Dimensi Instalasi Pompa Listrik Submersible".
2. Pompa listrik submersible kanthi sirah kurang saka 30 meter bisa diangkat langsung menyang sumur nggunakake selang lan tali kawat utawa tali rami liyane sing bisa nanggung bobot kabeh mesin, pipa banyu, lan banyu ing pipa.
3. Pumps kanthi sirah luwih saka 30 meter nggunakake pipa baja, lan urutan instalasi kaya ing ngisor iki:
①Gunakake penjepit kanggo ngapit ujung ndhuwur bagean pompa banyu (motor lan pompa banyu wis disambungake ing wektu iki), angkat nganggo rantai gantung, lan alon-alon dasi menyang sumur nganti pasang clamp ing sirah sumur lan copot ranté gantung.
② Gunakake sepasang klem liyane kanggo njepit pipa, angkat nganggo rante gantung 15 cm adoh saka flange, banjur mudhunake alon-alon. Antarane flange pipe lan flange pumpLebokake pad karet ing panggonan lan kenceng pipa lan pompa roto-roto nganggo bolts, perkakas lan spring washers.
③ Angkat pompa submersible rada, copot clamp ing mburi ndhuwur pump banyu, dasi kabel kuwat menyang pipa banyu karo plastik tape, lan alon dasi mudhun nganti Clamp diselehake ing wellhead.
④Gunakake cara sing padha kanggo naleni kabeh pipa banyu menyang sumur.
⑤Sawise kabel timbal-metu disambungake menyang saklar kontrol, disambungake menyang sumber daya telung fase.
(4) Bab sing kudu digatekake sajrone instalasi:
1. Yen ana fenomena jamming nalika proses pumping, nguripake utawa narik pipa banyu kanggo ngatasi titik jamming. Yen macem-macem langkah isih ora bisa, please Aja meksa kumpa mudhun kanggo ngindhari karusakan ing pompa listrik submersible lan sumur.
2. Sajrone instalasi, pad karet kudu diselehake ing flange saben pipa lan tightened roto-roto.
3. Nalika pompa banyu diturunake menyang sumur, kudu diselehake ing tengah pipa sumur supaya pompa ora mlaku ing tembok sumur nganti suwe, nyebabake pompa kedher lan motor nyapu lan diobong. .
4. Nemtokake ambane pompa banyu ing ngisor sumur miturut kondisi pasir lan lempung sing mili. Aja ngubur pompa ing lendhut. Jarak saka pompa banyu menyang dhasar sumur umume ora kurang saka 3 meter (pirsani Gambar 2).
5. Ambane entri banyu saka pompa banyu kudu ora kurang saka 1-1,5 meter saka tingkat banyu dinamis menyang simpul inlet banyu (pirsani Gambar 2). Yen ora, bantalan pompa banyu bisa gampang rusak.
6. Angkat pompa banyu ora bisa sithik banget. Yen ora, katup gapura kudu dipasang ing pipa banyu sumur kanggo ngontrol aliran pompa ing titik aliran sing dirating kanggo nyegah motor kakehan lan kobong amarga tingkat aliran gedhe.
7. Nalika pompa banyu mlaku, output banyu kudu terus-terusan lan malah, arus kudu stabil (ing kondisi kerja sing dirating, umume ora luwih saka 10% saka arus sing dirating), lan ora ana getaran utawa gangguan. Yen ana kelainan, mesin kudu mandheg kanggo ngerteni sababe lan ngilangi.
8. Nalika nginstal, mbayar manungsa waé menyang setelan saka kabel grounding motor (ndeleng Figure 2). Nalika pipa banyu minangka pipa baja, mimpin saka clamp wellhead; nalika pipa banyu minangka pipa plastik, mimpin saka tandha grounding pompa listrik.
- 1. Sawise pompa submersible dipasang, priksa resistensi insulasi lan konduksi telung fase saka saklar maneh, priksa manawa instrumen lan sambungan peralatan wiwitan salah, yen ora ana masalah, mesin uji coba bisa diwiwiti, lan mirsani apa maca Indikator saka instrument ngluwihi voltase dirating lan saiki kasebut ing nameplate sawise wiwitan, lan mirsani apa pump wis gangguan lan kedadean geter, lan sijine menyang operasi yen kabeh iku normal.
- 2.Sawise operasi pisanan saka pump kanggo patang jam, motor kudu mati kanggo nyoba resistance jampel termal cepet, lan regane ngirim ora kurang saka 0,5 megaohm.
- 3.After pump dipateni, iku kudu diwiwiti sawise limang menit kanggo nyegah kolom banyu ing pipo saka kang rampung reflowed lan nyebabake motor gedhe banget saiki lan burnout.
- 4.After pump wis sijine menyang operasi normal, supaya ndawakake umur layanan, iku perlu kanggo mriksa apa voltase sumber, saiki apa lan resistance jampel normal ajeg. Yen kahanan ing ngisor iki ditemokake, pompa kudu langsung mati kanggo ngatasi masalah.
1 In the rated condition, the current exceeds 20%.
2 Tingkat banyu dinamis mudhun menyang bagean mlebu banyu, nyebabake banyu intermiten.
3 Pompa submersible duwe geter utawa swara sing abot.
4 Tegangan suplai luwih murah tinimbang 340 volt.
5 Sekring mati.
6 Pipa pasokan banyu rusak.
7 The motor's thermal insulation resistance to the earth is less than 0.5 megaohm.
- 4.We are very happy to introduce our new product -- this submersible pump. This pump has an easy-to-use design that makes it easy to disassemble and clean. With the disassembly steps we provide, you can easily disassemble and clean the various parts, ensuring that it always maintains its best working condition. From loosening the anchoring screws to removing the filter screen and separating the pump and motor, we provide you with clear step-by-step instructions. When assembling, simply follow the reverse order of disassembly, ensuring that each part is cleaned and sealed, and you can complete the assembly. Whether it is an annual inspection or more frequent cleaning, this submersible pump can help you accomplish the task easily.
1, sijine metu banyu ing growong motor (utamané ing mangsa kanggo nyegah motor saka pembekuan), lan dasi kabel uga.
2, simpen ing kamar njero ruangan tanpa zat korosif lan gas, kanthi suhu ing ngisor 40 °C.
3, nggunakake long-term kudu mbayar manungsa waé kanggo Nyegah teyeng saka pumps submersible.
- Impeller
- Lengan poros
- Lengan poros karet
-
Ring segel
01 Intake banyu sumur jero
02 Sumber banyu dhuwur
03 banyu gunung
04 banyu menara
05 Irigasi Pertanian
06 irigasi kebon
07 intake banyu kali
08 banyu omah