125QJB Deep Well Submersible Pump

Lakukan pemprosesan OEM! Mengikut keperluan pengguna, reka bentuk dan pembuatan pelbagai jenis keperluan khas motor dan pam tenggelam bukan standard. Piawaian pelaksanaan produk: GB/T2816-2014 "pam tenggelam telaga", GB/T2818-2014 "motor tak segerak tenggelam telaga". WhatsApp:17855846335
PDF DOWNLOAD
Butiran
Tag
 
Gambaran Keseluruhan Produk

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Syarat Penggunaan

1, bekalan kuasa: tiga fasa AC 380V (toleransi + / - 5%), 50HZ (toleransi + / - 1%).

2, kualiti air:

(1) water temperature is not higher than 20 °C;

(2) kandungan kekotoran pepejal (nisbah jisim) tidak melebihi 0.01%;

(3) Nilai PH (pH) 6.5-8.5;

(4) kandungan hidrogen sulfida tidak melebihi 1.5mg/L;

(5) kandungan ion klorida tidak melebihi 400mg/L.

3, motor ditutup atau struktur basah yang dipenuhi air, sebelum menggunakan rongga motor tenggelam mesti penuh dengan air bersih, untuk mengelakkan penuh palsu, dan kemudian ketatkan suntikan air, bolt pelepas udara, jika tidak, tidak dibenarkan menggunakan

4, pam tenggelam mesti tenggelam sepenuhnya di dalam air, kedalaman menyelam tidak lebih daripada 70m, bahagian bawah pam tenggelam dari bahagian bawah telaga tidak kurang daripada 3m.

5, aliran air telaga harus dapat memenuhi keluaran air pam tenggelam dan operasi berterusan, keluaran air pam tenggelam harus dikawal pada 0.7 - 1.2 kali aliran undian.

6, telaga harus lurus, pam tenggelam tidak boleh digunakan atau dibuang, hanya penggunaan menegak.

7, pam tenggelam mesti dipadankan dengan kabel mengikut keperluan, dan peranti perlindungan beban luaran. 8, pam adalah dilarang sama sekali tanpa mesin ujian tanpa beban air

 

 
Maksud Model

125QJB Deep Well Submersible Pump

 
Rujukan Model Separa
Model Aliran (m3/j)  kepala
(m)
 Rotating speed(change/point)  Pam air(%)  Outlet
diameter
(mm)
Berkenaan dengan baik
diameter(mm) 
Dinilai
kuasa(KW)
Rated voltage(V) Ratedcurrent(A)  Kecekapan motor (%)  power factorcosφ  Unit
Saiz Maksimum Jejari (mm)
Teguran
125QJ5-34 5 34 2850 53 40  125atas 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125atas 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125atas 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125atas 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125atas 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125atas 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125atas 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125atas 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125atas 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125atas 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125atas 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125atas 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125atas 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125atas 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Amaran keselamatan

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Pengenalan kepada Struktur
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Ciri-ciri utama produk termasuk:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

125QJB Deep Well Submersible Pump

 

 
Pasang

(1) Penyediaan sebelum pemasangan:
1. Periksa sama ada pam tenggelam memenuhi syarat penggunaan dan skop yang dinyatakan dalam manual.
2. Menggunakan obiect berat dengan diameter sama dengan diameter luar maksimum pam tenggelam, ukur sama ada diameter dalam lubang telaga boleh memuatkan pam tenggelam, dan ukur sama ada kedalaman telaga memenuhi keperluan pemasangan.

3. Periksa sama ada lubang telaga bersih dan sama ada air telaga itu keruh. Jangan sekali-kali menggunakan pam elektrik tenggelam untuk mencuci lumpur pam welor dan air pasir untuk mengelakkan kerosakan pramatang pada pam elektrik tenggelam.

4. Periksa sama ada kedudukan pengapit pemasangan welhead sesuai dan sama ada ia boleh menahan kualiti keseluruhan unit

5. Periksa sama ada komponen pam tenggelam lengkap dan dipasang dengan betul mengikut gambar rajah pemasangan dalam manual Tanggalkan skrin penapis dan putar gandingan untuk melihat sama ada ia berputar secara fleksibel

6. Tanggalkan skru air dan isikan rongga motor dengan air bersih dan tidak menghakis (nota. pastikan anda mengisinya), kemudian ketatkan skru air. Selepas 12 jam suntikan air, rintangan penebat motor hendaklah tidak kurang daripada 150M Q apabila diukur dengan meja goncang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Gambar rajah proses pendawaian kabel yang dilampirkan adalah seperti berikut:

125QJB Deep Well Submersible Pump

8. Gunakan multimeter untuk memeriksa sama ada wayar tiga fasa disambungkan dan sama ada rintangan DC adalah lebih kurang seimbang.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Peralatan dan alatan pemasangan:
1. Sepasang rantai angkat untuk lebih daripada dua tan.
2. Tripod dengan ketinggian menegak tidak kurang daripada empat meter.
3. Dua tali gantung (tali dawai) yang boleh menanggung berat lebih daripada satu tan (boleh menanggung berat set lengkap pam air).
4. Pasang dua pasang pengapit (splints).
5. Sepana, tukul, pemutar skru, alatan dan instrumen elektrik, dsb.

 

(3) Pemasangan pam elektrik:
1. Gambar rajah pemasangan pam elektrik tenggelam ditunjukkan dalam Rajah 2. Dimensi pemasangan khusus ditunjukkan dalam Jadual 3 "Senarai Dimensi Pemasangan Pam Elektrik Rendam".


2. Pam elektrik tenggelam dengan kepala kurang daripada 30 meter boleh dinaikkan terus ke dalam telaga menggunakan hos dan tali dawai atau tali rami lain yang boleh menanggung berat penuh keseluruhan mesin, paip air, dan air dalam paip.

3. Pam dengan kepala lebih daripada 30 meter menggunakan paip keluli, dan urutan pemasangan adalah seperti berikut:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Angkat sedikit pam tenggelam, keluarkan pengapit di hujung atas pam air, ikat kabel dengan kuat pada paip air dengan pita plastik, dan ikat perlahan-lahan sehingga Pengapit diletakkan di kepala telaga.
④Gunakan kaedah yang sama untuk mengikat semua paip air ke dalam telaga.
⑤Selepas kabel plumbum disambungkan ke suis kawalan, ia disambungkan ke bekalan kuasa tiga fasa.

 

(4) Perkara yang perlu diberi perhatian semasa pemasangan:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Semasa pemasangan, pad getah hendaklah diletakkan pada bebibir setiap paip dan diketatkan sama rata.
3. Apabila pam air diturunkan ke dalam telaga, ia harus diletakkan di tengah-tengah paip telaga untuk mengelakkan pam daripada berjalan di dinding telaga untuk masa yang lama, menyebabkan pam bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pam air ke dasar telaga mengikut keadaan pasir dan kelodak telaga yang mengalir. Jangan tanam pam di dalam lumpur. Jarak dari pam air ke dasar telaga biasanya tidak kurang daripada 3 meter (lihat Rajah 2).
5. Kedalaman kemasukan air pam air hendaklah tidak kurang daripada 1-1.5 meter dari paras air dinamik ke nod salur masuk air (lihat Rajah 2). Jika tidak, galas pam air mungkin mudah rosak.
6. Lif pam air tidak boleh terlalu rendah. Jika tidak, injap pintu perlu dipasang pada saluran paip air kepala telaga untuk mengawal aliran pam pada titik aliran berkadar untuk mengelakkan motor daripada terlebih beban dan terbakar akibat kadar aliran yang besar.
7. Apabila pam air sedang berjalan, keluaran air hendaklah berterusan dan sekata, arus harus stabil (di bawah keadaan kerja yang diberi nilai, secara amnya tidak lebih daripada 10% daripada arus undian), dan tidak sepatutnya ada getaran atau bunyi. Sekiranya terdapat sebarang kelainan, mesin hendaklah dihentikan untuk mengetahui punca dan menghapuskannya.
8. Apabila memasang, perhatikan tetapan wayar pembumian motor (lihat Rajah 2). Apabila paip air adalah paip keluli, bawa ia dari pengapit kepala telaga; apabila paip air adalah paip plastik, bawa ia dari tanda pembumian pam elektrik.

 

 
Penyelenggaraan dan Penyelenggaraan
  • 1. Selepas pam tenggelam dipasang, periksa rintangan penebat dan pengaliran tiga fasa dari suis sekali lagi, periksa sama ada instrumen dan sambungan peralatan permulaan adalah salah, jika tiada masalah, mesin percubaan boleh dimulakan, dan perhatikan sama ada bacaan penunjuk instrumen melebihi voltan dan arus terkadar yang dinyatakan pada papan nama selepas permulaan, dan perhatikan sama ada pam mempunyai fenomena bunyi dan getaran, dan mula beroperasi jika semuanya normal.
  • 2. Selepas operasi pertama pam selama empat jam, motor hendaklah dimatikan untuk menguji rintangan penebat haba dengan cepat, dan nilainya tidak boleh kurang daripada 0.5 megaohm.
  • 3. Selepas pam ditutup, ia perlu dimulakan selepas lima minit untuk mengelakkan ruang air dalam paip daripada dialirkan semula sepenuhnya dan menyebabkan arus motor berlebihan dan keletihan.
  • 4. Selepas pam dimasukkan ke dalam operasi biasa, untuk memanjangkan hayat perkhidmatannya, adalah perlu untuk memeriksa sama ada voltan bekalan, arus kerja dan rintangan penebat adalah normal dengan kerap. Jika keadaan berikut ditemui, pam hendaklah dimatikan serta-merta untuk menyelesaikan masalah.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Paras air dinamik menurun ke bahagian salur masuk air, menyebabkan air terputus-putus.
  • 3 Pam tenggelam mempunyai getaran atau bunyi yang teruk.
  • 4 Voltan bekalan adalah lebih rendah daripada 340 volt.
  • 5 Fius terbakar.
  • 6 Paip bekalan air rosak.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Penyimpanan dan Penjagaan

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Memakai Bahagian
    • Pendesak
    • Lengan aci
    • Lengan aci getah
    •  Cincin pengedap

 
Senario Aplikasi

01 Pengambilan air perigi dalam

02 Bekalan air bertingkat tinggi

03 bekalan air gunung 

04 air menara

05 Pengairan pertanian

06 pengairan taman

07 pengambilan air sungai

08 air domestik

 

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


Tulis mesej anda di sini dan hantarkan kepada kami

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


ms_MYMalay