This product adopts a variable frequency winding design, ensuring the motor's smooth conversion operation between 1HZ and 50HZ for a long time. This innovative design not only saves energy and prolongs service life, but also provides lasting and reliable performance in the work process. Whether in a home or industrial environment, this product will provide users with excellent efficiency and reliability, making it an indispensable tool in the manufacturing and production process.

 

Katentuan Pangginaan supados langkung

1, sumber daya: telung fase AC 380V (toleransi + / - 5%), 50HZ (toleransi + / - 1%).

2, kualitas banyu:

(1) suhu banyu ora luwih saka 20 °C;

(2) isi impurities padhet (rasio massa) ora luwih saka 0,01%;

(3) Nilai PH (pH) 6,5-8,5;

(4) isi hidrogen sulfida ora luwih saka 1,5mg / L;

(5) isi ion klorida ora luwih saka 400mg/L.

3, motor ditutup utawa struktur udan sing diisi banyu, sadurunge nggunakake rongga motor submersible kudu kebak banyu sing resik, kanggo nyegah kebak palsu, banjur kenceng injeksi banyu, baut pelepasan udara, yen ora diijini nggunakake

4, submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m. 5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.

6, sumur kudu lurus, pompa submersible ora bisa digunakake utawa dibuwang, mung nggunakake vertikal.

7, pompa submersible kudu cocog karo kabel miturut syarat, lan piranti pangayoman kakehan external.

8, pump wis strictly dilarang tanpa banyu tanpa mbukak mesin test

 

 
Arti Model

 
Referensi Model parsial
Model Aliran (m3/jam) sirah
(m)

Kacepetan puteran

(ganti/titik)

Pompa banyu (%)  Outlet
diameteripun
(mm)
Ditrapake kanthi apik
diameteripun (mm) 
 Dirating
power(KW)
Dirating
tegangan (V)
Dirating
saiki (A)
Efisiensi motor (%) faktor daya φ   Unit
Ukuran maksimal Radial (mm)
Tetembungane
300QJ200-40 200 40 2900 76 150  300ndhuwur 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300ndhuwur 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Pancegahan Safety

 This well submersible pump is a pump suitable for clean water. It is strictly prohibited to dig new wells and pump dirty water containing sediment. The voltage grade of the pump is 380/50HZ, and other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, dephase protection, undervoltage protection, grounding protection and idling protection, etc., in order to prevent timely tripping when abnormal conditions occur. During the installation and use process, the pump must have reliable grounding. It is strictly prohibited to push and pull the switch when your hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. An obvious sign "anti-electric shock" must be set up where the pump is used. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water, and the water inlet and outlet bolts must be tightened. When testing the pump on the ground, water must be filled into the pump chamber to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the steering is correct. Pay attention to safety when the pump is upright to prevent toppling and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump with a large flow at low lift or produce a large pull at high lift, resulting in extreme wear of thrust bearings and other parts, the motor overload and burn. After the pump into the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ. After starting, regularly observe the voltage and current, and check whether the motor winding insulation meets the requirements; if the pump storage temperature below freezing point, should be drained to prevent the water in the motor cavity from freezing and cause the motor damage due to low temperature.

 

 
Pambuka kanggo Struktur

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components.


Fitur utama produk kalebu:

  1. 1.The motor is a water-filled wet submersible three-phase asynchronous motor. The motor cavity is filled with clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water in the body caused by the temperature rise of the motor.
  2. 2. In order to prevent the sand particles from entering the motor, two sand seals are installed at the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed at the bottom of the motor.
  4. 4. The lubrication method of the motor and the pump bearing is water lubrication.
  5. 5. The stator winding of the motor adopts high quality submersible motor winding wire with high insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
 
Instal

(1) Preparation sadurunge instalasi:
1. Priksa manawa pompa submersible cocog karo kahanan panggunaan lan ruang lingkup sing ditemtokake ing manual.
2. Nggunakake obiect abot karo diameteripun witjaksono menyang diameteripun njaba maksimum pump submersible, ngukur apa inneldiameter saka wellbore bisa pas pump submersible, lan ngukur apa ambane sumur meets syarat instalasi.
3. Priksa manawa sumur sumur resik lan banyu sumur keruh. Aja nggunakake pompa listrik submersible kanggo ngumbah lendhut pompa welor lan banyu pasir supaya ora rusak sadurunge pompa listrik submersible.
4. Priksa manawa posisi clamp instalasi welhead cocok lan apa bisa tahan kualitas kabeh unit
5. Priksa manawa komponen pompa submersible wis lengkap lan dipasang kanthi bener miturut diagram perakitan ing manual Copot layar panyaring lan puterake kopling kanggo ndeleng apa rotasi kanthi fleksibel
6. Copot sekrup banyu lan isi rongga motor kanthi banyu sing resik lan ora korosif (cathetan, manawa kanggo ngisi), banjur kencengake sekrup banyu. Sawise 12 jam injeksi banyu, ing resistance jampel saka motor ngirim ora kurang saka 150M Q nalika diukur karo 500V goyang meja.
7. Sambungan kabel, ngethok lengen karet 120mm saka siji ujung kabel sing metu lan kabel sing cocog karo piso tukang listrik banjur stagger dawa telung kabel inti ing wangun stepped, copot inti tembaga 20mm, scrape saka oksida lapisan ing njaba kabel tembaga karo piso utawa kain wedhi, lan masang loro kabel disambungake ends ing palirs.Sawise naleni lapisan tightly karo kabel tembaga nggoleki, solder iku sak tenane lan kuwat, lan wedhi sembarang. burrs ing lumahing. Banjur, kanggo telung joints, gunakake tape insulasi polyvester kanggo mbungkus kanthi cara setengah ditumpuk kanggo telung laver. Bungkus rong ujung lapisan bungkus kanthi kenceng karo benang nyion, banjur gunakake cara setengah ditumpuk kanggo mbungkus tape kanggo telung lapisan. Bungkus outellayer kanthi tape insulasi tekanan dhuwur kanggo telung lapisan. Pungkasan, lempitan telung untaian lan bola-bali bungkus limang lapisan kanthi tape tekanan dhuwur. Saben lapisan kudu tightly disambungake, lan joints interlayer kudu nyenyet lan fimm kanggo nyegah banyu saka penetrating lan ngrusak jampel, Sawise mbungkus, rendhem ing banyu ing suhu kamar saka 20 'c kanggo 12 jam, lan ngukur resistance jampel karo goyang meja. , sing ngirim ora kurang saka 100M Ω

 

Diagram proses pengkabelan kabel minangka nderek:

 

8. Gunakake multimeter kanggo mriksa apa kabel telung phase disambungake lan apa resistance DC kira-kira imbang.
9. Priksa manawa sirkuit lan trafo kapasitas overloaded, lan banjur nyambungake ngalih pangayoman kakehan utawa miwiti peralatan. Waca Tabel 2 kanggo model tartamtu, banjurPour ember banyu menyang kumpa banyu saka stopkontak pump banyu kanggo lubricate bantalan karet ing kumpa, lan banjur sijine pump listrik submersible mujur lan ajeg.Mulai (ora luwih saka siji detik) lan priksa manawa arah setir cocog karo tandha setir. Yen ora, ganti loro konektor kabel telung fase. Banjur pasang filter lan siyap mudhun sumur. Yen digunakake ing acara khusus (kayata selokan, selokan, kali, blumbang, blumbang, lan sapiturute), pompa listrik kudu dilebokake kanthi andal.

 

(2) Peralatan lan piranti instalasi:
1. Siji pasang rentengan ngangkat luwih saka rong ton.
2. Tripod kanthi dhuwur vertikal ora kurang saka patang meter.
3. Rong tali gantung (tali kawat) sing bisa nanggung bobot luwih saka siji ton (bisa nanggung bobot saka set lengkap pompa banyu).
4. Pasang rong pasang clamps (splints).
5. Kunci pas, palu, obeng, piranti lan piranti listrik, lsp.

 

(3) Instalasi pompa listrik:
1. Diagram instalasi pompa listrik submersible ditampilake ing Gambar 2. Dimensi instalasi spesifik ditampilake ing Tabel 3 "Dhaptar Dimensi Instalasi Pompa Listrik Submersible".

 

2. Pompa listrik submersible kanthi sirah kurang saka 30 meter bisa diangkat langsung menyang sumur nggunakake selang lan tali kawat utawa tali rami liyane sing bisa nanggung bobot kabeh mesin, pipa banyu, lan banyu ing pipa.

 

3. Pumps kanthi sirah luwih saka 30 meter nggunakake pipa baja, lan urutan instalasi kaya ing ngisor iki:
①Gunakake penjepit kanggo ngapit ujung ndhuwur bagean pompa banyu (motor lan pompa banyu wis disambungake ing wektu iki), angkat nganggo rantai gantung, lan alon-alon dasi menyang sumur nganti pasang clamp ing sirah sumur lan copot ranté gantung.
② Gunakake sepasang klem liyane kanggo njepit pipa, angkat nganggo rante gantung 15 cm adoh saka flange, banjur mudhunake alon-alon. Antarane flange pipe lan flange pumpLebokake pad karet ing panggonan lan kenceng pipa lan pompa roto-roto nganggo bolts, perkakas lan spring washers.
③ Angkat pompa submersible rada, copot clamp ing mburi ndhuwur pump banyu, dasi kabel kuwat menyang pipa banyu karo plastik tape, lan alon dasi mudhun nganti Clamp diselehake ing wellhead.
④Gunakake cara sing padha kanggo naleni kabeh pipa banyu menyang sumur.
⑤Sawise kabel timbal-metu disambungake menyang saklar kontrol, disambungake menyang sumber daya telung fase.


(4) Bab sing kudu digatekake sajrone instalasi:
1. Yen ana fenomena jamming nalika proses pumping, nguripake utawa narik pipa banyu kanggo ngatasi titik jamming. Yen macem-macem langkah isih ora bisa, please Aja meksa kumpa mudhun kanggo ngindhari karusakan ing pompa listrik submersible lan sumur.
2. Sajrone instalasi, pad karet kudu diselehake ing flange saben pipa lan tightened roto-roto.
3. Nalika pompa banyu diturunake menyang sumur, kudu diselehake ing tengah pipa sumur supaya pompa ora mlaku ing tembok sumur nganti suwe, nyebabake pompa kedher lan motor nyapu lan diobong. .
4. Nemtokake ambane pompa banyu ing ngisor sumur miturut kondisi pasir lan lempung sing mili. Aja ngubur pompa ing lendhut. Jarak saka pompa banyu menyang dhasar sumur umume ora kurang saka 3 meter (pirsani Gambar 2).
5. Ambane entri banyu saka pompa banyu kudu ora kurang saka 1-1,5 meter saka tingkat banyu dinamis menyang simpul inlet banyu (pirsani Gambar 2). Yen ora, bantalan pompa banyu bisa gampang rusak.
6. Angkat pompa banyu ora bisa sithik banget. Yen ora, katup gapura kudu dipasang ing pipa banyu sumur kanggo ngontrol aliran pompa ing titik aliran sing dirating kanggo nyegah motor kakehan lan kobong amarga tingkat aliran gedhe.
7. Nalika pompa banyu mlaku, output banyu kudu terus-terusan lan malah, arus kudu stabil (ing kondisi kerja sing dirating, umume ora luwih saka 10% saka arus sing dirating), lan ora ana getaran utawa gangguan. Yen ana kelainan, mesin kudu mandheg kanggo ngerteni sababe lan ngilangi.
8. Nalika nginstal, mbayar manungsa waé menyang setelan saka kabel grounding motor (ndeleng Figure 2). Nalika pipa banyu minangka pipa baja, mimpin saka clamp wellhead; nalika pipa banyu minangka pipa plastik, mimpin saka tandha grounding pompa listrik.

 

 
Maintenance lan Maintenance
  • 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  • 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  •  
  • 4.After the pump is running normally, in order to prolong its service life, it is necessary to check the power supply voltage, running current and insulation resistance regularly to see if they are normal.If the following conditions are found, the equipment should be shut down immediately to troubleshoot.
  • (1)Under the rated working conditions, the current exceeds 20% of the rated value.
  • (2)The dynamic water level drops to the inlet part, resulting in intermittent water discharge.
  • (3)The submersible pump vibrates violently or emits noisy noise.
  • (4)The power supply voltage is lower than 340 volts.
  • (5)A fuse is burned out.
  • (6)The water pipe is damaged.
  • (7)The thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
  • These inspections will help to ensure the normal operation of the pump, improve its reliability and stability, so as to ensure its durability and service life.
  •  
  • 5.unit disassembly:
  • - untie cable rope, remove the pipeline part, remove the wire plate.
  • - meneng mudhun bolt banyu, sijine banyu ing kamar motor.
  • - remove the filter, loose the fixed screw on the coupling fixed motor shaft.
  • - screw down the bolt connected with the motor at the inlet junction, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)
  • - pump disassembly sequence is: (see figure 1) inlet junction, impeller, guide housing, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.
  • - motor disassembly process is: (see figure 1) place the motor on the platform, remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn, then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • - unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Panyimpenan lan Kustodian

 1, sijine metu banyu ing growong motor (utamané ing mangsa kanggo nyegah motor saka pembekuan), lan dasi kabel uga.

 2, simpen ing kamar njero ruangan tanpa zat korosif lan gas, kanthi suhu ing ngisor 40 °C.

 3, nggunakake long-term kudu mbayar manungsa waé kanggo Nyegah teyeng saka pumps submersible.

 

 
Nganggo Parts
  • Impeller
  • Lengan poros
  • Lengan poros karet
  • Ring segel

 
Skenario Aplikasi

01 Intake banyu sumur jero

02 Sumber banyu dhuwur

03 banyu gunung 

04 banyu menara

05 Irigasi Pertanian

06 irigasi kebon

07 intake banyu kali

08 banyu omah

 

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


Tulis pesen ing kene lan kirimake menyang kita

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


jvJavanese