Pompë zhytëse me pus të thellë 135QJR

Ndërmerrni përpunimin OEM! Sipas kërkesave të përdoruesit, projektimi dhe prodhimi i llojeve të ndryshme të kërkesave të veçanta të motorit dhe pompës zhytëse jo standarde. Standardet e zbatimit të produktit: GB/T2816-2014 "pompë e zhytur pusi", GB/T2818-2014 "Motor asinkron i zhytur pusi". WhatsApp: 17855846335
PDF DOWNLOAD
Detajet
Etiketat
 
Përmbledhja e artikullit

This product is designed for underground hot water mining with a water temperature below 100°C. It has high temperature resistance, corrosion resistance and aging resistance. Whether used in underground mining or other hot water environments, it can effectively resist the challenges of harsh conditions. Its excellent performance and stable quality make it an ideal choice in the mining field.

 

 
Kushtet e Perdorimit

 The product power requirements for three-phase AC 380V (± 5%), 50HZ (± 1%); water quality requirements include water temperature not higher than 20 °C; solid impurities content (mass ratio) is not greater than 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content is not greater than 1.5mg/L; chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, the inner cavity of the submersible motor must be filled with water to prevent false filling, and then tighten the water injection and air exhaust bolts, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, the immersion depth shall not exceed 70m, and the distance between the bottom of the submersible pump and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the displacement and continuous operation requirements of the submersible pump, and the displacement of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to conduct no-water no-load test on the pump.

 

 
Kuptimi i modelit

135QJR Deep Well Submersible Pump

 
Referenca e pjesshme e modelit
Model Rrjedha (m3/h) kokë
(m)

Shpejtësia e rrotullimit

(ndryshim/pikë)

 Pompë uji(%) Prizë
diametri
(mm)
E zbatueshme mirë
diametri (mm) 
Vlerësuar
fuqi (KW)
Vlerësuar
tension (V)
Vlerësuar
aktuale(A)
Efikasiteti motorik (%) power factorcosφ   Njësia
Madhësia maksimale radiale (mm)
Vërejtje
135QJ5-34 5 34 2850   40  135sipër 1.5 380 4.23     128  
135QJ5-51 51 2.2 6.03      
135QJ5-68 68 3 8.01      
135QJ5-85 85 4 10.53      
135QJ5-102 102 5.5 14.1      
135QJ5-119 119 5.5 14.1      
135QJ5-240 240 11 26.28      
135QJ5-280 5 280 2850   40  135sipër 13 380 30.87     128  
135QJ5-320 320 15 35.62      
135QJ10-24 10 24 2850   50  135sipër 1.5 380 4.23     128  
135QJ10-32 32 2.2 6.03      
135QJ10-48 48 3 8.01      
135QJ10-56 56 4 10.53      
135QJ10-72 72 5.5 14.1      
135QJ10-80 80 5.5 14.1      
135QJ10-104 104 7.5 19.0      
135QJ10-120 120 7.5 19.0      
135QJ10-136 136 9.2 22.7      
135QJ10-180 180 11 26.28      
135QJ10-210 210 13 30.87      
135QJ10-240 240 15 35.62      
135QJ10-300 300 18.5 43.12      
135QJ15-36 15 36 2850   50  135sipër 2.2 380 6.03     128  
135QJ15-39 39 3 8.01      
135QJ15-46 46 4 10.53      
135QJ15-52 52 4 10.53      
135QJ15-59 59 5.5 14.1      
135QJ15-65 65 5.5 14.1      
135QJ15-78 78 7.5 19.0      
135QJ15-91 91 7.5 19.0      
135QJ15-104 104 9.2 22.7      
135QJ15-120 120 11 26.28      
135QJ15-142 142 13 30.87      
135QJ15-162 162 15 35.62      
135QJ15-200 200 18.5 43.12      
135QJ20-16 20 16 2850   50  135above 2.2 380 6.03     128  
135QJ20-24 24 3 8.01      
135QJ20-32 32 4 10.53      
135QJ20-40 40 4 10.53      
135QJ20-48 48 5.5 14.1      
135QJ20-56 56 5.5 14.1      
135QJ20-64 64 7.5 19.0      
135QJ20-72 72 7.5 19.0      
 135QJ20-80135QJ20-100 80 9.2 22.7      
100 11 26.28      
135QJ20-120 120 13 30.87      
135QJ20-136 136 15 35.62      
 135QJ20-168135QJ25-12 168 18.5 43.12      
25 12 2850   65  135sipër 2.2 380 6.03     128  
135QJ25-18 18 3 8.01      
135QJ25-24 24 4 10.53      
135QJ25-30 30 4 10.53      
135QJ25-36 36 5.5 14.1      
135QJ25-48 48 7.5 19.0      
135QJ25-60 60 9.2 22.7      
135QJ25-82 82 11 26.28      
135QJ25-97 97 13 30.87      
135QJ25-110 110 15 35.62      
135QJ25-130 130 18.5 43.12      
135QJ32-24 32 24 2850   80  135sipër 4 380 10.53     128  
135QJ32-30 30 5.5 14.1      
135QJ32-42 42 7.5 19.0      
135QJ32-54 54 9.2 22.7      
135QJ32-68 68 11 26.28      
135QJ32-80 80 13 30.87      
135QJ32-92 92 15 35.62      
135QJ32-104 104 18.5 43.12      
135QJ40-46 40 46 2850   80  135sipër 11 380 26.28     128  
135QJ40-54 54 13 30.87      
135QJ40-62 62 15 35.62      
135QJ40-84 84 18.5 43.12      

 

 
Masat e sigurise

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, rreptësisht në përputhje me dispozitat e ashensorit të pompës, diapazoni i rrjedhës së përdorimit, për të parandaluar rrjedhën e ulët ose forcën e pompimit të lartë të ngritjes, kushinetën e shtytjes dhe pjesët e tjera të konsumit, mbingarkesa motorike e djegur

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Hyrje në Strukturë

The pump part mainly includes pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components.

 The motor part mainly includes base, pressure regulating diaphragm, bearing, bearing seat, stator, rotor, water mouth part, lead cable and other components.


Karakteristikat kryesore të produktit përfshijnë:

  1. 1.The motor is a water-cooled submersible three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing.
  2. 2. In order to prevent the sand in the well water from entering the motor, the motor shaft extension is installed with two oil seals, and the sand throw ring is installed to form a sand prevention structure.
  3. 3. In order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the thrust bearing is installed under the motor.
  4. 4. The lubrication of the motor and the pump bearing is water lubrication.
  5. 5. The motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
  6. 6. The pump designed by computer CAD has simple structure and excellent technical performance.
135QJR Deep Well Submersible Pump
 
Instaloni

(1) Përgatitja para instalimit:
1. Kontrolloni nëse pompa zhytëse plotëson kushtet e përdorimit dhe shtrirjen e specifikuar në manual.
2. Duke përdorur një objekt të rëndë me një diametër të barabartë me diametrin maksimal të jashtëm të pompës zhytëse, matni nëse diametri i brendshëm i gropës së pusit mund të përshtatet me pompën zhytëse dhe mat nëse thellësia e pusit plotëson kërkesat e instalimit.
3. Kontrolloni nëse pusi është i pastër dhe nëse uji i pusit është i turbullt. Asnjëherë mos përdorni një pompë elektrike zhytëse për të larë baltën e pompës dhe ujin me rërë për të shmangur dëmtimin e parakohshëm të pompës elektrike zhytëse.
4. Kontrolloni nëse pozicioni i kapëses së instalimit të ballinës është i përshtatshëm dhe nëse mund të përballojë cilësinë e të gjithë njësisë
5. Kontrolloni nëse komponentët e pompës zhytëse janë të plotë dhe të instaluar siç duhet sipas diagramit të montimit në manual Hiqni ekranin e filtrit dhe rrotulloni bashkimin për të parë nëse rrotullohet në mënyrë fleksibël
6. Zhvidhosni vidën e ujit dhe mbushni zgavrën e motorit me ujë të pastër dhe jo gërryes (vini re. sigurohuni që ta mbushni lart), më pas shtrëngoni vidën e ujit. Pas 12 orësh injektim uji, rezistenca e izolimit të motorit nuk duhet të jetë më e vogël se 150 M Q kur matet me një tavolinë tundëse 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagrami i bashkangjitur i procesit të lidhjes së kabllove është si më poshtë:
135QJR Deep Well Submersible Pump

 

8. Përdorni një multimetër për të kontrolluar nëse telat trefazorë janë të lidhur dhe nëse rezistenca DC është afërsisht e balancuar.
9. Kontrolloni nëse qarku dhe kapaciteti i transformatorit janë të mbingarkuar dhe më pas lidhni çelësin e mbrojtjes nga mbingarkesa ose pajisjet e ndezjes. Shih Tabelën 2 për modele specifike dhe më pas Hidhni një kovë me ujë në pompën e ujit nga dalja e pompës së ujit për të lubrifikuar kushinetat e gomës në pompë dhe më pas vendoseni pompën elektrike zhytëse drejt dhe të qëndrueshme. Filloni (jo më shumë se një sekondë) dhe kontrolloni nëse drejtimi i drejtimit është në përputhje me shenjën e drejtimit. Nëse jo, ndërroni çdo dy lidhës të kabllit trefazor. Më pas instaloni filtrin dhe përgatituni të zbrisni në pus. Nëse përdoret në raste të veçanta (të tilla si kanale, kanale, lumenj, pellgje, pellgje, etj.), pompa elektrike duhet të jetë e tokëzuar në mënyrë të besueshme.

 

(2) Pajisjet dhe mjetet e instalimit:
1. Një palë zinxhirë ngritës për më shumë se dy tonë.
2. Trekëmbësh me lartësi vertikale jo më pak se katër metra.
3. Dy litarë të varur (litarë teli) që mund të mbajnë një peshë më shumë se një ton (mund të mbajnë peshën e një grupi të plotë pompash uji).
4. Instaloni dy palë kapëse (shanga).
5. Çelësat, çekiçët, kaçavidat, veglat dhe instrumentet elektrike etj.

 

(3) Instalimi i pompës elektrike:
1. Diagrami i instalimit të pompës elektrike zhytëse është paraqitur në figurën 2. Dimensionet specifike të instalimit janë paraqitur në tabelën 3 "Lista e dimensioneve të instalimit të pompës elektrike zhytëse".

2. Pompat elektrike zhytëse me kokë më pak se 30 metra mund të ngrihen direkt në pus duke përdorur zorrë dhe litarë teli ose litarë të tjerë kërpi që mund të mbajnë peshën e plotë të të gjithë makinës, tubacioneve të ujit dhe ujit në tuba.

3. Pompat me kokë më shumë se 30 metra përdorin tuba çeliku dhe sekuenca e instalimit është si më poshtë:
①Përdorni një kapëse për të mbërthyer skajin e sipërm të pjesës së pompës së ujit (motori dhe pompa e ujit janë lidhur në këtë moment), ngrijeni atë me një zinxhir të varur dhe lidheni ngadalë në pus derisa Vendoseni kapësin në krye të pusit dhe hiqni zinxhir i varur.
② Përdorni një palë tjetër kapëse për të mbërthyer një tub, ngrijeni atë me një zinxhir të varur 15 cm larg nga fllanxha dhe uleni ngadalë. Midis fllanxhës së tubit dhe fllanxhës së pompës Vendosni mbulesën e gomës në vend dhe shtrëngoni tubin dhe pomponi në mënyrë të barabartë me bulona, ​​dado dhe rondele me susta.
③ Ngrini pak pompën zhytëse, hiqni kapësen në skajin e sipërm të pompës së ujit, lidhni kabllon fort në tubin e ujit me një shirit plastik dhe lidheni ngadalë derisa kapësja të vendoset në grykën e pusit.
④Përdorni të njëjtën metodë për të lidhur të gjithë tubat e ujit në pus.
⑤Pasi kablloja dalëse lidhet me çelësin e kontrollit, lidhet me furnizimin me energji trefazore.


(4) Gjërat që duhen mbajtur parasysh gjatë instalimit:
1. Nëse zbulohet një fenomen bllokimi gjatë procesit të pompimit, kthejeni ose tërhiqni tubin e ujit për të kapërcyer pikën e bllokimit. Nëse masat e ndryshme ende nuk funksionojnë, ju lutemi, mos e detyroni pompën të ulet për të shmangur dëmtimin e pompës elektrike zhytëse dhe të pusit.
2. Gjatë instalimit, një jastëk gome duhet të vendoset në fllanxhën e çdo tubi dhe të shtrëngohet në mënyrë të barabartë.
3. Kur pompa e ujit ulet në pus, ajo duhet të vendoset në mes të tubit të pusit për të parandaluar që pompa të funksionojë kundër murit të pusit për një kohë të gjatë, duke shkaktuar që pompa të dridhet dhe motori të fshihet dhe digjet. .
4. Përcaktoni thellësinë e pompës së ujit në fund të pusit sipas kushteve të rrjedhjes së rërës dhe baltës së pusit. Mos e varrosni pompën në baltë. Distanca nga pompa e ujit në fund të pusit në përgjithësi nuk është më pak se 3 metra (shih Figurën 2).
5. Thellësia e hyrjes së ujit të pompës së ujit duhet të jetë jo më pak se 1-1,5 metra nga niveli dinamik i ujit në nyjen e hyrjes së ujit (shih Figurën 2). Përndryshe, kushinetat e pompës së ujit mund të dëmtohen lehtësisht.
6. Ngritja e pompës së ujit nuk mund të jetë shumë e ulët. Përndryshe, një valvul porta duhet të instalohet në tubacionin e ujit në krye të pusit për të kontrolluar rrjedhën e pompës në pikën e vlerësuar të rrjedhës për të parandaluar mbingarkimin dhe djegien e motorit për shkak të shpejtësive të mëdha të rrjedhës.
7. Kur pompa e ujit është në punë, dalja e ujit duhet të jetë e vazhdueshme dhe e barabartë, rryma duhet të jetë e qëndrueshme (në kushte të vlerësuara të punës, përgjithësisht jo më shumë se 10% e rrymës së vlerësuar), dhe nuk duhet të ketë dridhje ose zhurmë. Nëse ka ndonjë anomali, makina duhet të ndalet për të zbuluar shkakun dhe për ta eliminuar atë.
8. Gjatë instalimit, kushtojini vëmendje cilësimit të telit të tokëzimit të motorit (shih Figurën 2). Kur tubi i ujit është një tub çeliku, nxirreni atë nga kapësja e kokës së pusit; kur tubi i ujit është një tub plastik, nxirreni atë nga shenja e tokëzimit të pompës elektrike.

 

 
Mirëmbajtja dhe Mirëmbajtja
  1. 1.Pasi të instalohet pompa zhytëse, kontrolloni përsëri rezistencën e izolimit dhe përcjelljen trefazore nga çelësi, kontrolloni nëse instrumenti dhe lidhja e pajisjes së ndezjes janë të gabuara, nëse nuk ka problem, makina e provës mund të ndizet, dhe vëzhgoni nëse leximet e treguesit të instrumentit tejkalojnë tensionin dhe rrymën nominale të specifikuar në pllakën e emrit pas fillimit, dhe vëzhgoni nëse pompa ka fenomen zhurmash dhe dridhjeje dhe vini në punë nëse gjithçka është normale.
  2. 2. Pas funksionimit të parë të pompës për katër orë, motori duhet të fiket për të testuar shpejt rezistencën e izolimit termik dhe vlera e tij nuk duhet të jetë më e vogël se 0,5 megaohm.
  3. 3. Pasi pompa të jetë mbyllur, ajo duhet të fillojë pas pesë minutash për të parandaluar rrjedhjen e plotë të kolonës së ujit në tub dhe shkaktimin e rrymës së tepërt të motorit dhe djegies.
  4. 4. Pasi pompa të vihet në funksionim normal, për të zgjatur jetëgjatësinë e saj, është e nevojshme të kontrollohet rregullisht nëse tensioni i furnizimit, rryma e punës dhe rezistenca e izolimit janë normale. Nëse gjenden kushtet e mëposhtme, pompa duhet të fiket menjëherë për të zgjidhur problemet.

 

 1 In the rated condition, the current exceeds 20%.

 2 Niveli dinamik i ujit bie në pjesën e hyrjes së ujit, duke shkaktuar ujë me ndërprerje.

 3 Pompa zhytëse ka dridhje ose zhurmë të fortë.

 4 Tensioni i furnizimit është më i ulët se 340 volt.

 5 Një siguresë është djegur.

 6 Tubi i furnizimit me ujë është i dëmtuar.

 7 The motor's thermal insulation resistance to the earth is less than 0.5 megaohm.

  1.  
  2. 4.We are very happy to introduce our new product -- this submersible pump. This pump has an easy-to-use design that makes it easy to disassemble and clean. With the disassembly steps we provide, you can easily disassemble and clean the various parts, ensuring that it always maintains its best working condition. From loosening the anchoring screws to removing the filter screen and separating the pump and motor, we provide you with clear step-by-step instructions. When assembling, simply follow the reverse order of disassembly, ensuring that each part is cleaned and sealed, and you can complete the assembly. Whether it is an annual inspection or more frequent cleaning, this submersible pump can help you accomplish the task easily.

 

 
Magazinimi dhe ruajtja

 1, fikeni ujin në zgavrën e motorit (veçanërisht në dimër për të parandaluar ngrirjen e motorit) dhe lidheni mirë kabllon.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, përdorimi afatgjatë duhet t'i kushtojë vëmendje parandalimit të ndryshkut të pompave zhytëse.

 

 
Pjesë të veshura
  • Shtytës
  • Mëngë bosht
  • Mëngë e boshtit të gomës
  • Unaza mbyllëse

 
Skenarët e aplikimit

01 Marrja e ujit në pus të thellë

02 Furnizimi me ujë të lartë

03 Ujësjellësi malor 

04 uji i kullës

05 Ujitje bujqësore

06 ujitje kopshti

07 marrja e ujit të lumit

08 ujë shtëpiak

 

Nëse jeni të interesuar për produktet tona, mund të zgjidhni të lini informacionin tuaj këtu dhe ne do t'ju kontaktojmë së shpejti.


Shkruani mesazhin tuaj këtu dhe na dërgoni

Nëse jeni të interesuar për produktet tona, mund të zgjidhni të lini informacionin tuaj këtu dhe ne do t'ju kontaktojmë së shpejti.


sqAlbanian