135QJR Tiefbrunnen-Tauchpumpe

OEM-Verarbeitung durchführen! Entsprechend den Benutzeranforderungen werden verschiedene Arten von Sonderanforderungen für nicht standardmäßige Tauchmotoren und -pumpen entworfen und hergestellt. Die Produktimplementierungsstandards: GB/T2816-2014 „Brunnen-Tauchpumpe“, GB/T2818-2014 „Brunnen-Tauch-Asynchronmotor“. WhatsApp: 17855846335
PDF DOWNLOAD
Einzelheiten
Stichworte
 
Produktübersicht

This product is designed for underground hot water mining with a water temperature below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. Whether used in underground mining or other hot water environments, it can effectively resist the challenges of harsh conditions. Its excellent performance and stable quality make it an ideal choice in the mining field.

 

 
Nutzungsbedingungen

 The product power requirements for three-phase AC 380V (± 5%), 50HZ (± 1%); water quality requirements include water temperature not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, the inner cavity of the submersible motor must be filled with water to prevent false filling, and then tighten the water injection and air exhaust bolts, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70m, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the displacement and continuous operation requirements of the submersible pump, and the displacement of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
Modell Bedeutung

135QJR Deep Well Submersible Pump

 
Teilmodellreferenz
Modell Durchfluss (m3/h) Kopf
(M)

Drehgeschwindigkeit

(Wechselpunkt)

 Wasserpumpe(%) Auslauf
Durchmesser
(mm)
Gut anwendbar
Durchmesser (mm) 
Bewertet
Leistung (KW)
Bewertet
Spannung (V)
Bewertet
Strom (A)
Motoreffizienz (%) power factorcosφ   Einheit
Radiale Maximalgröße (mm)
Anmerkung
135QJ5-34 5 34 2850   40  135über 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135über 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135über 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135über 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135über 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135über 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135über 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Sicherheitsvorkehrungen

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5. Halten Sie sich strikt an die Bestimmungen für die Pumpenförderung und den Durchflussbereich, um eine zu geringe oder zu hohe Pumpenleistung, Verschleiß des Axiallagers und anderer Teile sowie ein Durchbrennen des Motors durch Überlastung zu verhindern.

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Einführung in die Struktur

The pump part mainly includes pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components.

 The motor part mainly includes base, pressure regulating diaphragm, bearing, bearing seat, stator, rotor, water mouth part, lead cable and other components.


Zu den Hauptmerkmalen des Produkts gehören:

  1. 1.The motor is a water-cooled submersible three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing.
  2. 2. In order to prevent the sand in the well water from entering the motor, the motor shaft extension is installed with two oil seals, and the sand throw ring is installed to form a sand prevention structure.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the thrust bearing is installed under the motor.
  4. 4. The lubrication of the motor and the pump bearing is water lubrication.
  5. 5. The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
  6. 6. The pump designed by computer CAD has simple structure and excellent technical performance.
135QJR Deep Well Submersible Pump
 
Installieren

(1)Vorbereitung vor der Installation:
1. Prüfen Sie, ob die Tauchpumpe die in der Anleitung angegebenen Einsatzbedingungen und den Einsatzbereich erfüllt.
2. Messen Sie mit einem schweren Gegenstand, dessen Durchmesser dem maximalen Außendurchmesser der Tauchpumpe entspricht, ob der Innendurchmesser des Bohrlochs für die Tauchpumpe geeignet ist, und messen Sie, ob die Bohrlochtiefe den Installationsanforderungen entspricht.
3. Überprüfen Sie, ob das Bohrloch sauber ist und ob das Brunnenwasser trübe ist. Verwenden Sie niemals eine Tauchpumpe, um Schlamm und Sandwasser aus der Brunnenpumpe zu waschen, um vorzeitige Schäden an der Tauchpumpe zu vermeiden.
4. Prüfen Sie, ob die Position der Schweißkopf-Montageklemme geeignet ist und ob sie der Qualität der gesamten Einheit standhält
5. Überprüfen Sie, ob die Komponenten der Tauchpumpe vollständig sind und gemäß dem Montageplan im Handbuch ordnungsgemäß installiert wurden. Entfernen Sie das Filtersieb und drehen Sie die Kupplung, um zu sehen, ob sie sich flexibel dreht.
6. Die Wasserschraube abschrauben und den Motorhohlraum mit sauberem, nicht korrosivem Wasser füllen (Hinweis: unbedingt auffüllen), dann die Wasserschraube festziehen. Nach 12 Stunden Wassereinspritzung sollte der Isolationswiderstand des Motors bei Messung mit einem 500-V-Schütteltisch nicht weniger als 150 MQ betragen.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Das beigefügte Diagramm zur Kabelverlegung sieht wie folgt aus:
135QJR Deep Well Submersible Pump

 

8. Prüfen Sie mit einem Multimeter, ob die Drehstromleitungen angeschlossen sind und der Gleichstromwiderstand etwa ausgeglichen ist.
9. Überprüfen Sie, ob der Stromkreis und die Transformatorkapazität überlastet sind, und schließen Sie dann den Überlastschutzschalter oder die Startvorrichtung an. Siehe Tabelle 2 für bestimmte Modelle. Gießen Sie dann einen Eimer Wasser aus dem Wasserpumpenauslass in die Wasserpumpe, um die Gummilager in der Pumpe zu schmieren, und stellen Sie die Tauchpumpe dann aufrecht und stabil auf. Starten Sie (nicht länger als eine Sekunde) und prüfen Sie, ob die Lenkrichtung mit dem Lenkzeichen übereinstimmt. Wenn nicht, tauschen Sie zwei beliebige Anschlüsse des Dreiphasenkabels aus. Installieren Sie dann den Filter und bereiten Sie sich darauf vor, in den Brunnen zu gehen. Bei Verwendung in besonderen Fällen (z. B. Gräben, Flüssen, Teichen, Teichen usw.) muss die Elektropumpe zuverlässig geerdet sein.

 

(2)Installationsausrüstung und Werkzeuge:
1. Ein Paar Hebeketten für mehr als zwei Tonnen.
2. Ein Stativ mit einer vertikalen Höhe von mindestens vier Metern.
3. Zwei Hängeseile (Drahtseile), die ein Gewicht von mehr als einer Tonne tragen können (können das Gewicht eines kompletten Wasserpumpensatzes tragen).
4. Installieren Sie zwei Paar Klammern (Schienen).
5. Schraubenschlüssel, Hämmer, Schraubendreher, elektrische Werkzeuge und Instrumente usw.

 

(3)Installation der elektrischen Pumpe:
1. Das Installationsdiagramm der Tauchelektropumpe ist in Abbildung 2 dargestellt. Die spezifischen Installationsabmessungen sind in Tabelle 3 „Liste der Installationsabmessungen der Tauchelektropumpe“ aufgeführt.

2. Tauchpumpen mit einer Förderhöhe von weniger als 30 Metern können mit Schläuchen und Drahtseilen oder anderen Hanfseilen, die das gesamte Gewicht der gesamten Maschine, der Wasserleitungen und des Wassers in den Rohren tragen können, direkt in den Brunnen gehoben werden.

3. Pumpen mit einer Förderhöhe von mehr als 30 Metern verwenden Stahlrohre und die Installationsreihenfolge ist wie folgt:
①Befestigen Sie das obere Ende des Wasserpumpenteils mit einer Klemme (Motor und Wasserpumpe sind zu diesem Zeitpunkt bereits verbunden), heben Sie es mit einer Hängekette an und binden Sie es langsam in den Brunnen, bis die Klemme auf den Brunnenkopf aufgesetzt und die Hängekette entfernt ist.
② Verwenden Sie ein weiteres Paar Klemmen, um ein Rohr festzuklemmen, heben Sie es mit einer Hängekette 15 cm vom Flansch entfernt an und senken Sie es langsam ab. Legen Sie zwischen Rohrflansch und Pumpenflansch das Gummipolster an und ziehen Sie Rohr und Pumpe mit Schrauben, Muttern und Federscheiben gleichmäßig fest.
③ Heben Sie die Tauchpumpe leicht an, entfernen Sie die Klemme am oberen Ende der Wasserpumpe, binden Sie das Kabel mit einem Kunststoffband fest an die Wasserleitung und binden Sie es langsam nach unten, bis die Klemme am Bohrlochkopf platziert ist.
④Verwenden Sie die gleiche Methode, um alle Wasserleitungen an den Brunnen anzuschließen.
⑤Nachdem das Ausgangskabel mit dem Steuerschalter verbunden ist, wird es an die dreiphasige Stromversorgung angeschlossen.


(4)Bei der Installation zu beachtende Punkte:
1. Wenn während des Pumpvorgangs ein Blockierungsphänomen festgestellt wird, drehen oder ziehen Sie am Wasserrohr, um die Blockierungsstelle zu beheben. Wenn verschiedene Maßnahmen immer noch nicht funktionieren, drücken Sie die Pumpe bitte nicht mit Gewalt nach unten, um Schäden an der Tauchpumpe und dem Brunnen zu vermeiden.
2. Während der Installation sollte am Flansch jedes Rohrs eine Gummiunterlage platziert und gleichmäßig festgezogen werden.
3. Wenn die Wasserpumpe in den Brunnen abgesenkt wird, sollte sie in der Mitte des Brunnenrohrs platziert werden, um zu verhindern, dass die Pumpe längere Zeit gegen die Brunnenwand läuft, was zu Vibrationen der Pumpe und zum Fegen und Verbrennen des Motors führen kann.
4. Bestimmen Sie die Tiefe der Wasserpumpe bis zum Boden des Brunnens entsprechend den fließenden Sand- und Schlickbedingungen des Brunnens. Vergraben Sie die Pumpe nicht im Schlamm. Der Abstand von der Wasserpumpe bis zum Boden des Brunnens beträgt im Allgemeinen nicht weniger als 3 Meter (siehe Abbildung 2).
5. Die Wassereintrittstiefe der Wasserpumpe sollte vom dynamischen Wasserstand bis zum Wassereinlassknoten nicht weniger als 1–1,5 Meter betragen (siehe Abbildung 2). Andernfalls können die Lager der Wasserpumpe leicht beschädigt werden.
6. Die Förderhöhe der Wasserpumpe darf nicht zu niedrig sein. Andernfalls muss an der Wasserleitung am Bohrlochkopf ein Absperrschieber installiert werden, um den Pumpendurchfluss am Nenndurchflusspunkt zu steuern und zu verhindern, dass der Motor aufgrund großer Durchflussraten überlastet wird und durchbrennt.
7. Wenn die Wasserpumpe läuft, sollte die Wasserabgabe kontinuierlich und gleichmäßig erfolgen, der Strom sollte stabil sein (unter Nennbetriebsbedingungen im Allgemeinen nicht mehr als 10 % des Nennstroms) und es sollten keine Vibrationen oder Geräusche auftreten. Bei Anomalien sollte die Maschine angehalten werden, um die Ursache herauszufinden und zu beseitigen.
8. Achten Sie bei der Installation auf die Einstellung des Motorerdungskabels (siehe Abbildung 2). Wenn es sich bei der Wasserleitung um ein Stahlrohr handelt, führen Sie es von der Bohrlochkopfklemme aus; wenn es sich bei der Wasserleitung um ein Kunststoffrohr handelt, führen Sie es von der Erdungsmarkierung der Elektropumpe aus.

 

 
Wartung und Instandhaltung
  1. 1. Nachdem die Tauchpumpe installiert wurde, überprüfen Sie erneut den Isolationswiderstand und die Dreiphasenleitung vom Schalter aus. Prüfen Sie, ob das Instrument und der Anschluss der Startausrüstung falsch sind. Wenn kein Problem vorliegt, kann die Testmaschine gestartet werden. Beobachten Sie, ob die Anzeigewerte des Instruments nach dem Start die auf dem Typenschild angegebene Nennspannung und -stromstärke überschreiten. Beobachten Sie, ob die Pumpe Geräusche oder Vibrationen aufweist. Wenn alles normal ist, nehmen Sie sie in Betrieb.
  2. 2. Nach dem ersten Betrieb der Pumpe für vier Stunden sollte der Motor abgeschaltet werden, um den Wärmeisolationswiderstand schnell zu testen. Sein Wert sollte nicht weniger als 0,5 Megaohm betragen.
  3. 3. Nachdem die Pumpe abgeschaltet wurde, sollte sie nach fünf Minuten wieder gestartet werden, um zu verhindern, dass die Wassersäule in der Leitung vollständig zurückfließt und es zu übermäßigem Motorstrom und Durchbrennen kommt.
  4. 4.Nachdem die Pumpe in den Normalbetrieb genommen wurde, muss zur Verlängerung ihrer Lebensdauer regelmäßig überprüft werden, ob Versorgungsspannung, Betriebsstrom und Isolationswiderstand normal sind. Wenn die folgenden Bedingungen vorliegen, sollte die Pumpe zur Fehlerbehebung sofort abgeschaltet werden.

 

 1 In the rated condition, the current exceeds 20%.

 2 Der dynamische Wasserstand sinkt bis zum Wassereinlassbereich und verursacht intermittierendes Wasser.

 3 Die Tauchpumpe vibriert stark oder macht Geräusche.

 4 Die Versorgungsspannung ist niedriger als 340 Volt.

 5 Eine Sicherung ist durchgebrannt.

 6 Die Wasserzuleitung ist beschädigt.

 7 The motor's thermal insulation resistance to the earth is less than 0.5 megaohm.

  1.  
  2. 4.We are very happy to introduce our new product -- this submersible pump. This pump has an easy-to-use design that makes it easy to disassemble and clean. With the disassembly steps we provide, you can easily disassemble and clean the various parts, ensuring that it always maintains its best working condition. From loosening the anchoring screws to removing the filter screen and separating the pump and motor, we provide you with clear step-by-step instructions. When assembling, simply follow the reverse order of disassembly, ensuring that each part is cleaned and sealed, and you can complete the assembly. Whether it is an annual inspection or more frequent cleaning, this submersible pump can help you accomplish the task easily.

 

 
Lagerung und Verwahrung

 1. Lassen Sie das Wasser im Motorraum ab (besonders im Winter, um ein Einfrieren des Motors zu verhindern) und binden Sie das Kabel gut fest.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3. Bei längerem Gebrauch sollte auf den Rostschutz der Tauchpumpen geachtet werden.

 

 
Verschleißteile
  • Laufrad
  • Wellenschutzhülse
  • Wellenschutzhülse aus Gummi
  • Siegelring

 
Anwendungsszenarien

01 Wasserentnahme aus einem tiefen Brunnen

02 Hochwasserversorgung

03 Bergwasserversorgung 

04 Turm Wasser

05 Landwirtschaftliche Bewässerung

06 Gartenbewässerung

07 Flusswasserentnahme

08 Brauchwasser

 

Wenn Sie an unseren Produkten interessiert sind, können Sie hier Ihre Informationen hinterlassen und wir werden uns in Kürze mit Ihnen in Verbindung setzen.


Schreiben Sie hier Ihre Nachricht und senden Sie diese an uns

Wenn Sie an unseren Produkten interessiert sind, können Sie hier Ihre Informationen hinterlassen und wir werden uns in Kürze mit Ihnen in Verbindung setzen.


de_DEGerman