Pam Telaga Dalam Siri Separa Tahan Karat Split

Lakukan pemprosesan OEM! Mengikut keperluan pengguna, reka bentuk dan pembuatan pelbagai jenis keperluan khas motor dan pam tenggelam bukan standard. Piawaian pelaksanaan produk: GB/T2816-2014 "pam tenggelam telaga", GB/T2818-2014 "motor tak segerak tenggelam telaga". WhatsApp:17855846335
PDF DOWNLOAD
Butiran
Tag
 
Gambaran Keseluruhan Produk

Penggunaan motor tenggelam terendam air, lengan aloi tahan haus rotor dan reka bentuk cakera tujahan aloi.Lebih tahan lama daripada (penggulungan terendam minyak, motor galas rotor), lebih mesra alam.Tiada kebocoran minyak selepas kegagalan pam, tiada pencemaran air telaga, penggunaan lebih selamat.Kumpulan pendesak menggunakan bahan polimer komposit PC tahan haus anti-pasir kekuatan tinggi, reka bentuk hidraulik tiga dimensi baharu, pendesak terapung, rintangan haus struktur anti-pasir seramik, lif penuh, aliran besar. motor boleh menyelam kedalaman 300 meter.

 

 
Syarat Penggunaan

This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply system, designed for strict water quality requirements. The product is suitable for water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L environment. This product is equipped with a closed or water-filled wet structure motor, before use must be submersible motor inner cavity filled with clean water to prevent false full, and then tighten the water and air bolts, otherwise not to use. The submersible pump must be completely immersed in water to work, penetration depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. In addition, the well water flow should meet the continuous operation requirements of the submersible pump, the water output of the submersible pump should be controlled at 0.7-1.2 times the rated flow. When used, the well must be vertical, and the submersible pump can not be used horizontally or dumped, only vertical installation. To ensure safety, the submersible pump must match the cable according to the requirements and be equipped with external overload protection device, and it is strictly prohibited to conduct no-load test on the pump without water. This product is an ideal choice for providing high quality water source, and can be widely used in various industrial and civil water processing fields.

 

 
Maksud Model

Semi-Stainless Steel Split Series Deep Well Pump

 
Rujukan Model Separa

105QJ series water-filled stainless steel deep well pump

Model

Aliran

m³/h

kepala

(m)

Motor

Kuasa

(KW)

Unit

diameter

(mm)

diameter (mm)

105QJ2-230/36

2

230

4kw

103

105

105QJ2-300/50

300

5.5kw

105QJ2-390/65

390

7.5kw

105QJ4-50/10

4

50

1.1kw

103

105

105QJ4-60/12

60

1.5kw

105QJ4-80/16

80

2.2kw

105QJ4-100/20

100

3kw

105QJ4-140/28

140

4kw

105QJ4-200/40

200

5.5kw

105QJ4-275/55

275

7.5kw

105QJ6-35/10

6

35

1.1kw

103

105

105QJ6-40/12

40

1.5kw

105QJ6-60/16

60

2.2kw

105QJ6-75/20

75

3kw

105QJ6-105/28

105

4kw

105QJ6-140/40

140

5.5kw

105QJ6-192/55

192

7.5kw

105QJ8-25/5

8

25

1.1kw

103

105

105QJ8-40/8

40

1.5kw

105QJ8-55/11

55

2.2kw

105QJ8-75/15

75

3kw

105QJ8-95/19

95

4kw

105QJ8-125/25

125

5.5kw

105QJ8-160/32

160

7.5kw

105QJ10-20/5

10

20

1.1kw

103

105

105QJ10-30/8

30

1.5kw

105QJ10-40/11

40

2.2kw

105QJ10-55/15

55

3kw

105QJ10-75/19

75

4kw

105QJ10-90/25

90

5.5kw

105QJ10-120/32

120

7.5kw

105QJ16-22/9

16

22

2.2kw

103

105

105QJ16-28/12

28

3kw

105QJ16-35/15

35

4kw

105QJ16-50/20

50

5.5kw

105QJ16-68/27

68

7.5kw

 

130QJ series water-filled stainless steel deep well pump

Model

Aliran

m³/h

kepala

(m)

Motor

Kuasa

(KW)

Unit

diameter

(mm)

diameter (mm)

130QJ10-60/7

10

60

1.5kw

130

135

130QJ10-80/12

80

2.2kw

130QJ10-100/15

100

3kw

130QJ10-130/20

130

4kw

130QJ10-160/25

160

5.5kw

130QJ10-220/32

220

7.5kw

130QJ10-250/38

250

9.2kw

130QJ10-300/42

300

11kw

130QJ10-350/50

350

13kw

130QJ10-400/57

400

15kw

130QJ10-450/64

450

18.5kw

130QJ10-500/70

500

22kw

130QJ15-40/5

15

40

1.5kw

130

135

130QJ15-50/7

50

2.2kw

130QJ15-60/10

60

3kw

130QJ15-80/12

80

4kw

130QJ15-105/15

105

5.5kw

130QJ15-150/22

150

7.5kw

130QJ15-170/25

170

9.2kw

130QJ15-200/28

200

11kw

130QJ15-240/34

240

13kw

130QJ15-280/40

280

15kw

130QJ15-300/42

300

18.5kw

130QJ15-336/48

336

18.5kw

130QJ15-350/50

350

22kw

130QJ15-400/56

400

22kw

 

130QJ series water-filled stainless steel deep well pump

 

Model

Aliran

m³/h

kepala

(m)

Motor

Kuasa

(KW)

Unit

diameter

(mm)

diameter (mm)

130QJ20-22/3

20

30

2.2kw

130

135

130QJ20-30/5

42

3kw

130QJ20-42/6

54

4kw

130QJ20-52/8

65

5.5kw

130QJ20-72/11

85

7.5kw

130QJ20-90/14

110

9.2kw

130QJ20-105/16

128

11kw

130QJ20-130/19

145

13kw

130QJ20-150/22

164

15kw

130QJ20-182/27

182

18.5kw

130QJ20-208/31

208

22kw

130QJ20-240/35

240

25kw

130QJ20-286/42

286

30kw

130QJ25-35/6

25

35

3kw

130

135

130QJ25-40/7

40

4kw

130QJ25-52/9

52

5.5kw

130QJ25-70/12

70

7.5kw

130QJ25-85/15

85

9.2kw

130QJ25-105/18

105

11kw

130QJ25-120/21

120

13kw

130QJ25-140/24

140

15kw

 

150QJ series water-filled stainless steel deep well pump

Model

Aliran

m³/h

kepala

(m)

Motor

Kuasa

(KW)

Unit

diameter

(mm)

diameter (mm)

150QJ12-40/3

12

40

2.2kw

143

150

150QJ12-55/5

55

3kw

150QJ12-80/7

80

4kw

150QJ12-107/9

107

5.5kw

150QJ12-142/11

142

7.5kw

150QJ12-175/14

175

9.2kw

150QJ12-200/16

200

11kw

150QJ12-242/19

242

13kw

150QJ12-268/21

268

15kw

150QJ12-293/23

293

18.5kw

150QJ20-28/3

20

28

3kw

143

150

150QJ20-48/5

48

4kw

150QJ20-70/7

70

5.5kw

150QJ20-90/9

90

7.5kw

150QJ20-107/11

107

9.2kw

150QJ20-135/14

135

11kw

150QJ20-155/16

155

13kw

150QJ20-175/18

175

15kw

150QJ20-195/20

195

18.5kw

150QJ20-220/22

220

18.5kw

150QJ20-235/25

235

22kw

150QJ20-255/28

255

25kw

 

150QJ series water-filled stainless steel deep well pump

Model

Aliran

m³/h

kepala

(m)

Motor

Kuasa

(KW)

Unit

diameter

(mm)

diameter (mm)

150QJ45-18/2

45

18

4KW

143

150

150QJ45-28/3

28

5.5KW

150QJ45-46/5

46

7.5KW

150QJ45-57/6

57

9.2KW

150QJ45-65/7

65

11KW

150QJ45-75/8

75

13KW

150QJ45-90/10

90

15KW

150QJ45-108/12

108

18.5KW

150QJ45-125/14

125

22KW

150QJ45-145/16

145

25KW

150QJ45-168/18

168

30KW

150QJ32-20/2

32

20

3kw

143

150

150QJ32-30/3

30

4kw

150QJ32-43/4

43

5.5kw

150QJ32-60/5

60

7.5kw

150QJ32-65/6

65

7.5kw

150QJ32-75/7

75

9.2kw

150QJ32-85/8

85

11kw

150QJ32-100/9

100

13kw

150QJ32-110/10

110

15kw

150QJ32-118/11

118

18.5kw

150QJ32-140/13

140

18.5kw

150QJ32-155/15

155

22kw

150QJ32-185/18

185

25kw

150QJ32-215/21

215

30kw

 

 

 
Amaran keselamatan

 This kind of well submersible pump is a clean water pump. It is strictly prohibited to dig new wells and extract sediments and turbid water. The voltage grade of the well pump is 380/50HZ. The submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common comprehensive motor protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc., to prevent timely tripping when abnormal conditions occur. The pump must be reliably grounded during installation and use, and it is strictly prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installation and maintenance of the pump. The place where the pump is used must be set up with obvious "anti-electric shock" marks. Before going down the well or installation, the motor must be filled with distilled water or non-corrosive clean cold water in the internal chamber, and the drain bolt must be fastened. When testing the pump on the ground, water must be injected into the pump chamber to lubricate the rubber bearings. The instantaneous start time shall not exceed one second to check whether the direction is correct, and the direction is the same as the direction indicator. When the pump is erected, pay attention to safety to prevent injury from tilting. Strictly in accordance with the provisions of the pump lift and flow range of use, to avoid the pump in the low flow when the large flow or in the high lift appears in the large pull, resulting in extreme wear of thrust bearings and other components, the motor overload and burn. After the pump into the well, the insulation resistance between the motor and the ground should be measured, not less than 100MΩ. After the start, regular observation of voltage and current, and check whether the motor winding insulation meets the requirements of the provisions. If the location temperature of the pump storage is below the freezing point, the water in the motor cavity should be drained, so as not to damage the motor in winter low temperature freezing.

 

 
Penyelenggaraan dan Penyelenggaraan
  1. 1.Pemasangan pam tenggelam selesai, semak semula rintangan penebat dan pengaliran tiga fasa dari suis, periksa instrumen dan mulakan ralat sambungan peralatan, jika tiada masalah, boleh memulakan percubaan, selepas permulaan instrumen menunjukkan bacaan sama ada lebih daripada papan nama yang ditetapkan voltan dan arus undian, perhatikan bunyi pam dan fenomena getaran, segala-galanya adalah normal boleh dimasukkan ke dalam operasi.
  2. 2. Operasi pertama pam selama empat jam, hendaklah ditutup dengan cepat menguji rintangan penebat haba motor, nilainya tidak boleh kurang daripada 0.5 megaohm.
  3. 3. Selepas penutupan pam, hendaklah dimulakan selepas selang lima minit, untuk mengelakkan lajur air dalam paip tidak refluks sepenuhnya disebabkan oleh arus motor yang berlebihan dan keletihan.
  4. 4. Selepas pam ke dalam operasi biasa, untuk memanjangkan hayat perkhidmatannya, untuk memeriksa voltan bekalan, arus kerja dan rintangan penebat adalah normal, jika mendapati situasi berikut, harus segera menutup penyelesaian masalah.
  5.  

 1 dalam keadaan undian, arus lebih daripada 20%.

 2 aras air dinamik ke bahagian salur masuk air, menyebabkan air terputus-putus.

 3 pam tenggelam getaran atau bunyi yang teruk.

 4 voltan bekalan adalah lebih rendah daripada 340 volt.

 5 fius terbakar satu fasa.

 6 kerosakan paip air.

 7 motor kepada rintangan penebat haba adalah kurang daripada 0.5 megaohm.

 

  1. 5. Unit pembongkaran:

 1 buka ikatan kabel, tanggalkan bahagian saluran paip, tanggalkan plat wayar.

 2 skru ke bawah bolt air, masukkan air ke dalam ruang motor.

 3 keluarkan penapis, longgarkan skru tetap pada gandingan untuk menetapkan aci motor.

 4 skru ke bawah bolt yang menyambungkan bahagian salur masuk air dengan motor, dan pisahkan pam daripada motor (perhatikan kusyen unit semasa memisahkan, untuk mengelakkan lenturan aci pam)

 5 urutan pembongkaran pam ialah: (lihat rajah 1) bahagian salur masuk air, pendesak, cangkerang lencongan, pendesak...... badan injap semak, apabila mengeluarkan pendesak, gunakan alat khas untuk melonggarkan lengan kon tetap pendesak terlebih dahulu, dan elakkan lenturan dan lebam aci pam semasa proses pembongkaran.

 6 proses pembongkaran motor ialah: (lihat rajah 1) letakkan motor pada platform, dan tanggalkan nat, tapak, nat pengunci kepala aci, plat tujah, kunci, tempat duduk galas pemandu bawah dan bolt kepala dua dari bahagian bawah motor pula, dan kemudian keluarkan pemutar (perhatikan untuk tidak merosakkan pakej wayar) dan akhirnya keluarkan bahagian penyambung dan tempat duduk galas panduan atas.

 7 unit pemasangan: sebelum pemasangan, karat dan kotoran bahagian hendaklah dibersihkan, dan permukaan mengawan dan pengikat disalut dengan sealant, dan kemudian dipasang dalam susunan yang bertentangan dengan pembongkaran (aci motor bergerak ke atas dan ke bawah selepas pemasangan selama kira-kira satu milimeter), selepas pemasangan, gandingan hendaklah fleksibel, dan kemudian mesin ujian skrin penapis. Pam tenggelam hendaklah dibawa keluar dari telaga untuk dibongkar dan penyelenggaraan mengikut Perkara 5 selepas setahun beroperasi, atau kurang daripada setahun beroperasi tetapi dua tahun masa menyelam, dan bahagian yang haus hendaklah diganti.

 

 
Penyimpanan dan Penjagaan

Produk ini adalah pam elektrik tenggelam dengan prestasi cemerlang. Reka bentuknya yang unik sesuai digunakan dalam pelbagai majlis. Sama ada untuk mengelakkan motor daripada membeku pada musim sejuk atau untuk mengelakkan karat apabila ia tidak digunakan untuk jangka masa yang lama, pam elektrik tenggelam ini boleh memenuhi keperluan anda untuk penyelenggaraan peralatan. Ia mudah dikendalikan dan mudah diselenggara. Hanya ikuti langkah dalam manual untuk penyelenggaraan dan penyimpanan yang betul, yang boleh memanjangkan hayat perkhidmatan produk dengan berkesan. Dapatkan pam elektrik tenggelam ini sekarang dan jadikan kerja anda lebih lancar dan cekap!

 

 
Senario Aplikasi

01 Pengambilan air perigi dalam

02 Bekalan air bertingkat tinggi

03 bekalan air gunung 

04 air menara

05 Pengairan pertanian

06 pengairan taman

07 pengambilan air sungai

08 air domestik

 

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


Tulis mesej anda di sini dan hantarkan kepada kami

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


ms_MYMalay