175QJR Pompa Sommersibbli Tajjeb Fond

Iwettaq l-ipproċessar OEM! Skont ir-rekwiżiti tal-utent, id-disinn u l-manifattura ta 'diversi tipi ta' rekwiżiti speċjali ta 'mutur u pompa sommerġibbli mhux standard. L-istandards tal-implimentazzjoni tal-prodott: GB/T2816-2014 "pompa sommerġibbli sew", GB/T2818-2014 "mutur asinkroniku sommerġibbli tajjeb". WhatsApp: 17855846335
PDF DOWNLOAD
Dettalji
Tikketti
 
Ħarsa ġenerali tal-prodott

This product is designed for underground hot water mining and is suitable for water temperatures below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. This product is very suitable for use in underground hot water mining environments, which can effectively deal with high temperatures and corrosion of various chemical substances, while having good aging resistance, ensuring stable operation of equipment for a long time. Whether it is needed to be used in harsh mining environments or in the face of high water temperatures, this product can provide reliable protection, ensuring continuous operation and efficient work of equipment.

 

 
Kundizzjonijiet ta' Użu

 Product introduction: we recommend this product is equipped with three-phase AC 380V (tolerance + / - 1%), 50HZ (tolerance + / - 1%) power supply. Water quality requirements are strict, the water temperature shall not be higher than 20 °C, the content of solid impurities (mass ratio) shall not be greater than 0.01%; PH value (pH) between 6.5-8.5; hydrogen sulfide content shall not be greater than 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product is equipped with a closed or water-cooled wet structure motor. Before use, the inner cavity of the submersible motor shall be filled with clean water to prevent empty. Then tighten the water injection and air exhaust screws, otherwise it is prohibited to use. The submersible pump must be completely immersed in water to operate, the penetration depth shall not exceed 70 meters, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3 meters. The inflow of well water shall meet the water output and continuous operation requirements of the submersible pump, and the water output of the pump shall be controlled between 0.7 and 1.2 times the rated flow. The well must be vertical, and the submersible pump can not be used horizontally or dumped, but only vertically. The submersible pump must be equipped with cables as required, and is equipped with external overload protection device. It is prohibited to test the pump without water and no load.

 

 
Tifsira tal-Mudell

 
Referenza tal-Mudell Parzjali
Mudell Fluss (m3/h) Kap
(m)

Rotatingspeed

(bidla/punt)

Pompa tal-ilma (%)  Żbokk
dijametru
(mm)
Applikabbli sew
dijametru (mm) 
 Rated
power(KW)
Rated
vultaġġ (V)
Rated
kurrenti (A)
Effiċjenza tal-mutur (%) fattur tal-qawwacosφ   Unità
Daqs massimu radjali (mm)
175QJ10-42 10 42 2850 53 50  175hawn fuq 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175hawn fuq 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175hawn fuq 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175hawn fuq 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175hawn fuq 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175hawn fuq 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175hawn fuq 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175hawn fuq 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175hawn fuq 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175hawn fuq 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175hawn fuq 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175hawn fuq 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175hawn fuq 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Prekawzjonijiet tas-Sigurtà

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, strettament skond id-dispożizzjonijiet tal-lift tal-pompa, firxa tal-fluss ta 'użu, biex jipprevjenu fluss baxx jew forza ta' ippumpjar ta 'lift għoli, il-bearing ta' l-ispinta u partijiet oħra ta 'l-ilbies, it-tagħbija żejda tal-mutur maħruqa

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introduzzjoni għall-Istruttura

Introduzzjoni qasira ta 'struttura: parti tal-pompa hija magħmula prinċipalment minn xaft tal-pompa, impeller, qoxra tad-devjazzjoni, ġarr tal-gomma, korp tal-valv tal-kontroll (partijiet mhux obbligatorji) u komponenti oħra. Il-parti tal-mutur hija magħmula prinċipalment minn bażi, film li jirregola l-pressjoni, thrust bearing, pjanċa tal-ispinta , sedil li jġorr il-gwida t'isfel, stator, rotor, sedil li jġorr il-gwida ta 'fuq, ċirku tar-ramel, sezzjoni tad-daħla tal-ilma, kejbil u komponenti oħra.


Il-karatteristiċi ewlenin tal-prodott jinkludu:

 1, Il-mutur huwa mutur asinkronu bi tliet fażijiet sommerġibbli imxarrab mimli bl-ilma, il-kavità tal-mutur hija mimlija ilma nadif, użata biex tkessaħ il-mutur u tillubrikha l-bearing, il-film li jirregola l-pressjoni fil-qiegħ tal-mutur jintuża biex jaġġusta id-differenza fil-pressjoni ta 'espansjoni u kontrazzjoni ta' l-ilma ġewwa l-ġisem ikkawżata mill-bidla taż-żieda fit-temperatura tal-mutur.

 2, Sabiex jiġi evitat li r-ramel fl-ilma tal-bir jidħol fil-mutur, it-tarf ta 'fuq tax-xaft tal-mutur huwa mgħammar b'żewġ siġilli taż-żejt, u ċirku tar-ramel huwa installat biex jifforma struttura ta' prevenzjoni tar-ramel.

 3, Sabiex tevita li x-xaft tal-pompa jibda jaħdem, ix-xaft tal-pompa u x-xaft tal-mutur huma konnessi permezz ta 'akkoppjar, u thrust bearing ta' fuq huwa installat fil-parti t'isfel tal-mutur.

 4, Il-lubrikazzjoni tal-mutur u l-bearing tal-pompa hija lubrikazzjoni tal-ilma.

 5, L-istralċ tal-istator tal-mutur huwa magħmul minn wajer tal-istralċ tal-mutur sommerġibbli ta 'kwalità għolja, b'rendiment għoli ta' insulazzjoni.

 6, Il-pompa hija ddisinjata minn CAD tal-kompjuter, bi struttura sempliċi u prestazzjoni teknika tajba.

 
Installa

(1) Tħejjija qabel l-installazzjoni:
1. Iċċekkja jekk il-pompa sommerġibbli tissodisfax il-kundizzjonijiet tal-użu u l-ambitu speċifikati fil-manwal.
2. billi tuża object tqil b'dijametru ugwali għad-dijametru massimu ta 'barra tal-pompa sommerġibbli, kejjel jekk il-inneldiameter tal-wellbore jistax joqgħod mal-pompa sommerġibbli, u kejjel jekk il-fond tal-bir jissodisfax ir-rekwiżiti tal-installazzjoni.
3. Iċċekkja jekk il-bore huwiex nadif u jekk l-ilma tal-bir huwiex imdardra. Qatt tuża pompa elettrika sommerġibbli biex taħsel it-tajn tal-pompa welor u l-ilma tar-ramel biex tevita ħsara prematura lill-pompa elettrika sommerġibbli.
4. Iċċekkja jekk il-pożizzjoni tal-morsa tal-installazzjoni tal-welhead hijiex adattata u jekk tistax tiflaħ il-kwalità tal-unità kollha
5. Iċċekkja jekk il-komponenti tal-pompa sommerġibbli humiex kompluti u installati kif suppost skont id-dijagramma tal-assemblaġġ fil-manwal Neħħi l-iskrin tal-filtru u dawwar l-akkoppjar biex tara jekk idurx b'mod flessibbli
6. Ħoll il-kamin tal-ilma u fillthe kavità tal-mutur b'ilma nadif, mhux korrużiv (nota. kun żgur li fil it up), imbagħad issikka l-kamin tal-ilma. Wara 12-il siegħa ta 'injezzjoni ta' l-ilma, ir-reżistenza ta 'insulazzjoni tal-mutur m'għandhiex tkun inqas minn 150M Q meta titkejjel b'tabella li tħawwad 500V.
7. Ġonta tal-kejbil, aqta 'kmiem tal-gomma ta' 120mm minn tarf wieħed tal-kejbil ħerġin u l-kejbil li jaqbel b'sikkina ta 'elettriċista imbagħad iħawwad it-tul tat-tliet wajers tal-qalba f'forma mtarġa, qaxxar qalba tar-ram ta' 20mm, jinbarax l-ossidu saff fuq theoutside tal-wajer tar-ram b'sikkina jew drapp tar-ramel, u daħħal iż-żewġt itruf tal-wajer konnessi f'palirs.Wara li torbot is-saff sewwa b'wajer tar-ram fin, issaldjah sewwa u sod, u ramel ta 'kwalunkwe. burrs fuq il-wiċċ. Imbagħad, għat-tliet ġonot, uża tejp ta 'insulazzjoni tal-polivester biex ikebbebhom b'mod semi stacked għal tliet lavers. Kebbeb iż-żewġt itruf tas-saff tat-tgeżwir tightywith nyion thread, u mbagħad uża metodu semi stacked biex ikebbeb it-tejp għal tliet saffi. Kebbeb is-saff ta 'barra b'tejp ta' insulazzjoni ta 'pressjoni għolja għal tliet saffi. Fl-aħħarnett, itwi t-tliet linji flimkien u ripetutament wraphom għal ħames saffi b'tejp ta 'pressjoni għolja. Kull saff għandu jkun marbut sewwa, u l-ġonot tas-saff ta 'bejn is-saffi għandhom ikunu ssikkati u fimm biex jipprevjenu li l-ilma jippenetra u jagħmel ħsara lill-insulazzjoni, Wara t-tgeżwir, xarrab fl-ilma f'temperatura tal-kamra ta' 20 'ċ għal 12-il siegħa, u kejjel ir-reżistenza tal-insulazzjoni b'tabella li tħawwad , li m'għandux ikun inqas minn 100M Ω

 

Id-dijagramma tal-proċess tal-wiring tal-kejbil mehmuża hija kif ġej:

 

8. Uża multimeter biex tivverifika jekk il-wajers bi tliet fażijiet humiex konnessi u jekk ir-reżistenza DC hijiex bejn wieħed u ieħor bilanċjata.
9. Iċċekkja jekk iċ-ċirkwit u l-kapaċità tat-transformer humiex mgħobbija żżejjed, u mbagħad qabbad is-swiċċ tal-protezzjoni ta 'tagħbija żejda jew it-tagħmir tal-bidu. Ara Tabella 2 għal mudelli speċifiċi, and thenPour barmil ilma fil-pompa tal-ilma mill-iżbokk tal-pompa tal-ilma biex tillubrikha l-berings tal-gomma fil-pompa, u mbagħad poġġi l-pompa elettrika sommerġibbli wieqfa u stabbli.Ibda (mhux aktar minn sekonda) u iċċekkja jekk id-direzzjoni ta 'l-istering hijiex konsistenti mas-sinjal ta' l-istering. Jekk le, tbiddel kwalunkwe żewġ konnetturi tal-kejbil bi tliet fażijiet. Imbagħad installa l-filtru u pprepara biex tinżel fil-bir. Jekk tintuża f'okkażjonijiet speċjali (bħal fosos, fosos, xmajjar, għadajjar, għadajjar, eċċ.), Il-pompa elettrika għandha tkun ertjata b'mod affidabbli.

 

(2) Tagħmir u għodda ta' installazzjoni:
1. Par wieħed ta 'ktajjen ta' rfigħ għal aktar minn żewġ tunnellati.
2. Tripod b'għoli vertikali ta' mhux inqas minn erba' metri.
3. Żewġ ħbula mdendlin (ħbula tal-wajer) li jistgħu jġorru piż ta 'aktar minn tunnellata (jistgħu iġorru l-piż ta' sett komplut ta 'pompi tal-ilma).
4. Installa żewġ pari ta 'klampi (splints).
5. Wrenches, imrietel, tornaviti, għodod u strumenti elettriċi, eċċ.

 

(3) Installazzjoni ta 'pompa elettrika:
1. Id-dijagramma tal-installazzjoni tal-pompa elettrika sommerġibbli hija murija fil-Figura 2. Id-dimensjonijiet tal-installazzjoni speċifiċi huma murija fit-Tabella 3 "Lista tad-Dimensjonijiet tal-Installazzjoni tal-Pompa Elettrika Sommerġibbli".

 

2. Pompi elettriċi sommerġibbli b'ras ta 'inqas minn 30 metru jistgħu jittellgħu direttament fil-bir bl-użu ta' pajpijiet u ħbula tal-wajer jew ħbula oħra tal-qanneb li jistgħu jġorru l-piż sħiħ tal-magna kollha, pajpijiet tal-ilma, u ilma fil-pajpijiet.

 

3. Pompi b'ras ta 'aktar minn 30 metru jużaw pajpijiet ta' l-azzar, u s-sekwenza ta 'installazzjoni hija kif ġej:
①Uża morsa biex tikklampja t-tarf ta 'fuq tal-parti tal-pompa ta' l-ilma (il-mutur u l-pompa ta 'l-ilma ġew imqabbda f'dan il-ħin), erfaha b'katina mdendla, u orbotha bil-mod fil-bir sakemm Poġġi l-morsa fuq ir-ras u neħħi l- katina mdendlin.
② Uża par klampi ieħor biex tikklampja pajp, erfah b'katina mdendla 15 ċm 'il bogħod mill-flanġ, u niżżlu bil-mod. Bejn il-flanġ tal-pajp u l-flanġ tal-pompa Poġġi l-kuxxinett tal-gomma f'postu u issikka l-pajp u l-pompa b'mod uniformi b'boltijiet, ġewż u woxers tar-rebbiegħa.
③ Neħħi ftit il-pompa sommerġibbli, neħħi l-morsa fuq it-tarf ta 'fuq tal-pompa ta' l-ilma, torbot il-kejbil sew mal-pajp ta 'l-ilma b'tejp tal-plastik, u orbotha bil-mod sakemm Il-morsa titqiegħed fil-bir.
④Uża l-istess metodu biex torbot il-pajpijiet tal-ilma kollha fil-bir.
⑤Wara li l-kejbil tal-ħruġ ikun imqabbad mal-iswiċċ tal-kontroll, huwa konness mal-provvista tal-enerġija bi tliet fażijiet.


(4) Affarijiet li għandek tinnota waqt l-installazzjoni:
1. Jekk jinstab fenomenu ta 'iġġammjar waqt il-proċess ta' l-ippumpjar, dawwar jew iġbed il-pajp ta 'l-ilma biex tegħleb il-punt ta' iġġamjar. Jekk il-miżuri varji għadhom ma jaħdmux, jekk jogħġbokMa jġiegħelx il-pompa 'l isfel biex tevita ħsara lill-pompa elettrika sommerġibbli u l-bir.
2. Waqt l-installazzjoni, kuxxinett tal-gomma għandu jitqiegħed fil-ħanek ta 'kull pajp u ssikkat indaqs.
3. Meta l-pompa tal-ilma titbaxxa fil-bir, għandha titqiegħed fin-nofs tal-pajp tal-bir biex tevita li l-pompa taħdem kontra l-ħajt tal-bir għal żmien twil, u tikkawża li l-pompa tivvibra u l-mutur jiknes u jinħaraq .
4. Iddetermina l-fond tal-pompa ta 'l-ilma sal-qiegħ tal-bir skond il-kundizzjonijiet ta' ramel u ħama li jirriżultaw tal-bir. Tidfenx il-pompa fit-tajn. Id-distanza mill-pompa tal-ilma sal-qiegħ tal-bir hija ġeneralment mhux inqas minn 3 metri (ara Figura 2).
5. Il-fond tad-dħul ta 'l-ilma tal-pompa ta' l-ilma m'għandux ikun inqas minn 1-1.5 metri mil-livell dinamiku ta 'l-ilma għan-nodu tad-dħul ta' l-ilma (ara l-Figura 2). Inkella, il-bearings tal-pompa tal-ilma jistgħu jiġu mħassra faċilment.
6. Il-lift tal-pompa tal-ilma ma jistax ikun baxx wisq. Inkella, valv gate jeħtieġ li jiġi installat fuq il-pipeline ta 'l-ilma tar-ras biex jikkontrolla l-fluss tal-pompa fil-punt tal-fluss nominali biex jipprevjeni li l-mutur jiġi mgħobbi żżejjed u jinħaraq minħabba rati ta' fluss kbar.
7. Meta l-pompa ta 'l-ilma tkun qed taħdem, l-output ta' l-ilma għandu jkun kontinwu u saħansitra, il-kurrent għandu jkun stabbli (taħt kundizzjonijiet tax-xogħol ratati, ġeneralment mhux aktar minn 10% tal-kurrent nominali), u m'għandux ikun hemm vibrazzjoni jew storbju. Jekk ikun hemm xi anormalità, il-magna għandha titwaqqaf biex issir taf il-kawża u teliminaha.
8. Meta tinstalla, oqgħod attent għall-issettjar tal-wajer tal-ert tal-mutur (ara l-Figura 2). Meta l-pajp ta 'l-ilma jkun pajp ta' l-azzar, wassalha mill-morsa tal-ħofor; meta l-pajp ta 'l-ilma huwa pajp tal-plastik, wassalha mill-marka ta' l-ert tal-pompa elettrika.

 

 
Manutenzjoni u Manutenzjoni
  1. 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from burning due to excessive motor current.
  4. 4. After the pump is running normally, in order to prolong its service life, it is necessary to check whether the power supply voltage, running current and insulation resistance are normal on a regular basis.If the following conditions are found, the equipment should be shut down immediately to eliminate the fault:
  5. - Under the rated working conditions, the current exceeds 20%.
  6. - The dynamic water level drops to the inlet section, resulting in intermittent drainage.
  7. - The submersible pump vibrates violently or emits noisy sounds.
  8. - The power supply voltage is lower than 340 volts.
  9. - There is a phase blown out in the fuse.
  10. - The water pipe is damaged.
  11. - The thermal insulation resistance between the motor and the ground is less than 0.5 megaohm.

 

  1. 5. Disassembly device:
  2. - Untie the cable, take off the pipe part and remove the line protection plate.
  3. - Unscrew the drain screw and exclude all water in the motor chamber.
  4. - Take out the filter and loosen the fixing screw on the coupling fixed to the motor shaft.
  5. - Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to the level of the device to prevent the bending of the pump shaft when separating).
  6. - The disassembly sequence of the pump is as follows: (see Figure 1) water inlet section, impeller, shunt shell, impeller, check valve body. When removing the impeller, use special tools to loosen the cone sleeve fixed to the impeller. In the process of disassembly, avoid bending the pump shaft and damaging various parts.
  7. - The disassembly process of the motor is as follows: (see Figure 1) place the motor on the platform, and remove the nuts, base, shaft head lock nut, thrust plate, key, lower guide bearing. seat, and tie rod bolts from the bottom of the motor in order (see Figure 1), and then take out the rotor (be careful not to damage the wiring harness) and finally take out the connector and upper guide bearing seat.
  8. - Assembly unit: before assembly, all parts should be cleaned of rust and dirt, and smear sealant on all the surfaces and fasteners, and then assemble in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then wear the filter for machine test. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Ħażna u Kustodja

 1, poġġi l-ilma fil-kavità tal-mutur (speċjalment fix-xitwa biex tevita li l-mutur jiffriża), u torbot sew il-kejbil.

 2, aħżen f'kamra ta 'ġewwa mingħajr sustanzi u gassijiet korrużivi, b'temperatura taħt l-40 °C.

 3, l-użu fit-tul għandu joqgħod attent għall-prevenzjoni tas-sadid tal-pompi sommerġibbli.

 

 
Partijiet li jilbsu
  • Impeller
  • Kmiem tax-xaft
  • Kmiem tax-xaft tal-gomma
  • Ċirku tas-siġillar

 
Xenarji ta' Applikazzjoni

01 Intake ta 'ilma fil-fond

02 Provvista ta' ilma għoli

03 provvista ta 'ilma fil-muntanji 

04 torri ilma

05 Tisqija agrikola

06 tisqija tal-ġnien

07 teħid ta 'ilma tax-xmara

08 ilma domestiku

 

Jekk inti interessat fil-prodotti tagħna, tista 'tagħżel li tħalli l-informazzjoni tiegħek hawn, u aħna ser inkunu f'kuntatt miegħek dalwaqt.


Ikteb il-messaġġ tiegħek hawn u ibgħatilna

Jekk inti interessat fil-prodotti tagħna, tista 'tagħżel li tħalli l-informazzjoni tiegħek hawn, u aħna ser inkunu f'kuntatt miegħek dalwaqt.


mtMaltese