This product adopts a variable frequency winding design, ensuring the motor's smooth conversion operation between 1HZ and 50HZ for a long time. This innovative design not only saves energy and prolongs service life, but also provides lasting and reliable performance in the work process. Whether in a home or industrial environment, this product will provide users with excellent efficiency and reliability, making it an indispensable tool in the manufacturing and production process.
1, fais fab mov: peb-theem AC 380V ( kam rau ua + / - 5%), 50HZ ( kam rau ua + / - 1%).
2, dej zoo:
(1) water temperature is not higher than 20 °C;
(2) cov khoom impurities cov ntsiab lus (qhov loj piv) tsis ntau tshaj 0.01%;
(3) PH tus nqi (pH) 6.5-8.5;
(4) cov ntsiab lus hydrogen sulfide tsis ntau dua 1.5mg / L;
(5) chloride ion cov ntsiab lus tsis ntau dua 400mg / L.
3, lub cev muaj zog raug kaw los yog dej puv ntub cov qauv, ua ntej siv lub submersible lub cev muaj zog kab noj hniav yuav tsum muaj cov dej huv huv, kom tsis txhob muaj qhov tsis muaj tseeb, thiab tom qab ntawd nruj cov dej txhaj tshuaj, cua tso tawm bolts, txwv tsis pub siv.
4, submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m. 5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.
6, lub qhov dej yuav tsum ncaj, lub twj tso kua mis submersible tsis tuaj yeem siv lossis pov tseg, tsuas yog siv ntsug.
7, lub twj tso kua mis submersible yuav tsum tau sib phim nrog lub cable raws li qhov yuav tsum tau ua, thiab cov khoom siv tiv thaiv sab nraud.
8, lub twj tso kua mis yog nruj me ntsis txwv tsis pub dej tsis muaj-load tshuab kuaj
Qauv | Dej ntws (m 3 / h) | Lub taub hau (m) |
Rotatingspeed (hloov / point) |
Lub tshuab nqus dej (%) | Qhov hluav taws xob txoj kab uas hla (mm) |
Siv tau zoo txoj kab uas hla (mm) |
Rated power(KW) |
Rated voltage (V) |
Rated tam sim no (A) |
Motorefficiency (%) | power factorcosφ | Chav tsev Radial Maximu loj (mm) |
Lus ceeb toom | |||||||||
300QJ200-40 | 200 | 40 | 2900 | 76 | 150 | 300saum toj no | 37 | 380 | 77.8 | 85.0 | 0.85 | 281 | ||||||||||
300QJ200-60 | 60 | 55 | 115 | 85.5 | 0.85 | |||||||||||||||||
300QJ200-80 | 80 | 75 | 154.1 | 86.0 | 0.86 | |||||||||||||||||
300QJ200-100 | 100 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-120 | 120 | 100 | 204.3 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ200-160 | 160 | 140 | 277.8 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-180 | 180 | 160 | 317.5 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-200 | 200 | 185 | 367.2 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-240 | 240 | 220 | 436.6 | 88.0 | 0.87 | |||||||||||||||||
300QJ320-30 | 320 | 30 | 2900 | 77 | 200 | 300saum toj no | 45 | 380 | 94.6 | 85.0 | 0.85 | 281 | ||||||||||
300QJ320-60 | 60 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ320-90 | 90 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ320-120 | 120 | 160 | 317.5 | 88.0 | 0.87 |
This well submersible pump is a pump suitable for clean water. It is strictly prohibited to dig new wells and pump dirty water containing sediment. The voltage grade of the pump is 380/50HZ, and other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, dephase protection, undervoltage protection, grounding protection and idling protection, etc., in order to prevent timely tripping when abnormal conditions occur. During the installation and use process, the pump must have reliable grounding. It is strictly prohibited to push and pull the switch when your hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. An obvious sign "anti-electric shock" must be set up where the pump is used. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water, and the water inlet and outlet bolts must be tightened. When testing the pump on the ground, water must be filled into the pump chamber to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the steering is correct. Pay attention to safety when the pump is upright to prevent toppling and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump with a large flow at low lift or produce a large pull at high lift, resulting in extreme wear of thrust bearings and other parts, the motor overload and burn. After the pump into the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ. After starting, regularly observe the voltage and current, and check whether the motor winding insulation meets the requirements; if the pump storage temperature below freezing point, should be drained to prevent the water in the motor cavity from freezing and cause the motor damage due to low temperature.
The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components.
Cov yam ntxwv tseem ceeb ntawm cov khoom muaj xws li:
- 1.The motor is a water-filled wet submersible three-phase asynchronous motor. The motor cavity is filled with clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water in the body caused by the temperature rise of the motor.
- 2. In order to prevent the sand particles from entering the motor, two sand seals are installed at the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed at the bottom of the motor.
- 4. The lubrication method of the motor and the pump bearing is water lubrication.
- 5. The stator winding of the motor adopts high quality submersible motor winding wire with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Kev npaj ua ntej installation:
1. Xyuas seb lub twj tso kua mis submersible puas ua tau raws li qhov kev siv thiab qhov tshwj xeeb hauv phau ntawv qhia.
2. Siv lub qhov hnyav obiect nrog txoj kab uas hla sib npaug rau qhov siab tshaj plaws sab nraud ntawm lub twj tso kua mis submersible, ntsuas seb qhov inneldiameter ntawm lub qhov dej puas tuaj yeem haum rau lub twj tso kua mis submersible, thiab ntsuas seb qhov dej tob puas ua tau raws li qhov yuav tsum tau ua.
3. Xyuas seb lub qhov dej puas huv si thiab seb cov dej hauv qhov dej puas yog turbid. Tsis txhob siv lub tshuab hluav taws xob submersible los ntxuav lub welor twj av nkos thiab dej xuab zeb kom tsis txhob muaj kev puas tsuaj ntxov rau lub tshuab hluav taws xob submersible.
4. Tshawb xyuas seb txoj haujlwm ntawm lub welhead installation clamp puas haum thiab seb nws puas tuaj yeem tiv taus qhov zoo ntawm tag nrho chav tsev.
5. Tshawb xyuas seb cov twj tso kua dej submersible puas ua tiav thiab teeb tsa kom raug raws li daim duab sib dhos hauv phau ntawv tshem tawm cov ntxaij lim dej thiab tig lub coupling kom pom tias nws tig tau yooj yim.
6. Unscrew cov dej ntsia hlau thiab sau cov kab noj hniav nrog cov dej huv, tsis muaj corrosive (ceeb toom. Nco ntsoov sau nws), tom qab ntawd ceev cov dej screws. Tom qab 12 teev ntawm kev txhaj tshuaj dej, qhov rwb thaiv tsev ntawm lub cev muaj zog yuav tsum tsis txhob tsawg dua 150M Q thaum ntsuas nrog 500V co lub rooj.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Daim duab txuas cable thaiv txheej txheem yog raws li hauv qab no:
8. Siv multimeter los xyuas seb cov xov hlau peb-theem puas txuas thiab seb qhov DC tsis kam yog kwv yees li qhov sib npaug.
9. Xyuas seb puas muaj peev xwm ntawm lub Circuit Court thiab transformer yog overloaded, thiab ces txuas lub overload tiv thaiv hloov los yog pib cov khoom. Saib Table 2 rau cov qauv tshwj xeeb, thiab tom qab ntawd hliv ib lub thoob dej rau hauv lub twj tso kua mis los ntawm lub qhov dej twj tso kua mis kom lubricate cov roj hmab bearings hauv lub twj tso kua mis, thiab tom qab ntawd muab lub twj tso kua mis submersible fais fab tso ncaj thiab khov kho.Start (tsis pub ntau tshaj ib ob) thiab xyuas seb qhov kev taw qhia lub kauj tsheb puas zoo ib yam nrog lub kauj tsheb. Yog tias tsis yog, sib pauv ob qhov txuas ntawm peb-theem cable.Tom qab ntawd nruab lub lim thiab npaj mus rau hauv qhov dej. Yog tias siv rau lub sijhawm tshwj xeeb (xws li kwj dej, kwj dej, dej ntws, pas dej, pas dej, thiab lwm yam), lub twj tso kua mis hluav taws xob yuav tsum muaj kev ntseeg siab.
(2) Kev teeb tsa thiab cov cuab yeej siv:
1. Ib khub nqa cov hlua rau ntau tshaj ob tons.
2. Lub tripod nrog ib txoj kab ntsug qhov siab tsis pub tsawg tshaj plaub meters.
3. Ob txoj hlua dai (xov hlau hlua) uas tuaj yeem nqa tau qhov hnyav ntawm ntau tshaj ib tuj (tuaj yeem lav qhov hnyav ntawm cov twj tso kua dej tiav).
4. Nruab ob khub ntawm clamps (splnts).
5. Wrenches, hammers, ntswj ntsia hlau, cov cuab yeej hluav taws xob thiab cov twj paj nruag, thiab lwm yam.
(3) Hluav taws xob twj tso kua mis installation:
1. Daim duab qhia kev teeb tsa ntawm lub tshuab hluav taws xob submersible yog pom nyob rau hauv daim duab 2. Qhov tshwj xeeb installation qhov ntev yog qhia nyob rau hauv Table 3 "Daim Ntawv Teev Tseg Qhov Loj ntawm Submersible Electric Pump".
2. Cov twj siv hluav taws xob submersible nrog lub taub hau tsawg dua 30 meters tuaj yeem nqa ncaj qha mus rau hauv lub qhov dej siv cov hoses thiab cov hlua hlau lossis lwm cov hlua hemp uas tuaj yeem nqa tau qhov hnyav tag nrho ntawm lub tshuab, cov kav dej, thiab dej hauv cov kav dej.
3. Cov twj tso kua mis nrog lub taub hau ntau dua 30 meters siv cov kav dej steel, thiab cov txheej txheem kev teeb tsa yog raws li hauv qab no:
①Siv lub clamp los tuav lub siab kawg ntawm lub twj tso kua mis (lub cev muaj zog thiab lub twj tso kua dej tau txuas rau lub sijhawm no), nqa nws nrog cov hlua khi, thiab maj mam khi nws mus rau hauv lub qhov dej kom txog thaum muab lub clamp rau ntawm lub qhov dej thiab tshem tawm qhov saw caj dab.
② Siv lwm ob lub clamps los tuav cov yeeb nkab, nqa nrog ib txoj hlua dai 15 cm deb ntawm lub flange, thiab maj mam txo qis. Nruab nrab ntawm cov yeeb nkab flange thiab lub twj tso kua mis flange Muab cov roj hmab tso rau hauv qhov chaw thiab nruj cov yeeb nkab thiab twj tso kua mis sib npaug nrog bolts, ceev thiab lub caij nplooj ntoos hlav ntxhua.
③ Nqa lub twj tso kua mis submersible me ntsis, tshem lub clamp ntawm lub taub dej kawg ntawm lub twj tso kua mis, khi lub cable kom ruaj khov rau hauv cov kav dej nrog ib daim kab xev yas, thiab maj mam khi nws kom txog thaum lub clamp muab tso rau ntawm lub qhov dej.
④ Siv tib txoj kev los khi tag nrho cov kav dej rau hauv qhov dej.
⑤ Tom qab cov hlau lead-tawm txuas nrog rau kev tswj kev hloov, nws txuas nrog peb-theem fais fab mov.
(4) Tej yam yuav tsum nco ntsoov thaum lub installation:
1. Yog tias pom muaj qhov tshwm sim jamming thaum lub sij hawm siv cov txheej txheem, tig los yog rub cov yeeb nkab dej kom kov yeej qhov jamming point. Yog tias ntau yam kev ntsuas tseem tsis ua haujlwm, thov tsis txhob yuam lub twj tso kua mis kom tsis txhob muaj kev puas tsuaj rau lub tshuab hluav taws xob submersible thiab lub qhov dej.
2. Thaum lub sij hawm installation, yuav tsum tau muab tso rau ntawm ib tug roj hmab ncoo nyob rau hauv lub flange ntawm txhua lub yeeb nkab thiab nruj nreem sib npaug zos rau.
3. Thaum lub twj tso kua dej qis rau hauv lub qhov dej, nws yuav tsum tau muab tso rau hauv nruab nrab ntawm lub qhov dej kom tsis txhob lub twj tso kua mis khiav tawm ntawm lub qhov dej mus ntev, ua rau lub twj tso kua mis vibrate thiab lub cev muaj zog cheb thiab hlawv. .
4. Txiav txim siab qhov tob ntawm lub twj tso kua mis dej mus rau hauv qab ntawm lub qhov dej raws li cov xuab zeb ntws thiab cov av ntawm lub qhov dej. Tsis txhob faus lub twj tso kua mis hauv av nkos. Qhov kev ncua deb ntawm lub twj tso kua dej mus rau hauv qab ntawm lub qhov dej yog feem ntau tsis pub tsawg tshaj 3 meters (saib daim duab 2).
5. Qhov dej nkag qhov tob ntawm lub twj tso kua mis dej yuav tsum tsis pub tsawg tshaj 1-1.5 meters los ntawm cov dej dynamic mus rau qhov dej nkag ntawm qhov dej (saib daim duab 2). Txwv tsis pub, cov dej twj tso kua mis bearings yuav yooj yim puas.
6. Lub nqa ntawm lub twj tso kua dej tsis tuaj yeem qis dhau. Txwv tsis pub, lub rooj vag valve yuav tsum tau muab tso rau ntawm lub qhov dej hauv qhov dej los tswj lub twj tso kua mis ntawm qhov ntsuas qhov taw tes kom tsis txhob muaj lub cev muaj zog los ntawm overloaded thiab hlawv tawm vim qhov txaus txaus.
7. Thaum lub twj tso kua dej ua haujlwm, cov dej tso tawm yuav tsum tsis tu ncua thiab txawm tias, qhov tam sim no yuav tsum ruaj khov (raws li kev ntsuas kev ua haujlwm, feem ntau tsis pub tshaj 10% ntawm cov ntsuas tam sim no), thiab yuav tsum tsis muaj kev vibration lossis suab nrov. Yog tias muaj qhov txawv txav, lub tshuab yuav tsum tau nres kom paub qhov ua rau thiab tshem tawm nws.
8. Thaum txhim kho, xyuam xim rau qhov chaw ntawm lub cev muaj zog grounding hlau (saib daim duab 2). Thaum cov yeeb nkab dej yog cov yeeb nkab steel, coj nws los ntawm lub qhov dej zoo clamp; thaum cov yeeb nkab dej yog cov yeeb nkab yas, coj nws los ntawm cov cim hauv av ntawm lub tshuab hluav taws xob.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
- 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- 4.After the pump is running normally, in order to prolong its service life, it is necessary to check the power supply voltage, running current and insulation resistance regularly to see if they are normal.If the following conditions are found, the equipment should be shut down immediately to troubleshoot.
- (1)Under the rated working conditions, the current exceeds 20% of the rated value.
- (2)The dynamic water level drops to the inlet part, resulting in intermittent water discharge.
- (3)The submersible pump vibrates violently or emits noisy noise.
- (4)The power supply voltage is lower than 340 volts.
- (5)A fuse is burned out.
- (6)The water pipe is damaged.
- (7)The thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
- These inspections will help to ensure the normal operation of the pump, improve its reliability and stability, so as to ensure its durability and service life.
- 5.unit disassembly:
- - untie cable rope, remove the pipeline part, remove the wire plate.
- - ntsia hlau ntsia hlau dej, muab cov dej tso rau hauv lub cav tsav.
- - remove the filter, loose the fixed screw on the coupling fixed motor shaft.
- - screw down the bolt connected with the motor at the inlet junction, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)
- - pump disassembly sequence is: (see figure 1) inlet junction, impeller, guide housing, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.
- - motor disassembly process is: (see figure 1) place the motor on the platform, remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn, then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- - unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
- 6.The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.
1, muab cov dej tso rau hauv lub cav cav (tshwj xeeb tshaj yog nyob rau lub caij ntuj no los tiv thaiv lub cev tsis muaj zog), thiab khi lub cable zoo.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, kev siv mus sij hawm ntev yuav tsum tau them sai sai rau kev tiv thaiv xeb ntawm cov twj submersible.
- Impeller
- Ncej tes tsho
- Rubber ncej tes tsho
-
Lub nplhaib sealing
01 Lub qhov dej tob tob
02 High-rise water supply
03 roob dej
04 dej
05 Agricultural irrigation
06 vaj irrigation
07 dej haus
08 dej hauv tsev