150QJB Igwe mmiri na-ekpu mmiri nke ọma

Mepụta nhazi OEM! Dị ka onye ọrụ chọrọ, imewe na imepụta ụdị dị iche iche nke chọrọ pụrụ iche nke moto submersible na mgbapụta na-abụghị ọkọlọtọ. The ngwaahịa mmejuputa iwu ụkpụrụ: GB/T2816-2014 "ọma submersible mgbapụta", GB/T2818-2014 "ọma submersible asynchronous moto". WhatsApp: 17855846335
PDF DOWNLOAD
Nkọwa
Tags
 
Nchịkọta ngwaahịa

The motor winding adopts special water-resistant wire for frequency conversion winding, which has excellent characteristics such as high frequency stamping resistance, pulse peak voltage stamping resistance and high temperature aging resistance. The frequency conversion winding design ensures the long-term stable conversion operation of the motor between 1HZ-50HZ, making the frequency conversion deep well pump more energy saving and longer service life.

 

 
Ọnọdụ ojiji

The product is supplied by three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%). Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not more than 1.5mg/L, chloride ion content is not more than 400mg/L. The motor adopts closed or water-filled wet structure. Before use, the internal chamber needs to be filled with clean water to prevent virtual filling. The pump needs to be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water inlet of the well shall meet the water output and continuous operation requirements of the pump, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The pump shall be used vertically, and the pump must be matched with the cable according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no-load test of the pump, and it is necessary to avoid operation without water.

 

 
Ihe Nlereanya Pụtara

150QJB Deep Well Submersible Pump

 
Ihe Nlereanya Pụtara
Nlereanya Ọsọ (m3/h) Isi
(m)
Rotatingspeed(change/point) Mgbapu mmiri(%)  Mwepu
dayameta
(mm)
Ọdabara nke ọma
dayameta (mm) 
 Enyere aha
ike (KW)
Enyere aha
voltaji (V)
Enyere aha
ugbu a (A)
Ịrụ moto (%) power factorcosφ   Nkeji
Nha radial kacha (mm)
kwuo
150QJ5-100 5 100 2850 58 40 150 3 380 7.9 74.0 0.78 143  
150QJ5-150 5 150 2850 58 40  150 n'elu 4 380 10.25 75.0 0.79 143  
150QJ5-200 200 5.5 13.74 76.0 0.8  
150QJ5-250 250 7.5 18.5 77.0 0.8  
150QJ5-300 300 9.2 22.12 78.0 0.81  
150QJ10-50 10 50 2850 63 50  150n'elu 3 380 7.9 74.0 0.78 143  
150QJ10-66 66 4 10.25 75.0 0.79  
150QJ10-78 78 4 10.25 75.0 0.79  
150QJ10-84 84 5.5 13.74 76.0 0.8  
150QJ10-91 91 5.5 13.74 76.0 0.8  
150QJ10-100 100 5.5 13.74 76.0 0.8  
150QJ10-128 128 7.5 18.5 77.0 0.8  
150QJ10-150 150 7.5 18.5 77.0 0.8  
150QJ10-200 200 11 26.28 78.5 0.81  
150QJ10-250 250 13 30.87 79.0 0.81  
150QJ10-300 300 15 35.62 79.0 0.81  
150QJ15-33 15 33 2850 63 50  150n'elu 3 380 7.9 74.0 0.78 143  
150QJ15-42 42 4 10.25 75.0 0.79  
150QJ15-50 50 4 10.25 75.0 0.79  
150QJ15-60 60 5.5 13.74 76 0.8  
150QJ15-65 65 5.5 13.74 76.0 0.8  
150QJ15-72 72 5.5 13.74 76.0 0.8  
150QJ15-81 81 7.5 18.5 77.0 0.8  
150QJ15-90 90 7.5 18.5 77.0 0.8  
150QJ15-98 98 7.5 18.5 77.0 0.8  
150QJ15-106 106 9.2 22.12 78.0 0.81  
150QJ15-114 114 9.2 22.12 78.0 0.81  
150QJ15-130 130 11 26.28 78.5 0.81  
150QJ15-146 146 13 30.87 79.0 0.81  
150QJ15-162 162 13 30.87 79.0 0.81  
150QJ15-180 180 15 35.62 79.0 0.81  
150QJ20-26 20 26 2850 64 50  150n'elu 3 380 7.9 74.0 0.78 143  
150QJ20-33 33 3 7.9 74.0 0.78  
150QJ20-39 20 39 2850 64 50  150n'elu 4 380 10.25 75.0 0.79 143  
150QJ20-52 52 5.5 13.74 76.0 0.8  
150QJ20-65 65 7.5 18.5 77.0 0.8  
150QJ20-78 78 7.5 18.5 77.0 0.8  
150QJ20-91 91 9.2 22.12 78.0 0.81  
150QJ20-98 98 9.2 22.12 78.0 0.81  
150QJ20-104 104 11 26.28 78.5 0.81  
150QJ20-111 111 11 26.28 78.5 0.81  
150QJ20-130 130 13 30.87 79.0 0.81  
150QJ20-143 143 13 30.87 79.0 0.81  
150QJ20-156 156 15 35.62 79.0 0.81  
150QJ20-182 182 18.5 43.12 79.5 0.82  
150QJ25-24 25 24 2850 64 65  150n'elu 3 380 7.9 74.0 0.78 143  
150QJ25-32 32 4 10.25 75.0 0.79  
150QJ25-40 40 5.5 13.74 76.0 0.8  
150QJ25-48 48 5.5 13.74 76.0 0.8  
150QJ25-56 56 7.5 18.5 77.0 0.8  
150QJ25-64 64 7.5 18.5 77.0 0.8  
150QJ25-72 72 9.2 22.12 78.0 0.81  
150QJ25-77 77 9.2 22.12 78.0 0.81  
150QJ25-84 84 11 26.28 78.5 0.81  
150QJ25-96 96 11 26.28 78.5 0.81  
150QJ25-104 104 13 30.87 79.0 0.81  
150QJ25-110 110 13 30.87 79.0 0.81  
150QJ25-120 120 15 35.62 79.0 0.81  
150QJ25-128 128 15 35.62 79.0 0.81  
150QJ25-136 136 18.5 43.12 79.5 0.82  
150QJ25-154 154 18.5 43.12 79.5 0.82  
150QJ32-18 32 18 2850 66 80  150n'elu 3 380 7.9 74.0 0.78 143  
150QJ32-24 24 4 10.25 75.0 0.79  
150QJ32-30 30 5.5 13.74 76.0 0.8  
150QJ32-36 36 5.5 13.74 76.0 0.8  
150QJ32-42 32 42 2850 66 80  150n'elu 7.5 380 18.5 77.0 0.8 143  
150QJ32-54 54 9.2 22.12 78.0 0.81  
150QJ32-66 66 11 26.28 78.5 0.81  
150QJ32-72 72 13 30.87 79.0 0.81  
150QJ32-84 84 13 30.87 79.0 0.81  
150QJ32-90 90 15 35.62 79.0 0.81  
150QJ32-96 96 15 35.62 79.0 0.81  
150QJ32-114 114 18.5 43.12 79.5 0.82  
150QJ40-16 40 16 2850 66 80  150n'elu 3 380 7.9 74.0 0.78 143  
150QJ40-24 24 5.5 13.74 76.0 0.8  
150QJ40-30 30 5.5 13.74 76.0 0.8  
150QJ40-40 40 7.5 18.5 77.0 0.8  
150QJ40-48 48 9.2 22.12 78.0 0.81  
150QJ40-56 56 11 26.28 78.5 0.81  
150QJ40-64 64 13 30.87 79.0 0.81  
150QJ40-72 72 13 30.87 79.0 0.81  
150QJ40-80 80 15 35.62 79.0 0.81  
150QJ40-96 96 18.5 43.12 79.5 0.82  
150QJ50-16 50 16 2850 65 80  150n'elu 4 380 10.25 75.0 0.79 143  
150QJ50-22 22 5.5 13.74 76.0 0.8  
150QJ50-28 28 7.5 18.5 77.0 0.8  
150QJ50-34 34 9.2 22.12 78.0 0.81  
150QJ50-40 40 9.2 22.12 78.0 0.81  
150QJ50-46 46 11 26.28 78.5 0.81  
150QJ50-52 52 13 30.87 79.0 0.81  
150QJ50-57 57 15 35.62 79.0 0.81  
150QJ50-74 74 18.5 43.12 79.5 0.82  
150QJ50-80 80 18.5 43.12 79.5 0.82  
150QJ63-12 63 12 2850 60 80  150n'elu 4 380 10.25 75.0 0.79 143  
150QJ63-18 18 7.5 18.5 77.0 0.8  
150QJ63-30 30 9.2 22.12 78.0 0.81  
150QJ63-36 36 11 26.28 78.5 0.81  
150QJ63-42 63 42 2850 60 80  150n'elu 13 380 30.87 79.0 0.81 143  
150QJ63-48 48 15 35.62 79.0 0.81  
150QJ63-54 54 18.5 43.12 79.5 0.82  
150QJ15-220 15 220 2850   50  150n'elu 18.5 380 43.12     143  
150QJ15-260 260 20 49.7      
150QJ15-300 300 25 56.5      
150QJ20-210 20 210 2850   50  150n'elu 20 380 49.7     143  
150QJ20-240 240 25 56.5      
150QJ20-290 290 30 66.6      
150QJ25-175 25 175 2850   65  150n'elu 20   49.7     143  
150QJ25-200 200 30 66.6      
150QJ25-290 290 37 82.1      
150QJ32-120 32 120 2850   80  150n'elu 20 380 49.7     143  
150QJ32-132 132 25 56.5      
150QJ32-156 156 30 66.6      
150QJ32-190 190 37 82.1      
150QJ32-240 240 45 96.9      
150QJ40-110 40 110 2850   80  150n'elu 20 380 49.7     143  
150QJ40-121 121 25 56.5      
150QJ40-143 143 30 66.6      
150QJ40-176 176 37 82.1      
150QJ40-220 220 45 96.9      
150QJ50-100 50 100 2850   80  150n'elu 20 380 49.7     143  
150QJ50-110 110 25 56.5      
150QJ50-130 130 30 66.6      
150QJ50-160 160 37 82.1      
150QJ50-200 200 45 96.9      

 

 
Akpachara anya maka nchekwa

This well submersible pump is a pump suitable for clean water. It is strictly prohibited to pump sediment and turbid water in new wells. The voltage level of the pump is 380/50HZ. Other voltage levels of the submersible motor need to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. Under abnormal circumstances, the protection device should be tripped in time. In the process of installation and use, the pump must be reliably grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power must be cut off before installation and maintenance of the pump. The place where the pump is used must set up a clear "anti-electric shock" mark. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive cool water, and the water inlet and outlet screws must be tightened. When testing the pump, water must be injected into the pump chamber to lubricate the rubber bearings. The instant start shall not exceed one second to check whether the direction is correct. It is necessary to pay attention to the safety of the pump when it is erected to prevent it from toppling and hurting people. Strictly in accordance with the provisions of the pump lift and flow range of use, so as not to have a large flow in the low lift pump or a large pull in the high lift, causing extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the measurement of the motor and ground insulation resistance, not less than 100M. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements; if the pump storage location temperature is below freezing, storage should discharge the water in the motor cavity, to prevent the water in the motor cavity due to low temperature and freeze damage the motor.

 

 
Okwu Mmalite na Ọdịdị

Nkowa okwu nkenke nke usoro: akụkụ mgbapụta na-abụkarị nke mgbapụta mgbapụta, impeller, shei ntugharị, ihe mkpuchi roba, ahụ valvụ (akụkụ nhọrọ) na ihe ndị ọzọ. Akụkụ moto na-abụkarị nke isi, ihe nkiri na-achịkwa nrụgide, ihe na-ebugharị ebugharị, efere ntinye, oche oche na-eduzi ala, stator, rotor, oche na-ebu elu, mgbanaka ájá, ngalaba ntinye mmiri, eriri na ihe ndị ọzọ.


Isi njirimara ngwaahịa a gụnyere:

1.The motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing, the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the change of the temperature rise of the motor.

2.In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft is equipped with two oil seals, and a sand ring is installed to form a sand prevention structure.

3.In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed at the lower part of the motor.

4.The lubrication of the motor and the pump bearing is water lubrication.

5.The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.

6.The pump is designed by computer CAD, with simple structure and good technical performance.

150QJB Deep Well Submersible Pump
 
Wụnye

(1) Nkwadebe tupu echichi:
1. Lelee ma mgbapụta submersible na-ezute ọnọdụ ojiji yana oke akọwapụtara na ntuziaka.
2. Iji obiect dị arọ nke nwere dayameta hà nhata kachasị elu nke mgbapụta mmiri na-ekpuchi mmiri, tụọ ma inneldiameter nke olulu mmiri ahụ nwere ike dabara na mgbapụta mmiri, ma tụọ ma omimi nke ọma na-emezu ihe achọrọ nrụnye.
3. Lelee ma olulu mmiri ahụ ọ dị ọcha ma mmiri olulu mmiri ahụ ọ na-asọ oyi. Ejila mgbapụta ọkụ eletrik na-eme ka mmiri na-asachapụ apịtị welor na mmiri ájá ka ịzenarị mmebi nke mgbapụta ọkụ eletrik n'oge.
4. Lelee ma ọnọdụ nke welhead echichi mwekota dabara na ma ọ nwere ike iguzogide qualty nke dum unit.
5. Lelee ma ọ bụrụ na akụrụngwa mgbapụta submersible zuru ezu ma wụnye ya nke ọma dị ka eserese mgbakọ na mwepụ na akwụkwọ ntuziaka Wepụ ihuenyo nzacha ma gbanwee njikọ ahụ iji hụ ma ọ na-agbagharị na-agbanwe agbanwe.
6. Kpochapụ ihe nkedo mmiri ma jupụta oghere moto na mmiri dị ọcha, nke na-adịghị emebi emebi (dee. jide n'aka na ị ga-agbanye ya), wee mee ka mmiri sie ike. Mgbe awa 12 nke ịgbanye mmiri gasịrị, nguzogide mkpuchi nke moto ekwesịghị ịbụ ihe na-erughị 150M Q mgbe a tụrụ ya na tebụl ịma jijiji 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Eserese usoro wiring cable nke agbakwunyere bụ nke a:
150QJB Deep Well Submersible Pump

 

8. Jiri multimeter chọpụta ma ejikọrọ wires nke atọ na ma nkwụsi ike DC ọ dị oke nhata.
9. Lelee ma ikike sekit na transformer bubigara ibu, wee jikọọ ihe ngbanwe mkpuchi ibufe ma ọ bụ akụrụngwa mmalite. Hụ Tebụl 2 maka ụdị ụdị dị iche iche, wee wụsa ịwụ mmiri n'ime mgbapụta mmiri si na mmiri mgbapụta mmiri iji mee ka mmanu rọba dị na mgbapụta ahụ, wee debe mgbapụta ọkụ eletrik nke nwere ike ime ka ọ kwụ ọtọ na kwụ ọtọ. Malite (ọ bụghị ihe karịrị otu sekọnd) ma lelee ma ntụzịaka stereị ọ dabara na akara stereị. Ọ bụrụ na ọ bụghị, gbanwee njikọ abụọ ọ bụla nke eriri ụzọ atọ. Mgbe ahụ wụnye nzacha ma kwadebe ka ị gbadaa n'olulu mmiri ahụ. Ọ bụrụ na ejiri ya n'oge pụrụ iche (dịka ọwa mmiri, ọwa mmiri, osimiri, ọdọ mmiri, ọdọ mmiri, wdg), mgbapụta ọkụ eletrik ga-agbanyerịrị nke ọma.

 

(2) Akụrụngwa na akụrụngwa ntinye:
1. Otu ụzọ na-ebuli agbụ maka ihe karịrị tọn abụọ.
2. A tripod nwere ogologo kwụ ọtọ na-erughị mita anọ.
3. Ụdọ abụọ kwụgidere (ụdọ waya) nke nwere ike ibu ibu ihe karịrị otu ton (nwere ike ibu ibu nke nfuli mmiri zuru ezu).
4. Wụnye ụzọ abụọ nke clamps (splints).
5. Wrenches, hammers, screwdrivers, eletriki ngwaọrụ na ngwá, wdg.

 

(3) Nwụnye mgbapụta ọkụ eletrik:
1. E gosipụtara eserese nrụnye nke mgbapụta ọkụ eletrik submersible na eserese 2. A na-egosipụta akụkụ ntinye kpọmkwem na Tebụl 3 "Ndepụta nke nrụnye akụkụ nke mgbapụta ọkụ eletrik".

2. Enwere ike ibunye nfuli eletriki na-ekpuchi isi na isi ihe na-erughị mita 30 ozugbo n'ime olulu mmiri site na iji ụdọ na eriri waya ma ọ bụ eriri hemp ndị ọzọ nwere ike iburu igwe zuru oke nke igwe dum, ọkpọkọ mmiri na mmiri na ọkpọkọ.

3. Nfuli nke nwere isi ihe karịrị mita 30 na-eji ọkpọkọ ígwè, na usoro ntinye bụ nke a:
① Jiri ihe nkedo iji kpoo njedebe elu nke akụkụ mgbapụta mmiri (a na-ejikọta moto na mmiri mgbapụta n'oge a), bulite ya na agbụ nke nghọta, ma jiri nwayọọ nwayọọ kechie ya n'ime olulu mmiri ruo mgbe ịtinye ihe nkedo na isi mmiri ma wepụ ya. nghọta yinye.
② Jiri ụzọ mkpị ọzọ kụchie ọkpọkọ, were yinye kwụgidere 15 cm pụọ na flange, wee wetuo ya nwayọ. N'etiti ọkpọkọ flange na mgbapụta flange Tinye ihe mgbochi rọba n'ebe ma mee ka ọkpọkọ ahụ sie ike ma gbapụta ya nke ọma na bolts, mkpụrụ na mmiri mmiri.
③ Welite obere mgbapụta submersible, wepụ ihe nkedo dị na nsọtụ elu nke mgbapụta mmiri ahụ, kechie eriri ahụ nke ọma na ọkpọkọ mmiri na teepu rọba, ma jiri nwayọọ nwayọọ kechie ya ruo mgbe etinyere mkpọ ahụ n'isi olulu mmiri.
④ Jiri otu usoro ahụ kee ọkpọkọ mmiri niile n'ime olulu mmiri.
⑤ Mgbe ejikọtara eriri na-eduga na njikwa njikwa, a na-ejikọta ya na ọkụ ọkụ nke atọ.

 

(4) Ihe ị ga-ahụ n'oge echichi:
1. Ọ bụrụ na achọpụtara ihe mgbagwoju anya n'oge usoro mgbapụta ahụ, tụgharịa ma ọ bụ dọrọ ọkpọkọ mmiri iji merie ebe nkwụsị. Ọ bụrụ na usoro dị iche iche ka na-arụ ọrụ, biko Amanyela mgbapụta ahụ ka ọ ghara imebi mgbapụta ọkụ eletrik na olulu mmiri.
2. N'oge echichi, a ga-etinye ihe mkpuchi rọba na flange nke ọkpọkọ ọ bụla ma mee ka ọ sie ike.
3. Mgbe a na-agbanye mmiri mmiri n'ime olulu mmiri ahụ, a ga-etinye ya n'etiti ọkpọkọ nke ọma iji gbochie mgbapụta ahụ na-agba ọsọ megide mgbidi olulu mmiri ruo ogologo oge, na-eme ka mgbapụta ahụ na-ama jijiji na moto na-ekpochapụ ma gbaa ọkụ. .
4. Kpebie omimi nke mgbapụta mmiri na ala nke olulu mmiri dịka ájá na-asọ asọ na ọnọdụ silt nke olulu mmiri ahụ. Eliela mgbapụta n'ime apịtị. Ebe dị anya site na mgbapụta mmiri na ala nke olulu mmiri n'ozuzu ọ bụghị ihe na-erughị mita 3 (lee foto 2).
5. Ihe omimi ntinye mmiri nke mgbapụta mmiri kwesịrị ịbụ ihe na-erughị 1-1.5 mita site na mmiri dị ike na ọnụ mmiri ntinye mmiri (lee foto 2). Ma ọ bụghị ya, a ga-emebi bearings mgbapụta mmiri n'ụzọ dị mfe.
6. Ebuli nke mgbapụta mmiri enweghị ike ịdị ala. Ma ọ bụghị ya, ekwesịrị itinye valvụ ọnụ ụzọ ámá na pipeline mmiri nke ọma iji chịkwaa mgbapụta mgbapụta na ebe a na-agbapụta agbapụta iji gbochie moto ahụ ka ọ ghara ibufe ma gbaa ọkụ n'ihi nnukwu ọnụọgụ mmiri.
7. Mgbe mgbapụta mmiri na-agba ọsọ, mmepụta mmiri kwesịrị ịdị na-aga n'ihu na ọbụna, nke dị ugbu a kwesịrị ịdị na-eguzosi ike (n'okpuru ọnọdụ ọrụ a kwadoro, n'ozuzu ọ dịghị ihe karịrị 10% nke akara ugbu a), na e kwesịghị inwe mkpọtụ ma ọ bụ mkpọtụ. Ọ bụrụ na enwere ihe na-adịghị mma, a ga-akwụsị igwe ahụ iji chọpụta ihe kpatara ya ma kpochapụ ya.
8. Mgbe ị na-etinye ya, ṅaa ntị na ntọala nke waya mgbanaka moto (lee foto 2). Mgbe ọkpọkọ mmiri bụ ọkpọkọ ígwè, dupụta ya site na mkpọchi olulu mmiri; mgbe ọkpọkọ mmiri bụ ọkpọkọ plastik, duga ya site na akara ala nke mgbapụta eletrik.

 

 
Nlekọta na nlekọta

 1.submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.

 2.pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.

 3.pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.

 4.pump into normal operation, in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.

 

 1.in the rated condition, the current is more than20%.

 2.dynamic water level to the water inlet section, causing intermittent water.

 3.submersible pump severe vibration or noise.

 4.supply voltage is lower than 340 volts.

 5.fuse burned out a phase.

 6.water pipe damage.

 7.motor to the thermal insulation resistance is less than 0.5 megaohm. 5. The product is a pump unit with easy disassembly function, with simple steps of disassembly, so that users can easily maintain and clean. The disassembly steps include unraveling the cable rope, taking down the pipeline part and the line protection plate, unloosening the water discharge bolt, excluding all the water in the motor chamber, removing the filter and loosening the coupling fixing screw fixing the motor shaft, unscrewing the bolt connecting the water inlet section and the motor, separating the pump and the motor (note that the unit should be leveled when separating to prevent the bending of the pump shaft), the disassembly sequence of the pump is: water inlet section, impeller, shunt shell, impeller, and cleaning the valve body. When disassembling the impeller, use special tools to loosen the conical sleeve fixing the impeller. In the whole disassembly process, avoid bending the pump shaft and damaging various parts. The disassembly process of the motor is: put the motor on the platform, and remove the nuts, base, shaft head lock nut, thrust plate, key, and lower guide rail from the bottom of the motor in order. Bearing seat, tie rod bolt, and then take out the rotor (be careful not to damage the wiring harness) and finally remove the connecting section and the upper guide bearing seat. Before assembling the unit, the rust and dirt of each part should be cleaned, and the sealant should be coated on each mating surface and fastener, and then the assembly should be carried out in reverse order according to the disassembly (the movement of the motor shaft after assembly is about 1 mm). After the assembly is completed, the coupling should be flexibly rotated, and then the filter should be put on for machine test. This pump unit is not only convenient and easy to use, but also has detailed instructions, which provides users with convenient maintenance experience. 6. Submersible electric pump every operation for one year, or less than one year but the diving time has reached two years, should be put out of the well according to Article 5 for disassembly and maintenance, and replace the worn parts.

 

 
Nchekwa na njide

1, wepụta mmiri n'ime oghere moto (karịsịa n'oge oyi iji gbochie moto ahụ ka ọ ghara ịnwụ), ma kee eriri ahụ nke ọma.

2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

3, ogologo oge ojiji kwesịrị ịṅa ntị na nchara mgbochi nke submersible nfuli.

 

 
Ime akụkụ
  • impeller
  • Ogwe aka
  • Roba aro ogwe aka
  • mgbanaka akara

 
Ihe ngosi ngwa

01 Mmiri olulu mmiri miri emi

02 Mmiri mmiri dị elu

03 mmiri mmiri ugwu

04 ụlọ elu mmiri

05 Agricultural ogbugba mmiri n'ubi

06 ogbugba mmiri n'ubi

07 oriri mmiri osimiri  

08 mmiri ụlọ

 

Ọ bụrụ na ị nwere mmasị na ngwaahịa anyị, ị nwere ike ịhọrọ ịhapụ ozi gị ebe a, anyị ga-akpọtụrụ gị n'oge na-adịghị anya.


Dee ozi gị ebe a ziga anyị ya

Ọ bụrụ na ị nwere mmasị na ngwaahịa anyị, ị nwere ike ịhọrọ ịhapụ ozi gị ebe a, anyị ga-akpọtụrụ gị n'oge na-adịghị anya.


igIgbo