Bomba sumergible para pozos profundos 135QJR

Realice o procesamento OEM! Segundo os requisitos do usuario, deseño e fabricación de varios tipos de requisitos especiais de motores e bombas sumerxibles non estándar. Os estándares de implementación do produto: GB/T2816-2014 "bomba sumerxible de pozo", GB/T2818-2014 "motor asíncrono de pozo sumerxible". WhatsApp: 17855846335
PDF DOWNLOAD
Detalles
Etiquetas
 
Visión xeral do produto

This product is designed for underground hot water mining with a water temperature below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. Whether used in underground mining or other hot water environments, it can effectively resist the challenges of harsh conditions. Its excellent performance and stable quality make it an ideal choice in the mining field.

 

 
Condicións de uso

 The product power requirements for three-phase AC 380V (± 5%), 50HZ (± 1%); water quality requirements include water temperature not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, the inner cavity of the submersible motor must be filled with water to prevent false filling, and then tighten the water injection and air exhaust bolts, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70m, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the displacement and continuous operation requirements of the submersible pump, and the displacement of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
Significado do modelo

135QJR Deep Well Submersible Pump

 
Modelo parcial de referencia
Modelo Caudal (m3/h) Cabeza
(m)

Velocidade de rotación

(cambio/punto)

 Bomba de auga (%) Outlet
diámetro
(mm)
Aplicable ben
diámetro (mm) 
Calificado
potencia (KW)
Calificado
tensión (V)
Calificado
corrente (A)
Eficiencia do motor (%) power factorcosφ   Unidade
Tamaño máximo radial (mm)
Observación
135QJ5-34 5 34 2850   40  135arriba 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135arriba 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135arriba 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135arriba 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135arriba 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135arriba 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135arriba 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Precaucións de seguridade

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, estrictamente de acordo coas disposicións do elevador da bomba, o intervalo de uso de fluxo, para evitar a forza de bombeo de baixo fluxo ou alta elevación, o rolamento de empuxe e outras partes do desgaste, a sobrecarga do motor queimado

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introdución á estrutura

The pump part mainly includes pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components.

 The motor part mainly includes base, pressure regulating diaphragm, bearing, bearing seat, stator, rotor, water mouth part, lead cable and other components.


As principais características do produto inclúen:

  1. 1.The motor is a water-cooled submersible three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing.
  2. 2. In order to prevent the sand in the well water from entering the motor, the motor shaft extension is installed with two oil seals, and the sand throw ring is installed to form a sand prevention structure.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the thrust bearing is installed under the motor.
  4. 4. The lubrication of the motor and the pump bearing is water lubrication.
  5. 5. The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
  6. 6. The pump designed by computer CAD has simple structure and excellent technical performance.
135QJR Deep Well Submersible Pump
 
Instalar

(1) Preparación antes da instalación:
1. Comprobe se a bomba sumerxible cumpre as condicións de uso e o alcance especificados no manual.
2. Usando un obxecto pesado cun diámetro igual ao diámetro exterior máximo da bomba sumerxible, medir se o diámetro interior do pozo pode caber na bomba sumerxible e medir se a profundidade do pozo cumpre os requisitos de instalación.
3. Comproba se o pozo está limpo e se a auga do pozo está turbia. Nunca use unha bomba eléctrica sumerxible para lavar a auga de barro e area da bomba welor para evitar danos prematuros na bomba eléctrica sumerxible.
4. Comprobe se a posición da pinza de instalación da cabeza de welhead é adecuada e se pode soportar a calidade de toda a unidade
5. Comprobe se os compoñentes da bomba sumerxible están completos e instalados correctamente segundo o diagrama de montaxe do manual. Retire a pantalla do filtro e xire o acoplamento para ver se xira con flexibilidade.
6. Desenrosque o parafuso de auga e enche a cavidade do motor con auga limpa e non corrosiva (ten en conta. Asegúrese de enchelo), despois aperte o parafuso. Despois de 12 horas de inxección de auga, a resistencia de illamento do motor non debe ser inferior a 150 M Q cando se mide cunha mesa de axitación de 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

O diagrama de proceso de cableado anexo é o seguinte:
135QJR Deep Well Submersible Pump

 

8. Use un multímetro para comprobar se os cables trifásicos están conectados e se a resistencia de CC está aproximadamente equilibrada.
9. Comprobe se o circuíto e a capacidade do transformador están sobrecargados e, a continuación, conecte o interruptor de protección contra sobrecarga ou o equipo de arranque. Consulte a Táboa 2 para coñecer modelos específicos e, a continuación, verte un balde de auga na bomba de auga desde a saída da bomba de auga para lubricar os rodamentos de goma da bomba e, a continuación, coloque a bomba eléctrica sumerxible en posición vertical e firme. Arranque (non máis dun segundo) e verifique se a dirección de dirección é coherente co sinal de dirección. Se non, intercambia dous conectores calquera do cable trifásico. Despois instala o filtro e prepárate para baixar polo pozo. Se se usa en ocasións especiais (como gabias, gabias, ríos, estanques, estanques, etc.), a bomba eléctrica debe estar conectada a terra de forma fiable.

 

(2) Equipos e ferramentas de instalación:
1. Un par de cadeas de elevación de máis de dúas toneladas.
2. Un trípode cunha altura vertical non inferior a catro metros.
3. Dúas cordas colgantes (cables de arame) que poden soportar un peso superior a unha tonelada (poden soportar o peso dun conxunto completo de bombas de auga).
4. Instale dous pares de abrazaderas (férulas).
5. Chaves inglesas, martelos, desaparafusadores, ferramentas e instrumentos eléctricos, etc.

 

(3) Instalación de bombas eléctricas:
1. O diagrama de instalación da bomba eléctrica sumerxible móstrase na Figura 2. As dimensións específicas da instalación móstranse na Táboa 3 "Lista de dimensións de instalación da bomba eléctrica sumerxible".

2. As bombas eléctricas sumerxibles cunha cabeza inferior a 30 metros pódense izar directamente ao pozo mediante mangueiras e cables de arame ou outras cordas de cánabo que poidan soportar todo o peso de toda a máquina, tubos de auga e auga nos tubos.

3. As bombas cunha cabeza de máis de 30 metros utilizan tubos de aceiro, e a secuencia de instalación é a seguinte:
①Usa unha abrazadeira para suxeitar o extremo superior da parte da bomba de auga (o motor e a bomba de auga están conectados neste momento), levántaa cunha cadea colgante e átea lentamente ao pozo ata que coloque a abrazadeira na cabeza do pozo e retire o cadea colgante.
② Use outro par de abrazaderas para suxeitar un tubo, levántao cunha cadea colgante a 15 cm de distancia da brida e báixao lentamente. Entre a brida do tubo e a brida da bomba Coloque a almofada de goma no seu lugar e aperte o tubo e bombee uniformemente con parafusos, porcas e arandelas de resorte.
③ Levante lixeiramente a bomba sumerxible, retire a abrazadeira do extremo superior da bomba de auga, ate o cable firmemente á tubería de auga cunha cinta de plástico e áteo lentamente ata que a abrazadeira estea colocada na cabeza do pozo.
④Usa o mesmo método para amarrar todos os tubos de auga ao pozo.
⑤ Despois de conectar o cable de saída ao interruptor de control, conéctase á fonte de alimentación trifásica.


(4) Cousas a ter en conta durante a instalación:
1. Se se atopa un fenómeno de atasco durante o proceso de bombeo, xire ou tire da tubaxe de auga para superar o punto de atasco. Se varias medidas aínda non funcionan, non forzar a bomba abaixo para evitar danos á bomba eléctrica sumerxible e ao pozo.
2. Durante a instalación, debe colocarse unha almofada de goma na brida de cada tubo e apertar uniformemente.
3. Cando se baixa a bomba de auga no pozo, debe colocarse no medio do tubo do pozo para evitar que a bomba funcione contra a parede do pozo durante moito tempo, provocando que a bomba vibre e que o motor varrer e queimar. .
4. Determine a profundidade da bomba de auga ata o fondo do pozo segundo as condicións de area e limo fluídos do pozo. Non enterre a bomba na lama. A distancia desde a bomba de auga ata o fondo do pozo xeralmente non é inferior a 3 metros (ver Figura 2).
5. A profundidade de entrada de auga da bomba de auga non debe ser inferior a 1-1,5 metros desde o nivel dinámico da auga ata o nó de entrada de auga (ver Figura 2). En caso contrario, os rodamentos da bomba de auga poden danar facilmente.
6. A elevación da bomba de auga non pode ser demasiado baixa. En caso contrario, é necesario instalar unha válvula de compuerta na canalización de auga da cabeza do pozo para controlar o fluxo da bomba no punto de fluxo nominal para evitar que o motor se sobrecargue e se queime debido a grandes caudais.
7. Cando a bomba de auga está funcionando, a saída de auga debe ser continua e uniforme, a corrente debe ser estable (en condicións de traballo nominales, xeralmente non máis do 10% da corrente nominal), e non debe haber vibracións ou ruídos. Se hai algunha anormalidade, a máquina debe pararse para descubrir a causa e eliminala.
8. Ao instalar, preste atención á configuración do cable de posta a terra do motor (consulte a Figura 2). Cando o tubo de auga é un tubo de aceiro, lévao desde a abrazadeira da cabeza do pozo; cando o tubo de auga é un tubo de plástico, lévao desde a marca de conexión a terra da bomba eléctrica.

 

 
Mantemento e Mantemento
  1. 1.Despois de instalar a bomba sumerxible, verifique de novo a resistencia de illamento e a condución trifásica do interruptor, comprobe se o instrumento e a conexión do equipo de inicio están incorrectos, se non hai ningún problema, pódese iniciar a máquina de proba. e observe se as lecturas do indicador do instrumento superan a tensión nominal e a corrente especificadas na placa de identificación despois do inicio, e observe se a bomba ten fenómenos de ruído e vibración, e poña en funcionamento se todo é normal.
  2. 2.Despois da primeira operación da bomba durante catro horas, o motor debe apagarse para probar rapidamente a resistencia de illamento térmico e o seu valor non debe ser inferior a 0,5 megaohmios.
  3. 3.Despois de apagar a bomba, debe iniciarse despois de cinco minutos para evitar que a columna de auga do tubo se refluxa por completo e provoque unha corrente excesiva do motor e queimadura.
  4. 4.Despois de poñer a bomba en funcionamento normal, para prolongar a súa vida útil, é necesario comprobar se a tensión de alimentación, a corrente de traballo e a resistencia de illamento son normais regularmente. Se se atopan as seguintes condicións, a bomba debe apagarse inmediatamente para solucionar os problemas.

 

 1 In the rated condition, the current exceeds 20%.

 2 O nivel dinámico da auga baixa ata a sección de entrada de auga, provocando auga intermitente.

 3 A bomba sumerxible presenta vibracións ou ruídos graves.

 4 A tensión de alimentación é inferior a 340 voltios.

 5 Un fusible está queimado.

 6 O tubo de abastecemento de auga está danado.

 7 The motor's thermal insulation resistance to the earth is less than 0.5 megaohm.

  1.  
  2. 4.We are very happy to introduce our new product -- this submersible pump. This pump has an easy-to-use design that makes it easy to disassemble and clean. With the disassembly steps we provide, you can easily disassemble and clean the various parts, ensuring that it always maintains its best working condition. From loosening the anchoring screws to removing the filter screen and separating the pump and motor, we provide you with clear step-by-step instructions. When assembling, simply follow the reverse order of disassembly, ensuring that each part is cleaned and sealed, and you can complete the assembly. Whether it is an annual inspection or more frequent cleaning, this submersible pump can help you accomplish the task easily.

 

 
Almacenamento e Custodia

 1, apague a auga na cavidade do motor (especialmente no inverno para evitar que o motor se conxele) e amarre ben o cable.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, o uso a longo prazo debe prestar atención á prevención da ferruxe das bombas sumerxibles.

 

 
Pezas de desgaste
  • Impulsor
  • Manga do eixe
  • Funda de eixe de goma
  • Anel de selado

 
Escenarios de aplicación

01 Toma de auga de pozo profundo

02 Subministro de auga en rañaceos

03 abastecemento de auga de montaña 

04 torre de auga

05 Rego agrícola

06 rego do xardín

07 captación de auga do río

08 auga doméstica

 

Se estás interesado nos nosos produtos, podes deixar aquí a túa información e porémonos en contacto contigo en breve.


Escribe aquí a túa mensaxe e envíanolo

Se estás interesado nos nosos produtos, podes deixar aquí a túa información e porémonos en contacto contigo en breve.


gl_ESGalician