QJ series submersible pump is a kind of water lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small use area, compact structure, easy installation, easy maintenance and repair. Widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage and industrial and mining enterprises, drought relief and flood drainage and other fields. Flow range of 5-500m3/h, lift of 4-800m, power 3-315KW. The QJ series submersible pump has stable and reliable performance, suitable for various needs of pump applications.
1, provvista ta 'enerġija: AC bi tliet fażijiet 380V (tolleranza + / - 5%), 50HZ (tolleranza + / - 1%).
2, kwalità tal-ilma:
(1) it-temperatura tal-ilma mhix ogħla minn 20 °C;
(2) kontenut ta 'impuritajiet solidi (proporzjon tal-massa) mhuwiex akbar minn 0.01%;
(3) valur PH (pH) 6.5-8.5;
(4) il-kontenut ta 'sulfid ta' l-idroġenu mhuwiex akbar minn 1.5mg/L;
(5) il-kontenut tal-jone tal-klorur mhuwiex akbar minn 400mg/L.
3, the motor is closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use.
4, pompa sommerġibbli għandha tkun kompletament mgħaddsa fl-ilma, il-fond tal-għadis ma jkunx akbar minn 70m, il-qiegħ tal-pompa sommerġibbli mill-qiegħ tal-bir ma jkunx inqas minn 3m.
5, il-fluss tal-ilma tal-bir għandu jkun kapaċi jilħaq il-produzzjoni tal-ilma tal-pompa sommerġibbli u tħaddim kontinwu, il-produzzjoni tal-ilma tal-pompa sommerġibbli għandha tkun ikkontrollata f'0.7 - 1.2 darbiet il-fluss nominali.
6, il-bir għandu jkun dritta, il-pompa sommerġibbli ma tistax tintuża jew mormija, użu vertikali biss.
7, il-pompa sommerġibbli għandha tkun imqabbla mal-kejbil skond ir-rekwiżiti, u l-apparat ta 'protezzjoni ta' tagħbija żejda esterna.
8, the pump is strictly prohibited without water no-load test machine.
Mudell | Fluss (m3/h) | Kap (m) |
Rotatingspeed (bidla/punt) |
Pompa tal-ilma (%) | Żbokk dijametru (mm) |
Applikabbli sew dijametru (mm) |
Rated power(KW) |
Rated vultaġġ (V) |
Rated kurrenti (A) |
Effiċjenza tal-mutur (%) | fattur tal-qawwacosφ | Unità Daqs massimu radjali (mm) |
Rimarka | |||||||||
200QJ20-40 | 20 | 40 | 2850 | 66 | 50 | 200hawn fuq | 4 | 380 | 10.1 | 76.0 | 0.79 | 184 | ||||||||||
200QJ20-54 | 54 | 5.5 | 13.6 | 77.0 | 0.8 | |||||||||||||||||
200QJ20-81 | 81 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ20-93 | 93 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ20-108 | 108 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ20-121 | 121 | 13 | 29.8 | 80.0 | 0.83 | |||||||||||||||||
200QJ20-148 | 148 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ20-175 | 175 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ20-202 | 202 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ20-243 | 243 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ20-270 | 270 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ20-360 | 360 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ20-442 | 442 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ25-28 | 25 | 28 | 2850 | 68 | 65 | 200hawn fuq | 4 | 380 | 10.1 | 76.0 | 0.79 | 184 | ||||||||||
200QJ25-42 | 42 | 5.5 | 13.6 | 77.0 | 0.8 | |||||||||||||||||
200QJ25-56 | 56 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ25-70 | 70 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ25-98 | 98 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ25-112 | 25 | 112 | 2850 | 68 | 65 | 200hawn fuq | 13 | 380 | 29.8 | 80.0 | 0.83 | 184 | ||||||||||
200QJ25-126 | 126 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ25-154 | 154 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ25-182 | 182 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ25-210 | 210 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ25-252 | 252 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ25-308 | 308 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ25-378 | 378 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ32-26 | 32 | 26 | 2850 | 70 | 80 | 200hawn fuq | 4 | 380 | 10.1 | 76.0 | 0.79 | 184 | ||||||||||
200QJ32-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | |||||||||||||||||
200QJ32-52 | 52 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ32-65 | 65 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ32-78 | 78 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ32-91 | 91 | 13 | 29.8 | 80.0 | 0.83 | |||||||||||||||||
200QJ32-104 | 104 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ32-130 | 130 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ32-143 | 143 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ32-169 | 169 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ32-195 | 195 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ32-247 | 247 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ32-299 | 299 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ40-26 | 40 | 26 | 2850 | 72 | 80 | 200hawn fuq | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 184 | ||||||||||
200QJ40-39 | 39 | 7.5 | 18.0 | 78.0 | 0.81 | |||||||||||||||||
200QJ40-52 | 52 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ40-65 | 65 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ40-78 | 78 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ40-104 | 104 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ40-117 | 117 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ40-143 | 143 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ40-169 | 169 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ40-208 | 208 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ40-247 | 247 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ50-26 | 50 | 26 | 2850 | 74 | 80 | 200hawn fuq | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 184 | ||||||||||
200QJ50-39 | 39 | 9.2 | 21.7 | 78.5 | 0.82 | |||||||||||||||||
200QJ50-52 | 52 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ50-65 | 65 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ50-78 | 78 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ50-91 | 91 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ50-104 | 104 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ50-130 | 130 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ50-156 | 156 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ50-208 | 208 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ63-24 | 63 | 24 | 2850 | 74 | 80 | 200hawn fuq | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 184 | ||||||||||
200QJ63-36 | 36 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ63-60 | 60 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ63-72 | 72 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ63-84 | 84 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ63-96 | 96 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ63-120 | 120 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ63-144 | 144 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ80-22 | 80 | 22 | 2850 | 75 | 100 | 200hawn fuq | 7.5 | 380 | 18.0 | 78.0 | 0.81 | 184 | ||||||||||
200QJ80-33 | 33 | 11 | 25.8 | 79.0 | 0.82 | |||||||||||||||||
200QJ80-44 | 44 | 15 | 33.9 | 81.0 | 0.83 | |||||||||||||||||
200QJ80-55 | 55 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ80-66 | 66 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ80-88 | 88 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ80-99 | 99 | 37 | 79.7 | 84.0 | 0.84 | |||||||||||||||||
200QJ80-121 | 121 | 45 | 96.9 | 84.0 | 0.84 | |||||||||||||||||
200QJ100-18 | 100 | 18 | 2850 | 75 | 100 | 200hawn fuq | 9.2 | 380 | 21.7 | 78.5 | 0.82 | 184 | ||||||||||
200QJ100-27 | 27 | 13 | 29.8 | 80.0 | 0.83 | |||||||||||||||||
200QJ100-36 | 36 | 18.5 | 41.6 | 81.5 | 0.83 | |||||||||||||||||
200QJ100-45 | 45 | 22 | 48.2 | 82.5 | 0.84 | |||||||||||||||||
200QJ100-54 | 54 | 25 | 54.5 | 83.0 | 0.84 | |||||||||||||||||
200QJ100-63 | 63 | 30 | 65.4 | 83.0 | 0.84 | |||||||||||||||||
200QJ100-72 | 100 | 72 | 2850 | 75 | 100 | 200hawn fuq | 37 | 380 | 79.7 | 84.0 | 0.84 | 184 | ||||||||||
200QJ100-90 | 90 | 45 | 96.9 | 84.0 | 0.84 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strettament skond id-dispożizzjonijiet tal-lift tal-pompa, firxa ta 'fluss ta' użu, biex jipprevjenu fluss baxx jew forza ta 'l-ippumpjar ta' lift għoli, il-bearing ta 'l-ispinta u partijiet oħra ta' l-ilbies, it-tagħbija żejda tal-mutur maħruqa 6, wara l-pompa 'l isfel mill-bir, il-kejl tal-mutur għar-reżistenza tal-insulazzjoni tal-art m'għandux ikun inqas minn 100M, wara l-bidu biex josserva l-vultaġġ u l-kurrent, iċċekkja l-insulazzjoni tal-istralċ tal-mutur, kemm jekk konformi mar-rekwiżiti; temperatura tal-post tal-ħażna tal-pompa jekk inqas mill-punt tal-iffriżar, għandu jkun niexef l-ilma tal-kavità tal-mutur, jipprevjeni l-ħsara tas-silġ tal-ilma tal-kavità tal-mutur ikkawżata minn temperatura baxxa.
Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable and other components.
Il-karatteristiċi ewlenin tal-prodott jinkludu:
1, Il-mutur huwa mutur asinkronu bi tliet fażijiet sommerġibbli imxarrab mimli bl-ilma, il-kavità tal-mutur hija mimlija ilma nadif, użata biex tkessaħ il-mutur u tillubrikha l-bearing, il-film li jirregola l-pressjoni fil-qiegħ tal-mutur jintuża biex jaġġusta id-differenza fil-pressjoni ta 'espansjoni u kontrazzjoni ta' l-ilma ġewwa l-ġisem ikkawżata mill-bidla taż-żieda fit-temperatura tal-mutur.
2, Sabiex jiġi evitat li r-ramel fl-ilma tal-bir jidħol fil-mutur, it-tarf ta 'fuq tax-xaft tal-mutur huwa mgħammar b'żewġ siġilli taż-żejt, u ċirku tar-ramel huwa installat biex jifforma struttura ta' prevenzjoni tar-ramel.
3, Sabiex tevita li x-xaft tal-pompa jibda jaħdem, ix-xaft tal-pompa u x-xaft tal-mutur huma konnessi permezz ta 'akkoppjar, u thrust bearing ta' fuq huwa installat fil-parti t'isfel tal-mutur.
4, Il-lubrikazzjoni tal-mutur u l-bearing tal-pompa hija lubrikazzjoni tal-ilma.
5, L-istralċ tal-istator tal-mutur huwa magħmul minn wajer tal-istralċ tal-mutur sommerġibbli ta 'kwalità għolja, b'rendiment għoli ta' insulazzjoni.
6, Il-pompa hija ddisinjata minn CAD tal-kompjuter, bi struttura sempliċi u prestazzjoni teknika tajba.

(1) Tħejjija qabel l-installazzjoni:
1. Iċċekkja jekk il-pompa sommerġibbli tissodisfax il-kundizzjonijiet tal-użu u l-ambitu speċifikati fil-manwal.
2. billi tuża object tqil b'dijametru ugwali għad-dijametru massimu ta 'barra tal-pompa sommerġibbli, kejjel jekk il-inneldiameter tal-wellbore jistax joqgħod mal-pompa sommerġibbli, u kejjel jekk il-fond tal-bir jissodisfax ir-rekwiżiti tal-installazzjoni.
3. Iċċekkja jekk il-bore huwiex nadif u jekk l-ilma tal-bir huwiex imdardra. Qatt tuża pompa elettrika sommerġibbli biex taħsel it-tajn tal-pompa welor u l-ilma tar-ramel biex tevita ħsara prematura lill-pompa elettrika sommerġibbli.
4. Iċċekkja jekk il-pożizzjoni tal-morsa tal-installazzjoni tal-welhead hijiex adattata u jekk tistax tiflaħ il-kwalità tal-unità kollha
5. Iċċekkja jekk il-komponenti tal-pompa sommerġibbli humiex kompluti u installati kif suppost skont id-dijagramma tal-assemblaġġ fil-manwal Neħħi l-iskrin tal-filtru u dawwar l-akkoppjar biex tara jekk idurx b'mod flessibbli
6. Ħoll il-kamin tal-ilma u fillthe kavità tal-mutur b'ilma nadif, mhux korrużiv (nota. kun żgur li fil it up), imbagħad issikka l-kamin tal-ilma. Wara 12-il siegħa ta 'injezzjoni ta' l-ilma, ir-reżistenza ta 'insulazzjoni tal-mutur m'għandhiex tkun inqas minn 150M Q meta titkejjel b'tabella li tħawwad 500V.
7. Ġonta tal-kejbil, aqta 'kmiem tal-gomma ta' 120mm minn tarf wieħed tal-kejbil ħerġin u l-kejbil li jaqbel b'sikkina ta 'elettriċista imbagħad iħawwad it-tul tat-tliet wajers tal-qalba f'forma mtarġa, qaxxar qalba tar-ram ta' 20mm, jinbarax l-ossidu saff fuq theoutside tal-wajer tar-ram b'sikkina jew drapp tar-ramel, u daħħal iż-żewġt itruf tal-wajer konnessi f'palirs.Wara li torbot is-saff sewwa b'wajer tar-ram fin, issaldjah sewwa u sod, u ramel ta 'kwalunkwe. burrs fuq il-wiċċ. Imbagħad, għat-tliet ġonot, uża tejp ta 'insulazzjoni tal-polivester biex ikebbebhom b'mod semi stacked għal tliet lavers. Kebbeb iż-żewġt itruf tas-saff tat-tgeżwir tightywith nyion thread, u mbagħad uża metodu semi stacked biex ikebbeb it-tejp għal tliet saffi. Kebbeb is-saff ta 'barra b'tejp ta' insulazzjoni ta 'pressjoni għolja għal tliet saffi. Fl-aħħarnett, itwi t-tliet linji flimkien u ripetutament wraphom għal ħames saffi b'tejp ta 'pressjoni għolja. Kull saff għandu jkun marbut sewwa, u l-ġonot tas-saff ta 'bejn is-saffi għandhom ikunu ssikkati u fimm biex jipprevjenu li l-ilma jippenetra u jagħmel ħsara lill-insulazzjoni, Wara t-tgeżwir, xarrab fl-ilma f'temperatura tal-kamra ta' 20 'ċ għal 12-il siegħa, u kejjel ir-reżistenza tal-insulazzjoni b'tabella li tħawwad , li m'għandux ikun inqas minn 100M Ω
Id-dijagramma tal-proċess tal-wiring tal-kejbil mehmuża hija kif ġej:
8. Uża multimeter biex tivverifika jekk il-wajers bi tliet fażijiet humiex konnessi u jekk ir-reżistenza DC hijiex bejn wieħed u ieħor bilanċjata.
9. Iċċekkja jekk iċ-ċirkwit u l-kapaċità tat-transformer humiex mgħobbija żżejjed, u mbagħad qabbad is-swiċċ tal-protezzjoni ta 'tagħbija żejda jew it-tagħmir tal-bidu. Ara Tabella 2 għal mudelli speċifiċi, and thenPour barmil ilma fil-pompa tal-ilma mill-iżbokk tal-pompa tal-ilma biex tillubrikha l-berings tal-gomma fil-pompa, u mbagħad poġġi l-pompa elettrika sommerġibbli wieqfa u stabbli.Ibda (mhux aktar minn sekonda) u iċċekkja jekk id-direzzjoni ta 'l-istering hijiex konsistenti mas-sinjal ta' l-istering. Jekk le, tbiddel kwalunkwe żewġ konnetturi tal-kejbil bi tliet fażijiet. Imbagħad installa l-filtru u pprepara biex tinżel fil-bir. Jekk tintuża f'okkażjonijiet speċjali (bħal fosos, fosos, xmajjar, għadajjar, għadajjar, eċċ.), Il-pompa elettrika għandha tkun ertjata b'mod affidabbli.
(2) Tagħmir u għodda ta' installazzjoni:
1. Par wieħed ta 'ktajjen ta' rfigħ għal aktar minn żewġ tunnellati.
2. Tripod b'għoli vertikali ta' mhux inqas minn erba' metri.
3. Żewġ ħbula mdendlin (ħbula tal-wajer) li jistgħu jġorru piż ta 'aktar minn tunnellata (jistgħu iġorru l-piż ta' sett komplut ta 'pompi tal-ilma).
4. Installa żewġ pari ta 'klampi (splints).
5. Wrenches, imrietel, tornaviti, għodod u strumenti elettriċi, eċċ.
(3) Installazzjoni ta 'pompa elettrika:
1. Id-dijagramma tal-installazzjoni tal-pompa elettrika sommerġibbli hija murija fil-Figura 2. Id-dimensjonijiet tal-installazzjoni speċifiċi huma murija fit-Tabella 3 "Lista tad-Dimensjonijiet tal-Installazzjoni tal-Pompa Elettrika Sommerġibbli".
2. Pompi elettriċi sommerġibbli b'ras ta 'inqas minn 30 metru jistgħu jittellgħu direttament fil-bir bl-użu ta' pajpijiet u ħbula tal-wajer jew ħbula oħra tal-qanneb li jistgħu jġorru l-piż sħiħ tal-magna kollha, pajpijiet tal-ilma, u ilma fil-pajpijiet.
3. Pompi b'ras ta 'aktar minn 30 metru jużaw pajpijiet ta' l-azzar, u s-sekwenza ta 'installazzjoni hija kif ġej:
①Uża morsa biex tikklampja t-tarf ta 'fuq tal-parti tal-pompa ta' l-ilma (il-mutur u l-pompa ta 'l-ilma ġew imqabbda f'dan il-ħin), erfaha b'katina mdendla, u orbotha bil-mod fil-bir sakemm Poġġi l-morsa fuq ir-ras u neħħi l- katina mdendlin.
② Uża par klampi ieħor biex tikklampja pajp, erfah b'katina mdendla 15 ċm 'il bogħod mill-flanġ, u niżżlu bil-mod. Bejn il-flanġ tal-pajp u l-flanġ tal-pompa Poġġi l-kuxxinett tal-gomma f'postu u issikka l-pajp u l-pompa b'mod uniformi b'boltijiet, ġewż u woxers tar-rebbiegħa.
③ Neħħi ftit il-pompa sommerġibbli, neħħi l-morsa fuq it-tarf ta 'fuq tal-pompa ta' l-ilma, torbot il-kejbil sew mal-pajp ta 'l-ilma b'tejp tal-plastik, u orbotha bil-mod sakemm Il-morsa titqiegħed fil-bir.
④Uża l-istess metodu biex torbot il-pajpijiet tal-ilma kollha fil-bir.
⑤Wara li l-kejbil tal-ħruġ ikun imqabbad mal-iswiċċ tal-kontroll, huwa konness mal-provvista tal-enerġija bi tliet fażijiet.
(4) Affarijiet li għandek tinnota waqt l-installazzjoni:
1. Jekk jinstab fenomenu ta 'iġġammjar waqt il-proċess ta' l-ippumpjar, dawwar jew iġbed il-pajp ta 'l-ilma biex tegħleb il-punt ta' iġġamjar. Jekk il-miżuri varji għadhom ma jaħdmux, jekk jogħġbokMa jġiegħelx il-pompa 'l isfel biex tevita ħsara lill-pompa elettrika sommerġibbli u l-bir.
2. Waqt l-installazzjoni, kuxxinett tal-gomma għandu jitqiegħed fil-ħanek ta 'kull pajp u ssikkat indaqs.
3. Meta l-pompa tal-ilma titbaxxa fil-bir, għandha titqiegħed fin-nofs tal-pajp tal-bir biex tevita li l-pompa taħdem kontra l-ħajt tal-bir għal żmien twil, u tikkawża li l-pompa tivvibra u l-mutur jiknes u jinħaraq .
4. Iddetermina l-fond tal-pompa ta 'l-ilma sal-qiegħ tal-bir skond il-kundizzjonijiet ta' ramel u ħama li jirriżultaw tal-bir. Tidfenx il-pompa fit-tajn. Id-distanza mill-pompa tal-ilma sal-qiegħ tal-bir hija ġeneralment mhux inqas minn 3 metri (ara Figura 2).
5. Il-fond tad-dħul ta 'l-ilma tal-pompa ta' l-ilma m'għandux ikun inqas minn 1-1.5 metri mil-livell dinamiku ta 'l-ilma għan-nodu tad-dħul ta' l-ilma (ara l-Figura 2). Inkella, il-bearings tal-pompa tal-ilma jistgħu jiġu mħassra faċilment.
6. Il-lift tal-pompa tal-ilma ma jistax ikun baxx wisq. Inkella, valv gate jeħtieġ li jiġi installat fuq il-pipeline ta 'l-ilma tar-ras biex jikkontrolla l-fluss tal-pompa fil-punt tal-fluss nominali biex jipprevjeni li l-mutur jiġi mgħobbi żżejjed u jinħaraq minħabba rati ta' fluss kbar.
7. Meta l-pompa ta 'l-ilma tkun qed taħdem, l-output ta' l-ilma għandu jkun kontinwu u saħansitra, il-kurrent għandu jkun stabbli (taħt kundizzjonijiet tax-xogħol ratati, ġeneralment mhux aktar minn 10% tal-kurrent nominali), u m'għandux ikun hemm vibrazzjoni jew storbju. Jekk ikun hemm xi anormalità, il-magna għandha titwaqqaf biex issir taf il-kawża u teliminaha.
8. Meta tinstalla, oqgħod attent għall-issettjar tal-wajer tal-ert tal-mutur (ara l-Figura 2). Meta l-pajp ta 'l-ilma jkun pajp ta' l-azzar, wassalha mill-morsa tal-ħofor; meta l-pajp ta 'l-ilma huwa pajp tal-plastik, wassalha mill-marka ta' l-ert tal-pompa elettrika.
- (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
- (2) After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3) After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal.If the following conditions are found, the pump should be shut down immediately to eliminate the fault:
- 1 under the rated working conditions, the current exceeds 20%;
- 2 the dynamic water level drops to the water inlet part, resulting in intermittent drainage;
- 3 the submersible pump vibrates seriously or emits huge noise;
- 4 the supply voltage is lower than 340 volts;
- 5 a fuse is blown out;
- 6 the water pipe is damaged;
- 7 the thermal insulation resistance between the motor and the ground is less than 0.5 megaohm. The discovery of these problems need to be handled in time to ensure the normal operation of the pump, improve its reliability, so as to ensure the stable operation of the equipment for a long time.
(5)unit disassembly:
1 untie the cable tie, remove the pipeline part, remove the wire plate.
2 kamin il-bolt tal-ilma, poġġi l-ilma fil-kamra tal-mutur.
3 remove the filter, loose the fixing screw on the coupling to fix the motor shaft.
4 screw down the bolt connecting the water inlet section with the motor, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)
5 pump disassembly sequence is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.
6 motor disassembly process is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and the upper guide bearing seat.
7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
- The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.
1, poġġi l-ilma fil-kavità tal-mutur (speċjalment fix-xitwa biex tevita li l-mutur jiffriża), u torbot sew il-kejbil.
2, aħżen f'kamra ta 'ġewwa mingħajr sustanzi u gassijiet korrużivi, b'temperatura taħt l-40 °C.
3, l-użu fit-tul għandu joqgħod attent għall-prevenzjoni tas-sadid tal-pompi sommerġibbli.
- Impeller
- Kmiem tax-xaft
- Kmiem tax-xaft tal-gomma
-
Ċirku tas-siġillar
01 Intake ta 'ilma fil-fond
02 Provvista ta' ilma għoli
03 provvista ta 'ilma fil-muntanji
04 torri ilma
05 Tisqija agrikola
06 tisqija tal-ġnien
07 teħid ta 'ilma tax-xmara
08 ilma domestiku