QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Nlereanya | Ọsọ (m3/h) | Isi (m) |
Rotatingspeed(change/point) | Mgbapu mmiri(%) | Mwepu dayameta (mm) |
Ọdabara nke ọma dayameta (mm) |
Enyere aha power(KW) |
Enyere aha voltaji (V) |
Enyere aha ugbu a (A) |
Ịrụ moto (%) | ike factorcos | Nkeji Nha radial kacha (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175n'elu | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175n'elu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175n'elu | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175n'elu | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175n'elu | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175n'elu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175n'elu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175n'elu | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175n'elu | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175n'elu | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175n'elu | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175n'elu | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175n'elu | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, nke ọma submersible mgbapụta maka mmiri dị ọcha, machibidoro ịsacha olulu mmiri ọhụrụ, na-agbapụta sedimenti na mmiri apịtị,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, n'ụzọ doro anya dị ka ndokwa nke mgbapụta ebuli, eruba nso nke ojiji, iji gbochie ala eruba ma ọ bụ elu ebuli pumping ike, mkpali ibu na akụkụ ndị ọzọ nke eyi, moto bufee ọkụ.
6, mgbe mgbapụta gbadaa olulu mmiri ahụ, nha nke moto na nguzogide mkpuchi ala ekwesịghị ịbụ ihe na-erughị 100M, mgbe mmalite na-ekiri voltaji na ugbu a, lelee mkpuchi mkpuchi moto, ma ọ dabara na ihe ndị a chọrọ; mgbapụta nchekwa ọnọdụ okpomọkụ ma ọ bụrụ na-erughị kefriza ebe, kwesịrị akọrọ mmiri na moto oghere, gbochie moto oghere mmiri ice mebiri mere site ala okpomọkụ.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Isi njirimara ngwaahịa a gụnyere:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Nkwadebe tupu echichi:
1. Lelee ma mgbapụta submersible na-ezute ọnọdụ ojiji yana oke akọwapụtara na ntuziaka.
2. Iji obiect dị arọ nke nwere dayameta hà nhata kachasị elu nke mgbapụta mmiri na-ekpuchi mmiri, tụọ ma inneldiameter nke olulu mmiri ahụ nwere ike dabara na mgbapụta mmiri, ma tụọ ma omimi nke ọma na-emezu ihe achọrọ nrụnye.
3. Lelee ma olulu mmiri ahụ ọ dị ọcha ma mmiri olulu mmiri ahụ ọ na-asọ oyi. Ejila mgbapụta ọkụ eletrik na-eme ka mmiri na-asachapụ apịtị welor na mmiri ájá ka ịzenarị mmebi nke mgbapụta ọkụ eletrik n'oge.
4. Lelee ma ọnọdụ nke welhead echichi mwekota dabara na ma ọ nwere ike iguzogide qualty nke dum unit.
5. Lelee ma ọ bụrụ na akụrụngwa mgbapụta submersible zuru ezu ma wụnye ya nke ọma dị ka eserese mgbakọ na mwepụ na akwụkwọ ntuziaka Wepụ ihuenyo nzacha ma gbanwee njikọ ahụ iji hụ ma ọ na-agbagharị na-agbanwe agbanwe.
6. Kpochapụ ihe nkedo mmiri ma jupụta oghere moto na mmiri dị ọcha, nke na-adịghị emebi emebi (dee. jide n'aka na ị ga-agbanye ya), wee mee ka mmiri sie ike. Mgbe awa 12 nke ịgbanye mmiri gasịrị, nguzogide mkpuchi nke moto ekwesịghị ịbụ ihe na-erughị 150M Q mgbe a tụrụ ya na tebụl ịma jijiji 500V.
7. Njikọ eriri USB, bepụ aka uwe roba 120mm site na otu njedebe nke eriri na-apụ apụ na eriri dabara na ya na mma eletriki wee tụọ ogologo eriri isi atọ ahụ n'ụdị steepụ, wepụ isi ọla kọpa 20mm, kpochapu oxide. oyi akwa na theside nke ọla kọpa waya na mma ma ọ bụ ájá ákwà, na fanye abụọ ejikọrọ waya agwụ na palirs.Mgbe ekekọta oyi akwa tightly na ezi ọla kọpa waya, solder ya nke ọma na ike, na ájá nke ọ bụla. burrs n'elu. Mgbe ahụ, maka nkwonkwo atọ ahụ, jiri teepu mkpuchi mkpuchi polyvester kechie ha n'ụzọ dị nkenke nke etinyere maka ọdọ mmiri atọ. Jiri eriri nyion kechie nsọtụ abụọ nke oyi akwa mkpuchi, wee jiri usoro echekwabara ọkara wee kechie teepu ahụ maka ọkwa atọ. Kechie outellayer na teepu mkpuchi mkpuchi dị elu maka ọkwa atọ. N'ikpeazụ, jikọta eriri atọ ahụ ma kechie ha ugboro ugboro maka ihe ise na teepu dị elu. A ghaghị ijikọta oyi akwa nke ọ bụla, na nkwonkwo interlayer ga-adị ike na fimm ka mmiri ghara ịbanye ma mebie ihe mkpuchi ahụ, Mgbe ị na-ekpuchi ya, gbanye n'ime mmiri na okpomọkụ nke 20 'c maka awa 12, wee tụọ nguzogide mkpuchi na tebụl na-ama jijiji. , nke ekwesịghị ịbụ ihe na-erughị 100M Ω
Eserese usoro wiring cable nke agbakwunyere bụ nke a:
8. Jiri multimeter chọpụta ma ejikọrọ wires nke atọ na ma nkwụsi ike DC ọ dị oke nhata.
9. Lelee ma ikike sekit na transformer bubigara ibu, wee jikọọ ihe ngbanwe mkpuchi ibufe ma ọ bụ akụrụngwa mmalite. Hụ Tebụl 2 maka ụdị ụdị dị iche iche, wee wụsa ịwụ mmiri n'ime mgbapụta mmiri si na mmiri mgbapụta mmiri iji mee ka mmanu rọba dị na mgbapụta ahụ, wee debe mgbapụta ọkụ eletrik nke nwere ike ime ka ọ kwụ ọtọ na kwụ ọtọ. Malite (ọ bụghị ihe karịrị otu sekọnd) ma lelee ma ntụzịaka stereị ọ dabara na akara stereị. Ọ bụrụ na ọ bụghị, gbanwee njikọ abụọ ọ bụla nke eriri ụzọ atọ. Mgbe ahụ wụnye nzacha ma kwadebe ka ị gbadaa n'olulu mmiri ahụ. Ọ bụrụ na ejiri ya n'oge pụrụ iche (dịka ọwa mmiri, ọwa mmiri, osimiri, ọdọ mmiri, ọdọ mmiri, wdg), mgbapụta ọkụ eletrik ga-agbanyerịrị nke ọma.
(2) Akụrụngwa na akụrụngwa ntinye:
1. Otu ụzọ na-ebuli agbụ maka ihe karịrị tọn abụọ.
2. A tripod nwere ogologo kwụ ọtọ na-erughị mita anọ.
3. Ụdọ abụọ kwụgidere (ụdọ waya) nke nwere ike ibu ibu ihe karịrị otu ton (nwere ike ibu ibu nke nfuli mmiri zuru ezu).
4. Wụnye ụzọ abụọ nke clamps (splints).
5. Wrenches, hammers, screwdrivers, eletriki ngwaọrụ na ngwá, wdg.
(3) Nwụnye mgbapụta ọkụ eletrik:
1. E gosipụtara eserese nrụnye nke mgbapụta ọkụ eletrik submersible na eserese 2. A na-egosipụta akụkụ ntinye kpọmkwem na Tebụl 3 "Ndepụta nke nrụnye akụkụ nke mgbapụta ọkụ eletrik".
2. Enwere ike ibunye nfuli eletriki na-ekpuchi isi na isi ihe na-erughị mita 30 ozugbo n'ime olulu mmiri site na iji ụdọ na eriri waya ma ọ bụ eriri hemp ndị ọzọ nwere ike iburu igwe zuru oke nke igwe dum, ọkpọkọ mmiri na mmiri na ọkpọkọ.
3. Nfuli nke nwere isi ihe karịrị mita 30 na-eji ọkpọkọ ígwè, na usoro ntinye bụ nke a:
① Jiri ihe nkedo iji kpoo njedebe elu nke akụkụ mgbapụta mmiri (a na-ejikọta moto na mmiri mgbapụta n'oge a), bulite ya na agbụ nke nghọta, ma jiri nwayọọ nwayọọ kechie ya n'ime olulu mmiri ruo mgbe ịtinye ihe nkedo na isi mmiri ma wepụ ya. nghọta yinye.
② Jiri ụzọ mkpị ọzọ kụchie ọkpọkọ, were yinye kwụgidere 15 cm pụọ na flange, wee wetuo ya nwayọ. N'etiti ọkpọkọ flange na mgbapụta flange Tinye ihe mgbochi rọba n'ebe ma mee ka ọkpọkọ ahụ sie ike ma gbapụta ya nke ọma na bolts, mkpụrụ na mmiri mmiri.
③ Welite obere mgbapụta submersible, wepụ ihe nkedo dị na nsọtụ elu nke mgbapụta mmiri ahụ, kechie eriri ahụ nke ọma na ọkpọkọ mmiri na teepu rọba, ma jiri nwayọọ nwayọọ kechie ya ruo mgbe etinyere mkpọ ahụ n'isi olulu mmiri.
④ Jiri otu usoro ahụ kee ọkpọkọ mmiri niile n'ime olulu mmiri.
⑤ Mgbe ejikọtara eriri na-eduga na njikwa njikwa, a na-ejikọta ya na ọkụ ọkụ nke atọ.
(4) Ihe ị ga-ahụ n'oge echichi:
1. Ọ bụrụ na achọpụtara ihe mgbagwoju anya n'oge usoro mgbapụta ahụ, tụgharịa ma ọ bụ dọrọ ọkpọkọ mmiri iji merie ebe nkwụsị. Ọ bụrụ na usoro dị iche iche ka na-arụ ọrụ, biko Amanyela mgbapụta ahụ ka ọ ghara imebi mgbapụta ọkụ eletrik na olulu mmiri.
2. N'oge echichi, a ga-etinye ihe mkpuchi rọba na flange nke ọkpọkọ ọ bụla ma mee ka ọ sie ike.
3. Mgbe a na-agbanye mmiri mmiri n'ime olulu mmiri ahụ, a ga-etinye ya n'etiti ọkpọkọ nke ọma iji gbochie mgbapụta ahụ na-agba ọsọ megide mgbidi olulu mmiri ruo ogologo oge, na-eme ka mgbapụta ahụ na-ama jijiji na moto na-ekpochapụ ma gbaa ọkụ. .
4. Kpebie omimi nke mgbapụta mmiri na ala nke olulu mmiri dịka ájá na-asọ asọ na ọnọdụ silt nke olulu mmiri ahụ. Eliela mgbapụta n'ime apịtị. Ebe dị anya site na mgbapụta mmiri na ala nke olulu mmiri n'ozuzu ọ bụghị ihe na-erughị mita 3 (lee foto 2).
5. Ihe omimi ntinye mmiri nke mgbapụta mmiri kwesịrị ịbụ ihe na-erughị 1-1.5 mita site na mmiri dị ike na ọnụ mmiri ntinye mmiri (lee foto 2). Ma ọ bụghị ya, a ga-emebi bearings mgbapụta mmiri n'ụzọ dị mfe.
6. Ebuli nke mgbapụta mmiri enweghị ike ịdị ala. Ma ọ bụghị ya, ekwesịrị itinye valvụ ọnụ ụzọ ámá na pipeline mmiri nke ọma iji chịkwaa mgbapụta mgbapụta na ebe a na-agbapụta agbapụta iji gbochie moto ahụ ka ọ ghara ibufe ma gbaa ọkụ n'ihi nnukwu ọnụọgụ mmiri.
7. Mgbe mgbapụta mmiri na-agba ọsọ, mmepụta mmiri kwesịrị ịdị na-aga n'ihu na ọbụna, nke dị ugbu a kwesịrị ịdị na-eguzosi ike (n'okpuru ọnọdụ ọrụ a kwadoro, n'ozuzu ọ dịghị ihe karịrị 10% nke akara ugbu a), na e kwesịghị inwe mkpọtụ ma ọ bụ mkpọtụ. Ọ bụrụ na enwere ihe na-adịghị mma, a ga-akwụsị igwe ahụ iji chọpụta ihe kpatara ya ma kpochapụ ya.
8. Mgbe ị na-etinye ya, ṅaa ntị na ntọala nke waya mgbanaka moto (lee foto 2). Mgbe ọkpọkọ mmiri bụ ọkpọkọ ígwè, dupụta ya site na mkpọchi olulu mmiri; mgbe ọkpọkọ mmiri bụ ọkpọkọ plastik, duga ya site na akara ala nke mgbapụta eletrik.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 n'ọnọdụ a tụrụ anya, nke ugbu a karịrị 20%.
2 mmiri dị ike na mpaghara ntinye mmiri, na-eme ka mmiri na-adịghị agbanwe agbanwe.
3 submersible mgbapụta siri ike ịma jijiji ma ọ bụ mkpọtụ.
4 ọkọnọ voltaji dị ala karịa 340 volts.
5 fuse gbara ọkụ otu nkeji.
6 mmebi ọkpọkọ mmiri.
7 moto na nguzogide mkpuchi ọkụ erughị 0.5 megaohm.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, wepụta mmiri n'ime oghere moto (karịsịa n'oge oyi iji gbochie moto ahụ ka ọ ghara ịnwụ), ma kee eriri ahụ nke ọma.
2, na-echekwa n'ime ụlọ na-enweghị ihe ndị na-emebi emebi na gas, na-enwe okpomọkụ n'okpuru 40 Celsius.
3, ogologo oge ojiji kwesịrị ịṅa ntị na nchara mgbochi nke submersible nfuli.
- impeller
- Ogwe aka
- Roba aro ogwe aka
-
mgbanaka akara
01 Mmiri olulu mmiri miri emi
02 Mmiri mmiri dị elu
03 mmiri mmiri ugwu
04 ụlọ elu mmiri
05 Agricultural ogbugba mmiri n'ubi
06 ogbugba mmiri n'ubi
07 oriri mmiri osimiri
08 mmiri ụlọ