125QJB Deep Well Submersible Pump

Mepụta nhazi OEM! Dị ka onye ọrụ chọrọ, imewe na imepụta ụdị dị iche iche nke chọrọ pụrụ iche nke moto submersible na mgbapụta na-abụghị ọkọlọtọ. The ngwaahịa mmejuputa iwu ụkpụrụ: GB/T2816-2014 "ọma submersible mgbapụta", GB/T2818-2014 "ọma submersible asynchronous moto". WhatsApp: 17855846335
PDF DOWNLOAD
Nkọwa
Tags
 
Nchịkọta ngwaahịa

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Ọnọdụ ojiji

1, ike ọkọnọ: atọ-adọ AC 380V ( ndidi + / - 5%), 50HZ ( ndidi + / - 1%).

2, ogo mmiri:

(1) mmiri okpomọkụ adịghị elu karịa 20 Celsius;

(2) ọdịnaya adịghị ọcha siri ike (oke oke) adịghị elu karịa 0.01%;

(3) PH uru (pH) 6.5-8.5;

(4) hydrogen sulfide ọdịnaya abụghị ihe karịrị 1.5mg / L;

(5) Ọdịnaya ion chloride adịghị elu karịa 400mg/L.

3, moto na-emechi ma ọ bụ mmiri jupụtara mmiri Ọdịdị, tupu eji submersible moto oghere ga-ejupụta na mmiri dị ọcha, iji gbochie ụgha zuru, na mgbe ahụ ikesiike mmiri injection, ikuku ntọhapụ bolts, ma ọ bụghị ekwe ka iji.

4, mgbapụta mmiri na-agbapụta mmiri ga-ejupụta kpamkpam n'ime mmiri, omimi mmiri adịghị agafe 70m, ala nke mmiri na-esi na ala nke olulu mmiri adịghị erughị 3m.

5, mmiri mmiri nke ọma ga-enwe ike izute mmepụta mmiri na-emepụta mmiri na-arụ ọrụ na-arụ ọrụ na-aga n'ihu, a ga-achịkwa mmepụta mmiri na-emepụta mmiri na 0.7 - 1.2 ugboro nke a kwadoro.

6, olulu mmiri kwesịrị ịdị ogologo, enweghị ike iji ma ọ bụ tụfuo mgbapụta submersible, naanị iji kwụ ọtọ.

7, mgbapụta nke submersible ga-adaba na eriri dị ka ihe ndị a chọrọ, na ngwaọrụ nchebe nke mpụga. 8, a na-amachibido mgbapụta ahụ nke ọma na-enweghị igwe nyocha enweghị mmiri

 

 
Ihe Nlereanya Pụtara

 
Ntụtụ aka Model
Nlereanya Ọsọ (m3/h)  Isi
(m)
 Rotating speed(change/point)  Mgbapu mmiri(%)  Mwepu
dayameta
(mm)
Ọdabara nke ọma
dayameta (mm) 
Enyere aha
ike (KW)
Rated voltage(V) Ratedcurrent(A)  Ịrụ moto (%)  ike factorcos  Nkeji
Nha radial kacha (mm)
kwuo
125QJ5-34 5 34 2850 53 40  125n'elu 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125n'elu 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125n'elu 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125n'elu 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125n'elu 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125n'elu 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125n'elu 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125n'elu 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125n'elu 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125n'elu 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125n'elu 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125n'elu 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125n'elu 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125n'elu 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Akpachara anya maka nchekwa

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Okwu Mmalite na Ọdịdị
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Isi njirimara ngwaahịa a gụnyere:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

 

 
Wụnye

(1) Nkwadebe tupu echichi:
1. Lelee ma mgbapụta submersible na-ezute ọnọdụ ojiji yana oke akọwapụtara na ntuziaka.
2. Iji obiect dị arọ nke nwere dayameta hà nhata kachasị elu nke mgbapụta mmiri na-ekpuchi mmiri, tụọ ma inneldiameter nke olulu mmiri ahụ nwere ike dabara na mgbapụta mmiri, ma tụọ ma omimi nke ọma na-emezu ihe achọrọ nrụnye.

3. Lelee ma olulu mmiri ahụ ọ dị ọcha ma mmiri olulu mmiri ahụ ọ na-asọ oyi. Ejila mgbapụta ọkụ eletrik na-eme ka mmiri na-asachapụ apịtị welor na mmiri ájá ka ịzenarị mmebi nke mgbapụta ọkụ eletrik n'oge.

4. Lelee ma ọnọdụ nke welhead echichi mwekota dabara na ma ọ nwere ike iguzogide qualty nke dum unit.

5. Lelee ma ọ bụrụ na akụrụngwa mgbapụta submersible zuru ezu ma wụnye ya nke ọma dị ka eserese mgbakọ na mwepụ na akwụkwọ ntuziaka Wepụ ihuenyo nzacha ma gbanwee njikọ ahụ iji hụ ma ọ na-agbagharị na-agbanwe agbanwe.

6. Kpochapụ ihe nkedo mmiri ma jupụta oghere moto na mmiri dị ọcha, nke na-adịghị emebi emebi (dee. jide n'aka na ị ga-agbanye ya), wee mee ka mmiri sie ike. Mgbe awa 12 nke ịgbanye mmiri gasịrị, nguzogide mkpuchi nke moto ekwesịghị ịbụ ihe na-erughị 150M Q mgbe a tụrụ ya na tebụl ịma jijiji 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Eserese usoro wiring cable nke agbakwunyere bụ nke a:

8. Jiri multimeter chọpụta ma ejikọrọ wires nke atọ na ma nkwụsi ike DC ọ dị oke nhata.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Akụrụngwa na akụrụngwa ntinye:
1. Otu ụzọ na-ebuli agbụ maka ihe karịrị tọn abụọ.
2. A tripod nwere ogologo kwụ ọtọ na-erughị mita anọ.
3. Ụdọ abụọ kwụgidere (ụdọ waya) nke nwere ike ibu ibu ihe karịrị otu ton (nwere ike ibu ibu nke nfuli mmiri zuru ezu).
4. Wụnye ụzọ abụọ nke clamps (splints).
5. Wrenches, hammers, screwdrivers, eletriki ngwaọrụ na ngwá, wdg.

 

(3) Nwụnye mgbapụta ọkụ eletrik:
1. E gosipụtara eserese nrụnye nke mgbapụta ọkụ eletrik submersible na eserese 2. A na-egosipụta akụkụ ntinye kpọmkwem na Tebụl 3 "Ndepụta nke nrụnye akụkụ nke mgbapụta ọkụ eletrik".


2. Enwere ike ibunye nfuli eletriki na-ekpuchi isi na isi ihe na-erughị mita 30 ozugbo n'ime olulu mmiri site na iji ụdọ na eriri waya ma ọ bụ eriri hemp ndị ọzọ nwere ike iburu igwe zuru oke nke igwe dum, ọkpọkọ mmiri na mmiri na ọkpọkọ.

3. Nfuli nke nwere isi ihe karịrị mita 30 na-eji ọkpọkọ ígwè, na usoro ntinye bụ nke a:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Welite obere mgbapụta submersible, wepụ ihe nkedo dị na nsọtụ elu nke mgbapụta mmiri ahụ, kechie eriri ahụ nke ọma na ọkpọkọ mmiri na teepu rọba, ma jiri nwayọọ nwayọọ kechie ya ruo mgbe etinyere mkpọ ahụ n'isi olulu mmiri.
④ Jiri otu usoro ahụ kee ọkpọkọ mmiri niile n'ime olulu mmiri.
⑤ Mgbe ejikọtara eriri na-eduga na njikwa njikwa, a na-ejikọta ya na ọkụ ọkụ nke atọ.

 

(4) Ihe ị ga-ahụ n'oge echichi:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. N'oge echichi, a ga-etinye ihe mkpuchi rọba na flange nke ọkpọkọ ọ bụla ma mee ka ọ sie ike.
3. Mgbe a na-agbanye mmiri mmiri n'ime olulu mmiri ahụ, a ga-etinye ya n'etiti ọkpọkọ nke ọma iji gbochie mgbapụta ahụ na-agba ọsọ megide mgbidi olulu mmiri ruo ogologo oge, na-eme ka mgbapụta ahụ na-ama jijiji na moto na-ekpochapụ ma gbaa ọkụ. .
4. Kpebie omimi nke mgbapụta mmiri na ala nke olulu mmiri dịka ájá na-asọ asọ na ọnọdụ silt nke olulu mmiri ahụ. Eliela mgbapụta n'ime apịtị. Ebe dị anya site na mgbapụta mmiri na ala nke olulu mmiri n'ozuzu ọ bụghị ihe na-erughị mita 3 (lee foto 2).
5. Ihe omimi ntinye mmiri nke mgbapụta mmiri kwesịrị ịbụ ihe na-erughị 1-1.5 mita site na mmiri dị ike na ọnụ mmiri ntinye mmiri (lee foto 2). Ma ọ bụghị ya, a ga-emebi bearings mgbapụta mmiri n'ụzọ dị mfe.
6. Ebuli nke mgbapụta mmiri enweghị ike ịdị ala. Ma ọ bụghị ya, ekwesịrị itinye valvụ ọnụ ụzọ ámá na pipeline mmiri nke ọma iji chịkwaa mgbapụta mgbapụta na ebe a na-agbapụta agbapụta iji gbochie moto ahụ ka ọ ghara ibufe ma gbaa ọkụ n'ihi nnukwu ọnụọgụ mmiri.
7. Mgbe mgbapụta mmiri na-agba ọsọ, mmepụta mmiri kwesịrị ịdị na-aga n'ihu na ọbụna, nke dị ugbu a kwesịrị ịdị na-eguzosi ike (n'okpuru ọnọdụ ọrụ a kwadoro, n'ozuzu ọ dịghị ihe karịrị 10% nke akara ugbu a), na e kwesịghị inwe mkpọtụ ma ọ bụ mkpọtụ. Ọ bụrụ na enwere ihe na-adịghị mma, a ga-akwụsị igwe ahụ iji chọpụta ihe kpatara ya ma kpochapụ ya.
8. Mgbe ị na-etinye ya, ṅaa ntị na ntọala nke waya mgbanaka moto (lee foto 2). Mgbe ọkpọkọ mmiri bụ ọkpọkọ ígwè, dupụta ya site na mkpọchi olulu mmiri; mgbe ọkpọkọ mmiri bụ ọkpọkọ plastik, duga ya site na akara ala nke mgbapụta eletrik.

 

 
Nlekọta na nlekọta
  • 1.Mgbe etinyere mgbapụta submersible, lelee nguzogide mkpuchi na ntụgharị nke atọ site na mgba ọkụ ọzọ, lelee ma ngwá ọrụ na njikọ nke ngwa mmalite adịghị mma, ma ọ bụrụ na enweghi nsogbu, enwere ike ịmalite igwe ikpe. ma lelee ma agụ ihe ngosi nke ngwa ahụ gafere oke voltaji na nke ugbu a akọwapụtara na efere aha mgbe mmalite, ma hụ ma mgbapụta ahụ nwere mkpọtụ na ihe na-ama jijiji, ma tinye ya n'ọrụ ma ọ bụrụ na ihe niile dị mma.
  • 2.Mgbe ọrụ mbụ nke mgbapụta ahụ gasịrị maka awa anọ, a ga-emechi moto ahụ iji nwalee nkwụsị mkpuchi ọkụ ngwa ngwa, uru ya ekwesịghị ịbụ ihe na-erughị 0,5 megaohm.
  • 3.Mgbe agbanyụchara mgbapụta ahụ, ọ ga-amalite mgbe nkeji ise gachara iji gbochie kọlụm mmiri dị na ọkpọkọ ka ọ ghara ịmịgharị kpamkpam ma na-eme ka moto dị ukwuu na ọkụ ọkụ.
  • 4.Mgbe a na-etinye mgbapụta ahụ n'ime ọrụ nkịtị, iji mee ka ndụ ọrụ ya dịkwuo ogologo, ọ dị mkpa iji chọpụta ma voltaji ọkọnọ, na-arụ ọrụ ugbu a na mkpuchi mkpuchi bụ ihe nkịtị mgbe niile. Ọ bụrụ na achọpụtara ọnọdụ ndị a, a ga-emechi mgbapụta ahụ ozugbo iji dozie nsogbu.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Mmiri dị ike na-adaba na ngalaba ntinye mmiri, na-eme ka mmiri na-adịte aka.
  • 3 Mgbapu nke submersible nwere oke ịma jijiji ma ọ bụ mkpọtụ.
  • 4 voltaji ọkọnọ dị ala karịa 340 volts.
  • 5 Igwe ọkụ na-agbanyụ ọkụ.
  • 6 Igwe mmiri na-enye mmiri mebiri emebi.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Nchekwa na njide

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Ime akụkụ
    • impeller
    • Ogwe aka
    • Roba aro ogwe aka
    •  mgbanaka akara

 
Ihe ngosi ngwa

01 Mmiri olulu mmiri miri emi

02 Mmiri mmiri dị elu

03 mmiri mmiri ugwu 

04 ụlọ elu mmiri

05 Agricultural ogbugba mmiri n'ubi

06 ogbugba mmiri n'ubi

07 oriri mmiri osimiri

08 mmiri ụlọ

 

Ọ bụrụ na ị nwere mmasị na ngwaahịa anyị, ị nwere ike ịhọrọ ịhapụ ozi gị ebe a, anyị ga-akpọtụrụ gị n'oge na-adịghị anya.


Dee ozi gị ebe a ziga anyị ya

Ọ bụrụ na ị nwere mmasị na ngwaahịa anyị, ị nwere ike ịhọrọ ịhapụ ozi gị ebe a, anyị ga-akpọtụrụ gị n'oge na-adịghị anya.


igIgbo