This product is designed for underground hot water mining with a water temperature below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. Whether used in underground mining or other hot water environments, it can effectively resist the challenges of harsh conditions. Its excellent performance and stable quality make it an ideal choice in the mining field.
The product power requirements for three-phase AC 380V (± 5%), 50HZ (± 1%); water quality requirements include water temperature not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, the inner cavity of the submersible motor must be filled with water to prevent false filling, and then tighten the water injection and air exhaust bolts, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70m, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the displacement and continuous operation requirements of the submersible pump, and the displacement of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to conduct no-water no-load test on the pump.
Cins | Herikîn (m3/h) | Ser (m) |
Rotatingspeed (guhertin / xal) |
Pompa avê(%) | Outlet çap (mm) |
Baş tê sepandin diameter (mm) |
Rated hêz (KW) |
Rated voltaja (V) |
Rated niha(A) |
Hêza motorê (%) | power factorcosφ | Yekbûn Mezinahiya Radyal Maximu (mm) |
Bingotin | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135ser | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135ser | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135ser | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135ser | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135ser | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135ser | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135ser | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, bi hişkî li gorî bendên hilkişîna pompê, rêza herikînê ya karanîna, ji bo pêşîgirtina li herikîna kêm an hêza pompkirina bilindkirina bilind, hilgirtina lêdanê û beşên din ên cilê, bargiraniya motorê şewitandin.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
The pump part mainly includes pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components.
The motor part mainly includes base, pressure regulating diaphragm, bearing, bearing seat, stator, rotor, water mouth part, lead cable and other components.
Taybetmendiyên sereke yên hilberê hene:
- 1.The motor is a water-cooled submersible three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing.
- 2. In order to prevent the sand in the well water from entering the motor, the motor shaft extension is installed with two oil seals, and the sand throw ring is installed to form a sand prevention structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the thrust bearing is installed under the motor.
- 4. The lubrication of the motor and the pump bearing is water lubrication.
- 5. The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
- 6. The pump designed by computer CAD has simple structure and excellent technical performance.

(1) Amadekirina berî sazkirinê:
1. Kontrol bikin ka pompeya binavbûyî şert û mercên karanîna ku di manualê de hatine destnîşan kirin pêk tîne.
2. Bikaranîna obiekek giran a bi pîvana ku bi qasî pîvana derveyî ya herî zêde ya pompeya binavkirî ye, bipîvin ka gelo inneldiameter ya kaniyê dikare pompeya binavbûyî bicîh bike, û bipîve ka kûrahiya baş hewcedariyên sazkirinê pêk tîne.
3. Kontrol bikin ka kaniya bîrê paqij e û ava bîrê gemar e. Tu carî pompeya elektrîkê ya binavbûyî bikar neynin da ku pompeya welor xwelî û ava qûmê bişon da ku ji zûde zirarê nede pompeya elektrîkê ya binavbûyî.
4. Kontrol bikin ka pozîsyona kemîna sazkirinê ya welhead guncan e û gelo ew dikare qalîteya tevahiya yekîneyê bisekine
5. Kontrol bikin ka hêmanên pompeya binavbûyî temam in û bi rêkûpêk hatine saz kirin li gorî nexşeya kombûnê ya di destanê de Perçeya parzûnê rakin û hevgirêdanê bizivirînin da ku bibînin ka ew bi nermî dizivire.
6. Pîra avê vekin û valahiya motorê bi ava paqij û ne-xirab tije bikin (binihêrin. Birastî ku wê tije bikin), dûv re şûşa avê zexm bikin. Piştî 12 demjimêran ji derzîlêdana avê, dema ku bi tabloya hejandina 500V were pîvandin divê berxwedana însulasyona motorê ji 150M Q kêmtir nebe.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Diagrama pêvajoya têlkirina kabloya pêvekirî wiha ye:
8. Multimeterek bikar bînin da ku kontrol bikin ka têlên sê-qonaxê girêdayî ne û gelo berxwedana DC bi qasî hevseng e.
9. Kontrol bikin ka kapasîteya danûstendinê û veguherîner zêde barkirî ne, û dûv re guheztina parastina zêde barkirinê an alavên destpêkirinê girêdin. Ji bo modelên taybetî li Tabloya 2-ê binêre, û dûv re ji dergeha pompa avê satilek av birijîne nav pompa avê da ku çîçekên gomî yên di pompê de rûn bike, û dûv re pompeya elektrîkê ya binavbûyî rast û domdar bi cîh bike. Dest pê bike (ji saniyeyekê bêtir) û kontrol bikin ka arastekirina rêveberiyê bi nîşana rêvekirinê re hevaheng e. Ger na, her du girêdanên kabloya sê-qonaxê biguhezînin. Dûv re parzûnê saz bikin û xwe amade bikin ku dakevin binê bîrê. Ger di rewşên taybetî de (wek xendek, xendek, çem, hewz, hewz, hwd.) were bikar anîn, pêdivî ye ku pompeya elektrîkê bi pêbawer were zexm kirin.
(2) Amûr û amûrên sazkirinê:
1. Yek cotek zincîra hilgirtinê ji du ton zêdetir.
2. Tripod bi bilindahiya vertical ji çar metre ne kêmtir.
3. Du xelekên daleqandî (telên têl) ku dikarin giraniya ji yek ton zêdetir hilgirin (dikarin giraniya komek tevahî pompeyên avê hilgirin).
4. Du cot kelemçeyan (pişkan) saz bikin.
5. Wrenches, çakûç, screwdrivers, alav û amûrên elektrîkê, hwd.
(3) Sazkirina pompeya elektrîkê:
1. Diyagrama sazkirinê ya pompeya elektrîkê ya binavbûyî di jimar 2 de tê nîşandan. Pîvanên sazkirinê yên taybetî di Tabloya 3 "Lîsteya Pîvana Sazkirinê ya Pompeya Elektrîkê ya Binavbûyî" de hatine nîşandan.
2. Pompeyên elektrîkê yên binavkirî yên ku serê wan ji 30 metreyan kêmtir e, dikarin rasterast di nav bîrê de bi karanîna çîp û têl an jî têlên din ên hempê ku dikarin giraniya tevahî ya makîneyê, lûleyên avê û avê di lûleyan de hilgirin werin hilgirtin.
3. Pompeyên bi serê wan ji 30 metreyan lûleyên pola bikar tînin, û rêza sazkirinê wiha ye:
① Ji bo ku dawiya jorîn a beşa pompeya avê girêbide (motor û pompeya avê di vê demê de bi hev ve girêdaye) kelemek bikar bînin, bi zincîreka daleqandî hildin û hêdî hêdî bi bîrê ve girêdin heta ku girêkê deynin ser serê bîrê û jêkin. zencîra daleqandî.
② Ji bo ku boriyekê girêbide, cotek din girêk bikar bînin, wê bi zincîreyek daleqandî 15 cm ji felekê dûr rakin, û hêdî hêdî dakêşin. Di navbera flangeya boriyê û flangeya pompê de Paçika lastîkî têxin cihê xwe û boriyê hişk bikin û bi kulm, gwîz û şûşeyên biharê bi hevûdu pomp bikin.
③ Pompeya binavbûyî hinekî bilind bikin, kefenê li dawiya jorîn a pompeya avê derxînin, kabloyê bi tîrêjek plastîk bi lûleya avê ve girê bidin û hêdî hêdî pê ve girêdin heya ku kelem li serê bîrê were danîn.
④ Heman rêbazê bikar bînin da ku hemî boriyên avê bi bîrê ve girêdin.
⑤Piştî ku kabloya derçûyê bi guheztina kontrolê ve girêdayî ye, ew bi dabînkirina hêza sê-qonaxê ve girêdayî ye.
(4) Tiştên ku di dema sazkirinê de bala xwe bidin:
1. Ger di pêvajoya pompkirinê de diyardeyek tevlihevkirinê were dîtin, lûleya avê bizivirînin an bikişînin da ku xala tevlihevkirinê derbas bike. Ger tedbîrên cûrbecûr hîn jî nexebitin, ji kerema xwe pompê bi zorê nexin xwarê da ku zirarê nedin pompeya elektrîkê ya binavbûyî û bîrê.
2. Di dema sazkirinê de, pêdivî ye ku pêlek gomîkî li ser flangeya her lûleyê were danîn û bi rengek wekhev were hişk kirin.
3. Dema ku pompeya avê di nav bîrê de tê daxistin, divê ew di nîvê lûleya bîrê de were danîn da ku nehêle pomp ji bo demek dirêj li hember dîwarê bîrê bixebite, bibe sedema ku pomp bilerize û motor bişewite û bişewite. .
4. Kûrahiya pompeya avê heta binê bîrê li gorî şert û mercên qûmê û siltê yên ku diherike diyar bikin. Pompê di nav heriyê de nehêlin. Dûrahiya ji pompeya avê heya binê bîrê bi gelemperî ne kêmî 3 metre ye (binihêre Figure 2).
5. Kûrahiya ketina avê ya pompeya avê divê ji asta avê ya dînamîk heya girêka ketina avê ne kêmtirî 1-1,5 metre be (binêre Figure 2). Wekî din, dibe ku hilgirên pompeya avê bi hêsanî xera bibin.
6. Hilkişîna pompeya avê nikare pir kêm be. Wekî din, pêdivî ye ku valvek dergehek li ser lûleya avê ya serê bîrê were saz kirin da ku herikîna pompê li xala herikîna binavkirî kontrol bike da ku rê li ber bargiran û şewitandina motor ji ber rêjeyên mezin ên herikînê bigire.
7. Dema ku pompeya avê dimeşe, divê hilberîna avê domdar be û tewra jî, niha divê sabît be (di bin şert û mercên xebatê yên binavkirî de, bi gelemperî ji% 10-a niha ya binavkirî zêdetir nabe), û divê lerzîn û deng tune be. Ger anormaliyek hebe, pêdivî ye ku makîneyê were sekinandin da ku sedem were zanîn û jêbirin.
8. Dema sazkirinê, bala xwe bidin mîhengê têl zemîna motorê (binihêre Figure 2). Dema ku lûleya avê boriyek pola ye, wê ji kefa serê bîrê derxînin; gava ku boriya avê boriyek plastîk be, wê ji nîşana zemînê ya pompeya elektrîkê derxînin.
- 1.Piştî ku pompeya binavê hatî saz kirin, berxwedana însulasyonê û guheztina sê-qonaxê ji guheztinê dîsa kontrol bikin, kontrol bikin ka amûr û girêdana alavên destpêkê xelet in, heke pirsgirêk tune be, makîneya ceribandinê dikare were destpêkirin, û binihêrin ka xwendinên nîşankerê amûrê ji voltaja binavkirî û niha ya ku li ser tabloya navê piştî destpêkê hatî destnîşan kirin derbas dibe, û binihêrin ka pompê xwedan deng û fenomena vibrasyonê ye, û heke her tişt normal be têxe xebatê.
- 2.Piştî xebata yekem a pompê ji bo çar demjimêran, divê motor were girtin da ku berxwedana însulasyona germê zû biceribîne, û nirxa wê ji 0,5 megaohm kêmtir nebe.
- 3.Piştî ku pomp tê girtin, divê piştî pênc hûrdeman were dest pê kirin da ku stûna avê ya di boriyê de bi tevahî venegere û bibe sedema zêdebûna tîrêjê û şewitandina motorê.
- 4.Piştî ku pomp tê xebitandin normal, ji bo ku jiyana karûbarê xwe dirêj bike, pêdivî ye ku meriv kontrol bike ka voltaja dabînkirinê, niha kar û berxwedana însulasyonê bi rêkûpêk normal e. Ger şert û mercên jêrîn werin dîtin, divê pomp tavilê were girtin da ku pirsgirêk were çareser kirin.
1 In the rated condition, the current exceeds 20%.
2 Asta avê ya dînamîk dadikeve beşa ketina avê, dibe sedema ava navber.
3 Pompeya binavbûyî xwedan lerizîn an dengek dijwar e.
4 Voltaja dabînkirinê ji 340 volt kêmtir e.
5 Fuzeyek şewitî.
6 Boriya avê xera bûye.
7 The motor's thermal insulation resistance to the earth is less than 0.5 megaohm.
- 4.We are very happy to introduce our new product -- this submersible pump. This pump has an easy-to-use design that makes it easy to disassemble and clean. With the disassembly steps we provide, you can easily disassemble and clean the various parts, ensuring that it always maintains its best working condition. From loosening the anchoring screws to removing the filter screen and separating the pump and motor, we provide you with clear step-by-step instructions. When assembling, simply follow the reverse order of disassembly, ensuring that each part is cleaned and sealed, and you can complete the assembly. Whether it is an annual inspection or more frequent cleaning, this submersible pump can help you accomplish the task easily.
1, avê di valahiya motorê de derxînin (nemaze di zivistanê de da ku motor ji cemidandinê nemîne), û kabloyê baş girêdin.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, karanîna dirêj-dirêj divê balê bikişîne ser pêşîgirtina rustê ya pompeyên binavê.
- Impeller
- Şaft sleeve
- Çîçek mîlî gomî
-
Zengila morkirinê
01 Vegirtina ava bîrê ya kûr
02 Avakirina avê ya bilind
03 ava çiya
04 ava birca
05 Avdaniya çandiniyê
06 avdana baxçe
07 girtina ava çem
08 ava navxweyî