Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.
1, wutar lantarki: uku-lokaci AC 380V (haƙuri +/- 5%), 50HZ (haƙuri +/- 1%).
2, ingancin ruwa:
(1) zafin ruwa bai wuce 20 ° C ba;
(2) ƙaƙƙarfan abun ciki na ƙazanta (rabo mai yawa) bai fi 0.01% ba;
(3) ƙimar PH (pH) 6.5-8.5;
(4) abun ciki na hydrogen sulfide bai fi 1.5mg/L ba;
(5) abun ciki na chloride bai wuce 400mg/L ba.
3, an rufe motar ko tsarin jika mai cike da ruwa, kafin a yi amfani da kogon motar da ke ƙarƙashin ruwa dole ne ya kasance cike da ruwa mai tsafta, don hana cikar ƙarya, sannan a ɗaure allurar ruwa, kusoshi na sakin iska, in ba haka ba ba za a bari a yi amfani da su ba.
4, dole ne a nutse cikin ruwa gaba daya, zurfin nutsewar bai wuce 70m ba, kasan famfon mai jujjuyawar daga kasan rijiyar bai wuce 3m ba.
5, Ruwan rijiyar ruwa ya kamata ya iya saduwa da fitowar ruwan famfo mai jujjuyawar ruwa da ci gaba da aiki, ya kamata a sarrafa fitar da ruwan famfo mai ruwa a cikin 0.7 - 1.2 sau da yawa.
6, Rijiyar ta zama madaidaiciya, ba za a iya amfani da famfo mai ruwa ba ko zubar da shi, amfani da shi kawai a tsaye.
7, dole ne a dace da famfo mai ruwa tare da kebul bisa ga buƙatun, da na'urar kariya ta waje. 8, an haramta famfo ba tare da na'urar gwajin ruwa ba
Samfura | Yawo (m3/h) | Shugaban (m) |
Rotating speed(change/point) | Ruwan Ruwa(%) | Fitowa diamita (mm) |
Aiwatar da kyau diamita (mm) |
An ƙididdigewa wuta (KW) |
Rated voltage(V) | Ratedcurrent(A) | Ingancin Motoci (%) | ikon factorcos | Naúrar Girman Radial Maximu (mm) |
Magana | |||||||||
125QJ5-34 | 5 | 34 | 2850 | 53 | 40 | 125a sama | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ5-51 | 51 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ5-68 | 68 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ5-85 | 85 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ5-102 | 102 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ5-119 | 119 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-24 | 10 | 24 | 2850 | 60 | 50 | 125a sama | 1.5 | 380 | 4.23 | 70.0 | 0.77 | 118 | ||||||||||
125QJ10-32 | 32 | 2.2 | 6.03 | 72.0 | 0.77 | |||||||||||||||||
125QJ10-48 | 48 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ10-56 | 56 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ10-72 | 72 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-80 | 80 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ10-104 | 104 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ10-120 | 10 | 120 | 2850 | 60 | 50 | 125a sama | 7.5 | 380 | 19.0 | 76.0 | 0.79 | 118 | ||||||||||
125QJ10-136 | 136 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ15-36 | 15 | 36 | 2850 | 63 | 50 | 125a sama | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ15-39 | 39 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ15-46 | 46 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-52 | 52 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ15-59 | 59 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-65 | 65 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ15-78 | 78 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-91 | 91 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ15-104 | 104 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ20-16 | 20 | 16 | 2850 | 64 | 50 | 125a sama | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ20-24 | 24 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ20-32 | 32 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-40 | 40 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ20-48 | 48 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-56 | 56 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ20-64 | 64 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-72 | 72 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ20-80 | 80 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ25-12 | 25 | 12 | 2850 | 64 | 65 | 125a sama | 2.2 | 380 | 6.03 | 72.0 | 0.77 | 118 | ||||||||||
125QJ25-18 | 18 | 3 | 8.01 | 73.0 | 0.78 | |||||||||||||||||
125QJ25-24 | 24 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-30 | 30 | 4 | 10.53 | 74.0 | 0.78 | |||||||||||||||||
125QJ25-36 | 36 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ25-48 | 48 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ25-60 | 60 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ32-24 | 32 | 24 | 2850 | 64 | 80 | 125a sama | 4 | 380 | 10.53 | 74.0 | 0.78 | 118 | ||||||||||
125QJ32-30 | 30 | 5.5 | 14.1 | 75.0 | 0.79 | |||||||||||||||||
125QJ32-42 | 42 | 7.5 | 19.0 | 76.0 | 0.79 | |||||||||||||||||
125QJ32-54 | 54 | 9.2 | 22.7 | 77.0 | 0.8 | |||||||||||||||||
125QJ5-240 | 5 | 240 | 2850 | 40 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ5-280 | 280 | 13 | 30.87 | |||||||||||||||||||
125QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
125QJ10-180 | 10 | 180 | 2850 | 50 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
125QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
125QJ15-120 | 15 | 120 | 2850 | 50 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
125QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
125QJ20-100 | 20 | 100 | 2850 | 50 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
125QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
125QJ25-82 | 25 | 82 | 2850 | 65 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
125QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
125QJ32-68 | 32 | 68 | 2850 | 80 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
125QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
125QJ40-46 | 40 | 46 | 2850 | 80 | 125a sama | 11 | 380 | 26.28 | 118 | |||||||||||||
125QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
125QJ40-62 | 62 | 15 | 35.62 |
The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.
Babban fasali na samfurin sun haɗa da:
1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

(1)Shiri kafin shigarwa:
1. Bincika ko famfo mai nutsewa ya dace da yanayin amfani da iyaka da aka ƙayyade a cikin littafin.
2. Yin amfani da maɗaukaki mai nauyi tare da diamita daidai da matsakaicin matsakaicin diamita na waje na famfo, auna ko inneldimeter na rijiyar zai iya dacewa da famfo mai ruwa, kuma auna ko zurfin rijiyar ya dace da bukatun shigarwa.
3. A duba ko rijiyar tana da tsafta da kuma ko ruwan rijiyar turbude ne. Kada a taɓa amfani da famfon lantarki mai nutsewa don wanke laka na welor da ruwan yashi don gujewa lalacewa da wuri ga famfon lantarki mai nisa.
4. Bincika ko matsayin mannen shigarwa na welhead ya dace kuma ko zai iya jure ingancin duka naúrar.
5. Bincika idan kayan aikin famfo na submersible sun cika kuma an shigar dasu yadda ya kamata bisa ga zanen taron da ke cikin littafin
6. Cire dunƙule ruwa kuma cika ramin motar da ruwa mai tsabta mara lalacewa (bayanin kula. Tabbatar da cika shi), sannan ƙara matse ruwan. Bayan sa'o'i 12 na allurar ruwa, juriyar juriya na motar kada ta zama ƙasa da 150M Q lokacin da aka auna tare da tebur girgiza 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.
After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Jadawalin tsarin aikin wayoyi na USB wanda aka makala shine kamar haka:
8. Yi amfani da multimeter don bincika ko an haɗa wayoyi masu hawa uku kuma ko juriyar DC ta kusan daidaita.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.
(2) Kayan aiki da kayan aiki:
1. Ɗaya daga cikin sarƙoƙi na ɗagawa don fiye da ton biyu.
2. Tafiya mai tsayi a tsaye wanda bai gaza mita hudu ba.
3. Igiyoyin rataye guda biyu ( igiyoyin waya ) waɗanda zasu iya ɗaukar nauyin fiye da ton ɗaya (za su iya ɗaukar nauyin cikakken saitin famfo na ruwa).
4. Shigar da nau'i-nau'i biyu na manne (splints).
5. Wrenches, guduma, screwdrivers, lantarki kayan aiki da kayan aiki, da dai sauransu.
(3) Shigar da famfun lantarki:
1. Shigarwa ta hanyar yin gwajin lantarki mai saukarwa an nuna shi a cikin Hoto na 2. Ana nuna takamaiman girma a cikin Table 3 "Jerin shigarwa girma na famfo mai saukarwa".
2. Za a iya ɗaga famfunan wutar lantarki da ke ƙarƙashin ƙasa da kai ƙasa da mita 30 kai tsaye a cikin rijiyar ta hanyar amfani da tudu da igiyoyin waya ko wasu igiyoyin hemp waɗanda za su iya ɗaukar cikakken nauyin injin gabaɗaya, bututun ruwa, da ruwa a cikin bututu.
3. Pumps tare da shugaban sama da mita 30 suna amfani da bututun ƙarfe, kuma tsarin shigarwa shine kamar haka:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Ɗaga fam ɗin da ke ƙarƙashin ruwa kaɗan, cire matsi a saman ƙarshen famfon na ruwa, ɗaure kebul ɗin da ƙarfi ga bututun ruwa tare da tef ɗin filastik, sannan a daure ta ƙasa har sai an sanya matsi a bakin rijiyar.
④ Yi amfani da wannan hanyar don ɗaure duk bututun ruwa a cikin rijiyar.
⑤ Bayan an haɗa kebul na gubar da aka haɗa zuwa maɓallin sarrafawa, an haɗa shi da wutar lantarki na matakai uku.
(4) Abubuwan lura yayin shigarwa:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. A lokacin shigarwa, ya kamata a sanya takalmin roba a gefen kowane bututu kuma a ɗaure shi daidai.
3. Idan aka saukar da famfon ruwa a cikin rijiyar, sai a sanya shi a tsakiyar bututun rijiyar don hana famfo yin gudu da bangon rijiyar na tsawon lokaci, wanda hakan zai sa fam ɗin ya yi rawar jiki, motar kuma ta share ta ƙone. .
4. Ƙayyade zurfin famfo na ruwa zuwa kasan rijiyar bisa ga yanayin yashi da yashi na rijiyar. Kada a binne famfo a cikin laka. Nisa daga famfon ruwa zuwa kasan rijiyar gabaɗaya bai wuce mita 3 ba (duba hoto na 2).
5. Zurfin shigar ruwa na famfo ruwa ya kamata ya zama ƙasa da mita 1-1.5 daga matakin ruwa mai ƙarfi zuwa kullin shigar ruwa (duba Hoto 2). In ba haka ba, famfo famfo na ruwa na iya lalacewa cikin sauƙi.
6. Tashin famfo na ruwa ba zai iya zama ƙasa da ƙasa ba. In ba haka ba, ana buƙatar shigar da bawul ɗin gate a kan bututun ruwa na rijiyar don sarrafa magudanar famfo a wurin da aka ƙididdige shi don hana yin lodin motar da ƙonewa saboda yawan kwararar ruwa.
7. Lokacin da famfo na ruwa ke gudana, fitar da ruwa ya kamata ya kasance mai ci gaba kuma har ma, halin yanzu ya kamata ya kasance mai ƙarfi (a karkashin yanayin aiki mai ƙima, gabaɗaya ba fiye da 10% na halin yanzu ba), kuma kada a yi rawar jiki ko amo. Idan akwai wata matsala, yakamata a dakatar da injin don gano dalilin da kuma kawar da shi.
8. Lokacin shigarwa, kula da saitin waya ta ƙasa (duba hoto 2). Lokacin da bututun ruwa ya kasance bututun ƙarfe, kai shi daga matsewar rijiyar; lokacin da bututun ruwa ya zama bututun filastik, kai shi daga alamar ƙasa na famfon lantarki.
- 1.Bayan an shigar da famfo mai jujjuyawar, duba juriya na kariya da kuma tafiyar matakai guda uku daga juyawa sake, duba ko kayan aiki da haɗin kayan aiki na farawa ba daidai ba ne, idan babu matsala, za a iya fara na'urar gwaji, da kuma lura da ko ma'auni na kayan aikin sun wuce ƙimar ƙarfin lantarki da halin yanzu da aka ƙayyade akan farantin suna bayan farawa, kuma duba ko famfo yana da amo da rawar girgiza, kuma sanya aiki idan komai ya kasance al'ada.
- 2.Bayan aikin farko na famfo na tsawon sa'o'i hudu, ya kamata a rufe motar don gwada juriya na thermal da sauri, kuma darajarta kada ta kasance ƙasa da 0.5 megaohm.
- 3.Bayan an rufe famfo, ya kamata a fara bayan mintuna biyar don hana ginshiƙin ruwa a cikin bututu daga sake cikawa gaba ɗaya kuma haifar da matsanancin motsin motsi da ƙonawa.
- 4.Bayan an saka famfo a cikin aiki na al'ada, domin ya tsawaita rayuwar sabis, ya zama dole don duba ko ƙarfin lantarki, aiki na yanzu da kuma juriya na insulation sune al'ada akai-akai. Idan an sami waɗannan sharuɗɗa masu zuwa, yakamata a rufe fam ɗin nan da nan don magance matsala.
- 1 In the rated condition, the current exceeds 20%.
- 2 Matsayin ruwa mai ƙarfi yana faɗuwa zuwa sashin shigar ruwa, yana haifar da ruwa mai tsaka-tsaki.
- 3 Famfutar da ke ƙarƙashin ruwa tana da tsananin girgiza ko amo.
- 4 Ƙarfin wutar lantarki yana ƙasa da 340 volts.
- 5 An ƙone fiusi.
- 6 Bututun samar da ruwa ya lalace.
- 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- Unit disassembly:
- 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
- 2.screw down the water bolt, put the water in the motor chamber.
- 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
- 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
- 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
- 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
- 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.
-
- impeller
- Shaft hannun riga
- Rubber shaft hannun riga
-
Zoben rufewa
01 Ruwa mai zurfi mai zurfi
02 Ruwa mai tsayi mai tsayi
03 ruwan tudu
04 Tower ruwa
05 Noma ban ruwa
06 ban ruwa na lambu
07 ruwan kogi
08 ruwan gida