250QJB Pompa Sommersibbli Tajjeb Fond

Iwettaq l-ipproċessar OEM! Skont ir-rekwiżiti tal-utent, id-disinn u l-manifattura ta 'diversi tipi ta' rekwiżiti speċjali ta 'mutur u pompa sommerġibbli mhux standard. L-istandards tal-implimentazzjoni tal-prodott: GB/T2816-2014 "pompa sommerġibbli sew", GB/T2818-2014 "mutur asinkroniku sommerġibbli tajjeb". WhatsApp: 17855846335
PDF DOWNLOAD
Dettalji
Tikketti
 
Ħarsa ġenerali tal-prodott

The product adopts special waterproof wire design, which can realize long-term stable conversion operation of the motor within the frequency range of 1HZ-50HZ. The frequency conversion winding design not only makes the frequency conversion deep well pump more energy saving, but also prolongs its service life. The motor winding adopts special water-resistant conductors that are resistant to high frequency impact, pulse peak voltage impact and high temperature aging, with excellent characteristics and stability.

 

 
Kundizzjonijiet ta' Użu

The product is powered by three-phase AC 380V power supply, 50HZ frequency, suitable for the environment with harsh water quality conditions. Specific requirements include water temperature below 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The product adopts closed or water immersion structure of the motor, before use to ensure that the pump is fully filled with water, no-load test run is strictly prohibited. The pump must be completely immersed in water, not more than 70m water depth, water source to meet the requirements of the pump water output and continuous operation. In addition, the well must be vertical, the pump can only be used vertically. The wiring should be supported according to the requirements, and equipped with external overload protection device. This series of requirements to ensure the efficient and stable operation of the product, suitable for all kinds of special environment of the pump demand.

 

 
Tifsira tal-Mudell

250QJB Deep Well Submersible Pump

 
Referenza tal-Mudell Parzjali
Mudell Fluss (m3/h) Kap
(m)

Rotatingspeed

(bidla/punt)

Pompa tal-ilma (%) Żbokk
dijametru
(mm)
Applikabbli sew
dijametru (mm) 
Rated
power(KW)
Rated
vultaġġ (V)
Rated
kurrenti (A)
Effiċjenza tal-mutur (%) power factorcosφ   Unità
Daqs massimu radjali (mm)
Rimarka
250QJ50-40 50 40 2875 72 80  250hawn fuq 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250hawn fuq 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250hawn fuq 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250hawn fuq 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250hawn fuq 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250hawn fuq 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250hawn fuq 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250hawn fuq 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250hawn fuq 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Prekawzjonijiet tas-Sigurtà

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, strettament skond id-dispożizzjonijiet tal-lift tal-pompa, firxa tal-fluss ta 'użu, biex jipprevjenu fluss baxx jew forza ta' ippumpjar ta 'lift għoli, il-bearing ta' l-ispinta u partijiet oħra ta 'l-ilbies, it-tagħbija żejda tal-mutur maħruqa

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introduzzjoni għall-Istruttura

The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body and so on; the motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, cable lead, etc. The main characteristic of the product is that the motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is filled with water, used to cool the motor and lubricate the bearing; the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two sand sealing rings are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand prevention structure. To prevent the pump shaft from jumping when starting up, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed on the lower part of the motor. The motor and pump bearing adopt water lubrication technology, and the stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump is designed by computer CAD, with simple structure and excellent technical performance.

250QJB Deep Well Submersible Pump

 

 
Installa

(1) Tħejjija qabel l-installazzjoni:
1. Iċċekkja jekk il-pompa sommerġibbli tissodisfax il-kundizzjonijiet tal-użu u l-ambitu speċifikati fil-manwal.
2. billi tuża object tqil b'dijametru ugwali għad-dijametru massimu ta 'barra tal-pompa sommerġibbli, kejjel jekk il-inneldiameter tal-wellbore jistax joqgħod mal-pompa sommerġibbli, u kejjel jekk il-fond tal-bir jissodisfax ir-rekwiżiti tal-installazzjoni.
3. Iċċekkja jekk il-bore huwiex nadif u jekk l-ilma tal-bir huwiex imdardra. Qatt tuża pompa elettrika sommerġibbli biex taħsel it-tajn tal-pompa welor u l-ilma tar-ramel biex tevita ħsara prematura lill-pompa elettrika sommerġibbli.
4. Iċċekkja jekk il-pożizzjoni tal-morsa tal-installazzjoni tal-welhead hijiex adattata u jekk tistax tiflaħ il-kwalità tal-unità kollha
5. Iċċekkja jekk il-komponenti tal-pompa sommerġibbli humiex kompluti u installati kif suppost skont id-dijagramma tal-assemblaġġ fil-manwal Neħħi l-iskrin tal-filtru u dawwar l-akkoppjar biex tara jekk idurx b'mod flessibbli
6. Ħoll il-kamin tal-ilma u fillthe kavità tal-mutur b'ilma nadif, mhux korrużiv (nota. kun żgur li fil it up), imbagħad issikka l-kamin tal-ilma. Wara 12-il siegħa ta 'injezzjoni ta' l-ilma, ir-reżistenza ta 'insulazzjoni tal-mutur m'għandhiex tkun inqas minn 150M Q meta titkejjel b'tabella li tħawwad 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Id-dijagramma tal-proċess tal-wiring tal-kejbil mehmuża hija kif ġej:
250QJB Deep Well Submersible Pump

 

8. Uża multimeter biex tivverifika jekk il-wajers bi tliet fażijiet humiex konnessi u jekk ir-reżistenza DC hijiex bejn wieħed u ieħor bilanċjata.
9. Iċċekkja jekk iċ-ċirkwit u l-kapaċità tat-transformer humiex mgħobbija żżejjed, u mbagħad qabbad is-swiċċ tal-protezzjoni ta 'tagħbija żejda jew it-tagħmir tal-bidu. Ara Tabella 2 għal mudelli speċifiċi, and thenPour barmil ilma fil-pompa tal-ilma mill-iżbokk tal-pompa tal-ilma biex tillubrikha l-berings tal-gomma fil-pompa, u mbagħad poġġi l-pompa elettrika sommerġibbli wieqfa u stabbli.Ibda (mhux aktar minn sekonda) u iċċekkja jekk id-direzzjoni ta 'l-istering hijiex konsistenti mas-sinjal ta' l-istering. Jekk le, tbiddel kwalunkwe żewġ konnetturi tal-kejbil bi tliet fażijiet. Imbagħad installa l-filtru u pprepara biex tinżel fil-bir. Jekk tintuża f'okkażjonijiet speċjali (bħal fosos, fosos, xmajjar, għadajjar, għadajjar, eċċ.), Il-pompa elettrika għandha tkun ertjata b'mod affidabbli.

 

(2) Tagħmir u għodda ta' installazzjoni:
1. Par wieħed ta 'ktajjen ta' rfigħ għal aktar minn żewġ tunnellati.
2. Tripod b'għoli vertikali ta' mhux inqas minn erba' metri.
3. Żewġ ħbula mdendlin (ħbula tal-wajer) li jistgħu jġorru piż ta 'aktar minn tunnellata (jistgħu iġorru l-piż ta' sett komplut ta 'pompi tal-ilma).
4. Installa żewġ pari ta 'klampi (splints).
5. Wrenches, imrietel, tornaviti, għodod u strumenti elettriċi, eċċ.

 

(3) Installazzjoni ta 'pompa elettrika:
1. Id-dijagramma tal-installazzjoni tal-pompa elettrika sommerġibbli hija murija fil-Figura 2. Id-dimensjonijiet tal-installazzjoni speċifiċi huma murija fit-Tabella 3 "Lista tad-Dimensjonijiet tal-Installazzjoni tal-Pompa Elettrika Sommerġibbli".

2. Pompi elettriċi sommerġibbli b'ras ta 'inqas minn 30 metru jistgħu jittellgħu direttament fil-bir bl-użu ta' pajpijiet u ħbula tal-wajer jew ħbula oħra tal-qanneb li jistgħu jġorru l-piż sħiħ tal-magna kollha, pajpijiet tal-ilma, u ilma fil-pajpijiet.

3. Pompi b'ras ta 'aktar minn 30 metru jużaw pajpijiet ta' l-azzar, u s-sekwenza ta 'installazzjoni hija kif ġej:
①Uża morsa biex tikklampja t-tarf ta 'fuq tal-parti tal-pompa ta' l-ilma (il-mutur u l-pompa ta 'l-ilma ġew imqabbda f'dan il-ħin), erfaha b'katina mdendla, u orbotha bil-mod fil-bir sakemm Poġġi l-morsa fuq ir-ras u neħħi l- katina mdendlin.
② Uża par klampi ieħor biex tikklampja pajp, erfah b'katina mdendla 15 ċm 'il bogħod mill-flanġ, u niżżlu bil-mod. Bejn il-flanġ tal-pajp u l-flanġ tal-pompa Poġġi l-kuxxinett tal-gomma f'postu u issikka l-pajp u l-pompa b'mod uniformi b'boltijiet, ġewż u woxers tar-rebbiegħa.
③ Neħħi ftit il-pompa sommerġibbli, neħħi l-morsa fuq it-tarf ta 'fuq tal-pompa ta' l-ilma, torbot il-kejbil sew mal-pajp ta 'l-ilma b'tejp tal-plastik, u orbotha bil-mod sakemm Il-morsa titqiegħed fil-bir.
④Uża l-istess metodu biex torbot il-pajpijiet tal-ilma kollha fil-bir.
⑤Wara li l-kejbil tal-ħruġ ikun imqabbad mal-iswiċċ tal-kontroll, huwa konness mal-provvista tal-enerġija bi tliet fażijiet.


(4) Affarijiet li għandek tinnota waqt l-installazzjoni:
1. Jekk jinstab fenomenu ta 'iġġammjar waqt il-proċess ta' l-ippumpjar, dawwar jew iġbed il-pajp ta 'l-ilma biex tegħleb il-punt ta' iġġamjar. Jekk il-miżuri varji għadhom ma jaħdmux, jekk jogħġbokMa jġiegħelx il-pompa 'l isfel biex tevita ħsara lill-pompa elettrika sommerġibbli u l-bir.
2. Waqt l-installazzjoni, kuxxinett tal-gomma għandu jitqiegħed fil-ħanek ta 'kull pajp u ssikkat indaqs.
3. Meta l-pompa tal-ilma titbaxxa fil-bir, għandha titqiegħed fin-nofs tal-pajp tal-bir biex tevita li l-pompa taħdem kontra l-ħajt tal-bir għal żmien twil, u tikkawża li l-pompa tivvibra u l-mutur jiknes u jinħaraq .
4. Iddetermina l-fond tal-pompa ta 'l-ilma sal-qiegħ tal-bir skond il-kundizzjonijiet ta' ramel u ħama li jirriżultaw tal-bir. Tidfenx il-pompa fit-tajn. Id-distanza mill-pompa tal-ilma sal-qiegħ tal-bir hija ġeneralment mhux inqas minn 3 metri (ara Figura 2).
5. Il-fond tad-dħul ta 'l-ilma tal-pompa ta' l-ilma m'għandux ikun inqas minn 1-1.5 metri mil-livell dinamiku ta 'l-ilma għan-nodu tad-dħul ta' l-ilma (ara l-Figura 2). Inkella, il-bearings tal-pompa tal-ilma jistgħu jiġu mħassra faċilment.
6. Il-lift tal-pompa tal-ilma ma jistax ikun baxx wisq. Inkella, valv gate jeħtieġ li jiġi installat fuq il-pipeline ta 'l-ilma tar-ras biex jikkontrolla l-fluss tal-pompa fil-punt tal-fluss nominali biex jipprevjeni li l-mutur jiġi mgħobbi żżejjed u jinħaraq minħabba rati ta' fluss kbar.
7. Meta l-pompa ta 'l-ilma tkun qed taħdem, l-output ta' l-ilma għandu jkun kontinwu u saħansitra, il-kurrent għandu jkun stabbli (taħt kundizzjonijiet tax-xogħol ratati, ġeneralment mhux aktar minn 10% tal-kurrent nominali), u m'għandux ikun hemm vibrazzjoni jew storbju. Jekk ikun hemm xi anormalità, il-magna għandha titwaqqaf biex issir taf il-kawża u teliminaha.
8. Meta tinstalla, oqgħod attent għall-issettjar tal-wajer tal-ert tal-mutur (ara l-Figura 2). Meta l-pajp ta 'l-ilma jkun pajp ta' l-azzar, wassalha mill-morsa tal-ħofor; meta l-pajp ta 'l-ilma huwa pajp tal-plastik, wassalha mill-marka ta' l-ert tal-pompa elettrika.

 

 
Manutenzjoni u Manutenzjoni
  • 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start 2.equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on 3.the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  • 4.After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • 5.After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  • 6.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Il-livell tal-ilma dinamiku jinżel fis-sezzjoni tad-daħla tal-ilma, u jikkawża ilma intermittenti.
  • 3 Il-pompa sommerġibbli għandha vibrazzjoni jew storbju severi.
  • 4 Il-vultaġġ tal-provvista huwa inqas minn 340 volt.
  • 5 Fjus jinħaraq.
  • 6 Il-pajp tal-provvista tal-ilma huwa bil-ħsara.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1 Untie the cable tie, remove the pipeline part, and remove the wire plate. 2 screw down the water bolt, put the water in the motor chamber.
  • 3 neħħi l-filtru, ħoll il-kamin fiss fuq l-akkoppjar biex tiffissa x-xaft tal-mutur.
  • 4 kamin il-bolt li jgħaqqad is-sezzjoni tad-daħla tal-ilma mal-mutur, u issepara l-pompa mill-mutur (oqgħod attent għall-kuxxin tal-unità meta tissepara, biex tevita l-liwja tax-xaft tal-pompa)
  • 5 is-sekwenza taż-żarmar tal-pompa hija: (ara l-figura 1) sezzjoni tad-daħla tal-ilma, impeller, qoxra tad-devjazzjoni, impeller ...... korp tal-valv tal-kontroll, meta tneħħi l-impeller, uża għodda speċjali biex tħoll il-kmiem koniku tal-fiss impeller l-ewwel, u tevita li tgħawweġ u tbenġil ix-xaft tal-pompa fil-proċess taż-żarmar.
  • 6 il-proċess taż-żarmar tal-mutur huwa: (ara l-figura 1) poġġi l-mutur fuq il-pjattaforma, u neħħi l-ġewż, bażi, ġewż tal-qfil tar-ras tax-xaft, pjanċa tal-ispinta, ċavetta, sedil li jġorr il-gwida t'isfel u bolt tar-ras doppju mill-qiegħ ta ' il-mutur min-naħa tiegħu, u mbagħad oħroġ ir-rotor (oqgħod attent li ma tagħmilx ħsara lill-pakkett tal-wajer) u fl-aħħar neħħi s-sezzjoni tal-konnessjoni u s-sedil li jġorr il-gwida ta 'fuq.
  • 7 assemblaġġ ta 'unità: qabel l-assemblaġġ, is-sadid u l-ħmieġ tal-partijiet għandhom jitnaddfu, u l-wiċċ tat-tgħammir u l-qfieli miksija b'siġillant, u mbagħad immuntati fl-ordni oppost taż-żarmar (ix-xaft tal-mutur jimxi 'l fuq u' l isfel wara l-assemblaġġ għal madwar wieħed millimetru), wara l-assemblaġġ, l-akkoppjar għandu jkun flessibbli, u mbagħad il-magna tat-test tal-iskrin tal-filtru. Pompi sommerġibbli għandhom jinħarġu mill-bir għaż-żarmar u l-manutenzjoni skond l-Artikolu 5 wara sena ta 'tħaddim, jew inqas minn sena ta' tħaddim iżda sentejn ta 'ħin ta' għadis, u l-partijiet li jintlibsu għandhom jiġu sostitwiti.

 

 
Ħażna u Kustodja

 In order to ensure the long-term use and stable performance of submersible electric pump, we have launched a convenient and practical product. The product has a unique design, easy operation, and is perfect for various application scenarios. After use, remember to discharge all the water in the electric pump, especially in winter, so as not to freeze the motor. Wind the cable and bundle it. Store it in an environment without corrosive substances and gases, and keep the temperature below 40 °C. In addition, if you do not use it for a long time, you should pay attention to prevent the submersible electric pump from rusting. Choose our products to make your work more convenient and efficient.

 

 
Partijiet li jilbsu
  • Impeller
  • Kmiem tax-xaft
  • Kmiem tax-xaft tal-gomma
  • Ċirku tas-siġillar

 
Xenarji ta' Applikazzjoni

01 Intake ta 'ilma fil-fond

02 Provvista ta' ilma għoli

03 provvista ta 'ilma fil-muntanji 

04 torri ilma

05 Tisqija agrikola

06 tisqija tal-ġnien

07 teħid ta 'ilma tax-xmara

08 ilma domestiku

 

Jekk inti interessat fil-prodotti tagħna, tista 'tagħżel li tħalli l-informazzjoni tiegħek hawn, u aħna ser inkunu f'kuntatt miegħek dalwaqt.


Ikteb il-messaġġ tiegħek hawn u ibgħatilna

Jekk inti interessat fil-prodotti tagħna, tista 'tagħżel li tħalli l-informazzjoni tiegħek hawn, u aħna ser inkunu f'kuntatt miegħek dalwaqt.


mtMaltese