QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeves as lubricant. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and burnout caused by motor lack of oil wear. Most suitable for music fountains, all models can be used flat.
The product is powered by three-phase AC 380V power supply, 50HZ pump, suitable for water temperature is not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality conditions. The product adopts closed or water-filled wet structure of the motor, before use the submersible motor chamber filled with clean water to prevent the occurrence of virtual filling. The submersible pump must be completely immersed in water operation, penetration depth shall not exceed 70 meters, to the bottom of the well distance shall not be less than 3 meters. The water flow in the well must meet the water requirements of the submersible pump and continuous operation, and the water output of the pump is controlled between 0.7-1.2 times the rated flow. The well should be vertical and the submersible pump can only be placed vertically, not horizontal or upside down. The submersible pump must be equipped with cables and external overload protection devices as required. It is strictly prohibited to conduct no-load test of the pump without water.
Model |
Aliran (m3/h) |
kepala (m) |
Kelajuan berputar (ubah/titik) |
Waterpump (%) |
Outlet diameter (mm) |
Berkenaan dengan baik diameter(mm) |
Dinilai power(KW) |
Dinilai voltan(V) |
Dinilai semasa (A) |
Kecekapan motor (%) | power factorcosφ | Unit Saiz Maksimum Jejari (mm) |
Teguran | |||||||||
300QJ200-40 | 200 | 40 | 2900 | 76 | 150 | 300atas | 37 | 380 | 77.8 | 85.0 | 0.85 | 281 | ||||||||||
300QJ200-60 | 60 | 55 | 115 | 85.5 | 0.85 | |||||||||||||||||
300QJ200-80 | 80 | 75 | 154.1 | 86.0 | 0.86 | |||||||||||||||||
300QJ200-100 | 100 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-120 | 120 | 100 | 204.3 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ200-160 | 160 | 140 | 277.8 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-180 | 180 | 160 | 317.5 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-200 | 200 | 185 | 367.2 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-240 | 240 | 220 | 436.6 | 88.0 | 0.87 | |||||||||||||||||
300QJ320-30 | 320 | 30 | 2900 | 77 | 200 | 300atas | 45 | 380 | 94.6 | 85.0 | 0.85 | 281 | ||||||||||
300QJ320-60 | 60 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ320-90 | 90 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ320-120 | 120 | 160 | 317.5 | 88.0 | 0.87 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, dengan ketat mengikut peruntukan angkat pam, julat aliran penggunaan, untuk mengelakkan aliran rendah atau daya pam angkat tinggi, galas tujahan dan bahagian lain haus, beban motor terbakar
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ, after the start to observe the voltage and current, check the motor winding insulation, whether it meets the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature motor
The pump parts of this product are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The product adopts water immersion wet three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm set at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the temperature rise of the motor. In order to prevent the sand particles from entering the motor, the upper end of the motor shaft extension is installed with two oil seals, and the sand ring is set to form a sand blocking structure. At the same time, in order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the bottom of the motor is equipped with a thrust bearing. The motor and pump bearing are lubricated by water. The stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump design adopts computer CAD, with simple structure and good technical performance.

(1) Penyediaan sebelum pemasangan:
1. Periksa sama ada pam tenggelam memenuhi syarat penggunaan dan skop yang dinyatakan dalam manual.
2. Menggunakan obiect berat dengan diameter sama dengan diameter luar maksimum pam tenggelam, ukur sama ada diameter dalam lubang telaga boleh memuatkan pam tenggelam, dan ukur sama ada kedalaman telaga memenuhi keperluan pemasangan.
3. Periksa sama ada lubang telaga bersih dan sama ada air telaga itu keruh. Jangan sekali-kali menggunakan pam elektrik tenggelam untuk mencuci lumpur pam welor dan air pasir untuk mengelakkan kerosakan pramatang pada pam elektrik tenggelam.
4. Periksa sama ada kedudukan pengapit pemasangan welhead sesuai dan sama ada ia boleh menahan kualiti keseluruhan unit
5. Periksa sama ada komponen pam tenggelam lengkap dan dipasang dengan betul mengikut gambar rajah pemasangan dalam manual Tanggalkan skrin penapis dan putar gandingan untuk melihat sama ada ia berputar secara fleksibel
6. Tanggalkan skru air dan isikan rongga motor dengan air bersih dan tidak menghakis (nota. pastikan anda mengisinya), kemudian ketatkan skru air. Selepas 12 jam suntikan air, rintangan penebat motor hendaklah tidak kurang daripada 150M Q apabila diukur dengan meja goncang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Gambar rajah proses pendawaian kabel yang dilampirkan adalah seperti berikut:
8. Gunakan multimeter untuk memeriksa sama ada wayar tiga fasa disambungkan dan sama ada rintangan DC adalah lebih kurang seimbang.
9. Periksa sama ada kapasiti litar dan pengubah telah terlebih beban, dan kemudian sambungkan suis perlindungan beban lampau atau peralatan permulaan. Lihat Jadual 2 untuk model tertentu, dan kemudianTuangkan baldi air ke dalam pam air dari alur keluar pam air untuk melincirkan galas getah dalam pam, dan kemudian letakkan pam elektrik tenggelam tegak dan stabil. Mula (tidak lebih dari satu saat) dan semak sama ada arah stereng adalah konsisten dengan tanda stereng. Jika tidak, tukar mana-mana dua penyambung kabel tiga fasa. Kemudian pasang penapis dan bersedia untuk turun ke dalam telaga. Jika digunakan dalam majlis-majlis khas (seperti parit, parit, sungai, kolam, kolam, dll.), pam elektrik mesti dibumikan dengan pasti.
(2) Peralatan dan alatan pemasangan:
1. Sepasang rantai angkat untuk lebih daripada dua tan.
2. Tripod dengan ketinggian menegak tidak kurang daripada empat meter.
3. Dua tali gantung (tali dawai) yang boleh menanggung berat lebih daripada satu tan (boleh menanggung berat set lengkap pam air).
4. Pasang dua pasang pengapit (splints).
5. Sepana, tukul, pemutar skru, alatan dan instrumen elektrik, dsb.
(3) Pemasangan pam elektrik:
1. Gambar rajah pemasangan pam elektrik tenggelam ditunjukkan dalam Rajah 2. Dimensi pemasangan khusus ditunjukkan dalam Jadual 3 "Senarai Dimensi Pemasangan Pam Elektrik Rendam".
2. Pam elektrik tenggelam dengan kepala kurang daripada 30 meter boleh dinaikkan terus ke dalam telaga menggunakan hos dan tali dawai atau tali rami lain yang boleh menanggung berat penuh keseluruhan mesin, paip air, dan air dalam paip.
3. Pam dengan kepala lebih daripada 30 meter menggunakan paip keluli, dan urutan pemasangan adalah seperti berikut:
①Gunakan pengapit untuk mengapit hujung atas bahagian pam air (motor dan pam air telah disambungkan pada masa ini), angkatnya dengan rantai gantung, dan ikat perlahan-lahan ke dalam perigi sehingga Letakkan pengapit pada kepala perigi dan keluarkan rantai gantung.
② Gunakan sepasang pengapit lain untuk mengapit paip, angkat dengan rantai gantung 15 cm dari bebibir, dan turunkannya perlahan-lahan. Antara bebibir paip dan bebibir pamLetakkan pad getah pada tempatnya dan ketatkan paip dan pam sama rata dengan bolt, nat dan pencuci spring.
③ Angkat sedikit pam tenggelam, keluarkan pengapit di hujung atas pam air, ikat kabel dengan kuat pada paip air dengan pita plastik, dan ikat perlahan-lahan sehingga Pengapit diletakkan di kepala telaga.
④Gunakan kaedah yang sama untuk mengikat semua paip air ke dalam telaga.
⑤Selepas kabel plumbum disambungkan ke suis kawalan, ia disambungkan ke bekalan kuasa tiga fasa.
(4) Perkara yang perlu diberi perhatian semasa pemasangan:
1. Jika fenomena jamming ditemui semasa proses mengepam, pusing atau tarik paip air untuk mengatasi masalah jamming point. Jika pelbagai langkah masih tidak berkesan, silaJangan paksa pam ke bawah untuk mengelakkan kerosakan pada pam elektrik tenggelam dan telaga.
2. Semasa pemasangan, pad getah hendaklah diletakkan pada bebibir setiap paip dan diketatkan sama rata.
3. Apabila pam air diturunkan ke dalam telaga, ia harus diletakkan di tengah-tengah paip telaga untuk mengelakkan pam daripada berjalan di dinding telaga untuk masa yang lama, menyebabkan pam bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pam air ke dasar telaga mengikut keadaan pasir dan kelodak telaga yang mengalir. Jangan tanam pam di dalam lumpur. Jarak dari pam air ke dasar telaga biasanya tidak kurang daripada 3 meter (lihat Rajah 2).
5. Kedalaman kemasukan air pam air hendaklah tidak kurang daripada 1-1.5 meter dari paras air dinamik ke nod salur masuk air (lihat Rajah 2). Jika tidak, galas pam air mungkin mudah rosak.
6. Lif pam air tidak boleh terlalu rendah. Jika tidak, injap pintu perlu dipasang pada saluran paip air kepala telaga untuk mengawal aliran pam pada titik aliran berkadar untuk mengelakkan motor daripada terlebih beban dan terbakar akibat kadar aliran yang besar.
7. Apabila pam air sedang berjalan, keluaran air hendaklah berterusan dan sekata, arus harus stabil (di bawah keadaan kerja yang diberi nilai, secara amnya tidak lebih daripada 10% daripada arus undian), dan tidak sepatutnya ada getaran atau bunyi. Sekiranya terdapat sebarang kelainan, mesin hendaklah dihentikan untuk mengetahui punca dan menghapuskannya.
8. Apabila memasang, perhatikan tetapan wayar pembumian motor (lihat Rajah 2). Apabila paip air adalah paip keluli, bawa ia dari pengapit kepala telaga; apabila paip air adalah paip plastik, bawa ia dari tanda pembumian pam elektrik.
- 1 submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
- 2 operasi pam untuk empat jam pertama, perlu ditutup dengan cepat menguji rintangan penebat haba motor, nilainya tidak boleh kurang daripada 0.5 megaohm.
- 3 pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
- 4 pam ke dalam operasi biasa, untuk memanjangkan hayat perkhidmatannya, untuk memeriksa voltan bekalan, arus kerja dan rintangan penebat adalah normal, jika mendapati situasi berikut, harus segera menutup penyelesaian masalah.
- 1 dalam keadaan undian, arus lebih daripada 20%.
- 2 aras air dinamik ke bahagian salur masuk air, menyebabkan air terputus-putus.
- 3 pam tenggelam getaran atau bunyi yang teruk.
- 4 voltan bekalan adalah lebih rendah daripada 340 volt.
- 5 fius terbakar satu fasa.
- 6 kerosakan paip air.
- 7 motor kepada rintangan penebat haba adalah kurang daripada 0.5 megaohm.
- 5. This product is a high-quality submersible pump, in addition to the efficient pumping function, but also easy to maintain and clean. The disassembly process is simple and clear, just follow the steps to untie the cable, remove the pipeline part, take off the line protection plate, loosen the water discharge bolt, remove the filter and loosen the fixing screw, separate the pump and the motor, and then remove the parts of the pump and the motor, pay attention to avoid damage. When assembling, thoroughly clean the components, apply sealant on the mating surface and fasteners, and then assemble in the opposite order. Every year or two years after immersion, check in accordance with the steps, replace the worn parts. This product has a reasonable structure, easy to operate, and is suitable for various occasions for pump needs.
1, keluarkan air dalam rongga motor (terutama pada musim sejuk untuk mengelakkan motor daripada membeku), dan ikat kabel dengan baik.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, penggunaan jangka panjang perlu memberi perhatian kepada pencegahan karat pam tenggelam.
- Pendesak
- Lengan aci
- Lengan aci getah
-
Cincin pengedap
01 Pengambilan air perigi dalam
02 Bekalan air bertingkat tinggi
03 bekalan air gunung
04 air menara
05 Pengairan pertanian
06 pengairan taman
07 pengambilan air sungai
08 air domestik