125QJB Deep Well Submersible Pump

Antreprann pwosesis OEM! Dapre kondisyon itilizatè, konsepsyon ak fabrikasyon divès kalite kondisyon espesyal nan motè ki pa estanda submersible ak ponp. Estanda aplikasyon pwodwi yo: GB/T2816-2014 "byen submersible ponp", GB/T2818-2014 "byen submersible asynchrone motè". WhatsApp: 17855846335
PDF DOWNLOAD
Detay yo
Tags
 
Apèsi sou pwodwi a

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Kondisyon pou itilize

1, ekipman pou pouvwa: twa-faz AC 380V (tolerans + / - 5%), 50HZ (tolerans + / - 1%).

2, bon jan kalite dlo:

(1) tanperati dlo a pa pi wo pase 20 °C;

(2) kontni enpurte solid (rapò mas) pa pi gran pase 0.01%;

(3) valè PH (pH) 6.5-8.5;

(4) kontni ilfid idwojèn pa pi gran pase 1.5mg/L;

(5) kontni ion klori pa pi gran pase 400mg/L.

3, motè a fèmen oswa dlo-plen estrikti mouye, anvan ou itilize kavite nan motè submersible dwe plen ak dlo pwòp, yo anpeche fo plen, ak Lè sa a, sere boulon piki dlo a, boulon lage lè, otreman pa pèmèt yo sèvi ak

4, ponp submersible dwe konplètman submerged nan dlo a, pwofondè plonje a pa pi gran pase 70m, anba a nan ponp lan submersible soti nan anba a nan pi a se pa mwens pase 3m.

5, koule dlo a byen ta dwe kapab satisfè pwodiksyon dlo ponp submersible ak operasyon kontinyèl, pwodiksyon dlo ponp submersible yo ta dwe kontwole nan 0.7 - 1.2 fwa koule rated la.

6, pi a ta dwe dwat, ponp lan submersible pa ka itilize oswa jete, sèlman itilize vètikal.

7, ponp lan submersible dwe matche ak kab la selon kondisyon yo, ak aparèy la ekstèn pwoteksyon surcharge. 8, se ponp lan entèdi san yo pa machin tès dlo san chaj

 

 
Modèl siyifikasyon

 
Referans Modèl Pasyèl
Modèl Koule (m3/h)  Tèt
(m)
 Rotating speed(change/point)  Ponp dlo (%)  Debouche
dyamèt
(mm)
Aplikab byen
dyamèt (mm) 
Rated
pouvwa (KW)
Rated voltage(V) Ratedcurrent(A)  Efikasite motè (%)  pouvwa faktècosφ  Inite
Gwosè maksimòm radial (mm)
Remak
125QJ5-34 5 34 2850 53 40  125pi wo a 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125pi wo a 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125pi wo a 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125pi wo a 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125pi wo a 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125pi wo a 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125pi wo a 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125pi wo a 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125pi wo a 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125pi wo a 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125pi wo a 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125pi wo a 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125pi wo a 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125pi wo a 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Prekosyon sekirite

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Entwodiksyon nan Estrikti
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Karakteristik prensipal yo nan pwodwi a gen ladan:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

 

 
Enstale

(1) Preparasyon anvan enstalasyon:
1. Tcheke si ponp lan submersible satisfè kondisyon itilizasyon yo ak dimansyon ki espesifye nan manyèl la.
2. Sèvi ak yon objè lou ki gen yon dyamèt ki egal a maksimòm dyamèt ekstèn ponp submersible a, mezire si wi ou non dyamèt inelbore a ka anfòm ponp submersible a, epi mezire si pwofondè pi a satisfè kondisyon enstalasyon yo.

3. Tcheke si twou a pwòp epi si dlo a twoub. Pa janm sèvi ak yon ponp elektrik submersible pou lave welor ponp labou ak dlo sab pou evite domaj twò bonè nan ponp elektrik submersible a.

4. Tcheke si pozisyon nan kranpon enstalasyon welhead la apwopriye epi si li ka kenbe tèt ak kalite a nan tout inite a.

5. Tcheke si konpozan ponp submersible yo konplè epi yo enstale byen dapre dyagram asanble a nan manyèl la Retire ekran filtre a epi vire kouple a pou wè si li vire fleksib.

6. Devise vis dlo a ak fillthe motè kavite ak dlo pwòp, ki pa korozivite (nòt. asire w ke ou fil li moute), Lè sa a, sere boulon waterscrew la. Apre 12 èdtan nan piki dlo, rezistans izolasyon motè a pa ta dwe mwens pase 150M Q lè yo mezire ak yon tab tranbleman 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Dyagram pwosesis fil elektrik kab atache a se jan sa a:

8. Sèvi ak yon miltimèt pou tcheke si wi ou non fil twa-faz yo konekte epi si rezistans DC a apeprè ekilibre.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Enstalasyon ekipman ak zouti:
1. Yon pè chenn leve pou plis pase de tòn.
2. Yon trépied ak yon wotè vètikal pa mwens pase kat mèt.
3. De kòd pandye (kòd fil) ki ka pote yon pwa ki gen plis pase yon tòn (ka pote pwa a nan yon seri konplè ponp dlo).
4. Enstale de pè kranpon (atèl).
5. Kle, mato, tournevis, zouti elektrik ak enstriman, elatriye.

 

(3) Enstalasyon ponp elektrik:
1. Dyagram enstalasyon ponp elektrik submersible a montre nan Figi 2. Dimansyon enstalasyon espesifik yo montre nan Tablo 3 "Lis Dimansyon Enstalasyon ponp elektrik Submersible a".


2. Ponp elektrik submersible ak yon tèt mwens pase 30 mèt ka leve dirèkteman nan pi a lè l sèvi avèk kawotchou ak kòd fil oswa lòt kòd chanv ki ka pote pwa a plen nan machin nan tout antye, tiyo dlo, ak dlo nan tiyo yo.

3. Ponp ak yon tèt ki gen plis pase 30 mèt itilize tiyo asye, ak sekans enstalasyon an se jan sa a:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Leve ponp submersible a yon ti kras, retire kranpon an sou pwent anwo ponp dlo a, mare kab la byen fèm nan tiyo dlo a ak yon kasèt plastik, epi tou dousman mare li desann jiskaske kranpon an mete nan tèt pi a.
④Sèvi ak menm metòd pou mare tout tiyo dlo nan pi a.
⑤Apre kab plon an konekte ak switch kontwòl la, li konekte ak ekipman pou pouvwa twa faz la.

 

(4) Bagay ou dwe sonje pandan enstalasyon:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Pandan enstalasyon, yo ta dwe mete yon pad kawotchou nan bride chak tiyo epi sere boulon respire.
3. Lè ponp dlo a bese nan pi a, li ta dwe mete l nan mitan tiyo a pou anpeche ponp lan kouri kont miray la byen pou yon tan long, sa ki lakòz ponp lan vibre ak motè a bale ak boule. .
4. Detèmine pwofondè ponp dlo a nan fon pi a dapre sab koule ak kondisyon limon nan pi a. Pa antere ponp lan nan labou. Distans ki soti nan ponp dlo a nan anba a nan pi a se jeneralman pa mwens pase 3 mèt (gade Figi 2).
5. Pwofondè dlo a antre nan ponp dlo a ta dwe pa mwens pase 1-1.5 mèt soti nan nivo dlo dinamik nan ne inlet dlo a (gade Figi 2). Sinon, bi ponp dlo yo ka fasil domaje.
6. Leve ponp dlo a pa ka twò ba. Sinon, yon tiyo pòtay bezwen yo dwe enstale sou tiyo dlo a pou kontwole koule ponp lan nan pwen an koule rated pou anpeche motè a twò chaje ak boule akòz gwo pousantaj koule.
7. Lè ponp dlo a ap kouri, pwodiksyon dlo a ta dwe kontinyèl e menm, aktyèl la ta dwe estab (anba kondisyon travay rated, jeneralman pa plis pase 10% aktyèl la nominal), epi pa ta dwe gen okenn vibrasyon oswa bri. Si gen nenpòt anòmal, yo ta dwe sispann machin nan pou chèche konnen kòz la epi elimine li.
8. Lè w ap enstale, peye atansyon sou anviwònman fil motè a (gade Figi 2). Lè tiyo dlo a se yon tiyo asye, mennen li soti nan kranpon nan wellhead; lè tiyo dlo a se yon tiyo plastik, mennen li soti nan mak baz la nan ponp elektrik la.

 

 
Antretyen ak Antretyen
  • 1.Apre ponp lan submersible enstale, tcheke rezistans nan izolasyon ak kondiksyon twa-faz soti nan switch la ankò, tcheke si enstriman an ak koneksyon an nan ekipman an kòmanse yo mal, si pa gen okenn pwoblèm, machin nan jijman ka kòmanse, epi obsève si lekti endikatè enstriman an depase vòltaj nominal ak aktyèl espesifye sou plak la apre kòmansman an, epi obsève si ponp lan gen bri ak fenomèn Vibration, epi mete an fonksyon si tout bagay nòmal.
  • 2.Apre operasyon an premye nan ponp lan pou kat èdtan, motè a ta dwe fèmen pou teste rezistans nan izolasyon tèmik byen vit, ak valè li yo pa ta dwe mwens pase 0.5 megaohm.
  • 3.Apre ponp lan fèmen, li ta dwe kòmanse apre senk minit pou anpeche kolòn dlo a nan tiyo a te konplètman reflowed ak sa ki lakòz twòp aktyèl motè ak boule.
  • 4.Apre yo mete ponp lan nan operasyon nòmal, yo nan lòd yo pwolonje lavi sèvis li yo, li nesesè yo tcheke si vòltaj la ekipman pou, aktyèl k ap travay ak rezistans izolasyon yo nòmal regilyèman. Si yo jwenn kondisyon sa yo, ponp lan ta dwe fèmen imedyatman pou rezoud pwoblèm.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Nivo dlo dinamik desann nan seksyon inlet dlo a, sa ki lakòz dlo tanzantan.
  • 3 Ponp submersible a gen gwo Vibwasyon oswa bri.
  • 4 Vòltaj ekipman an pi ba pase 340 vòlt.
  • 5 Yon fuzib boule.
  • 6 Tiyo rezèv dlo a domaje.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Depo ak Gad

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Mete Pati
    • Impeller
    • Manch manch arbr
    • Kawotchou manch manch arbr
    •  Bag sele

 
Senaryo aplikasyon

01 Konsomasyon dlo byen fon

02 Pwovizyon dlo ki wo

03 rezèv dlo mòn 

04 gwo kay won dlo

05 Irigasyon agrikòl

06 irigasyon jaden

07 konsomasyon dlo rivyè

08 dlo domestik

 

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


Ekri mesaj ou la a epi voye l ba nou

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


htHaitian Creole