175QJP Pam Rendam Perigi Peep

Lakukan pemprosesan OEM! Mengikut keperluan pengguna, reka bentuk dan pembuatan pelbagai jenis keperluan khas motor dan pam tenggelam bukan standard. Piawaian pelaksanaan produk: GB/T2816-2014 "pam tenggelam telaga", GB/T2818-2014 "motor tak segerak tenggelam telaga". WhatsApp:17855846335
PDF DOWNLOAD
Butiran
Tag
 
Gambaran Keseluruhan Produk

QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.

 

 
Syarat Penggunaan

This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.

 

 
Maksud Model

175QJP Peep Well Submersible Pump

 
Rujukan Model Separa
Model Aliran (m3/j) kepala
(m)

Kelajuan berputar

(ubah/titik)

Pam air(%)  Outlet
diameter
(mm)
Berkenaan dengan baik
diameter(mm) 
 Dinilai
power(KW)
Dinilai
voltan(V)
Dinilai
semasa (A)
Kecekapan motor (%) power factorcosφ   Unit
Saiz Maksimum Jejari (mm)
175QJ10-42 10 42 2850 53 50  175atas 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175atas 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175atas 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175atas 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175atas 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175atas 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175atas 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175atas 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175atas 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175atas 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175atas 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175atas 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175atas 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Amaran keselamatan

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, dengan ketat mengikut peruntukan angkat pam, julat aliran penggunaan, untuk mengelakkan aliran rendah atau daya pam angkat tinggi, galas tujahan dan bahagian lain haus, beban motor terbakar

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Pengenalan kepada Struktur

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

175QJP Peep Well Submersible Pump
 
Pasang

(1) Penyediaan sebelum pemasangan:
1. Periksa sama ada pam tenggelam memenuhi syarat penggunaan dan skop yang dinyatakan dalam manual.
2. Menggunakan obiect berat dengan diameter sama dengan diameter luar maksimum pam tenggelam, ukur sama ada diameter dalam lubang telaga boleh memuatkan pam tenggelam, dan ukur sama ada kedalaman telaga memenuhi keperluan pemasangan.
3. Periksa sama ada lubang telaga bersih dan sama ada air telaga itu keruh. Jangan sekali-kali menggunakan pam elektrik tenggelam untuk mencuci lumpur pam welor dan air pasir untuk mengelakkan kerosakan pramatang pada pam elektrik tenggelam.
4. Periksa sama ada kedudukan pengapit pemasangan welhead sesuai dan sama ada ia boleh menahan kualiti keseluruhan unit
5. Periksa sama ada komponen pam tenggelam lengkap dan dipasang dengan betul mengikut gambar rajah pemasangan dalam manual Tanggalkan skrin penapis dan putar gandingan untuk melihat sama ada ia berputar secara fleksibel
6. Tanggalkan skru air dan isikan rongga motor dengan air bersih dan tidak menghakis (nota. pastikan anda mengisinya), kemudian ketatkan skru air. Selepas 12 jam suntikan air, rintangan penebat motor hendaklah tidak kurang daripada 150M Q apabila diukur dengan meja goncang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Gambar rajah proses pendawaian kabel yang dilampirkan adalah seperti berikut:
175QJP Peep Well Submersible Pump

 

8. Gunakan multimeter untuk memeriksa sama ada wayar tiga fasa disambungkan dan sama ada rintangan DC adalah lebih kurang seimbang.
9. Periksa sama ada kapasiti litar dan pengubah telah terlebih beban, dan kemudian sambungkan suis perlindungan beban lampau atau peralatan permulaan. Lihat Jadual 2 untuk model tertentu, dan kemudianTuangkan baldi air ke dalam pam air dari alur keluar pam air untuk melincirkan galas getah dalam pam, dan kemudian letakkan pam elektrik tenggelam tegak dan stabil. Mula (tidak lebih dari satu saat) dan semak sama ada arah stereng adalah konsisten dengan tanda stereng. Jika tidak, tukar mana-mana dua penyambung kabel tiga fasa. Kemudian pasang penapis dan bersedia untuk turun ke dalam telaga. Jika digunakan dalam majlis-majlis khas (seperti parit, parit, sungai, kolam, kolam, dll.), pam elektrik mesti dibumikan dengan pasti.

 

(2) Peralatan dan alatan pemasangan:
1. Sepasang rantai angkat untuk lebih daripada dua tan.
2. Tripod dengan ketinggian menegak tidak kurang daripada empat meter.
3. Dua tali gantung (tali dawai) yang boleh menanggung berat lebih daripada satu tan (boleh menanggung berat set lengkap pam air).
4. Pasang dua pasang pengapit (splints).
5. Sepana, tukul, pemutar skru, alatan dan instrumen elektrik, dsb.

 

(3) Pemasangan pam elektrik:
1. Gambar rajah pemasangan pam elektrik tenggelam ditunjukkan dalam Rajah 2. Dimensi pemasangan khusus ditunjukkan dalam Jadual 3 "Senarai Dimensi Pemasangan Pam Elektrik Rendam".

 

2. Pam elektrik tenggelam dengan kepala kurang daripada 30 meter boleh dinaikkan terus ke dalam telaga menggunakan hos dan tali dawai atau tali rami lain yang boleh menanggung berat penuh keseluruhan mesin, paip air, dan air dalam paip.

 

3. Pam dengan kepala lebih daripada 30 meter menggunakan paip keluli, dan urutan pemasangan adalah seperti berikut:
①Gunakan pengapit untuk mengapit hujung atas bahagian pam air (motor dan pam air telah disambungkan pada masa ini), angkatnya dengan rantai gantung, dan ikat perlahan-lahan ke dalam perigi sehingga Letakkan pengapit pada kepala perigi dan keluarkan rantai gantung.
② Gunakan sepasang pengapit lain untuk mengapit paip, angkat dengan rantai gantung 15 cm dari bebibir, dan turunkannya perlahan-lahan. Antara bebibir paip dan bebibir pamLetakkan pad getah pada tempatnya dan ketatkan paip dan pam sama rata dengan bolt, nat dan pencuci spring.
③ Angkat sedikit pam tenggelam, keluarkan pengapit di hujung atas pam air, ikat kabel dengan kuat pada paip air dengan pita plastik, dan ikat perlahan-lahan sehingga Pengapit diletakkan di kepala telaga.
④Gunakan kaedah yang sama untuk mengikat semua paip air ke dalam telaga.
⑤Selepas kabel plumbum disambungkan ke suis kawalan, ia disambungkan ke bekalan kuasa tiga fasa.


(4) Perkara yang perlu diberi perhatian semasa pemasangan:
1. Jika fenomena jamming ditemui semasa proses mengepam, pusing atau tarik paip air untuk mengatasi masalah jamming point. Jika pelbagai langkah masih tidak berkesan, silaJangan paksa pam ke bawah untuk mengelakkan kerosakan pada pam elektrik tenggelam dan telaga.
2. Semasa pemasangan, pad getah hendaklah diletakkan pada bebibir setiap paip dan diketatkan sama rata.
3. Apabila pam air diturunkan ke dalam telaga, ia harus diletakkan di tengah-tengah paip telaga untuk mengelakkan pam daripada berjalan di dinding telaga untuk masa yang lama, menyebabkan pam bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pam air ke dasar telaga mengikut keadaan pasir dan kelodak telaga yang mengalir. Jangan tanam pam di dalam lumpur. Jarak dari pam air ke dasar telaga biasanya tidak kurang daripada 3 meter (lihat Rajah 2).
5. Kedalaman kemasukan air pam air hendaklah tidak kurang daripada 1-1.5 meter dari paras air dinamik ke nod salur masuk air (lihat Rajah 2). Jika tidak, galas pam air mungkin mudah rosak.
6. Lif pam air tidak boleh terlalu rendah. Jika tidak, injap pintu perlu dipasang pada saluran paip air kepala telaga untuk mengawal aliran pam pada titik aliran berkadar untuk mengelakkan motor daripada terlebih beban dan terbakar akibat kadar aliran yang besar.
7. Apabila pam air sedang berjalan, keluaran air hendaklah berterusan dan sekata, arus harus stabil (di bawah keadaan kerja yang diberi nilai, secara amnya tidak lebih daripada 10% daripada arus undian), dan tidak sepatutnya ada getaran atau bunyi. Sekiranya terdapat sebarang kelainan, mesin hendaklah dihentikan untuk mengetahui punca dan menghapuskannya.
8. Apabila memasang, perhatikan tetapan wayar pembumian motor (lihat Rajah 2). Apabila paip air adalah paip keluli, bawa ia dari pengapit kepala telaga; apabila paip air adalah paip plastik, bawa ia dari tanda pembumian pam elektrik.

 
Penyelenggaraan dan Penyelenggaraan
  • 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
  • 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
  • 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
  •  
  • 1 Dalam keadaan kerja yang dinilai, arus melebihi 20%.
  • 2 Paras air dinamik menurun ke bahagian salur masuk air, menyebabkan air terputus-putus.
  • 3 Pam tenggelam mempunyai getaran atau bunyi yang teruk.
  • 4 Voltan bekalan adalah lebih rendah daripada 340 volt.
  • 5 Fius terbakar.
  • 6 Paip bekalan air rosak.
  • 7 Rintangan penebat motor terhadap keadaan geoterma adalah lebih rendah daripada 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.untie cable rope, remove the pipeline part, remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Penyimpanan dan Penjagaan

This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.

 

 
Memakai Bahagian
  • Pendesak
  • Lengan aci
  • Lengan aci getah
  • Cincin pengedap

 
Senario Aplikasi

01 Pengambilan air perigi dalam

02 Bekalan air bertingkat tinggi

03 bekalan air gunung 

04 air menara

05 Pengairan pertanian

06 pengairan taman

07 pengambilan air sungai

08 air domestik

 

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


Tulis mesej anda di sini dan hantarkan kepada kami

Jika anda berminat dengan produk kami, anda boleh memilih untuk meninggalkan maklumat anda di sini, dan kami akan menghubungi anda sebentar lagi.


ms_MYMalay