175QJR Deep Well Submersible Pump

Txais tos OEM ua! Raws li cov neeg siv khoom xav tau, tsim thiab tsim khoom ntawm ntau hom kev xav tau tshwj xeeb ntawm cov tsis yog tus qauv submersible lub cev muaj zog thiab lub twj tso kua mis. Cov khoom siv cov qauv: GB / T2816-2014 "zoo submersible twj", GB / T2818-2014 "zoo submersible asynchronous lub cev muaj zog". WhatsApp: 17855846335
PDF DOWNLOAD
Paub meej
Cim npe
 
Product Overview

This product is designed for underground hot water mining and is suitable for water temperatures below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. This product is very suitable for use in underground hot water mining environments, which can effectively deal with high temperatures and corrosion of various chemical substances, while having good aging resistance, ensuring stable operation of equipment for a long time. Whether it is needed to be used in harsh mining environments or in the face of high water temperatures, this product can provide reliable protection, ensuring continuous operation and efficient work of equipment.

 

 
Cov xwm txheej ntawm kev siv

 Product introduction: we recommend this product is equipped with three-phase AC 380V (tolerance + / - 1%), 50HZ (tolerance + / - 1%) power supply. Water quality requirements are strict, the water temperature shall not be higher than 20 °C, the content of solid impurities (mass ratio) shall not be greater than 0.01%; PH value (pH) between 6.5-8.5; hydrogen sulfide content shall not be greater than 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product is equipped with a closed or water-cooled wet structure motor. Before use, the inner cavity of the submersible motor shall be filled with clean water to prevent empty. Then tighten the water injection and air exhaust screws, otherwise it is prohibited to use. The submersible pump must be completely immersed in water to operate, the penetration depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The inflow of well water shall meet the water output and continuous operation requirements of the submersible pump, and the water output of the pump shall be controlled between 0.7 and 1.2 times the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or dumped, but only vertically. The submersible pump must be equipped with cables as required, and is equipped with external overload protection device. It is prohibited to test the pump without water and no load.

 

 
Lub ntsiab lus qauv

175QJR Deep Well Submersible Pump

 
Ib nrab qauv siv
Qauv Dej ntws (m 3 / h) Lub taub hau
(m)

Rotatingspeed

(hloov / point)

Lub tshuab nqus dej (%)  Qhov hluav taws xob
txoj kab uas hla
(mm)
Siv tau zoo
txoj kab uas hla (mm) 
 Rated
power(KW)
Rated
voltage (V)
Rated
tam sim no (A)
Motorefficiency (%) power factorcosφ   Chav tsev
Radial Maximu loj (mm)
175QJ10-42 10 42 2850 53 50  175saum toj no 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175saum toj no 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175saum toj no 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175saum toj no 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175saum toj no 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175saum toj no 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175saum toj no 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175saum toj no 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175saum toj no 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175saum toj no 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175saum toj no 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175saum toj no 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175saum toj no 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Kev Tiv Thaiv Kev Nyab Xeeb

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, nruj me ntsis raws li cov kev cai ntawm lub twj tso kua mis nqa, ntws ntau yam ntawm kev siv, los tiv thaiv qis ntws los yog siab nqa twj tso kua mis quab yuam, lub thrust bearing thiab lwm yam ntawm hnav, lub cev muaj zog overload hlawv.

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Taw qhia txog Cov Qauv

Kev taw qhia luv luv ntawm cov qauv: lub twj tso kua mis feem ntau yog tsim los ntawm lub twj tso kua mis, impeller, hloov pauv plhaub, roj hmab bearing, kos valve lub cev (xaiv qhov chaw) thiab lwm yam khoom siv.Motor feem yog tsim los ntawm lub hauv paus, lub zog tswj cov yeeb yaj kiab, thrust bearing, thrust phaj. , qis qhia bearing lub rooj, stator, rotor, sab sauv qhia bearing lub rooj, xuab zeb nplhaib, dej inlet seem, cable thiab lwm yam khoom.


Cov yam ntxwv tseem ceeb ntawm cov khoom muaj xws li:

 1, Lub cev muaj zog yog cov dej ntub dej submersible peb-theem asynchronous lub cev muaj zog, lub cev muaj zog muaj dej huv, siv los ua kom txias lub cev muaj zog thiab lubricate cov kabmob, lub siab tswj cov yeeb yaj kiab hauv qab ntawm lub cev yog siv los kho. qhov expansion thiab contraction siab sib txawv ntawm cov dej nyob rau hauv lub cev tshwm sim los ntawm kev hloov ntawm qhov kub thiab txias ntawm lub cev muaj zog.

 2, Txhawm rau tiv thaiv cov xuab zeb hauv cov dej hauv dej los ntawm kev nkag mus rau lub cev muaj zog, sab sauv kawg ntawm lub cev muaj zog yog nruab nrog ob lub roj foob, thiab lub nplhaib xuab zeb tau teeb tsa los tsim cov qauv kev tiv thaiv xuab zeb.

 3, txhawm rau tiv thaiv lub twj tso kua mis los ntawm kev khiav thaum pib, lub twj tso kua mis ncej thiab lub cev muaj zog yog txuas nrog lub coupling, thiab lub zog thrust bearing yog ntsia rau hauv qab ntawm lub cev muaj zog.

 4, Lub lubrication ntawm lub cev muaj zog thiab lub twj tso kua mis yog cov dej lubrication.

 5, Lub cev muaj zog stator winding yog ua los ntawm cov khoom siv zoo submersible motor winding hlau, nrog kev ua haujlwm siab rwb thaiv tsev.

 6, Lub twj tso kua mis tsim los ntawm lub computer CAD, nrog cov qauv yooj yim thiab kev ua haujlwm zoo.

175QJR Deep Well Submersible Pump
 
Nruab

(1) Kev npaj ua ntej installation:
1. Xyuas seb lub twj tso kua mis submersible puas ua tau raws li qhov kev siv thiab qhov tshwj xeeb hauv phau ntawv qhia.
2. Siv lub qhov hnyav obiect nrog txoj kab uas hla sib npaug rau qhov siab tshaj plaws sab nraud ntawm lub twj tso kua mis submersible, ntsuas seb qhov inneldiameter ntawm lub qhov dej puas tuaj yeem haum rau lub twj tso kua mis submersible, thiab ntsuas seb qhov dej tob puas ua tau raws li qhov yuav tsum tau ua.
3. Xyuas seb lub qhov dej puas huv si thiab seb cov dej hauv qhov dej puas yog turbid. Tsis txhob siv lub tshuab hluav taws xob submersible los ntxuav lub welor twj av nkos thiab dej xuab zeb kom tsis txhob muaj kev puas tsuaj ntxov rau lub tshuab hluav taws xob submersible.
4. Tshawb xyuas seb txoj haujlwm ntawm lub welhead installation clamp puas haum thiab seb nws puas tuaj yeem tiv taus qhov zoo ntawm tag nrho chav tsev.
5. Tshawb xyuas seb cov twj tso kua dej submersible puas ua tiav thiab teeb tsa kom raug raws li daim duab sib dhos hauv phau ntawv tshem tawm cov ntxaij lim dej thiab tig lub coupling kom pom tias nws tig tau yooj yim.
6. Unscrew cov dej ntsia hlau thiab sau cov kab noj hniav nrog cov dej huv, tsis muaj corrosive (ceeb toom. Nco ntsoov sau nws), tom qab ntawd ceev cov dej screws. Tom qab 12 teev ntawm kev txhaj tshuaj dej, qhov rwb thaiv tsev ntawm lub cev muaj zog yuav tsum tsis txhob tsawg dua 150M Q thaum ntsuas nrog 500V co lub rooj.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Daim duab txuas cable thaiv txheej txheem yog raws li hauv qab no:
175QJR Deep Well Submersible Pump

 

8. Siv multimeter los xyuas seb cov xov hlau peb-theem puas txuas thiab seb qhov DC tsis kam yog kwv yees li qhov sib npaug.
9. Xyuas seb puas muaj peev xwm ntawm lub Circuit Court thiab transformer yog overloaded, thiab ces txuas lub overload tiv thaiv hloov los yog pib cov khoom. Saib Table 2 rau cov qauv tshwj xeeb, thiab tom qab ntawd hliv ib lub thoob dej rau hauv lub twj tso kua mis los ntawm lub qhov dej twj tso kua mis kom lubricate cov roj hmab bearings hauv lub twj tso kua mis, thiab tom qab ntawd muab lub twj tso kua mis submersible fais fab tso ncaj thiab khov kho.Start (tsis pub ntau tshaj ib ob) thiab xyuas seb qhov kev taw qhia lub kauj tsheb puas zoo ib yam nrog lub kauj tsheb. Yog tias tsis yog, sib pauv ob qhov txuas ntawm peb-theem cable.Tom qab ntawd nruab lub lim thiab npaj mus rau hauv qhov dej. Yog tias siv rau lub sijhawm tshwj xeeb (xws li kwj dej, kwj dej, dej ntws, pas dej, pas dej, thiab lwm yam), lub twj tso kua mis hluav taws xob yuav tsum muaj kev ntseeg siab.

 

(2) Kev teeb tsa thiab cov cuab yeej siv:
1. Ib khub nqa cov hlua rau ntau tshaj ob tons.
2. Lub tripod nrog ib txoj kab ntsug qhov siab tsis pub tsawg tshaj plaub meters.
3. Ob txoj hlua dai (xov hlau hlua) uas tuaj yeem nqa tau qhov hnyav ntawm ntau tshaj ib tuj (tuaj yeem lav qhov hnyav ntawm cov twj tso kua dej tiav).
4. Nruab ob khub ntawm clamps (splnts).
5. Wrenches, hammers, ntswj ntsia hlau, cov cuab yeej hluav taws xob thiab cov twj paj nruag, thiab lwm yam.

 

(3) Hluav taws xob twj tso kua mis installation:
1. Daim duab qhia kev teeb tsa ntawm lub tshuab hluav taws xob submersible yog pom nyob rau hauv daim duab 2. Qhov tshwj xeeb installation qhov ntev yog qhia nyob rau hauv Table 3 "Daim Ntawv Teev Tseg Qhov Loj ntawm Submersible Electric Pump".

 

2. Cov twj siv hluav taws xob submersible nrog lub taub hau tsawg dua 30 meters tuaj yeem nqa ncaj qha mus rau hauv lub qhov dej siv cov hoses thiab cov hlua hlau lossis lwm cov hlua hemp uas tuaj yeem nqa tau qhov hnyav tag nrho ntawm lub tshuab, cov kav dej, thiab dej hauv cov kav dej.

 

3. Cov twj tso kua mis nrog lub taub hau ntau dua 30 meters siv cov kav dej steel, thiab cov txheej txheem kev teeb tsa yog raws li hauv qab no:
①Siv lub clamp los tuav lub siab kawg ntawm lub twj tso kua mis (lub cev muaj zog thiab lub twj tso kua dej tau txuas rau lub sijhawm no), nqa nws nrog cov hlua khi, thiab maj mam khi nws mus rau hauv lub qhov dej kom txog thaum muab lub clamp rau ntawm lub qhov dej thiab tshem tawm qhov saw caj dab.
② Siv lwm ob lub clamps los tuav cov yeeb nkab, nqa nrog ib txoj hlua dai 15 cm deb ntawm lub flange, thiab maj mam txo qis. Nruab nrab ntawm cov yeeb nkab flange thiab lub twj tso kua mis flange Muab cov roj hmab tso rau hauv qhov chaw thiab nruj cov yeeb nkab thiab twj tso kua mis sib npaug nrog bolts, ceev thiab lub caij nplooj ntoos hlav ntxhua.
③ Nqa lub twj tso kua mis submersible me ntsis, tshem lub clamp ntawm lub taub dej kawg ntawm lub twj tso kua mis, khi lub cable kom ruaj khov rau hauv cov kav dej nrog ib daim kab xev yas, thiab maj mam khi nws kom txog thaum lub clamp muab tso rau ntawm lub qhov dej.
④ Siv tib txoj kev los khi tag nrho cov kav dej rau hauv qhov dej.
⑤ Tom qab cov hlau lead-tawm txuas nrog rau kev tswj kev hloov, nws txuas nrog peb-theem fais fab mov.


(4) Tej yam yuav tsum nco ntsoov thaum lub installation:
1. Yog tias pom muaj qhov tshwm sim jamming thaum lub sij hawm siv cov txheej txheem, tig los yog rub cov yeeb nkab dej kom kov yeej qhov jamming point. Yog tias ntau yam kev ntsuas tseem tsis ua haujlwm, thov tsis txhob yuam lub twj tso kua mis kom tsis txhob muaj kev puas tsuaj rau lub tshuab hluav taws xob submersible thiab lub qhov dej.
2. Thaum lub sij hawm installation, yuav tsum tau muab tso rau ntawm ib tug roj hmab ncoo nyob rau hauv lub flange ntawm txhua lub yeeb nkab thiab nruj nreem sib npaug zos rau.
3. Thaum lub twj tso kua dej qis rau hauv lub qhov dej, nws yuav tsum tau muab tso rau hauv nruab nrab ntawm lub qhov dej kom tsis txhob lub twj tso kua mis khiav tawm ntawm lub qhov dej mus ntev, ua rau lub twj tso kua mis vibrate thiab lub cev muaj zog cheb thiab hlawv. .
4. Txiav txim siab qhov tob ntawm lub twj tso kua mis dej mus rau hauv qab ntawm lub qhov dej raws li cov xuab zeb ntws thiab cov av ntawm lub qhov dej. Tsis txhob faus lub twj tso kua mis hauv av nkos. Qhov kev ncua deb ntawm lub twj tso kua dej mus rau hauv qab ntawm lub qhov dej yog feem ntau tsis pub tsawg tshaj 3 meters (saib daim duab 2).
5. Qhov dej nkag qhov tob ntawm lub twj tso kua mis dej yuav tsum tsis pub tsawg tshaj 1-1.5 meters los ntawm cov dej dynamic mus rau qhov dej nkag ntawm qhov dej (saib daim duab 2). Txwv tsis pub, cov dej twj tso kua mis bearings yuav yooj yim puas.
6. Lub nqa ntawm lub twj tso kua dej tsis tuaj yeem qis dhau. Txwv tsis pub, lub rooj vag valve yuav tsum tau muab tso rau ntawm lub qhov dej hauv qhov dej los tswj lub twj tso kua mis ntawm qhov ntsuas qhov taw tes kom tsis txhob muaj lub cev muaj zog los ntawm overloaded thiab hlawv tawm vim qhov txaus txaus.
7. Thaum lub twj tso kua dej ua haujlwm, cov dej tso tawm yuav tsum tsis tu ncua thiab txawm tias, qhov tam sim no yuav tsum ruaj khov (raws li kev ntsuas kev ua haujlwm, feem ntau tsis pub tshaj 10% ntawm cov ntsuas tam sim no), thiab yuav tsum tsis muaj kev vibration lossis suab nrov. Yog tias muaj qhov txawv txav, lub tshuab yuav tsum tau nres kom paub qhov ua rau thiab tshem tawm nws.
8. Thaum txhim kho, xyuam xim rau qhov chaw ntawm lub cev muaj zog grounding hlau (saib daim duab 2). Thaum cov yeeb nkab dej yog cov yeeb nkab steel, coj nws los ntawm lub qhov dej zoo clamp; thaum cov yeeb nkab dej yog cov yeeb nkab yas, coj nws los ntawm cov cim hauv av ntawm lub tshuab hluav taws xob.

 

 
Kev tu thiab tu
  1. 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from burning due to excessive motor current.
  4. 4. After the pump is running normally, in order to prolong its service life, it is necessary to check whether the power supply voltage, running current and insulation resistance are normal on a regular basis.If the following conditions are found, the equipment should be shut down immediately to eliminate the fault:
  5. - Under the rated working conditions, the current exceeds 20%.
  6. - The dynamic water level drops to the inlet section, resulting in intermittent drainage.
  7. - The submersible pump vibrates violently or emits noisy sounds.
  8. - The power supply voltage is lower than 340 volts.
  9. - There is a phase blown out in the fuse.
  10. - The water pipe is damaged.
  11. - The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.

 

  1. 5. Disassembly device:
  2. - Untie the cable, take off the pipe part and remove the line protection plate.
  3. - Unscrew the drain screw and exclude all water in the motor chamber.
  4. - Take out the filter and loosen the fixing screw on the coupling fixed to the motor shaft.
  5. - Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to the level of the device to prevent the bending of the pump shaft when separating).
  6. - The disassembly sequence of the pump is as follows: (see Figure 1) water inlet section, impeller, shunt shell, impeller, check valve body. When removing the impeller, use special tools to loosen the cone sleeve fixed to the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various parts.
  7. - The disassembly process of the motor is as follows: (see Figure 1) place the motor on the platform, and remove the nuts, base, shaft head lock nut, thrust plate, key, lower guide bearing. seat, and tie rod bolts from the bottom of the motor in order (see Figure 1), and then take out the rotor (be careful not to damage the wiring harness) and finally take out the connector and upper guide bearing seat.
  8. - Assembly unit: before assembly, all parts should be cleaned of rust and dirt, and smear sealant on all the surfaces and fasteners, and then assemble in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then wear the filter for machine test. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Kev ruaj ntseg thiab kev tuav pov hwm

 1, muab cov dej tso rau hauv lub cav cav (tshwj xeeb tshaj yog nyob rau lub caij ntuj no los tiv thaiv lub cev tsis muaj zog), thiab khi lub cable zoo.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, kev siv mus sij hawm ntev yuav tsum tau them sai sai rau kev tiv thaiv xeb ntawm cov twj submersible.

 

 
Hnav Qhov Ncauj
  • Impeller
  • Ncej tes tsho
  • Rubber ncej tes tsho
  • Lub nplhaib sealing

 
Daim ntawv thov Scenario

01 Lub qhov dej tob tob

02 High-rise water supply

03 roob dej 

04 dej

05 Agricultural irrigation

06 vaj irrigation

07 dej haus

08 dej hauv tsev

 

Yog tias koj txaus siab rau peb cov khoom, koj tuaj yeem xaiv tawm koj cov ntaub ntawv ntawm no, thiab peb yuav tiv tauj koj sai sai.


Sau koj cov lus ntawm no thiab xa tuaj rau peb

Yog tias koj txaus siab rau peb cov khoom, koj tuaj yeem xaiv tawm koj cov ntaub ntawv ntawm no, thiab peb yuav tiv tauj koj sai sai.


hmnMiao