300QJB Zurfin Rijiya Mai Ruwa Mai Ruwa

Yi aikin OEM! Dangane da buƙatun mai amfani, ƙira da kera nau'ikan buƙatu daban-daban na buƙatu na musamman na injin da ba daidai ba da famfo. Ka'idojin aiwatar da samfur: GB/T2816-2014 " rijiyar famfo mai ratsawa ", GB/T2818-2014 "motar da ba ta dace ba". WhatsApp: 17855846335
PDF DOWNLOAD
Cikakkun bayanai
Tags
 
Bayanin Samfura

This product adopts a variable frequency winding design, ensuring the motor's smooth conversion operation between 1HZ and 50HZ for a long time. This innovative design not only saves energy and prolongs service life, but also provides lasting and reliable performance in the work process. Whether in a home or industrial environment, this product will provide users with excellent efficiency and reliability, making it an indispensable tool in the manufacturing and production process.

 

Sharuɗɗan Amfani

1, wutar lantarki: uku-lokaci AC 380V (haƙuri +/- 5%), 50HZ (haƙuri +/- 1%).

2, ingancin ruwa:

(1) water temperature is not higher than 20 °C;

(2) ƙaƙƙarfan abun ciki na ƙazanta (rabo mai yawa) bai fi 0.01% ba;

(3) ƙimar PH (pH) 6.5-8.5;

(4) abun ciki na hydrogen sulfide bai fi 1.5mg/L ba;

(5) abun ciki na chloride bai wuce 400mg/L ba.

3, an rufe motar ko tsarin jika mai cike da ruwa, kafin a yi amfani da kogon motar da ke ƙarƙashin ruwa dole ne ya kasance cike da ruwa mai tsafta, don hana cikar ƙarya, sannan a ɗaure allurar ruwa, kusoshi na sakin iska, in ba haka ba ba za a bari a yi amfani da su ba.

4, submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m. 5, the well water flow should be able to meet the submersible pump water output and continuous operation, the submersible pump water output should be controlled at 0.7 - 1.2 times the rated flow.

6, Rijiyar ta zama madaidaiciya, ba za a iya amfani da famfo mai ruwa ba ko zubar da shi, amfani da shi kawai a tsaye.

7, dole ne a daidaita famfo mai ruwa tare da kebul bisa ga buƙatun, da na'urar kariya ta wuce gona da iri.

8, an haramta famfo ba tare da na'urar gwajin ruwa ba

 

 
Ma'anar Samfura

300QJB Deep Well Submersible Pump

 
Bayanin Samfurin Bangaren
Samfura Yawo (m3/h) Shugaban
(m)

Saurin juyawa

(canji/maki)

Ruwan Ruwa(%)  Fitowa
diamita
(mm)
Aiwatar da kyau
diamita (mm) 
 An ƙididdigewa
power(KW)
An ƙididdigewa
irin ƙarfin lantarki (V)
An ƙididdigewa
halin yanzu (A)
Ingancin Motoci (%) power factorcosφ   Naúrar
Girman Radial Maximu (mm)
Magana
300QJ200-40 200 40 2900 76 150  300a sama 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300a sama 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Kariyar Tsaro

 This well submersible pump is a pump suitable for clean water. It is strictly prohibited to dig new wells and pump dirty water containing sediment. The voltage grade of the pump is 380/50HZ, and other submersible motors with different voltage grades need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution boxes, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, dephase protection, undervoltage protection, grounding protection and idling protection, etc., in order to prevent timely tripping when abnormal conditions occur. During the installation and use process, the pump must have reliable grounding. It is strictly prohibited to push and pull the switch when your hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. An obvious sign "anti-electric shock" must be set up where the pump is used. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water, and the water inlet and outlet bolts must be tightened. When testing the pump on the ground, water must be filled into the pump chamber to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the steering is correct. Pay attention to safety when the pump is upright to prevent toppling and injury. Strictly in accordance with the provisions of the pump lift and flow range, to prevent the pump with a large flow at low lift or produce a large pull at high lift, resulting in extreme wear of thrust bearings and other parts, the motor overload and burn. After the pump into the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ. After starting, regularly observe the voltage and current, and check whether the motor winding insulation meets the requirements; if the pump storage temperature below freezing point, should be drained to prevent the water in the motor cavity from freezing and cause the motor damage due to low temperature.

 

 
Gabatarwa ga Tsarin

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components.


Babban fasali na samfurin sun haɗa da:

  1. 1.The motor is a water-filled wet submersible three-phase asynchronous motor. The motor cavity is filled with clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water in the body caused by the temperature rise of the motor.
  2. 2. In order to prevent the sand particles from entering the motor, two sand seals are installed at the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed at the bottom of the motor.
  4. 4. The lubrication method of the motor and the pump bearing is water lubrication.
  5. 5. The stator winding of the motor adopts high quality submersible motor winding wire with high insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
300QJB Deep Well Submersible Pump
 
Shigar

(1)Shiri kafin shigarwa:
1. Bincika ko famfo mai nutsewa ya dace da yanayin amfani da iyaka da aka ƙayyade a cikin littafin.
2. Yin amfani da maɗaukaki mai nauyi tare da diamita daidai da matsakaicin matsakaicin diamita na waje na famfo, auna ko inneldimeter na rijiyar zai iya dacewa da famfo mai ruwa, kuma auna ko zurfin rijiyar ya dace da bukatun shigarwa.
3. A duba ko rijiyar tana da tsafta da kuma ko ruwan rijiyar turbude ne. Kada a taɓa amfani da famfon lantarki mai nutsewa don wanke laka na welor da ruwan yashi don gujewa lalacewa da wuri ga famfon lantarki mai nisa.
4. Bincika ko matsayin mannen shigarwa na welhead ya dace kuma ko zai iya jure ingancin duka naúrar.
5. Bincika idan kayan aikin famfo na submersible sun cika kuma an shigar dasu yadda ya kamata bisa ga zanen taron da ke cikin littafin
6. Cire dunƙule ruwa kuma cika ramin motar da ruwa mai tsabta mara lalacewa (bayanin kula. Tabbatar da cika shi), sannan ƙara matse ruwan. Bayan sa'o'i 12 na allurar ruwa, juriyar juriya na motar kada ta zama ƙasa da 150M Q lokacin da aka auna tare da tebur girgiza 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Jadawalin tsarin aikin wayoyi na USB wanda aka makala shine kamar haka:
300QJB Deep Well Submersible Pump

 

8. Yi amfani da multimeter don bincika ko an haɗa wayoyi masu hawa uku kuma ko juriyar DC ta kusan daidaita.
9. Bincika ko ikon kewayawa da na'ura mai canzawa sun yi yawa, sa'an nan kuma haɗa maɓallin kariya daga overload ko kayan farawa. Dubi Table 2 don takamaiman samfura, sa'an nan kuma Zuba guga na ruwa a cikin famfo na ruwa daga tashar famfo na ruwa don sa mai da igiya na roba a cikin famfo, sa'an nan kuma sanya famfo na lantarki da ke karkashin ruwa a tsaye kuma a tsaye. Fara (ba fiye da dakika ɗaya ba) kuma duba ko jagoran tuƙi ya yi daidai da alamar tuƙi. Idan ba haka ba, musanya kowane haɗe-haɗe biyu na kebul na zamani uku. Sannan shigar da tacewa kuma shirya don gangara rijiyar. Idan aka yi amfani da shi a lokuta na musamman (kamar ramuka, ramuka, koguna, tafkuna, tafkuna, da sauransu), famfon lantarki dole ne ya zama ƙasa da dogaro.

 

(2) Kayan aiki da kayan aiki:
1. Ɗaya daga cikin sarƙoƙi na ɗagawa don fiye da ton biyu.
2. Tafiya mai tsayi a tsaye wanda bai gaza mita hudu ba.
3. Igiyoyin rataye guda biyu ( igiyoyin waya ) waɗanda zasu iya ɗaukar nauyin fiye da ton ɗaya (za su iya ɗaukar nauyin cikakken saitin famfo na ruwa).
4. Shigar da nau'i-nau'i biyu na manne (splints).
5. Wrenches, guduma, screwdrivers, lantarki kayan aiki da kayan aiki, da dai sauransu.

 

(3) Shigar da famfun lantarki:
1. Shigarwa ta hanyar yin gwajin lantarki mai saukarwa an nuna shi a cikin Hoto na 2. Ana nuna takamaiman girma a cikin Table 3 "Jerin shigarwa girma na famfo mai saukarwa".

 

2. Za a iya ɗaga famfunan wutar lantarki da ke ƙarƙashin ƙasa da kai ƙasa da mita 30 kai tsaye a cikin rijiyar ta hanyar amfani da tudu da igiyoyin waya ko wasu igiyoyin hemp waɗanda za su iya ɗaukar cikakken nauyin injin gabaɗaya, bututun ruwa, da ruwa a cikin bututu.

 

3. Pumps tare da shugaban sama da mita 30 suna amfani da bututun ƙarfe, kuma tsarin shigarwa shine kamar haka:
①A yi amfani da matsi don matse ƙarshen ɓangaren fanfo na ruwa (motar da famfon ɗin an haɗa su a wannan lokacin), ɗaga shi da sarƙar rataye, a hankali daure shi a cikin rijiyar har sai a daka matsi a kan rijiyar a cire. sarkar rataye.
② Yi amfani da wani nau'i na manne guda biyu don matsa bututu, ɗaga shi tare da sarƙar rataye 15 cm daga flange, kuma rage shi a hankali. Tsakanin flange na bututu da famfo flange Saka robar kushin a wurin da kuma matsawa bututun da famfo daidai da kusoshi, goro da masu wankin bazara.
③ Ɗaga fam ɗin da ke ƙarƙashin ruwa kaɗan, cire matsi a saman ƙarshen famfon na ruwa, ɗaure kebul ɗin da ƙarfi ga bututun ruwa tare da tef ɗin filastik, sannan a daure ta ƙasa har sai an sanya matsi a bakin rijiyar.
④ Yi amfani da wannan hanyar don ɗaure duk bututun ruwa a cikin rijiyar.
⑤ Bayan an haɗa kebul na gubar da aka haɗa zuwa maɓallin sarrafawa, an haɗa shi da wutar lantarki na matakai uku.


(4) Abubuwan lura yayin shigarwa:
1. Idan an sami wani abin damuwa yayin aikin famfo, juya ko ja bututun ruwa don shawo kan matsewar. Idan har yanzu matakai daban-daban ba su yi aiki ba, don Allah kar a tilasta famfo ƙasa don guje wa lalacewa ga famfon lantarki da ke ƙarƙashin ruwa da rijiyar.
2. A lokacin shigarwa, ya kamata a sanya takalmin roba a gefen kowane bututu kuma a ɗaure shi daidai.
3. Idan aka saukar da famfon ruwa a cikin rijiyar, sai a sanya shi a tsakiyar bututun rijiyar don hana famfo yin gudu da bangon rijiyar na tsawon lokaci, wanda hakan zai sa fam ɗin ya yi rawar jiki, motar kuma ta share ta ƙone. .
4. Ƙayyade zurfin famfo na ruwa zuwa kasan rijiyar bisa ga yanayin yashi da yashi na rijiyar. Kada a binne famfo a cikin laka. Nisa daga famfon ruwa zuwa kasan rijiyar gabaɗaya bai wuce mita 3 ba (duba hoto na 2).
5. Zurfin shigar ruwa na famfo ruwa ya kamata ya zama ƙasa da mita 1-1.5 daga matakin ruwa mai ƙarfi zuwa kullin shigar ruwa (duba Hoto 2). In ba haka ba, famfo famfo na ruwa na iya lalacewa cikin sauƙi.
6. Tashin famfo na ruwa ba zai iya zama ƙasa da ƙasa ba. In ba haka ba, ana buƙatar shigar da bawul ɗin gate a kan bututun ruwa na rijiyar don sarrafa magudanar famfo a wurin da aka ƙididdige shi don hana yin lodin motar da ƙonewa saboda yawan kwararar ruwa.
7. Lokacin da famfo na ruwa ke gudana, fitar da ruwa ya kamata ya kasance mai ci gaba kuma har ma, halin yanzu ya kamata ya kasance mai ƙarfi (a karkashin yanayin aiki mai ƙima, gabaɗaya ba fiye da 10% na halin yanzu ba), kuma kada a yi rawar jiki ko amo. Idan akwai wata matsala, yakamata a dakatar da injin don gano dalilin da kuma kawar da shi.
8. Lokacin shigarwa, kula da saitin waya ta ƙasa (duba hoto 2). Lokacin da bututun ruwa ya kasance bututun ƙarfe, kai shi daga matsewar rijiyar; lokacin da bututun ruwa ya zama bututun filastik, kai shi daga alamar ƙasa na famfon lantarki.

 

 
Kulawa da Kulawa
  • 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  • 2. After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • 3. After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  •  
  • 4.After the pump is running normally, in order to prolong its service life, it is necessary to check the power supply voltage, running current and insulation resistance regularly to see if they are normal.If the following conditions are found, the equipment should be shut down immediately to troubleshoot.
  • (1)Under the rated working conditions, the current exceeds 20% of the rated value.
  • (2)The dynamic water level drops to the inlet part, resulting in intermittent water discharge.
  • (3)The submersible pump vibrates violently or emits noisy noise.
  • (4)The power supply voltage is lower than 340 volts.
  • (5)A fuse is burned out.
  • (6)The water pipe is damaged.
  • (7)The thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
  • These inspections will help to ensure the normal operation of the pump, improve its reliability and stability, so as to ensure its durability and service life.
  •  
  • 5.unit disassembly:
  • - untie cable rope, remove the pipeline part, remove the wire plate.
  • - dunƙule ƙullin ruwa, sanya ruwan a cikin ɗakin motar.
  • - remove the filter, loose the fixed screw on the coupling fixed motor shaft.
  • - screw down the bolt connected with the motor at the inlet junction, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)
  • - pump disassembly sequence is: (see figure 1) inlet junction, impeller, guide housing, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.
  • - motor disassembly process is: (see figure 1) place the motor on the platform, remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn, then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • - unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.
  •  
  • 6.The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Adana da Kulawa

 1, fitar da ruwa a cikin rami na motar (musamman a lokacin hunturu don hana motar daga daskarewa), kuma daure kebul ɗin da kyau.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, dogon lokacin amfani ya kamata kula da tsatsa rigakafin submersible farashinsa.

 

 
Saka Sashe
  • impeller
  • Shaft hannun riga
  • Rubber shaft hannun riga
  • Zoben rufewa

 
Yanayin aikace-aikace

01 Ruwa mai zurfi mai zurfi

02 Ruwa mai tsayi mai tsayi

03 ruwan tudu 

04 Tower ruwa

05 Noma ban ruwa

06 ban ruwa na lambu

07 ruwan kogi

08 ruwan gida

 

Idan kuna sha'awar samfuranmu, zaku iya zaɓar barin bayanin ku anan, kuma za mu tuntube ku nan ba da jimawa ba.


Ku rubuta sakonku anan ku aiko mana

Idan kuna sha'awar samfuranmu, zaku iya zaɓar barin bayanin ku anan, kuma za mu tuntube ku nan ba da jimawa ba.


haHausa