QJ series submersible electric pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy, urban water supply and drainage, as well as industrial and mining enterprises, disaster relief drainage and other fields. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible electric pump can efficiently lift and transport water, providing reliable water supply protection for various fields. Its stable performance and solid structure make it an indispensable machine in various water conservancy projects.
This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply pump, is designed for water requirements of strict occasions. The product is suitable for water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality environment. The pump adopts closed or water-filled wet structure motor, the inner cavity must be filled with clean water before use to prevent virtual filling, and then tighten the water injection and pressure relief bolts. The product shall be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water source required by the pump shall be able to meet its output demand and continuous operation, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the horizontal or inclined use shall be prohibited, and the cable shall be matched according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no water test on the electric pump.
Model | Oqim (m3/soat) | Bosh (m) |
Aylanish tezligi (o'zgartirish / nuqta) |
Suv nasosi(%) | Chiqish diametri (mm) |
Yaxshi qo'llanilishi mumkin diametri (mm) |
Baholangan quvvat (KVt) |
Baholangan kuchlanish (V) |
Baholangan joriy (A) |
Motor samaradorligi (%) | power factorcosφ | Birlik Radial maksimal o'lcham (mm) |
Izoh | |||||||||
150QJ5-100 | 5 | 100 | 2850 | 58 | 40 | 150 | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ5-150 | 5 | 150 | 2850 | 58 | 40 | 150 dan yuqori | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ5-200 | 200 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ5-250 | 250 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ5-300 | 300 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ10-50 | 10 | 50 | 2850 | 63 | 50 | 150yuqorida | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ10-66 | 66 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-78 | 78 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-84 | 84 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-91 | 91 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-100 | 100 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-128 | 128 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-150 | 150 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-200 | 200 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ10-250 | 250 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ10-300 | 300 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-33 | 15 | 33 | 2850 | 63 | 50 | 150yuqorida | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ15-42 | 42 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-50 | 50 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-60 | 60 | 5.5 | 13.74 | 76 | 0.8 | |||||||||||||||||
150QJ15-65 | 65 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-72 | 72 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-81 | 81 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-90 | 90 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-98 | 98 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-106 | 106 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-114 | 114 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-130 | 130 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ15-146 | 146 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-162 | 162 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-180 | 180 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 150yuqorida | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ20-33 | 33 | 3 | 7.9 | 74.0 | 0.78 | |||||||||||||||||
150QJ20-39 | 20 | 39 | 2850 | 64 | 50 | 150yuqorida | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ20-52 | 52 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ20-65 | 65 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-78 | 78 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-91 | 91 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-98 | 98 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-104 | 104 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-111 | 111 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-130 | 130 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-143 | 143 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-156 | 156 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-182 | 182 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-24 | 25 | 24 | 2850 | 64 | 65 | 150yuqorida | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ25-32 | 32 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ25-40 | 40 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-48 | 48 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-56 | 56 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-64 | 64 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-72 | 72 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-77 | 77 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-84 | 84 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-96 | 96 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-104 | 104 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-110 | 110 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-120 | 120 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-128 | 128 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-136 | 136 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-154 | 154 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ32-18 | 32 | 18 | 2850 | 66 | 80 | 150yuqorida | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ32-24 | 24 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ32-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-36 | 36 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-42 | 32 | 42 | 2850 | 66 | 80 | 150yuqorida | 7.5 | 380 | 18.5 | 77.0 | 0.8 | 143 | ||||||||||
150QJ32-54 | 54 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ32-66 | 66 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ32-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-84 | 84 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-90 | 90 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-96 | 96 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-114 | 114 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ40-16 | 40 | 16 | 2850 | 66 | 80 | 150yuqorida | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ40-24 | 24 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-40 | 40 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ40-48 | 48 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ40-56 | 56 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ40-64 | 64 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-80 | 80 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-96 | 96 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-16 | 50 | 16 | 2850 | 65 | 80 | 150yuqorida | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ50-22 | 22 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ50-28 | 28 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ50-34 | 34 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-40 | 40 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-46 | 46 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ50-52 | 52 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-57 | 57 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-74 | 74 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-80 | 80 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ63-12 | 63 | 12 | 2850 | 60 | 80 | 150yuqorida | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ63-18 | 18 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ63-30 | 30 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ63-36 | 36 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ63-42 | 63 | 42 | 2850 | 60 | 80 | 150yuqorida | 13 | 380 | 30.87 | 79.0 | 0.81 | 143 | ||||||||||
150QJ63-48 | 48 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ63-54 | 54 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ15-220 | 15 | 220 | 2850 | 50 | 150yuqorida | 18.5 | 380 | 43.12 | 143 | |||||||||||||
150QJ15-260 | 260 | 20 | 49.7 | |||||||||||||||||||
150QJ15-300 | 300 | 25 | 56.5 | |||||||||||||||||||
150QJ20-210 | 20 | 210 | 2850 | 50 | 150yuqorida | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ20-240 | 240 | 25 | 56.5 | |||||||||||||||||||
150QJ20-290 | 290 | 30 | 66.6 | |||||||||||||||||||
150QJ25-175 | 25 | 175 | 2850 | 65 | 150yuqorida | 20 | 49.7 | 143 | ||||||||||||||
150QJ25-200 | 200 | 30 | 66.6 | |||||||||||||||||||
150QJ25-290 | 290 | 37 | 82.1 | |||||||||||||||||||
150QJ32-120 | 32 | 120 | 2850 | 80 | 150yuqorida | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ32-132 | 132 | 25 | 56.5 | |||||||||||||||||||
150QJ32-156 | 156 | 30 | 66.6 | |||||||||||||||||||
150QJ32-190 | 190 | 37 | 82.1 | |||||||||||||||||||
150QJ32-240 | 240 | 45 | 96.9 | |||||||||||||||||||
150QJ40-110 | 40 | 110 | 2850 | 80 | 150yuqorida | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ40-121 | 121 | 25 | 56.5 | |||||||||||||||||||
150QJ40-143 | 143 | 30 | 66.6 | |||||||||||||||||||
150QJ40-176 | 176 | 37 | 82.1 | |||||||||||||||||||
150QJ40-220 | 220 | 45 | 96.9 | |||||||||||||||||||
150QJ50-100 | 50 | 100 | 2850 | 80 | 150yuqorida | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ50-110 | 110 | 25 | 56.5 | |||||||||||||||||||
150QJ50-130 | 130 | 30 | 66.6 | |||||||||||||||||||
150QJ50-160 | 160 | 37 | 82.1 | |||||||||||||||||||
150QJ50-200 | 200 | 45 | 96.9 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade 380/50HZ, the use of other voltage grades of submersible motors need to be customized.The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious sign:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering and steering instructions are the same.When the pump is upright, pay attention to safety, prevent overturning injury.
5, this pump has won wide acclaim for its efficiency and reliability. It is used in strict accordance with the applicable lift and flow range stipulated by the electric pump to avoid excessive wear of thrust bearings and other parts caused by large flow at low lift or excessive pumping force at high lift, resulting in motor overload and burnout. After being put into the well, the insulation resistance to the ground of the electric pump shall be measured and shall not be less than 100MΩ. After starting, the voltage and current shall be observed regularly, and the insulation of the motor winding shall be checked to meet the specified requirements. If the storage temperature is below freezing, the water in the pump shall be dried to avoid damage to the motor due to low temperature freezing in the motor cavity. This electric pump is your reliable choice, which can provide stable and reliable power support for your work.
Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet joint, lead cable and other components.
Mahsulotning asosiy xususiyatlari quyidagilardan iborat:
- 1.The motor is a water-sealed wet submersible three-phase asynchronous motor.The motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The voltage regulating film at the bottom of the motor is used to regulate the temperature rise caused by the motor.The expansion and contraction pressure difference of the body water caused by the change.
- 2. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand ring is installed to form a sand prevention structure.
- 3. In order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor.
- 4. The lubrication of the motor and pump bearing is water lubrication.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with excellent insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) O'rnatishdan oldin tayyorgarlik:
1. Suv osti nasosining qo'llanmada ko'rsatilgan foydalanish shartlari va ko'lamiga mos kelishini tekshiring.
2. Diametri suv osti nasosining maksimal tashqi diametriga teng bo'lgan og'ir obiektdan foydalanib, quduqning ichki diametri suv osti nasosiga mos kelishini o'lchang va quduq chuqurligi o'rnatish talablariga javob beradimi yoki yo'qligini o'lchang.
3. Quduq qudug'ining tozaligini va quduq suvining loyqaligini tekshiring. Suv osti elektr nasosiga muddatidan oldin shikast etkazmaslik uchun hech qachon suv osti nasosidan loy va qumli suvni yuvish uchun foydalanmang.
4. Quduq boshini o'rnatish qisqichining joylashuvi mos yoki yo'qligini va u butun qurilma sifatiga bardosh bera oladimi yoki yo'qligini tekshiring.
5. Qo'llanmadagi yig'ish sxemasiga muvofiq suv osti nasosi komponentlari to'liq va to'g'ri o'rnatilganligini tekshiring. Filtr ekranini olib tashlang va muftani egiluvchan aylanayotganligini ko'rish uchun aylantiring.
6. Suv vintini bo'shating va vosita bo'shlig'ini toza, korroziy bo'lmagan suv bilan to'ldiring (eslatma. uni to'ldirishni unutmang), so'ngra suv vintini torting. 12 soatlik suv quyishdan so'ng, 500V chayqash stoli bilan o'lchanganda, dvigatelning izolyatsiyaga chidamliligi 150M Q dan kam bo'lmasligi kerak.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Qo'shilgan kabelni ulash jarayoni diagrammasi quyidagicha:
8. Multimetrdan foydalanib, uch fazali simlarning ulanganligini va shahar qarshiligining taxminan muvozanatlanganligini tekshiring.
9. O'chirish va transformator quvvati haddan tashqari yuklangan yoki yo'qligini tekshirib ko'ring va keyin ortiqcha yuk himoyasi kalitini yoki ishga tushirish uskunasini ulang. Muayyan modellar uchun 2-jadvalga qarang, so'ngra nasosdagi rezina podshipniklarni moylash uchun suv nasosining chiqishidan suv nasosiga bir chelak suv quying, so'ngra suv ostidagi elektr nasosni tik va barqaror joylashtiring. Ishga tushirish (bir soniyadan oshmasligi kerak) va rul yo'nalishi rul belgisiga mos kelishini tekshiring. Agar yo'q bo'lsa, uch fazali kabelning har qanday ikkita ulagichini almashtiring.Keyin filtrni o'rnating va quduqqa tushishga tayyorlang. Maxsus holatlarda (masalan, ariqlar, ariqlar, daryolar, suv havzalari, suv havzalari va boshqalar) ishlatilsa, elektr nasos ishonchli tarzda erga ulangan bo'lishi kerak.
(2) O'rnatish uskunalari va asboblari:
1. Ikki tonnadan ortiq yuk ko'tarish uchun bir juft zanjir.
2. Vertikal balandligi to'rt metrdan kam bo'lmagan tripod.
3. Bir tonnadan ortiq og'irlikni ko'tara oladigan ikkita osilgan arqon (sim arqonlari) (suv nasoslarining to'liq to'plamining og'irligini ko'tara oladi).
4. Ikki juft qisqichni (shponlarni) o'rnating.
5. Kalitlar, bolg'alar, tornavidalar, elektr asboblari va asboblari va boshqalar.
(3) Elektr nasosni o'rnatish:
1. Suv osti elektr nasosining o'rnatish sxemasi 2-rasmda ko'rsatilgan. Maxsus o'rnatish o'lchamlari 3-jadvalda "Suv ostidagi elektr nasosni o'rnatish o'lchamlari ro'yxati" da ko'rsatilgan.
2. Boshi 30 metrdan kam bo'lgan suv osti elektr nasoslari to'g'ridan-to'g'ri quduqqa shlanglar va sim arqonlar yoki butun mashinaning, suv quvurlarining va quvurlardagi suvning to'liq og'irligini ko'tara oladigan boshqa kanop arqonlari yordamida ko'tarilishi mumkin.
3. Boshi 30 metrdan ortiq bo‘lgan nasoslar po‘lat quvurlardan foydalanadi va o‘rnatish ketma-ketligi quyidagicha:
①Suv nasos qismining yuqori uchini qisqich bilan mahkamlang (motor va suv nasosi bu vaqtda ulangan), uni osilgan zanjir bilan ko'taring va quduq boshiga qisqichni o'rnatguncha sekin quduqqa bog'lab qo'ying va osilgan zanjir.
② Quvurni mahkamlash uchun yana bir juft qisqichdan foydalaning, uni osilgan zanjir bilan gardishdan 15 sm uzoqlikda ko'taring va sekin pastga tushiring. Quvur gardish va nasos gardishi o'rtasida Kauchuk yostiqni joyiga qo'ying va quvurni torting va murvat, yong'oq va prujinali rondelalar bilan bir tekisda pompalang.
③ Suv osti nasosini biroz ko'taring, suv nasosining yuqori uchidagi qisqichni echib oling, kabelni suv trubasiga plastik lenta bilan mahkam bog'lang va qisqich quduq boshiga o'rnatilguncha sekin bog'lang.
④Hamma suv quvurlarini quduqqa ulash uchun xuddi shu usuldan foydalaning.
⑤Chiqish kabeli boshqaruv kalitiga ulangandan so'ng, u uch fazali quvvat manbaiga ulanadi.
(4) O'rnatish vaqtida e'tiborga olish kerak bo'lgan narsalar:
1. Nasos jarayonida tiqilib qolish hodisasi aniqlansa, tiqilib qolish nuqtasini yengish uchun suv trubkasini burang yoki torting. Agar turli xil choralar hali ham ishlamasa, iltimos, suv osti elektr nasosi va quduqqa shikast etkazmaslik uchun nasosni majburlamang.
2. O'rnatish vaqtida har bir quvurning gardish qismida kauchuk yostiq qo'yilishi va bir tekis tortilishi kerak.
3. Suv nasosi quduqqa tushirilganda, nasosning quduq devoriga uzoq vaqt davomida ishlamasligi, nasosning tebranishi va dvigatelning supurib yonishiga olib kelishi uchun uni quduq trubasining o'rtasiga qo'yish kerak. .
4. Quduqning oqayotgan qum va loy sharoitiga qarab suv nasosining quduq tubiga chuqurligini aniqlang. Nasosni loyga ko'mmang. Suv nasosidan quduq tubigacha bo'lgan masofa odatda 3 metrdan kam emas (2-rasmga qarang).
5. Suv nasosining suvga kirish chuqurligi dinamik suv sathidan suv kirish tuguniga qadar 1-1,5 metrdan kam bo'lmasligi kerak (2-rasmga qarang). Aks holda, suv nasosining podshipniklari osongina shikastlanishi mumkin.
6. Suv nasosining ko'tarilishi juda past bo'lishi mumkin emas. Aks holda, katta oqim tezligi tufayli dvigatelning haddan tashqari yuklanishi va yonib ketishining oldini olish uchun nominal oqim nuqtasida nasos oqimini nazorat qilish uchun quduq bo'yidagi suv quvur liniyasiga eshik klapanini o'rnatish kerak.
7. Suv pompasi ishlayotganida, suv chiqishi uzluksiz va bir tekis bo'lishi kerak, oqim barqaror bo'lishi kerak (nominal ish sharoitida, odatda nominal oqimning 10% dan ko'p bo'lmagan) va tebranish yoki shovqin bo'lmasligi kerak. Agar biron bir anormallik bo'lsa, sababni aniqlash va uni bartaraf etish uchun mashinani to'xtatish kerak.
8. O'rnatishda vosita topraklama simini sozlashga e'tibor bering (2-rasmga qarang). Suv trubkasi po'lat quvur bo'lsa, uni quduqning qisqichidan olib boring; suv trubkasi plastik quvur bo'lsa, uni elektr nasosning topraklama belgisidan olib boring.
- (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Dinamik suv sathi suv kirish qismiga tushib, suvning vaqti-vaqti bilan paydo bo'lishiga olib keladi.
3 Suv osti nasosi kuchli tebranish yoki shovqinga ega.
4 Ta'minot kuchlanishi 340 voltdan past.
5 Sug'urta yonib ketgan.
6 Suv ta'minoti trubkasi shikastlangan.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
1 Untie the cable tie, remove the pipeline part, and remove the wire plate.
2 suv murvatini burab, suvni vosita kamerasiga qo'ying.
3 filtrni olib tashlang, vosita milini mahkamlash uchun muftadagi mahkamlangan vintni bo'shating.
4 suv kirish qismini dvigatel bilan bog'laydigan murvatni burab, nasosni dvigateldan ajrating (nasos milining egilishiga yo'l qo'ymaslik uchun ajratishda birlik yostig'iga e'tibor bering)
5 nasosni qismlarga ajratish ketma-ketligi quyidagicha: (1-rasmga qarang) suv kirish qismi, pervanel, burilish qobig'i, pervanel...... nazorat valfi tanasi, pervanelni olishda, mahkamlangan konusning gilzasini bo'shatish uchun maxsus asboblardan foydalaning. avval pervaneni o'rnating va demontaj jarayonida nasos milini egmang va ko'karmang.
6. Dvigatelni demontaj qilish jarayoni: (1-rasmga qarang) dvigatelni platformaga joylashtiring va gaykani, taglikni, mil boshini qulflash gaykani, surish plitasini, kalitni, pastki yo'naltiruvchi podshipnik o'rindig'ini va ikkita boshli murvatni pastki qismidan chiqarib oling. o'z navbatida dvigatelni o'chiring va keyin rotorni chiqarib oling (sim paketiga zarar bermaslikka e'tibor bering) va nihoyat ulanish qismini va yuqori yo'riqnoma podshipnikini olib tashlang.
7 blokni yig'ish: yig'ishdan oldin qismlarning zang va axloqsizlikni tozalash kerak, birlashuvchi sirt va mahkamlagichlar plomba bilan qoplangan, so'ngra demontajning teskari tartibida yig'iladi (motor mili yig'ilgandan keyin taxminan bir marta yuqoriga va pastga siljiydi. millimetr), montajdan so'ng, mufta moslashuvchan bo'lishi kerak, keyin esa filtr ekrani sinov mashinasi. Suv osti nasoslari 5-moddaga muvofiq demontaj va texnik xizmat ko'rsatish uchun bir yil ishlagandan so'ng yoki bir yildan kam ishlagandan keyin, lekin ikki yil sho'ng'in vaqtidan keyin quduqdan chiqariladi va eskirgan qismlar almashtiriladi.
In order to ensure long-term use of your submersible pump, we strongly recommend that you drain the water in all motor cavities especially in winter to prevent the motor from freezing; at the same time, roll up the cable and tie it well. Store the equipment in a room without corrosive substances and gases, with the temperature below 40 °C. In addition, if you do not use the submersible pump for a long time, be sure to pay attention to rust prevention measures. These simple steps will help you maintain the performance of the equipment and extend its service life.
- Pervanel
- Mil yengi
- Kauchuk mil yengi
-
Muhrlash halqasi
01 Chuqur quduqdan suv olish
02 Ko'p qavatli suv ta'minoti
03 tog 'suv ta'minoti
04 minora suvi
05 Qishloq xo'jaligini sug'orish
06 bog'ni sug'orish
07 daryo suv olish
08 maishiy suv