This product is designed for underground hot water mining with a water temperature below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. Whether used in underground mining or other hot water environments, it can effectively resist the challenges of harsh conditions. Its excellent performance and stable quality make it an ideal choice in the mining field.
The product power requirements for three-phase AC 380V (± 5%), 50HZ (± 1%); water quality requirements include water temperature not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, the inner cavity of the submersible motor must be filled with water to prevent false filling, and then tighten the water injection and air exhaust bolts, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70m, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the displacement and continuous operation requirements of the submersible pump, and the displacement of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to conduct no-water no-load test on the pump.
Mudell | Fluss (m3/h) | Kap (m) |
Rotatingspeed (bidla/punt) |
Pompa tal-ilma (%) | Żbokk dijametru (mm) |
Applikabbli sew dijametru (mm) |
Rated qawwa (KW) |
Rated vultaġġ (V) |
Rated kurrenti (A) |
Effiċjenza tal-mutur (%) | fattur tal-qawwacosφ | Unità Daqs massimu radjali (mm) |
Rimarka | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135hawn fuq | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135hawn fuq | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135hawn fuq | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135hawn fuq | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135hawn fuq | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135hawn fuq | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135hawn fuq | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, strettament skond id-dispożizzjonijiet tal-lift tal-pompa, firxa tal-fluss ta 'użu, biex jipprevjenu fluss baxx jew forza ta' ippumpjar ta 'lift għoli, il-bearing ta' l-ispinta u partijiet oħra ta 'l-ilbies, it-tagħbija żejda tal-mutur maħruqa
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part mainly includes pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components.
The motor part mainly includes base, pressure regulating diaphragm, bearing, bearing seat, stator, rotor, water mouth part, lead cable and other components.
Il-karatteristiċi ewlenin tal-prodott jinkludu:
- 1.The motor is a water-cooled submersible three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing.
- 2. In order to prevent the sand in the well water from entering the motor, the motor shaft extension is installed with two oil seals, and the sand throw ring is installed to form a sand prevention structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the thrust bearing is installed under the motor.
- 4. The lubrication of the motor and the pump bearing is water lubrication.
- 5. The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
- 6. The pump designed by computer CAD has simple structure and excellent technical performance.

(1) Tħejjija qabel l-installazzjoni:
1. Iċċekkja jekk il-pompa sommerġibbli tissodisfax il-kundizzjonijiet tal-użu u l-ambitu speċifikati fil-manwal.
2. billi tuża object tqil b'dijametru ugwali għad-dijametru massimu ta 'barra tal-pompa sommerġibbli, kejjel jekk il-inneldiameter tal-wellbore jistax joqgħod mal-pompa sommerġibbli, u kejjel jekk il-fond tal-bir jissodisfax ir-rekwiżiti tal-installazzjoni.
3. Iċċekkja jekk il-bore huwiex nadif u jekk l-ilma tal-bir huwiex imdardra. Qatt tuża pompa elettrika sommerġibbli biex taħsel it-tajn tal-pompa welor u l-ilma tar-ramel biex tevita ħsara prematura lill-pompa elettrika sommerġibbli.
4. Iċċekkja jekk il-pożizzjoni tal-morsa tal-installazzjoni tal-welhead hijiex adattata u jekk tistax tiflaħ il-kwalità tal-unità kollha
5. Iċċekkja jekk il-komponenti tal-pompa sommerġibbli humiex kompluti u installati kif suppost skont id-dijagramma tal-assemblaġġ fil-manwal Neħħi l-iskrin tal-filtru u dawwar l-akkoppjar biex tara jekk idurx b'mod flessibbli
6. Ħoll il-kamin tal-ilma u fillthe kavità tal-mutur b'ilma nadif, mhux korrużiv (nota. kun żgur li fil it up), imbagħad issikka l-kamin tal-ilma. Wara 12-il siegħa ta 'injezzjoni ta' l-ilma, ir-reżistenza ta 'insulazzjoni tal-mutur m'għandhiex tkun inqas minn 150M Q meta titkejjel b'tabella li tħawwad 500V.
7. Ġonta tal-kejbil, aqta 'kmiem tal-gomma ta' 120mm minn tarf wieħed tal-kejbil ħerġin u l-kejbil li jaqbel b'sikkina ta 'elettriċista imbagħad iħawwad it-tul tat-tliet wajers tal-qalba f'forma mtarġa, qaxxar qalba tar-ram ta' 20mm, jinbarax l-ossidu saff fuq theoutside tal-wajer tar-ram b'sikkina jew drapp tar-ramel, u daħħal iż-żewġt itruf tal-wajer konnessi f'palirs.Wara li torbot is-saff sewwa b'wajer tar-ram fin, issaldjah sewwa u sod, u ramel ta 'kwalunkwe. burrs fuq il-wiċċ. Imbagħad, għat-tliet ġonot, uża tejp ta 'insulazzjoni tal-polivester biex ikebbebhom b'mod semi stacked għal tliet lavers. Kebbeb iż-żewġt itruf tas-saff tat-tgeżwir tightywith nyion thread, u mbagħad uża metodu semi stacked biex ikebbeb it-tejp għal tliet saffi. Kebbeb is-saff ta 'barra b'tejp ta' insulazzjoni ta 'pressjoni għolja għal tliet saffi. Fl-aħħarnett, itwi t-tliet linji flimkien u ripetutament wraphom għal ħames saffi b'tejp ta 'pressjoni għolja. Kull saff għandu jkun marbut sewwa, u l-ġonot tas-saff ta 'bejn is-saffi għandhom ikunu ssikkati u fimm biex jipprevjenu li l-ilma jippenetra u jagħmel ħsara lill-insulazzjoni, Wara t-tgeżwir, xarrab fl-ilma f'temperatura tal-kamra ta' 20 'ċ għal 12-il siegħa, u kejjel ir-reżistenza tal-insulazzjoni b'tabella li tħawwad , li m'għandux ikun inqas minn 100M Ω
Id-dijagramma tal-proċess tal-wiring tal-kejbil mehmuża hija kif ġej:
8. Uża multimeter biex tivverifika jekk il-wajers bi tliet fażijiet humiex konnessi u jekk ir-reżistenza DC hijiex bejn wieħed u ieħor bilanċjata.
9. Iċċekkja jekk iċ-ċirkwit u l-kapaċità tat-transformer humiex mgħobbija żżejjed, u mbagħad qabbad is-swiċċ tal-protezzjoni ta 'tagħbija żejda jew it-tagħmir tal-bidu. Ara Tabella 2 għal mudelli speċifiċi, and thenPour barmil ilma fil-pompa tal-ilma mill-iżbokk tal-pompa tal-ilma biex tillubrikha l-berings tal-gomma fil-pompa, u mbagħad poġġi l-pompa elettrika sommerġibbli wieqfa u stabbli.Ibda (mhux aktar minn sekonda) u iċċekkja jekk id-direzzjoni ta 'l-istering hijiex konsistenti mas-sinjal ta' l-istering. Jekk le, tbiddel kwalunkwe żewġ konnetturi tal-kejbil bi tliet fażijiet. Imbagħad installa l-filtru u pprepara biex tinżel fil-bir. Jekk tintuża f'okkażjonijiet speċjali (bħal fosos, fosos, xmajjar, għadajjar, għadajjar, eċċ.), Il-pompa elettrika għandha tkun ertjata b'mod affidabbli.
(2) Tagħmir u għodda ta' installazzjoni:
1. Par wieħed ta 'ktajjen ta' rfigħ għal aktar minn żewġ tunnellati.
2. Tripod b'għoli vertikali ta' mhux inqas minn erba' metri.
3. Żewġ ħbula mdendlin (ħbula tal-wajer) li jistgħu jġorru piż ta 'aktar minn tunnellata (jistgħu iġorru l-piż ta' sett komplut ta 'pompi tal-ilma).
4. Installa żewġ pari ta 'klampi (splints).
5. Wrenches, imrietel, tornaviti, għodod u strumenti elettriċi, eċċ.
(3) Installazzjoni ta 'pompa elettrika:
1. Id-dijagramma tal-installazzjoni tal-pompa elettrika sommerġibbli hija murija fil-Figura 2. Id-dimensjonijiet tal-installazzjoni speċifiċi huma murija fit-Tabella 3 "Lista tad-Dimensjonijiet tal-Installazzjoni tal-Pompa Elettrika Sommerġibbli".
2. Pompi elettriċi sommerġibbli b'ras ta 'inqas minn 30 metru jistgħu jittellgħu direttament fil-bir bl-użu ta' pajpijiet u ħbula tal-wajer jew ħbula oħra tal-qanneb li jistgħu jġorru l-piż sħiħ tal-magna kollha, pajpijiet tal-ilma, u ilma fil-pajpijiet.
3. Pompi b'ras ta 'aktar minn 30 metru jużaw pajpijiet ta' l-azzar, u s-sekwenza ta 'installazzjoni hija kif ġej:
①Uża morsa biex tikklampja t-tarf ta 'fuq tal-parti tal-pompa ta' l-ilma (il-mutur u l-pompa ta 'l-ilma ġew imqabbda f'dan il-ħin), erfaha b'katina mdendla, u orbotha bil-mod fil-bir sakemm Poġġi l-morsa fuq ir-ras u neħħi l- katina mdendlin.
② Uża par klampi ieħor biex tikklampja pajp, erfah b'katina mdendla 15 ċm 'il bogħod mill-flanġ, u niżżlu bil-mod. Bejn il-flanġ tal-pajp u l-flanġ tal-pompa Poġġi l-kuxxinett tal-gomma f'postu u issikka l-pajp u l-pompa b'mod uniformi b'boltijiet, ġewż u woxers tar-rebbiegħa.
③ Neħħi ftit il-pompa sommerġibbli, neħħi l-morsa fuq it-tarf ta 'fuq tal-pompa ta' l-ilma, torbot il-kejbil sew mal-pajp ta 'l-ilma b'tejp tal-plastik, u orbotha bil-mod sakemm Il-morsa titqiegħed fil-bir.
④Uża l-istess metodu biex torbot il-pajpijiet tal-ilma kollha fil-bir.
⑤Wara li l-kejbil tal-ħruġ ikun imqabbad mal-iswiċċ tal-kontroll, huwa konness mal-provvista tal-enerġija bi tliet fażijiet.
(4) Affarijiet li għandek tinnota waqt l-installazzjoni:
1. Jekk jinstab fenomenu ta 'iġġammjar waqt il-proċess ta' l-ippumpjar, dawwar jew iġbed il-pajp ta 'l-ilma biex tegħleb il-punt ta' iġġamjar. Jekk il-miżuri varji għadhom ma jaħdmux, jekk jogħġbokMa jġiegħelx il-pompa 'l isfel biex tevita ħsara lill-pompa elettrika sommerġibbli u l-bir.
2. Waqt l-installazzjoni, kuxxinett tal-gomma għandu jitqiegħed fil-ħanek ta 'kull pajp u ssikkat indaqs.
3. Meta l-pompa tal-ilma titbaxxa fil-bir, għandha titqiegħed fin-nofs tal-pajp tal-bir biex tevita li l-pompa taħdem kontra l-ħajt tal-bir għal żmien twil, u tikkawża li l-pompa tivvibra u l-mutur jiknes u jinħaraq .
4. Iddetermina l-fond tal-pompa ta 'l-ilma sal-qiegħ tal-bir skond il-kundizzjonijiet ta' ramel u ħama li jirriżultaw tal-bir. Tidfenx il-pompa fit-tajn. Id-distanza mill-pompa tal-ilma sal-qiegħ tal-bir hija ġeneralment mhux inqas minn 3 metri (ara Figura 2).
5. Il-fond tad-dħul ta 'l-ilma tal-pompa ta' l-ilma m'għandux ikun inqas minn 1-1.5 metri mil-livell dinamiku ta 'l-ilma għan-nodu tad-dħul ta' l-ilma (ara l-Figura 2). Inkella, il-bearings tal-pompa tal-ilma jistgħu jiġu mħassra faċilment.
6. Il-lift tal-pompa tal-ilma ma jistax ikun baxx wisq. Inkella, valv gate jeħtieġ li jiġi installat fuq il-pipeline ta 'l-ilma tar-ras biex jikkontrolla l-fluss tal-pompa fil-punt tal-fluss nominali biex jipprevjeni li l-mutur jiġi mgħobbi żżejjed u jinħaraq minħabba rati ta' fluss kbar.
7. Meta l-pompa ta 'l-ilma tkun qed taħdem, l-output ta' l-ilma għandu jkun kontinwu u saħansitra, il-kurrent għandu jkun stabbli (taħt kundizzjonijiet tax-xogħol ratati, ġeneralment mhux aktar minn 10% tal-kurrent nominali), u m'għandux ikun hemm vibrazzjoni jew storbju. Jekk ikun hemm xi anormalità, il-magna għandha titwaqqaf biex issir taf il-kawża u teliminaha.
8. Meta tinstalla, oqgħod attent għall-issettjar tal-wajer tal-ert tal-mutur (ara l-Figura 2). Meta l-pajp ta 'l-ilma jkun pajp ta' l-azzar, wassalha mill-morsa tal-ħofor; meta l-pajp ta 'l-ilma huwa pajp tal-plastik, wassalha mill-marka ta' l-ert tal-pompa elettrika.
- 1.Wara li l-pompa sommerġibbli tkun installata, iċċekkja r-reżistenza tal-insulazzjoni u l-konduzzjoni ta 'tliet fażijiet mill-iswiċċ mill-ġdid, iċċekkja jekk l-istrument u l-konnessjoni tat-tagħmir tal-bidu humiex ħażin, jekk ma jkunx hemm problema, il-magna tal-prova tista' tinbeda, u osserva jekk il-qari indikatur tal-istrument jaqbiżx il-vultaġġ nominali u l-kurrent speċifikati fuq il-pjanċa tal-isem wara l-bidu, u osserva jekk il-pompa għandhiex fenomenu ta 'ħoss u vibrazzjoni, u titħaddem jekk kollox ikun normali.
- 2.Wara l-ewwel tħaddim tal-pompa għal erba 'sigħat, il-mutur għandu jingħalaq biex tittestja r-reżistenza tal-insulazzjoni termali malajr, u l-valur tiegħu m'għandux ikun inqas minn 0.5 megaohm.
- 3.Wara li l-pompa tingħalaq, għandha tinbeda wara ħames minuti biex tipprevjeni li l-kolonna tal-ilma fil-pajp tiġi kompletament reflowed u tikkawża kurrent eċċessiv tal-mutur u burnout.
- 4.Wara li l-pompa titħaddem b'mod normali, sabiex ittawwal il-ħajja tas-servizz tagħha, huwa meħtieġ li tivverifika jekk il-vultaġġ tal-provvista, il-kurrent tax-xogħol u r-reżistenza tal-insulazzjoni humiex normali regolarment. Jekk jinstabu l-kundizzjonijiet li ġejjin, il-pompa għandha tintefa immedjatament biex issolvi l-problemi.
1 In the rated condition, the current exceeds 20%.
2 Il-livell tal-ilma dinamiku jinżel fis-sezzjoni tad-daħla tal-ilma, u jikkawża ilma intermittenti.
3 Il-pompa sommerġibbli għandha vibrazzjoni jew storbju severi.
4 Il-vultaġġ tal-provvista huwa inqas minn 340 volt.
5 Fjus jinħaraq.
6 Il-pajp tal-provvista tal-ilma huwa bil-ħsara.
7 The motor's thermal insulation resistance to the earth is less than 0.5 megaohm.
- 4.We are very happy to introduce our new product -- this submersible pump. This pump has an easy-to-use design that makes it easy to disassemble and clean. With the disassembly steps we provide, you can easily disassemble and clean the various parts, ensuring that it always maintains its best working condition. From loosening the anchoring screws to removing the filter screen and separating the pump and motor, we provide you with clear step-by-step instructions. When assembling, simply follow the reverse order of disassembly, ensuring that each part is cleaned and sealed, and you can complete the assembly. Whether it is an annual inspection or more frequent cleaning, this submersible pump can help you accomplish the task easily.
1, poġġi l-ilma fil-kavità tal-mutur (speċjalment fix-xitwa biex tevita li l-mutur jiffriża), u torbot sew il-kejbil.
2, aħżen f'kamra ta 'ġewwa mingħajr sustanzi u gassijiet korrużivi, b'temperatura taħt l-40 °C.
3, l-użu fit-tul għandu joqgħod attent għall-prevenzjoni tas-sadid tal-pompi sommerġibbli.
- Impeller
- Kmiem tax-xaft
- Kmiem tax-xaft tal-gomma
-
Ċirku tas-siġillar
01 Intake ta 'ilma fil-fond
02 Provvista ta' ilma għoli
03 provvista ta 'ilma fil-muntanji
04 torri ilma
05 Tisqija agrikola
06 tisqija tal-ġnien
07 teħid ta 'ilma tax-xmara
08 ilma domestiku