Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.
1, provvista ta 'enerġija: AC bi tliet fażijiet 380V (tolleranza + / - 5%), 50HZ (tolleranza + / - 1%).
2, kwalità tal-ilma:
(1) it-temperatura tal-ilma mhix ogħla minn 20 °C;
(2) kontenut ta 'impuritajiet solidi (proporzjon tal-massa) mhuwiex akbar minn 0.01%;
(3) valur PH (pH) 6.5-8.5;
(4) il-kontenut ta 'sulfid ta' l-idroġenu mhuwiex akbar minn 1.5mg/L;
(5) il-kontenut tal-jone tal-klorur mhuwiex akbar minn 400mg/L.
3, il-mutur huwa magħluq jew mimli bl-ilma struttura mxarrba, qabel l-użu l-kavità tal-mutur sommerġibbli għandha tkun sħiħa ta 'ilma nadif, biex jipprevjenu foloz sħiħa, u mbagħad issikka l-injezzjoni ta' l-ilma, boltijiet ta 'rilaxx ta' l-arja, inkella mhux permess li juża
4, pompa sommerġibbli għandha tkun kompletament mgħaddsa fl-ilma, il-fond tal-għadis ma jkunx akbar minn 70m, il-qiegħ tal-pompa sommerġibbli mill-qiegħ tal-bir ma jkunx inqas minn 3m.
5, il-fluss tal-ilma tal-bir għandu jkun kapaċi jilħaq il-produzzjoni tal-ilma tal-pompa sommerġibbli u tħaddim kontinwu, il-produzzjoni tal-ilma tal-pompa sommerġibbli għandha tkun ikkontrollata f'0.7 - 1.2 darbiet il-fluss nominali.
6, il-bir għandu jkun dritta, il-pompa sommerġibbli ma tistax tintuża jew mormija, użu vertikali biss.
7, il-pompa sommerġibbli għandha tkun imqabbla mal-kejbil skond ir-rekwiżiti, u l-apparat ta 'protezzjoni ta' tagħbija żejda esterna. 8, il-pompa hija strettament ipprojbita mingħajr magna tat-test ta 'l-ilma mingħajr tagħbija
Mudell | Fluss (m3/h) | Kap (m) |
Rotating speed(change/point) | Pompa tal-ilma (%) | Żbokk dijametru (mm) |
Applikabbli sew dijametru (mm) |
Rated qawwa (KW) |
Rated voltage(V) | Ratedcurrent(A) | Effiċjenza tal-mutur (%) | fattur tal-qawwacosφ | Unità Daqs massimu radjali (mm) |
Rimarka | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125hawn fuq | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125hawn fuq | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125hawn fuq | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125hawn fuq | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125hawn fuq | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125hawn fuq | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125hawn fuq | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125hawn fuq | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.
Il-karatteristiċi ewlenin tal-prodott jinkludu:
1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

(1) Tħejjija qabel l-installazzjoni:
1. Iċċekkja jekk il-pompa sommerġibbli tissodisfax il-kundizzjonijiet tal-użu u l-ambitu speċifikati fil-manwal.
2. billi tuża object tqil b'dijametru ugwali għad-dijametru massimu ta 'barra tal-pompa sommerġibbli, kejjel jekk il-inneldiameter tal-wellbore jistax joqgħod mal-pompa sommerġibbli, u kejjel jekk il-fond tal-bir jissodisfax ir-rekwiżiti tal-installazzjoni.
3. Iċċekkja jekk il-bore huwiex nadif u jekk l-ilma tal-bir huwiex imdardra. Qatt tuża pompa elettrika sommerġibbli biex taħsel it-tajn tal-pompa welor u l-ilma tar-ramel biex tevita ħsara prematura lill-pompa elettrika sommerġibbli.
4. Iċċekkja jekk il-pożizzjoni tal-morsa tal-installazzjoni tal-welhead hijiex adattata u jekk tistax tiflaħ il-kwalità tal-unità kollha
5. Iċċekkja jekk il-komponenti tal-pompa sommerġibbli humiex kompluti u installati kif suppost skont id-dijagramma tal-assemblaġġ fil-manwal Neħħi l-iskrin tal-filtru u dawwar l-akkoppjar biex tara jekk idurx b'mod flessibbli
6. Ħoll il-kamin tal-ilma u fillthe kavità tal-mutur b'ilma nadif, mhux korrużiv (nota. kun żgur li fil it up), imbagħad issikka l-kamin tal-ilma. Wara 12-il siegħa ta 'injezzjoni ta' l-ilma, ir-reżistenza ta 'insulazzjoni tal-mutur m'għandhiex tkun inqas minn 150M Q meta titkejjel b'tabella li tħawwad 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.
After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Id-dijagramma tal-proċess tal-wiring tal-kejbil mehmuża hija kif ġej:
8. Uża multimeter biex tivverifika jekk il-wajers bi tliet fażijiet humiex konnessi u jekk ir-reżistenza DC hijiex bejn wieħed u ieħor bilanċjata.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.
(2) Tagħmir u għodda ta' installazzjoni:
1. Par wieħed ta 'ktajjen ta' rfigħ għal aktar minn żewġ tunnellati.
2. Tripod b'għoli vertikali ta' mhux inqas minn erba' metri.
3. Żewġ ħbula mdendlin (ħbula tal-wajer) li jistgħu jġorru piż ta 'aktar minn tunnellata (jistgħu iġorru l-piż ta' sett komplut ta 'pompi tal-ilma).
4. Installa żewġ pari ta 'klampi (splints).
5. Wrenches, imrietel, tornaviti, għodod u strumenti elettriċi, eċċ.
(3) Installazzjoni ta 'pompa elettrika:
1. Id-dijagramma tal-installazzjoni tal-pompa elettrika sommerġibbli hija murija fil-Figura 2. Id-dimensjonijiet tal-installazzjoni speċifiċi huma murija fit-Tabella 3 "Lista tad-Dimensjonijiet tal-Installazzjoni tal-Pompa Elettrika Sommerġibbli".
2. Pompi elettriċi sommerġibbli b'ras ta 'inqas minn 30 metru jistgħu jittellgħu direttament fil-bir bl-użu ta' pajpijiet u ħbula tal-wajer jew ħbula oħra tal-qanneb li jistgħu jġorru l-piż sħiħ tal-magna kollha, pajpijiet tal-ilma, u ilma fil-pajpijiet.
3. Pompi b'ras ta 'aktar minn 30 metru jużaw pajpijiet ta' l-azzar, u s-sekwenza ta 'installazzjoni hija kif ġej:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Neħħi ftit il-pompa sommerġibbli, neħħi l-morsa fuq it-tarf ta 'fuq tal-pompa ta' l-ilma, torbot il-kejbil sew mal-pajp ta 'l-ilma b'tejp tal-plastik, u orbotha bil-mod sakemm Il-morsa titqiegħed fil-bir.
④Uża l-istess metodu biex torbot il-pajpijiet tal-ilma kollha fil-bir.
⑤Wara li l-kejbil tal-ħruġ ikun imqabbad mal-iswiċċ tal-kontroll, huwa konness mal-provvista tal-enerġija bi tliet fażijiet.
(4) Affarijiet li għandek tinnota waqt l-installazzjoni:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Waqt l-installazzjoni, kuxxinett tal-gomma għandu jitqiegħed fil-ħanek ta 'kull pajp u ssikkat indaqs.
3. Meta l-pompa tal-ilma titbaxxa fil-bir, għandha titqiegħed fin-nofs tal-pajp tal-bir biex tevita li l-pompa taħdem kontra l-ħajt tal-bir għal żmien twil, u tikkawża li l-pompa tivvibra u l-mutur jiknes u jinħaraq .
4. Iddetermina l-fond tal-pompa ta 'l-ilma sal-qiegħ tal-bir skond il-kundizzjonijiet ta' ramel u ħama li jirriżultaw tal-bir. Tidfenx il-pompa fit-tajn. Id-distanza mill-pompa tal-ilma sal-qiegħ tal-bir hija ġeneralment mhux inqas minn 3 metri (ara Figura 2).
5. Il-fond tad-dħul ta 'l-ilma tal-pompa ta' l-ilma m'għandux ikun inqas minn 1-1.5 metri mil-livell dinamiku ta 'l-ilma għan-nodu tad-dħul ta' l-ilma (ara l-Figura 2). Inkella, il-bearings tal-pompa tal-ilma jistgħu jiġu mħassra faċilment.
6. Il-lift tal-pompa tal-ilma ma jistax ikun baxx wisq. Inkella, valv gate jeħtieġ li jiġi installat fuq il-pipeline ta 'l-ilma tar-ras biex jikkontrolla l-fluss tal-pompa fil-punt tal-fluss nominali biex jipprevjeni li l-mutur jiġi mgħobbi żżejjed u jinħaraq minħabba rati ta' fluss kbar.
7. Meta l-pompa ta 'l-ilma tkun qed taħdem, l-output ta' l-ilma għandu jkun kontinwu u saħansitra, il-kurrent għandu jkun stabbli (taħt kundizzjonijiet tax-xogħol ratati, ġeneralment mhux aktar minn 10% tal-kurrent nominali), u m'għandux ikun hemm vibrazzjoni jew storbju. Jekk ikun hemm xi anormalità, il-magna għandha titwaqqaf biex issir taf il-kawża u teliminaha.
8. Meta tinstalla, oqgħod attent għall-issettjar tal-wajer tal-ert tal-mutur (ara l-Figura 2). Meta l-pajp ta 'l-ilma jkun pajp ta' l-azzar, wassalha mill-morsa tal-ħofor; meta l-pajp ta 'l-ilma huwa pajp tal-plastik, wassalha mill-marka ta' l-ert tal-pompa elettrika.
- 1.Wara li l-pompa sommerġibbli tkun installata, iċċekkja r-reżistenza tal-insulazzjoni u l-konduzzjoni ta 'tliet fażijiet mill-iswiċċ mill-ġdid, iċċekkja jekk l-istrument u l-konnessjoni tat-tagħmir tal-bidu humiex ħażin, jekk ma jkunx hemm problema, il-magna tal-prova tista' tinbeda, u osserva jekk il-qari indikatur tal-istrument jaqbiżx il-vultaġġ nominali u l-kurrent speċifikati fuq il-pjanċa tal-isem wara l-bidu, u osserva jekk il-pompa għandhiex fenomenu ta 'ħoss u vibrazzjoni, u titħaddem jekk kollox ikun normali.
- 2.Wara l-ewwel tħaddim tal-pompa għal erba 'sigħat, il-mutur għandu jingħalaq biex tittestja r-reżistenza tal-insulazzjoni termali malajr, u l-valur tiegħu m'għandux ikun inqas minn 0.5 megaohm.
- 3.Wara li l-pompa tingħalaq, għandha tinbeda wara ħames minuti biex tipprevjeni li l-kolonna tal-ilma fil-pajp tiġi kompletament reflowed u tikkawża kurrent eċċessiv tal-mutur u burnout.
- 4.Wara li l-pompa titħaddem b'mod normali, sabiex ittawwal il-ħajja tas-servizz tagħha, huwa meħtieġ li tivverifika jekk il-vultaġġ tal-provvista, il-kurrent tax-xogħol u r-reżistenza tal-insulazzjoni humiex normali regolarment. Jekk jinstabu l-kundizzjonijiet li ġejjin, il-pompa għandha tintefa immedjatament biex issolvi l-problemi.
- 1 In the rated condition, the current exceeds 20%.
- 2 Il-livell tal-ilma dinamiku jinżel fis-sezzjoni tad-daħla tal-ilma, u jikkawża ilma intermittenti.
- 3 Il-pompa sommerġibbli għandha vibrazzjoni jew storbju severi.
- 4 Il-vultaġġ tal-provvista huwa inqas minn 340 volt.
- 5 Fjus jinħaraq.
- 6 Il-pajp tal-provvista tal-ilma huwa bil-ħsara.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.
-
- Impeller
- Kmiem tax-xaft
- Kmiem tax-xaft tal-gomma
-
Ċirku tas-siġillar
01 Intake ta 'ilma fil-fond
02 Provvista ta' ilma għoli
03 provvista ta 'ilma fil-muntanji
04 torri ilma
05 Tisqija agrikola
06 tisqija tal-ġnien
07 teħid ta 'ilma tax-xmara
08 ilma domestiku