125QJB Deep Well Submersible Pump

Yenza inkqubo ye-OEM! Ngokweemfuno zabasebenzisi, uyilo kunye nokuveliswa kweentlobo ezahlukeneyo zeemfuno ezizodwa zemoto kunye nempompo engekho emgangathweni. Imigangatho yokuphunyezwa kwemveliso: GB/T2816-2014 "impompo ephantsi kwamanzi", i-GB/T2818-2014 "imoto ephantsi kwe-asynchronous kakuhle". WhatsApp: 17855846335
PDF DOWNLOAD
Iinkcukacha
Iithegi
 
Product Overview

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Imiqathango yokusetyenziswa

I-1, ukunikezelwa kwamandla: isigaba sesithathu se-AC 380V (ukunyamezela + / - 5%), 50HZ (ukunyamezela + / - 1%).

2, umgangatho wamanzi:

(1) water temperature is not higher than 20 °C;

(2) isiqulatho sobumdaka obuqinileyo (umlinganiselo wobunzima) awukho ngaphezu kwe-0.01%;

(3) ixabiso le-PH (pH) 6.5-8.5;

(4) umxholo we-hydrogen sulfide awukho mkhulu kune-1.5mg / L;

(5) umxholo we-chloride ion awukho mkhulu kune-400mg/L.

I-3, i-motor ivaliwe okanye izaliswe ngamanzi isakhiwo esimanzi, ngaphambi kokusetyenziswa i-submersible motor cavity kufuneka igcwele amanzi acocekileyo, ukuthintela ubuxoki obugcweleyo, kwaye emva koko uqinise inaliti yamanzi, iibholiti zokukhululwa komoya, kungenjalo akuvumelekanga ukusebenzisa.

I-4, impompo ephantsi kwamanzi kufuneka ifakwe ngokupheleleyo emanzini, ubunzulu bokuntywila abukho ngaphezu kwe-70m, i-bottom yepompo ephantsi kwamanzi ukusuka ezantsi kwequla ayikho ngaphantsi kwe-3m.

I-5, ukuhamba kwamanzi omthombo kufuneka kukwazi ukuhlangabezana nemveliso yamanzi epompo ephantsi kwamanzi kunye nokusebenza okuqhubekayo, i-submersible pump water output kufuneka ilawulwe kwi-0.7 - 1.2 amaxesha okuhamba okulinganiselwe.

I-6, iqula kufuneka lithe tye, impompo engaphantsi kwamanzi ayinakusetyenziswa okanye ilahlwe, ukusetyenziswa ngokuthe nkqo kuphela.

I-7, ipompo ye-submersible kufuneka ihambelane nekhebula ngokweemfuno, kunye nesixhobo sokukhusela ukugqithiswa kwangaphandle. I-8, impompo inqatshelwe ngokungqongqo ngaphandle komatshini wokuvavanya amanzi akukho mthwalo

 

 
Umzekelo Intsingiselo

125QJB Deep Well Submersible Pump

 
Isingqinisiso soMzekelo ongaphelelanga
Umzekelo Ukuhamba (m3/h)  Intloko
(m)
 Rotating speed(change/point)  Impompo yamanzi(%)  Indawo yokuphuma
ububanzi
(mm)
Isebenza kakuhle
ububanzi(mm) 
Ikaliwe
amandla (KW)
Rated voltage(V) Ratedcurrent(A)  Ukusebenza kakuhle (%)  power factorcosφ  Iyunithi
Ubungakanani beRadial Maximum (mm)
Phawula
125QJ5-34 5 34 2850 53 40  125ngaphezulu 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125ngaphezulu 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125ngaphezulu 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125ngaphezulu 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125ngaphezulu 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125ngaphezulu 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125ngaphezulu 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125ngaphezulu 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125ngaphezulu 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125ngaphezulu 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125ngaphezulu 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125ngaphezulu 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125ngaphezulu 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125ngaphezulu 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
ImiGaqo yoKhuseleko

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Intshayelelo kuLwakhiwo
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Iimpawu eziphambili zemveliso ziquka:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

125QJB Deep Well Submersible Pump

 

 
Faka

(1)Ulungiselelo phambi kofakelo:
1. Jonga ukuba impompo engaphantsi kwamanzi iyahlangabezana nemiqathango yokusetyenziswa kunye nobubanzi obuchazwe kwincwadana.
2. Ukusebenzisa i-obiect enzima ene-diameter elingana nobukhulu obungaphandle bedayamitha yempompo engaphantsi kwamanzi, linganisa ukuba i-inneldiameter ye-wellbore ingafanelana nempompo engaphantsi kwamanzi, kwaye ulinganise ukuba ubunzulu bomthombo buhlangabezana neemfuno zokufakela.

3. Jonga ukuba iqula licocekile na kunye nokuba amanzi amgxobhozo na. Ungaze usebenzise impompo yombane engaphantsi kwamanzi ukuhlamba udaka lwempompo ye-welor kunye namanzi esanti ukunqanda umonakalo ophambi kwexesha kwimpompo yombane engaphantsi kwamanzi.

4. Khangela ukuba indawo ye-welhead yokufakela i-clamp ifanelekile kwaye ingaba inokumelana nomgangatho weyunithi yonke.

5. Khangela ukuba izixhobo zempompo eziphantsi kwamanzi zigqityiwe kwaye zifakwe ngokufanelekileyo ngokwedayagram yendibano kwincwadana Susa isikrini sokucoca kwaye ujikelezise ukudibanisa ukuze ubone ukuba ijikeleza ngokuguquguqukayo.

6. Khupha isikrufu samanzi uze ugcwalise umngxuma wemoto ngamanzi acocekileyo, angadlekiyo (qaphela. qiniseka ukuba uyasifafa), uze uqinise isikrufu samanzi. Emva kweeyure ezili-12 zenaliti yamanzi, ukuxhathisa kwe-insulation ye-motor akufanele kube ngaphantsi kwe-150M Q xa kulinganiswa netafile yokungcangcazela ye-500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Umzobo oqhotyoshelweyo wenkqubo yokufaka iintambo zentambo umi ngolu hlobo lulandelayo:

125QJB Deep Well Submersible Pump

8. Sebenzisa i-multimeter ukujonga ukuba ngaba iingcingo zesigaba sesithathu zidibaniswe kunye nokuba ukuchasana kwe-DC kuphantse kulinganiswe.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2)Izixhobo zofakelo kunye nezixhobo:
1. Ipere enye yamatyathanga okuphakamisa ngaphezulu kweetoni ezimbini.
2. I-tripod enobude obuthe nkqo obungekho ngaphantsi kweemitha ezine.
3. Iintambo ezimbini ezijingayo (iintambo zocingo) ezinokuthwala ubunzima obungaphezu kwetoni enye (zinokuthwala ubunzima beseti epheleleyo yeempompo zamanzi).
4. Fakela izibini ezimbini zeeclamps (i-splints).
5. Izitshixo, izando, i-screwdrivers, izixhobo zombane kunye nezixhobo, njl.

 

(3)Ufakelo lwempompo yombane:
1. Umzobo wofakelo lwempompo yombane engaphantsi kwamanzi iboniswe kuMzobo 2. Imilinganiselo ethile yokufakela iboniswe kwiThebhile 3 "Uluhlu lweMilinganiselo yokuFakela iPump yoMbane ongaphantsi kwamanzi".


2. Iimpompo zombane ezingaphantsi kwamanzi ezinentloko engaphantsi kweemitha ezingama-30 zinokunyuswa ngokuthe ngqo equleni kusetyenziswa imibhobho kunye neentambo zocingo okanye ezinye iintambo zehemp ezinokuthwala ubunzima obupheleleyo bomatshini wonke, imibhobho yamanzi, kunye namanzi kwimibhobho.

3. Iipompo ezinentloko yeemitha ezingaphezu kwe-30 zisebenzisa iipayipi zensimbi, kwaye ulandelelwano lofakelo lulandelayo:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Phakamisa kancinane impompo entywilayo emanzini, susa isithinteli esikwisiphelo esiphezulu sempompo yamanzi, qhina intambo ngokuqinileyo kumbhobho wamanzi ngeteyiphu yeplastiki, kwaye uyibophe kancinane de Ibamba libekwe emthonjeni.
④Sebenzisa indlela efanayo ukubopha yonke imibhobho yamanzi equleni.
⑤Emva kokuba ikhebula elikhokelayo liqhagamshelwe kwisitshixo solawulo, liqhagamshelwe kunikezelo lwamandla amanqanaba amathathu.

 

(4)Izinto ekufuneka uziqwalasele ngexesha lofakelo:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Ngethuba lofakelo, i-rubber pad kufuneka ifakwe kwi-flange yombhobho ngamnye kwaye iqiniswe ngokulinganayo.
3. Xa impompo yamanzi ithotywa equleni, kufuneka ibekwe embindini wombhobho wequla ukuthintela ukuba impompo ihambe ngaphaya kodonga lwequla ixesha elide, nto leyo ebangela ukuba impompo ingcangcazele kwaye imotor itshayele kwaye itshise. .
4. Qinisekisa ubunzulu bempompo yamanzi ukuya ezantsi kwequla ngokwesanti equkuqelayo kunye neemeko zentlenge equleni. Musa ukungcwaba impompo eludakeni. Umgama ukusuka kumpompo wamanzi ukuya ezantsi kwequla awukho ngaphantsi kweemitha ezi-3 (jonga umfanekiso 2).
5. Ubunzulu bokungena kwamanzi kwimpompo yamanzi kufuneka bungabi ngaphantsi kwe-1-1.5 yeemitha ukusuka kwinqanaba lamanzi aguquguqukayo ukuya kwindawo yokungena kwamanzi (jonga uMfanekiso 2). Ngaphandle koko, iibheringi zempompo zamanzi zinokonakala lula.
6. Ukunyuswa kwempompo yamanzi akunakuba phantsi kakhulu. Kungenjalo, ivalve yesango kufuneka ifakwe kumbhobho wamanzi osentloko yomthombo ukulawula ukuhamba kwempompo kwindawo yokuqukuqela ehleliweyo ukuthintela ukugcwala okugqithisileyo kwemoto kwaye itshiswe ngenxa yamazinga amakhulu okuhamba.
7. Xa umpompo wamanzi usebenza, ukukhutshwa kwamanzi kufuneka kuqhubeke kwaye nokuba, okwangoku kufuneka kuzinzile (phantsi kweemeko zokusebenza ezilinganisiweyo, ngokuqhelekileyo akukho ngaphezu kwe-10% ye-current rated current), kwaye akufanele kubekho ukungcangcazela okanye ingxolo. Ukuba kukho nakuphi na ukungaqhelekanga, umatshini kufuneka umiswe ukufumanisa unobangela kwaye upheliswe.
8. Xa ufaka, qwa lasela ukusetwa kwe-motor grounding wire (jonga umfanekiso 2). Xa umbhobho wamanzi ungumbhobho wentsimbi, yiholele kwi-clamp ye-wellhead clamp; xa umbhobho wamanzi ungumbhobho weplastiki, ukhokele ukusuka kwindawo yokubeka ipompo yombane.

 

 
ULondolozo kunye noLondolozo
  • 1.Emva kokuba i-submersible impompo ifakwe, khangela ukuchasana kwe-insulation kunye nesigaba sesithathu sokuqhuba ukusuka kwitshintshi kwakhona, khangela ukuba isixhobo kunye nokudityaniswa kwezixhobo zokuqala zingalunganga, ukuba akukho ngxaki, umatshini wokulinga unokuqaliswa, kwaye uqaphele ukuba ukufundwa kwesalathisi sesixhobo kudlula i-voltage elinganisiweyo kunye nekhoyo ngoku echazwe kwi-nameplate emva kokuqala, kwaye uqaphele ukuba ipompo inesandi kunye ne-vibration phenomenon, kwaye ifakwe ekusebenzeni ukuba yonke into iyinto eqhelekileyo.
  • I-2.Emva kokusebenza kokuqala kompompo kwiiyure ezine, i-motor kufuneka ivalwe ukuvavanya ukuchasana kwe-thermal insulation ngokukhawuleza, kwaye ixabiso layo akufanele libe ngaphantsi kwe-0.5 megaohm.
  • 3.Emva kokuba ipompo ivaliwe, kufuneka iqalwe emva kwemizuzu emihlanu ukukhusela ikholomu yamanzi kumbhobho ukuba iphinde ihlaziywe ngokupheleleyo kwaye ibangele umbane ogqithiseleyo kunye nokutshiswa.
  • 4.Emva kokuba ipompo ifakwe ekusebenzeni okuqhelekileyo, ukwenzela ukwandisa ubomi bayo benkonzo, kuyimfuneko ukujonga ukuba i-voltage yokubonelela, ukusebenza ngoku kunye nokuchasana kwe-insulation kuqhelekileyo rhoqo. Ukuba le miqathango ilandelayo ifunyenwe, impompo kufuneka ivalwe ngokukhawuleza ukulungisa ingxaki.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Umgangatho wamanzi oguquguqukayo wehla ukuya kwindawo yokungena kwamanzi, okubangela ukuba amanzi aphumle.
  • 3 Impompo entywilayo phantsi inongcangcazelo olumandla okanye ingxolo.
  • 4 Umbane wokubonelela ungaphantsi kwe-340 volts.
  • 5 Ifuse iyatshiswa.
  • 6 Umbhobho wonikezelo lwamanzi wonakalisiwe.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Ukugcinwa kunye nokugcinwa

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Ukunxiba amalungu
    • Impeller
    • Umkhono weshaft
    • Umkhono weshaft yerabha
    •  Umsesane wokutywina

 
Iimeko zeSicelo

01 Ukusela amanzi kwiqula elinzulu

02 Ubonelelo lwamanzi olukwizinga eliphezulu

03 unikezelo lwamanzi entabeni 

04 amanzi enqaba

05 Ukunkcenkceshela kwezolimo

06 ukunkcenkceshela egadini

07 amanzi omlambo

08 amanzi asekhaya

 

Ukuba unomdla kwiimveliso zethu, unokukhetha ukushiya ulwazi lwakho apha, kwaye siya kuqhagamshelana nawe kungekudala.


Bhala umyalezo wakho apha kwaye uwuthumele kuthi

Ukuba unomdla kwiimveliso zethu, unokukhetha ukushiya ulwazi lwakho apha, kwaye siya kuqhagamshelana nawe kungekudala.


xhBantu