Bomba sumerxible de pozos profundos 250QJB

Realice o procesamento OEM! Segundo os requisitos do usuario, deseño e fabricación de varios tipos de requisitos especiais de motores e bombas sumerxibles non estándar. Os estándares de implementación do produto: GB/T2816-2014 "bomba sumerxible de pozo", GB/T2818-2014 "motor asíncrono de pozo sumerxible". WhatsApp: 17855846335
PDF DOWNLOAD
Detalles
Etiquetas
 
Visión xeral do produto

The product adopts special waterproof wire design, which can realize long-term stable conversion operation of the motor within the frequency range of 1HZ-50HZ. The frequency conversion winding design not only makes the frequency conversion deep well pump more energy saving, but also prolongs its service life. The motor winding adopts special water-resistant conductors that are resistant to high frequency impact, pulse peak voltage impact and high temperature aging, with excellent characteristics and stability.

 

 
Condicións de uso

The product is powered by three-phase AC 380V power supply, 50HZ frequency, suitable for the environment with harsh water quality conditions. Specific requirements include water temperature below 20 °C, solid impurities content is not greater than 0.01%, PH value is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The product adopts closed or water immersion structure of the motor, before use to ensure that the pump is fully filled with water, no-load test run is strictly prohibited. The pump must be completely immersed in water, not more than 70m water depth, water source to meet the requirements of the pump water output and continuous operation. In addition, the well must be vertical, the pump can only be used vertically. The wiring should be supported according to the requirements, and equipped with external overload protection device. This series of requirements to ensure the efficient and stable operation of the product, suitable for all kinds of special environment of the pump demand.

 

 
Significado do modelo

250QJB Deep Well Submersible Pump

 
Modelo parcial de referencia
Modelo Caudal (m3/h) Cabeza
(m)

Velocidade de rotación

(cambio/punto)

Bomba de auga (%) Outlet
diámetro
(mm)
Aplicable ben
diámetro (mm) 
Calificado
power(KW)
Calificado
tensión (V)
Calificado
corrente (A)
Eficiencia do motor (%) power factorcosφ   Unidade
Tamaño máximo radial (mm)
Observación
250QJ50-40 50 40 2875 72 80  250arriba 9.2 380 21.7 78.5 0.82 233  
250QJ50-60 60 13 30.1 80.0 0.82  
250QJ50-80 80 18.5 40.8 82.0 0.84  
250QJ50-100 100 22 47.9 83.0 0.84  
250QJ50-120 120 25 53.8 84.0 0.84  
250QJ50-140 140 30 64.2 84.5 0.84  
250QJ50-160 160 37 77.8 85.0 0.85  
250QJ50-200 200 45 94.1 85.5 0.85  
250QJ50-240 240 55 114.3 86.0 0.85  
250QJ50-280 280 63 131.0 86.0 0.85  
250QJ50-320 320 75 152.3 87.0 0.86  
250QJ50-400 400 90 182.8 87.0 0.86  
250QJ50-440 440 100 203.1 87.0 0.86  
250QJ63-40 63 40 2875 74 80  250arriba 11 380 25.8 79.0 0.82 233  
250QJ63-60 60 18.5 40.8 82.0 0.84  
250QJ63-80 80 22 47.9 83.0 0.84  
250QJ63-100 100 30 64.2 84.5 0.84  
250QJ63-120 120 37 77.8 85.0 0.85  
250QJ63-160 160 45 94.1 85.5 0.85  
250QJ63-200 200 55 114.3 86.0 0.85  
250QJ63-220 220 63 131.0 86.0 0.85  
250QJ63-260 260 75 152.3 87.0 0.86  
250QJ63-300 300 90 182.8 87.0 0.86  
250QJ63-360 360 100 203.1 87.0 0.86  
250QJ80-20 80 20 2875 75 100  250arriba 7.5 380 18.0 78.0 0.81 233  
250QJ80-40 40 15 33.9 81.0 0.83  
250QJ80-60 60 22 47.9 83.0 0.84  
250QJ80-80 80 30 64.2 84.5 0.84  
250QJ80-100 100 37 77.8 85.0 0.85  
250QJ80-120 120 45 94.1 85.5 0.85  
250QJ80-160 80 160 2875 75 100  250arriba 55 380 114.3 86.0 0.85 233  
250QJ80-180 180 63 131.0 86.0 0.85  
250QJ80-200 200 75 152.3 87.0 0.86  
250QJ80-240 240 90 182.8 87.0 0.86  
250QJ80-280 280 100 203.1 87.0 0.86  
250QJ100-18 100 18 2875 75 100  250arriba 7.5 380 18.0 78.0 0.81 233  
250QJ100-36 36 15 33.9 81.0 0.83  
250QJ100-54 54 25 53.8 84.0 0.84  
250QJ100-72 72 30 64.2 84.5 0.84  
250QJ100-90 90 37 77.8 85.0 0.85  
250QJ100-108 108 45 94.1 85.5 0.85  
250QJ100-126 126 55 114.3 86.0 0.85  
250QJ100-144 144 63 131.0 86.0 0.85  
250QJ100-162 162 75 152.3 87.0 0.86  
250QJ100-198 198 90 182.8 87.0 0.86  
250QJ100-216 216 100 203.1 87.0 0.86  
250QJ125-16 125 16 2875 76 125  250arriba 9.2 380 21.7 78.5 0.82 233  
250QJ125-32 32 18.5 40.8 82.0 0.84  
250QJ125-48 48 25 53.8 84.0 0.84  
250QJ125-64 64 37 77.8 85.0 0.85  
250QJ125-80 80 45 94.1 85.5 0.85  
250QJ125-96 96 55 114.3 86.0 0.85  
250QJ125-112 112 63 131.0 86.0 0.85  
250QJ125-128 128 75 152.3 87.0 0.86  
250QJ125-160 160 90 182.8 87.0 0.86  
250QJ125-176 176 100 203.1 87.0 0.86  
250QJ125-192 192 110 219.6 87.5 0.87  
250QJ140-15 140 15 2875 76 125  250arriba 9.2 380 21.7 78.5 0.82 233  
250QJ140-30 30 18.5 40.8 82.0 0.84  
250QJ140-45 45 30 64.2 84.5 0.84  
250QJ140-60 60 37 77.8 85.0 0.85  
250QJ140-75 45 45 94.1 85.5 0.85  
250QJ140-90 90 55 114.3 86.0 0.85  
250QJ140-105 140 105 2875 76 125  250arriba 63 380 131.0 86.0 0.85 233  
250QJ140-120 120 75 152.3 87.0 0.86  
250QJ140-150 150 90 182.8 87.0 0.86  
250QJ140-165 165 100 203.1 87.0 0.86  
250QJ140-180 180 110 219.6 87.5 0.87  
250QJ200-20 200 20 2875 75 150  250arriba 18.5 380 40.8 82.0 0.84 233  
250QJ200-40 40 37 77.8 85.0 0.85  
250QJ200-60 60 55 114.3 86.0 0.85  
250QJ200-80 80 75 152.3 87.0 0.86  
250QJ200-100 100 90 182.8 87.0 0.86  
250QJ200-120 120 100 203.1 87.0 0.86  
250QJ200-140 140 125 249.5 87.5 0.87  

 

 
Precaucións de seguridade

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, estrictamente de acordo coas disposicións do elevador da bomba, o intervalo de uso de fluxo, para evitar a forza de bombeo de baixo fluxo ou alta elevación, o rolamento de empuxe e outras partes do desgaste, a sobrecarga do motor queimado

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introdución á estrutura

The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body and so on; the motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, cable lead, etc. The main characteristic of the product is that the motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is filled with water, used to cool the motor and lubricate the bearing; the pressure regulating diaphragm at the bottom is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of the temperature rise of the motor. In order to prevent the sand particles in the well water from entering the motor, two sand sealing rings are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand prevention structure. To prevent the pump shaft from jumping when starting up, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed on the lower part of the motor. The motor and pump bearing adopt water lubrication technology, and the stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump is designed by computer CAD, with simple structure and excellent technical performance.

250QJB Deep Well Submersible Pump

 

 
Instalar

(1) Preparación antes da instalación:
1. Comprobe se a bomba sumerxible cumpre as condicións de uso e o alcance especificados no manual.
2. Usando un obxecto pesado cun diámetro igual ao diámetro exterior máximo da bomba sumerxible, medir se o diámetro interior do pozo pode caber na bomba sumerxible e medir se a profundidade do pozo cumpre os requisitos de instalación.
3. Comproba se o pozo está limpo e se a auga do pozo está turbia. Nunca use unha bomba eléctrica sumerxible para lavar a auga de barro e area da bomba welor para evitar danos prematuros na bomba eléctrica sumerxible.
4. Comprobe se a posición da pinza de instalación da cabeza de welhead é adecuada e se pode soportar a calidade de toda a unidade
5. Comprobe se os compoñentes da bomba sumerxible están completos e instalados correctamente segundo o diagrama de montaxe do manual. Retire a pantalla do filtro e xire o acoplamento para ver se xira con flexibilidade.
6. Desenrosque o parafuso de auga e enche a cavidade do motor con auga limpa e non corrosiva (ten en conta. Asegúrese de enchelo), despois aperte o parafuso. Despois de 12 horas de inxección de auga, a resistencia de illamento do motor non debe ser inferior a 150 M Q cando se mide cunha mesa de axitación de 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

O diagrama de proceso de cableado anexo é o seguinte:
250QJB Deep Well Submersible Pump

 

8. Use un multímetro para comprobar se os cables trifásicos están conectados e se a resistencia de CC está aproximadamente equilibrada.
9. Comprobe se o circuíto e a capacidade do transformador están sobrecargados e, a continuación, conecte o interruptor de protección contra sobrecarga ou o equipo de arranque. Consulte a Táboa 2 para coñecer modelos específicos e, a continuación, verte un balde de auga na bomba de auga desde a saída da bomba de auga para lubricar os rodamentos de goma da bomba e, a continuación, coloque a bomba eléctrica sumerxible en posición vertical e firme. Arranque (non máis dun segundo) e verifique se a dirección de dirección é coherente co sinal de dirección. Se non, intercambia dous conectores calquera do cable trifásico. Despois instala o filtro e prepárate para baixar polo pozo. Se se usa en ocasións especiais (como gabias, gabias, ríos, estanques, estanques, etc.), a bomba eléctrica debe estar conectada a terra de forma fiable.

 

(2) Equipos e ferramentas de instalación:
1. Un par de cadeas de elevación de máis de dúas toneladas.
2. Un trípode cunha altura vertical non inferior a catro metros.
3. Dúas cordas colgantes (cables de arame) que poden soportar un peso superior a unha tonelada (poden soportar o peso dun conxunto completo de bombas de auga).
4. Instale dous pares de abrazaderas (férulas).
5. Chaves inglesas, martelos, desaparafusadores, ferramentas e instrumentos eléctricos, etc.

 

(3) Instalación de bombas eléctricas:
1. O diagrama de instalación da bomba eléctrica sumerxible móstrase na Figura 2. As dimensións específicas da instalación móstranse na Táboa 3 "Lista de dimensións de instalación da bomba eléctrica sumerxible".

2. As bombas eléctricas sumerxibles cunha cabeza inferior a 30 metros pódense izar directamente ao pozo mediante mangueiras e cables de arame ou outras cordas de cánabo que poidan soportar todo o peso de toda a máquina, tubos de auga e auga nos tubos.

3. As bombas cunha cabeza de máis de 30 metros utilizan tubos de aceiro, e a secuencia de instalación é a seguinte:
①Usa unha abrazadeira para suxeitar o extremo superior da parte da bomba de auga (o motor e a bomba de auga están conectados neste momento), levántaa cunha cadea colgante e átea lentamente ao pozo ata que coloque a abrazadeira na cabeza do pozo e retire o cadea colgante.
② Use outro par de abrazaderas para suxeitar un tubo, levántao cunha cadea colgante a 15 cm de distancia da brida e báixao lentamente. Entre a brida do tubo e a brida da bomba Coloque a almofada de goma no seu lugar e aperte o tubo e bombee uniformemente con parafusos, porcas e arandelas de resorte.
③ Levante lixeiramente a bomba sumerxible, retire a abrazadeira do extremo superior da bomba de auga, ate o cable firmemente á tubería de auga cunha cinta de plástico e áteo lentamente ata que a abrazadeira estea colocada na cabeza do pozo.
④Usa o mesmo método para amarrar todos os tubos de auga ao pozo.
⑤ Despois de conectar o cable de saída ao interruptor de control, conéctase á fonte de alimentación trifásica.


(4) Cousas a ter en conta durante a instalación:
1. Se se atopa un fenómeno de atasco durante o proceso de bombeo, xire ou tire da tubaxe de auga para superar o punto de atasco. Se varias medidas aínda non funcionan, non forzar a bomba abaixo para evitar danos á bomba eléctrica sumerxible e ao pozo.
2. Durante a instalación, debe colocarse unha almofada de goma na brida de cada tubo e apertar uniformemente.
3. Cando se baixa a bomba de auga no pozo, debe colocarse no medio do tubo do pozo para evitar que a bomba funcione contra a parede do pozo durante moito tempo, provocando que a bomba vibre e que o motor varrer e queimar. .
4. Determine a profundidade da bomba de auga ata o fondo do pozo segundo as condicións de area e limo fluídos do pozo. Non enterre a bomba na lama. A distancia desde a bomba de auga ata o fondo do pozo xeralmente non é inferior a 3 metros (ver Figura 2).
5. A profundidade de entrada de auga da bomba de auga non debe ser inferior a 1-1,5 metros desde o nivel dinámico da auga ata o nó de entrada de auga (ver Figura 2). En caso contrario, os rodamentos da bomba de auga poden danar facilmente.
6. A elevación da bomba de auga non pode ser demasiado baixa. En caso contrario, é necesario instalar unha válvula de compuerta na canalización de auga da cabeza do pozo para controlar o fluxo da bomba no punto de fluxo nominal para evitar que o motor se sobrecargue e se queime debido a grandes caudais.
7. Cando a bomba de auga está funcionando, a saída de auga debe ser continua e uniforme, a corrente debe ser estable (en condicións de traballo nominales, xeralmente non máis do 10% da corrente nominal), e non debe haber vibracións ou ruídos. Se hai algunha anormalidade, a máquina debe pararse para descubrir a causa e eliminala.
8. Ao instalar, preste atención á configuración do cable de posta a terra do motor (consulte a Figura 2). Cando o tubo de auga é un tubo de aceiro, lévao desde a abrazadeira da cabeza do pozo; cando o tubo de auga é un tubo de plástico, lévao desde a marca de conexión a terra da bomba eléctrica.

 

 
Mantemento e Mantemento
  • 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start 2.equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on 3.the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  • 4.After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  • 5.After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  • 6.After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 O nivel dinámico da auga baixa ata a sección de entrada de auga, provocando auga intermitente.
  • 3 A bomba sumerxible presenta vibracións ou ruídos graves.
  • 4 A tensión de alimentación é inferior a 340 voltios.
  • 5 Un fusible está queimado.
  • 6 O tubo de abastecemento de auga está danado.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1 Untie the cable tie, remove the pipeline part, and remove the wire plate. 2 screw down the water bolt, put the water in the motor chamber.
  • 3 Retire o filtro, solte o parafuso fixo do acoplamento para fixar o eixe do motor.
  • 4 Atornille o parafuso que conecta a sección de entrada de auga co motor e separe a bomba do motor (preste atención ao almofada da unidade ao separar, para evitar que se dobra o eixe da bomba)
  • 5 a secuencia de desmontaxe da bomba é: (ver figura 1) sección de entrada de auga, impulsor, carcasa de derivación, impulsor...... corpo da válvula de retención, ao retirar o impulsor, use ferramentas especiais para afrouxar a manga cónica do primeiro impulsor, e evite dobrar e golpear o eixe da bomba no proceso de desmontaxe.
  • 6 o proceso de desmontaxe do motor é: (ver figura 1) coloque o motor na plataforma e retire as porcas, a base, a porca de bloqueo da cabeza do eixe, a placa de empuxe, a chave, o asento do rodamento de guía inferior e o parafuso de dobre cabeza da parte inferior do motor. o motor á súa vez e, a continuación, saque o rotor (preste atención a non danar o paquete de fío) e, finalmente, retire a sección de conexión e o asento do rolamento da guía superior.
  • Montaxe de 7 unidades: antes da montaxe, débense limpar a ferruxe e a sucidade das pezas, e a superficie de acoplamento e os parafusos recubertos de selante, e despois montados na orde oposta de desmontaxe (o eixe do motor móvese cara arriba e abaixo despois da montaxe durante aproximadamente un milímetro), despois da montaxe, o acoplamento debe ser flexible e, a continuación, a máquina de proba de pantalla de filtro. As bombas sumerxibles sacaranse do pozo para o seu desmontaxe e mantemento segundo o artigo 5 despois dun ano de funcionamento, ou menos dun ano de funcionamento pero dous anos de tempo de mergullo, e substituiranse as pezas desgastadas.

 

 
Almacenamento e Custodia

 In order to ensure the long-term use and stable performance of submersible electric pump, we have launched a convenient and practical product. The product has a unique design, easy operation, and is perfect for various application scenarios. After use, remember to discharge all the water in the electric pump, especially in winter, so as not to freeze the motor. Wind the cable and bundle it. Store it in an environment without corrosive substances and gases, and keep the temperature below 40 °C. In addition, if you do not use it for a long time, you should pay attention to prevent the submersible electric pump from rusting. Choose our products to make your work more convenient and efficient.

 

 
Pezas de desgaste
  • Impulsor
  • Manga do eixe
  • Funda de eixe de goma
  • Anel de selado

 
Escenarios de aplicación

01 Toma de auga de pozo profundo

02 Subministro de auga en rañaceos

03 abastecemento de auga de montaña 

04 torre de auga

05 Rego agrícola

06 rego do xardín

07 captación de auga do río

08 auga doméstica

 

Se estás interesado nos nosos produtos, podes deixar aquí a túa información e porémonos en contacto contigo en breve.


Escribe aquí a túa mensaxe e envíanolo

Se estás interesado nos nosos produtos, podes deixar aquí a túa información e porémonos en contacto contigo en breve.


gl_ESGalician