200QJ Deep Well Submersible Ponp

Antreprann pwosesis OEM! Dapre kondisyon itilizatè, konsepsyon ak fabrikasyon divès kalite kondisyon espesyal nan motè ki pa estanda submersible ak ponp. Estanda aplikasyon pwodwi yo: GB/T2816-2014 "byen submersible ponp", GB/T2818-2014 "byen submersible asynchrone motè". WhatsApp: 17855846335
PDF DOWNLOAD
Detay yo
Tags
 
Apèsi sou pwodwi a

QJ series submersible pump is a kind of water lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small use area, compact structure, easy installation, easy maintenance and repair. Widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage and industrial and mining enterprises, drought relief and flood drainage and other fields. Flow range of 5-500m3/h, lift of 4-800m, power 3-315KW. The QJ series submersible pump has stable and reliable performance, suitable for various needs of pump applications.

 
Kondisyon pou itilize

1, ekipman pou pouvwa: twa-faz AC 380V (tolerans + / - 5%), 50HZ (tolerans + / - 1%).

2, bon jan kalite dlo:

(1) tanperati dlo a pa pi wo pase 20 °C;

(2) kontni enpurte solid (rapò mas) pa pi gran pase 0.01%;

(3) valè PH (pH) 6.5-8.5;

(4) kontni ilfid idwojèn pa pi gran pase 1.5mg/L;

(5) kontni ion klori pa pi gran pase 400mg/L.

3, the motor is closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use.

4, ponp submersible dwe konplètman submerged nan dlo a, pwofondè plonje a pa pi gran pase 70m, anba a nan ponp lan submersible soti nan anba a nan pi a se pa mwens pase 3m.

5, koule dlo a byen ta dwe kapab satisfè pwodiksyon dlo ponp submersible ak operasyon kontinyèl, pwodiksyon dlo ponp submersible yo ta dwe kontwole nan 0.7 - 1.2 fwa koule rated la.

6, pi a ta dwe dwat, ponp lan submersible pa ka itilize oswa jete, sèlman itilize vètikal.

7, ponp lan submersible dwe matche ak kab la selon kondisyon yo, ak aparèy la ekstèn pwoteksyon surcharge.

8, the pump is strictly prohibited without water no-load test machine.

 

 
Modèl siyifikasyon

 
Referans Modèl Pasyèl
Modèl Koule (m3/h) Tèt
(m)

Vitès wotasyon

(chanje/pwen)

Ponp dlo (%)  Debouche
dyamèt
(mm)
Aplikab byen
dyamèt (mm) 
 Rated
power(KW)
Rated
vòltaj (V)
Rated
aktyèl (A)
Efikasite motè (%) pouvwa faktècosφ   Inite
Gwosè maksimòm radial (mm)
Remak
200QJ20-40 20 40 2850 66 50  200pi wo a 4 380 10.1 76.0 0.79 184  
200QJ20-54 54 5.5 13.6 77.0 0.8  
200QJ20-81 81 7.5 18.0 78.0 0.81  
200QJ20-93 93 9.2 21.7 78.5 0.82  
200QJ20-108 108 11 25.8 79.0 0.82  
200QJ20-121 121 13 29.8 80.0 0.83  
200QJ20-148 148 15 33.9 81.0 0.83  
200QJ20-175 175 18.5 41.6 81.5 0.83  
200QJ20-202 202 22 48.2 82.5 0.84  
200QJ20-243 243 25 54.5 83.0 0.84  
200QJ20-270 270 30 65.4 83.0 0.84  
200QJ20-360 360 37 79.7 84.0 0.84  
200QJ20-442 442 45 96.9 84.0 0.84  
200QJ25-28 25 28 2850 68 65  200pi wo a 4 380 10.1 76.0 0.79 184  
200QJ25-42 42 5.5 13.6 77.0 0.8  
200QJ25-56 56 7.5 18.0 78.0 0.81  
200QJ25-70 70 9.2 21.7 78.5 0.82  
200QJ25-98 98 11 25.8 79.0 0.82  
200QJ25-112 25 112 2850 68 65  200pi wo a 13 380 29.8 80.0 0.83 184  
200QJ25-126 126 15 33.9 81.0 0.83  
200QJ25-154 154 18.5 41.6 81.5 0.83  
200QJ25-182 182 22 48.2 82.5 0.84  
200QJ25-210 210 25 54.5 83.0 0.84  
200QJ25-252 252 30 65.4 83.0 0.84  
200QJ25-308 308 37 79.7 84.0 0.84  
200QJ25-378 378 45 96.9 84.0 0.84  
200QJ32-26 32 26 2850 70 80  200pi wo a 4 380 10.1 76.0 0.79 184  
200QJ32-39 39 5.5 13.6 77.0 0.8  
200QJ32-52 52 7.5 18.0 78.0 0.81  
200QJ32-65 65 9.2 21.7 78.5 0.82  
200QJ32-78 78 11 25.8 79.0 0.82  
200QJ32-91 91 13 29.8 80.0 0.83  
200QJ32-104 104 15 33.9 81.0 0.83  
200QJ32-130 130 18.5 41.6 81.5 0.83  
200QJ32-143 143 22 48.2 82.5 0.84  
200QJ32-169 169 25 54.5 83.0 0.84  
200QJ32-195 195 30 65.4 83.0 0.84  
200QJ32-247 247 37 79.7 84.0 0.84  
200QJ32-299 299 45 96.9 84.0 0.84  
200QJ40-26 40 26 2850 72 80  200pi wo a 5.5 380 13.6 77.0 0.8 184  
200QJ40-39 39 7.5 18.0 78.0 0.81  
200QJ40-52 52 9.2 21.7 78.5 0.82  
200QJ40-65 65 11 25.8 79.0 0.82  
200QJ40-78 78 15 33.9 81.0 0.83  
200QJ40-104 104 18.5 41.6 81.5 0.83  
200QJ40-117 117 22 48.2 82.5 0.84  
200QJ40-143 143 25 54.5 83.0 0.84  
200QJ40-169 169 30 65.4 83.0 0.84  
200QJ40-208 208 37 79.7 84.0 0.84  
200QJ40-247 247 45 96.9 84.0 0.84  
200QJ50-26 50 26 2850 74 80  200pi wo a 5.5 380 13.6 77.0 0.8 184  
200QJ50-39 39 9.2 21.7 78.5 0.82  
200QJ50-52 52 11 25.8 79.0 0.82  
200QJ50-65 65 15 33.9 81.0 0.83  
200QJ50-78 78 18.5 41.6 81.5 0.83  
200QJ50-91 91 22 48.2 82.5 0.84  
200QJ50-104 104 25 54.5 83.0 0.84  
200QJ50-130 130 30 65.4 83.0 0.84  
200QJ50-156 156 37 79.7 84.0 0.84  
200QJ50-208 208 45 96.9 84.0 0.84  
200QJ63-24 63 24 2850 74 80  200pi wo a 7.5 380 18.0 78.0 0.81 184  
200QJ63-36 36 11 25.8 79.0 0.82  
200QJ63-60 60 18.5 41.6 81.5 0.83  
200QJ63-72 72 22 48.2 82.5 0.84  
200QJ63-84 84 25 54.5 83.0 0.84  
200QJ63-96 96 30 65.4 83.0 0.84  
200QJ63-120 120 37 79.7 84.0 0.84  
200QJ63-144 144 45 96.9 84.0 0.84  
200QJ80-22 80 22 2850 75 100  200pi wo a 7.5 380 18.0 78.0 0.81 184  
200QJ80-33 33 11 25.8 79.0 0.82  
200QJ80-44 44 15 33.9 81.0 0.83  
200QJ80-55 55 18.5 41.6 81.5 0.83  
200QJ80-66 66 22 48.2 82.5 0.84  
200QJ80-88 88 30 65.4 83.0 0.84  
200QJ80-99 99 37 79.7 84.0 0.84  
200QJ80-121 121 45 96.9 84.0 0.84  
200QJ100-18 100 18 2850 75 100  200pi wo a 9.2 380 21.7 78.5 0.82 184  
200QJ100-27 27 13 29.8 80.0 0.83  
200QJ100-36 36 18.5 41.6 81.5 0.83  
200QJ100-45 45 22 48.2 82.5 0.84  
200QJ100-54 54 25 54.5 83.0 0.84  
200QJ100-63 63 30 65.4 83.0 0.84  
200QJ100-72 100 72 2850 75 100  200pi wo a 37 380 79.7 84.0 0.84 184  
200QJ100-90 90 45 96.9 84.0 0.84  

 

 

 
Prekosyon sekirite

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, estrikteman dapre dispozisyon ki nan leve ponp lan, ranje koule nan itilize, yo anpeche koule ki ba oswa segondè leve ponpe fòs, poussée portant la ak lòt pati nan mete a, surcharge motè a boule 6, apre ponp lan desann pi a, mezi a nan motè a nan rezistans nan izolasyon tè pa ta dwe mwens pase 100M, apre yo fin kòmanse a obsève vòltaj la ak aktyèl, tcheke izolasyon nan likidasyon motè, si wi ou non nan liy ak kondisyon yo; ponp depo kote tanperati a si mwens pase konjelasyon pwen, yo ta dwe sèk dlo a kavite motè, anpeche kavite motè a dlo glas domaj ki te koze pa tanperati ki ba.

 

 
Entwodiksyon nan Estrikti

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable and other components.


Karakteristik prensipal yo nan pwodwi a gen ladan:

 1, Motè a se yon motè asynchrone twa-faz ki ranpli dlo ki ranpli ak dlo ki anba dlo, kavite motè a plen dlo pwòp, yo itilize yo refwadi motè a ak wile kote yo pote, fim nan reglemante presyon nan pati anba a nan motè a itilize ajiste. diferans lan presyon ekspansyon ak kontraksyon nan dlo a andedan kò a ki te koze pa chanjman nan monte nan tanperati nan motè a.

 2, Yo nan lòd yo anpeche sab la nan dlo a byen antre nan motè a, se fen anwo nan arbr motè a ekipe ak de sele lwil oliv, epi yo enstale yon bag sab pou fòme yon estrikti prevansyon sab.

 3, Yo nan lòd yo anpeche arbr ponp lan soti nan kouri moute lè kòmanse, arbr ponp lan ak arbr motè a konekte pa yon kouple, ak yon anwo poussée portant enstale nan pati ki pi ba nan motè a.

 4, lubrification motè a ak ponp kote yo pote se dlo lubrification.

 5, la liquidation stator motè a fèt ak meyè kalite submersible motè liquidation fil elektrik, ak pèfòmans D' anwo nan syèl la.

 6, ponp lan fèt pa òdinatè CAD, ak estrikti senp ak bon pèfòmans teknik.

 
Enstale

(1) Preparasyon anvan enstalasyon:
1. Tcheke si ponp lan submersible satisfè kondisyon itilizasyon yo ak dimansyon ki espesifye nan manyèl la.
2. Sèvi ak yon objè lou ki gen yon dyamèt ki egal a maksimòm dyamèt ekstèn ponp submersible a, mezire si wi ou non dyamèt inelbore a ka anfòm ponp submersible a, epi mezire si pwofondè pi a satisfè kondisyon enstalasyon yo.
3. Tcheke si twou a pwòp epi si dlo a twoub. Pa janm sèvi ak yon ponp elektrik submersible pou lave welor ponp labou ak dlo sab pou evite domaj twò bonè nan ponp elektrik submersible a.
4. Tcheke si pozisyon nan kranpon enstalasyon welhead la apwopriye epi si li ka kenbe tèt ak kalite a nan tout inite a.
5. Tcheke si konpozan ponp submersible yo konplè epi yo enstale byen dapre dyagram asanble a nan manyèl la Retire ekran filtre a epi vire kouple a pou wè si li vire fleksib.
6. Devise vis dlo a ak fillthe motè kavite ak dlo pwòp, ki pa korozivite (nòt. asire w ke ou fil li moute), Lè sa a, sere boulon waterscrew la. Apre 12 èdtan nan piki dlo, rezistans izolasyon motè a pa ta dwe mwens pase 150M Q lè yo mezire ak yon tab tranbleman 500V.
7. Kab jwenti, koupe yon manch kawoutchou 120mm soti nan yon bout nan kab sortan an ak kab la matche ak yon kouto elektrisyen an ekilibre longè twa fil nwayo yo nan yon fòm etap, retire yon nwayo kwiv 20mm, grate nan oksid la. kouch sou deyò fil kwiv la ak yon kouto oswa twal sab, epi mete de pwent fil ki konekte nan palirs.Apre mare kouch la byen sere ak fil kwiv amann, soude li byen ak byen fèm, ak sab nan nenpòt ki. burrs sou sifas la. Lè sa a, pou twa jwenti yo, sèvi ak tep izolasyon polyester pou vlope yo nan yon fason semi anpile pou twa lavè. Vlope de pwent yo nan kouch anbalaj la sere ak fil nyion, ak Lè sa a, sèvi ak yon metòd semi anpile yo vlope kasèt la pou twa kouch. Vlope outellayer a ak tep izolasyon wo-presyon pou twa kouch. Finalman, pliye twa fil yo ansanm epi repete yo vlope yo pou senk kouch ak kasèt wo-presyon. Chak kouch dwe byen mare, ak jwenti yo entèrkouch yo dwe sere ak fimm yo anpeche dlo nan penetrasyon ak domaje izolasyon an, Apre vlope, tranpe nan dlo nan tanperati chanm nan 20 'c pou 12 èdtan, ak mezire rezistans izolasyon ak yon tab souke. , ki pa ta dwe mwens pase 100M Ω

 

Dyagram pwosesis fil elektrik kab atache a se jan sa a:

 

8. Sèvi ak yon miltimèt pou tcheke si wi ou non fil twa-faz yo konekte epi si rezistans DC a apeprè ekilibre.
9. Tcheke si sikwi a ak kapasite transfòmatè yo twò chaje, ak Lè sa a, konekte switch la pwoteksyon surcharge oswa ekipman kòmanse. Gade Tablo 2 pou modèl espesifik, ak Lè sa a, Vide yon bokit dlo nan ponp dlo a soti nan priz ponp dlo a wile BEARINGS kawotchou yo nan ponp lan, ak Lè sa a, mete ponp lan submersible elektrik dwat ak fiks. Kòmanse (pa plis pase yon segonn) epi tcheke si direksyon volan an konsistan avèk siy volan an. Si ou pa, chanje nenpòt ki de konektè nan twa-faz kab la. Lè sa a, enstale filtè a epi prepare yo desann pi a. Si yo itilize nan okazyon espesyal (tankou twou, twou, rivyè, etan, etan, elatriye), ponp elektrik la dwe fyab sou tè.

 

(2) Enstalasyon ekipman ak zouti:
1. Yon pè chenn leve pou plis pase de tòn.
2. Yon trépied ak yon wotè vètikal pa mwens pase kat mèt.
3. De kòd pandye (kòd fil) ki ka pote yon pwa ki gen plis pase yon tòn (ka pote pwa a nan yon seri konplè ponp dlo).
4. Enstale de pè kranpon (atèl).
5. Kle, mato, tournevis, zouti elektrik ak enstriman, elatriye.

 

(3) Enstalasyon ponp elektrik:
1. Dyagram enstalasyon ponp elektrik submersible a montre nan Figi 2. Dimansyon enstalasyon espesifik yo montre nan Tablo 3 "Lis Dimansyon Enstalasyon ponp elektrik Submersible a".

 

2. Ponp elektrik submersible ak yon tèt mwens pase 30 mèt ka leve dirèkteman nan pi a lè l sèvi avèk kawotchou ak kòd fil oswa lòt kòd chanv ki ka pote pwa a plen nan machin nan tout antye, tiyo dlo, ak dlo nan tiyo yo.

 

3. Ponp ak yon tèt ki gen plis pase 30 mèt itilize tiyo asye, ak sekans enstalasyon an se jan sa a:
①Sèvi ak yon kranpon pou sere pwent anwo nan pati ponp dlo a (motè a ak ponp dlo yo te konekte nan moman sa a), leve l ak yon chèn pandye, epi tou dousman mare l nan pi a jiskaske Mete kranpon an sou tèt pi a epi retire li. pandye chèn.
② Sèvi ak yon lòt pè kranpon pou sere yon tiyo, leve l ak yon chenn pandye 15 cm lwen bride a, epi bese l tou dousman. Ant bride tiyo ak bride ponp Mete pad kawotchou a an plas epi sere boulon tiyo a ak ponpe respire ak boulon, nwa ak rondelles prentan.
③ Leve ponp submersible a yon ti kras, retire kranpon an sou pwent anwo ponp dlo a, mare kab la byen fèm nan tiyo dlo a ak yon kasèt plastik, epi tou dousman mare li desann jiskaske kranpon an mete nan tèt pi a.
④Sèvi ak menm metòd pou mare tout tiyo dlo nan pi a.
⑤Apre kab plon an konekte ak switch kontwòl la, li konekte ak ekipman pou pouvwa twa faz la.


(4) Bagay ou dwe sonje pandan enstalasyon:
1. Si yo jwenn yon fenomèn blokis pandan pwosesis ponp lan, vire oswa rale tiyo dlo a simonte pwen an blocage. Si plizyè mezi toujou pa travay, tanpri pa fòse ponp lan desann pou evite domaj nan ponp elektrik submersible ak pi a.
2. Pandan enstalasyon, yo ta dwe mete yon pad kawotchou nan bride chak tiyo epi sere boulon respire.
3. Lè ponp dlo a bese nan pi a, li ta dwe mete l nan mitan tiyo a pou anpeche ponp lan kouri kont miray la byen pou yon tan long, sa ki lakòz ponp lan vibre ak motè a bale ak boule. .
4. Detèmine pwofondè ponp dlo a nan fon pi a dapre sab koule ak kondisyon limon nan pi a. Pa antere ponp lan nan labou. Distans ki soti nan ponp dlo a nan anba a nan pi a se jeneralman pa mwens pase 3 mèt (gade Figi 2).
5. Pwofondè dlo a antre nan ponp dlo a ta dwe pa mwens pase 1-1.5 mèt soti nan nivo dlo dinamik nan ne inlet dlo a (gade Figi 2). Sinon, bi ponp dlo yo ka fasil domaje.
6. Leve ponp dlo a pa ka twò ba. Sinon, yon tiyo pòtay bezwen yo dwe enstale sou tiyo dlo a pou kontwole koule ponp lan nan pwen an koule rated pou anpeche motè a twò chaje ak boule akòz gwo pousantaj koule.
7. Lè ponp dlo a ap kouri, pwodiksyon dlo a ta dwe kontinyèl e menm, aktyèl la ta dwe estab (anba kondisyon travay rated, jeneralman pa plis pase 10% aktyèl la nominal), epi pa ta dwe gen okenn vibrasyon oswa bri. Si gen nenpòt anòmal, yo ta dwe sispann machin nan pou chèche konnen kòz la epi elimine li.
8. Lè w ap enstale, peye atansyon sou anviwònman fil motè a (gade Figi 2). Lè tiyo dlo a se yon tiyo asye, mennen li soti nan kranpon nan wellhead; lè tiyo dlo a se yon tiyo plastik, mennen li soti nan mak baz la nan ponp elektrik la.

 

 
Antretyen ak Antretyen
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. (2) After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3) After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal.If the following conditions are found, the pump should be shut down immediately to eliminate the fault:
  5. 1 under the rated working conditions, the current exceeds 20%;
  6. 2 the dynamic water level drops to the water inlet part, resulting in intermittent drainage;
  7. 3 the submersible pump vibrates seriously or emits huge noise;
  8. 4 the supply voltage is lower than 340 volts;
  9. 5 a fuse is blown out;
  10. 6 the water pipe is damaged;
  11. 7 the thermal insulation resistance between the motor and the ground is less than 0.5 megaohm. The discovery of these problems need to be handled in time to ensure the normal operation of the pump, improve its reliability, so as to ensure the stable operation of the equipment for a long time.

 

(5)unit disassembly:

 1 untie the cable tie, remove the pipeline part, remove the wire plate.

 2 vis desann boulon dlo a, mete dlo a nan chanm motè a.

 3 remove the filter, loose the fixing screw on the coupling to fix the motor shaft.

 4 screw down the bolt connecting the water inlet section with the motor, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)

 5 pump disassembly sequence is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.

 6 motor disassembly process is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and the upper guide bearing seat.

 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.

  1. The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Depo ak Gad

 1, mete dlo a nan kavite motè a (sitou nan sezon fredi pou anpeche motè a konjel), epi mare kab la byen.

 2, magazen nan yon chanm andedan kay la san sibstans korozif ak gaz, ak yon tanperati ki anba a 40 °C.

 3, itilizasyon alontèm yo ta dwe peye atansyon sou prevansyon rouye ponp submersible yo.

 

 
Mete Pati
  • Impeller
  • Manch manch arbr
  • Kawotchou manch manch arbr
  • Bag sele

 
Senaryo aplikasyon

01 Konsomasyon dlo byen fon

02 Pwovizyon dlo ki wo

03 rezèv dlo mòn 

04 gwo kay won dlo

05 Irigasyon agrikòl

06 irigasyon jaden

07 konsomasyon dlo rivyè

08 dlo domestik

 

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


Ekri mesaj ou la a epi voye l ba nou

Si ou enterese nan pwodwi nou yo, ou ka chwazi kite enfòmasyon ou isit la, epi nou pral kontakte ou yon ti tan.


htHaitian Creole