Pompa Submersible Sumur 150QJ

Nindakake pangolahan OEM! Miturut syarat pangguna, desain lan manufaktur macem-macem jinis syarat khusus motor lan pompa submersible non-standar. Standar implementasi produk: GB / T2816-2014 "pompa submersible sumur", GB / T2818-2014 "motor asinkron sumur submersible". WhatsApp: 17855846335
PDF DOWNLOAD
Rincian
Tag
 
Ringkesan produk

QJ series submersible electric pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy, urban water supply and drainage, as well as industrial and mining enterprises, disaster relief drainage and other fields. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible electric pump can efficiently lift and transport water, providing reliable water supply protection for various fields. Its stable performance and solid structure make it an indispensable machine in various water conservancy projects.

 

 
Katentuan Pangginaan supados langkung

This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply pump, is designed for water requirements of strict occasions. The product is suitable for water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality environment. The pump adopts closed or water-filled wet structure motor, the inner cavity must be filled with clean water before use to prevent virtual filling, and then tighten the water injection and pressure relief bolts. The product shall be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water source required by the pump shall be able to meet its output demand and continuous operation, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the horizontal or inclined use shall be prohibited, and the cable shall be matched according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no water test on the electric pump.

 

 
Arti Model

Read More About deep water well pump

 
Referensi Model parsial
Model Aliran (m3/jam) sirah
(m)

Kacepetan puteran

(ganti/titik)

Pompa banyu (%)  Outlet
diameteripun
(mm)
Ditrapake kanthi apik
diameteripun (mm) 
 Dirating
daya (KW)
Dirating
tegangan (V)
Dirating
saiki (A)
Efisiensi motor (%) power factorcosφ   Unit
Ukuran maksimal Radial (mm)
Tetembungane
150QJ5-100 5 100 2850 58 40 150 3 380 7.9 74.0 0.78 143  
150QJ5-150 5 150 2850 58 40  150 ndhuwur 4 380 10.25 75.0 0.79 143  
150QJ5-200 200 5.5 13.74 76.0 0.8  
150QJ5-250 250 7.5 18.5 77.0 0.8  
150QJ5-300 300 9.2 22.12 78.0 0.81  
150QJ10-50 10 50 2850 63 50  150ndhuwur 3 380 7.9 74.0 0.78 143  
150QJ10-66 66 4 10.25 75.0 0.79  
150QJ10-78 78 4 10.25 75.0 0.79  
150QJ10-84 84 5.5 13.74 76.0 0.8  
150QJ10-91 91 5.5 13.74 76.0 0.8  
150QJ10-100 100 5.5 13.74 76.0 0.8  
150QJ10-128 128 7.5 18.5 77.0 0.8  
150QJ10-150 150 7.5 18.5 77.0 0.8  
150QJ10-200 200 11 26.28 78.5 0.81  
150QJ10-250 250 13 30.87 79.0 0.81  
150QJ10-300 300 15 35.62 79.0 0.81  
150QJ15-33 15 33 2850 63 50  150ndhuwur 3 380 7.9 74.0 0.78 143  
150QJ15-42 42 4 10.25 75.0 0.79  
150QJ15-50 50 4 10.25 75.0 0.79  
150QJ15-60 60 5.5 13.74 76 0.8  
150QJ15-65 65 5.5 13.74 76.0 0.8  
150QJ15-72 72 5.5 13.74 76.0 0.8  
150QJ15-81 81 7.5 18.5 77.0 0.8  
150QJ15-90 90 7.5 18.5 77.0 0.8  
150QJ15-98 98 7.5 18.5 77.0 0.8  
150QJ15-106 106 9.2 22.12 78.0 0.81  
150QJ15-114 114 9.2 22.12 78.0 0.81  
150QJ15-130 130 11 26.28 78.5 0.81  
150QJ15-146 146 13 30.87 79.0 0.81  
150QJ15-162 162 13 30.87 79.0 0.81  
150QJ15-180 180 15 35.62 79.0 0.81  
150QJ20-26 20 26 2850 64 50  150ndhuwur 3 380 7.9 74.0 0.78 143  
150QJ20-33 33 3 7.9 74.0 0.78  
150QJ20-39 20 39 2850 64 50  150ndhuwur 4 380 10.25 75.0 0.79 143  
150QJ20-52 52 5.5 13.74 76.0 0.8  
150QJ20-65 65 7.5 18.5 77.0 0.8  
150QJ20-78 78 7.5 18.5 77.0 0.8  
150QJ20-91 91 9.2 22.12 78.0 0.81  
150QJ20-98 98 9.2 22.12 78.0 0.81  
150QJ20-104 104 11 26.28 78.5 0.81  
150QJ20-111 111 11 26.28 78.5 0.81  
150QJ20-130 130 13 30.87 79.0 0.81  
150QJ20-143 143 13 30.87 79.0 0.81  
150QJ20-156 156 15 35.62 79.0 0.81  
150QJ20-182 182 18.5 43.12 79.5 0.82  
150QJ25-24 25 24 2850 64 65  150ndhuwur 3 380 7.9 74.0 0.78 143  
150QJ25-32 32 4 10.25 75.0 0.79  
150QJ25-40 40 5.5 13.74 76.0 0.8  
150QJ25-48 48 5.5 13.74 76.0 0.8  
150QJ25-56 56 7.5 18.5 77.0 0.8  
150QJ25-64 64 7.5 18.5 77.0 0.8  
150QJ25-72 72 9.2 22.12 78.0 0.81  
150QJ25-77 77 9.2 22.12 78.0 0.81  
150QJ25-84 84 11 26.28 78.5 0.81  
150QJ25-96 96 11 26.28 78.5 0.81  
150QJ25-104 104 13 30.87 79.0 0.81  
150QJ25-110 110 13 30.87 79.0 0.81  
150QJ25-120 120 15 35.62 79.0 0.81  
150QJ25-128 128 15 35.62 79.0 0.81  
150QJ25-136 136 18.5 43.12 79.5 0.82  
150QJ25-154 154 18.5 43.12 79.5 0.82  
150QJ32-18 32 18 2850 66 80  150ndhuwur 3 380 7.9 74.0 0.78 143  
150QJ32-24 24 4 10.25 75.0 0.79  
150QJ32-30 30 5.5 13.74 76.0 0.8  
150QJ32-36 36 5.5 13.74 76.0 0.8  
150QJ32-42 32 42 2850 66 80  150ndhuwur 7.5 380 18.5 77.0 0.8 143  
150QJ32-54 54 9.2 22.12 78.0 0.81  
150QJ32-66 66 11 26.28 78.5 0.81  
150QJ32-72 72 13 30.87 79.0 0.81  
150QJ32-84 84 13 30.87 79.0 0.81  
150QJ32-90 90 15 35.62 79.0 0.81  
150QJ32-96 96 15 35.62 79.0 0.81  
150QJ32-114 114 18.5 43.12 79.5 0.82  
150QJ40-16 40 16 2850 66 80  150ndhuwur 3 380 7.9 74.0 0.78 143  
150QJ40-24 24 5.5 13.74 76.0 0.8  
150QJ40-30 30 5.5 13.74 76.0 0.8  
150QJ40-40 40 7.5 18.5 77.0 0.8  
150QJ40-48 48 9.2 22.12 78.0 0.81  
150QJ40-56 56 11 26.28 78.5 0.81  
150QJ40-64 64 13 30.87 79.0 0.81  
150QJ40-72 72 13 30.87 79.0 0.81  
150QJ40-80 80 15 35.62 79.0 0.81  
150QJ40-96 96 18.5 43.12 79.5 0.82  
150QJ50-16 50 16 2850 65 80  150ndhuwur 4 380 10.25 75.0 0.79 143  
150QJ50-22 22 5.5 13.74 76.0 0.8  
150QJ50-28 28 7.5 18.5 77.0 0.8  
150QJ50-34 34 9.2 22.12 78.0 0.81  
150QJ50-40 40 9.2 22.12 78.0 0.81  
150QJ50-46 46 11 26.28 78.5 0.81  
150QJ50-52 52 13 30.87 79.0 0.81  
150QJ50-57 57 15 35.62 79.0 0.81  
150QJ50-74 74 18.5 43.12 79.5 0.82  
150QJ50-80 80 18.5 43.12 79.5 0.82  
150QJ63-12 63 12 2850 60 80  150ndhuwur 4 380 10.25 75.0 0.79 143  
150QJ63-18 18 7.5 18.5 77.0 0.8  
150QJ63-30 30 9.2 22.12 78.0 0.81  
150QJ63-36 36 11 26.28 78.5 0.81  
150QJ63-42 63 42 2850 60 80  150ndhuwur 13 380 30.87 79.0 0.81 143  
150QJ63-48 48 15 35.62 79.0 0.81  
150QJ63-54 54 18.5 43.12 79.5 0.82  
150QJ15-220 15 220 2850   50  150ndhuwur 18.5 380 43.12     143  
150QJ15-260 260 20 49.7      
150QJ15-300 300 25 56.5      
150QJ20-210 20 210 2850   50  150ndhuwur 20 380 49.7     143  
150QJ20-240 240 25 56.5      
150QJ20-290 290 30 66.6      
150QJ25-175 25 175 2850   65  150ndhuwur 20   49.7     143  
150QJ25-200 200 30 66.6      
150QJ25-290 290 37 82.1      
150QJ32-120 32 120 2850   80  150ndhuwur 20 380 49.7     143  
150QJ32-132 132 25 56.5      
150QJ32-156 156 30 66.6      
150QJ32-190 190 37 82.1      
150QJ32-240 240 45 96.9      
150QJ40-110 40 110 2850   80  150ndhuwur 20 380 49.7     143  
150QJ40-121 121 25 56.5      
150QJ40-143 143 30 66.6      
150QJ40-176 176 37 82.1      
150QJ40-220 220 45 96.9      
150QJ50-100 50 100 2850   80  150ndhuwur 20 380 49.7     143  
150QJ50-110 110 25 56.5      
150QJ50-130 130 30 66.6      
150QJ50-160 160 37 82.1      
150QJ50-200 200 45 96.9      

 

 
Pancegahan Safety

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade 380/50HZ, the use of other voltage grades of submersible motors need to be customized.The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious sign:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering and steering instructions are the same.When the pump is upright, pay attention to safety, prevent overturning injury.

5, this pump has won wide acclaim for its efficiency and reliability. It is used in strict accordance with the applicable lift and flow range stipulated by the electric pump to avoid excessive wear of thrust bearings and other parts caused by large flow at low lift or excessive pumping force at high lift, resulting in motor overload and burnout. After being put into the well, the insulation resistance to the ground of the electric pump shall be measured and shall not be less than 100MΩ. After starting, the voltage and current shall be observed regularly, and the insulation of the motor winding shall be checked to meet the specified requirements. If the storage temperature is below freezing, the water in the pump shall be dried to avoid damage to the motor due to low temperature freezing in the motor cavity. This electric pump is your reliable choice, which can provide stable and reliable power support for your work.

 

 
Pambuka kanggo Struktur

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet joint, lead cable and other components.


Fitur utama produk kalebu:

  1. 1.The motor is a water-sealed wet submersible three-phase asynchronous motor.The motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The voltage regulating film at the bottom of the motor is used to regulate the temperature rise caused by the motor.The expansion and contraction pressure difference of the body water caused by the change.
  2. 2. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand ring is installed to form a sand prevention structure.
  3. 3. In order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor.
  4. 4. The lubrication of the motor and pump bearing is water lubrication.
  5. 5. The motor stator winding is made of high-quality submersible motor winding wire, with excellent insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
Read More About deep well pump installation
 
Instal

(1) Preparation sadurunge instalasi:
1. Priksa manawa pompa submersible cocog karo kahanan panggunaan lan ruang lingkup sing ditemtokake ing manual.
2. Nggunakake obiect abot karo diameteripun witjaksono menyang diameteripun njaba maksimum pump submersible, ngukur apa inneldiameter saka wellbore bisa pas pump submersible, lan ngukur apa ambane sumur meets syarat instalasi.
3. Priksa manawa sumur sumur resik lan banyu sumur keruh. Aja nggunakake pompa listrik submersible kanggo ngumbah lendhut pompa welor lan banyu pasir supaya ora rusak sadurunge pompa listrik submersible.
4. Priksa manawa posisi clamp instalasi welhead cocok lan apa bisa tahan kualitas kabeh unit
5. Priksa manawa komponen pompa submersible wis lengkap lan dipasang kanthi bener miturut diagram perakitan ing manual Copot layar panyaring lan puterake kopling kanggo ndeleng apa rotasi kanthi fleksibel
6. Copot sekrup banyu lan isi rongga motor kanthi banyu sing resik lan ora korosif (cathetan, manawa kanggo ngisi), banjur kencengake sekrup banyu. Sawise 12 jam injeksi banyu, ing resistance jampel saka motor ngirim ora kurang saka 150M Q nalika diukur karo 500V goyang meja.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagram proses pengkabelan kabel minangka nderek:
Read More About deep well pump installation diagram

 

8. Gunakake multimeter kanggo mriksa apa kabel telung phase disambungake lan apa resistance DC kira-kira imbang.
9. Priksa manawa sirkuit lan trafo kapasitas overloaded, lan banjur nyambungake ngalih pangayoman kakehan utawa miwiti peralatan. Waca Tabel 2 kanggo model tartamtu, banjurPour ember banyu menyang kumpa banyu saka stopkontak pump banyu kanggo lubricate bantalan karet ing kumpa, lan banjur sijine pump listrik submersible mujur lan ajeg.Mulai (ora luwih saka siji detik) lan priksa manawa arah setir cocog karo tandha setir. Yen ora, ganti loro konektor kabel telung fase. Banjur pasang filter lan siyap mudhun sumur. Yen digunakake ing acara khusus (kayata selokan, selokan, kali, blumbang, blumbang, lan sapiturute), pompa listrik kudu dilebokake kanthi andal.

 

(2) Peralatan lan piranti instalasi:
1. Siji pasang rentengan ngangkat luwih saka rong ton.
2. Tripod kanthi dhuwur vertikal ora kurang saka patang meter.
3. Rong tali gantung (tali kawat) sing bisa nanggung bobot luwih saka siji ton (bisa nanggung bobot saka set lengkap pompa banyu).
4. Pasang rong pasang clamps (splints).
5. Kunci pas, palu, obeng, piranti lan piranti listrik, lsp.

 

(3) Instalasi pompa listrik:
1. Diagram instalasi pompa listrik submersible ditampilake ing Gambar 2. Dimensi instalasi spesifik ditampilake ing Tabel 3 "Dhaptar Dimensi Instalasi Pompa Listrik Submersible".

2. Pompa listrik submersible kanthi sirah kurang saka 30 meter bisa diangkat langsung menyang sumur nggunakake selang lan tali kawat utawa tali rami liyane sing bisa nanggung bobot kabeh mesin, pipa banyu, lan banyu ing pipa.

3. Pumps kanthi sirah luwih saka 30 meter nggunakake pipa baja, lan urutan instalasi kaya ing ngisor iki:
①Gunakake penjepit kanggo ngapit ujung ndhuwur bagean pompa banyu (motor lan pompa banyu wis disambungake ing wektu iki), angkat nganggo rantai gantung, lan alon-alon dasi menyang sumur nganti pasang clamp ing sirah sumur lan copot ranté gantung.
② Gunakake sepasang klem liyane kanggo njepit pipa, angkat nganggo rante gantung 15 cm adoh saka flange, banjur mudhunake alon-alon. Antarane flange pipe lan flange pumpLebokake pad karet ing panggonan lan kenceng pipa lan pompa roto-roto nganggo bolts, perkakas lan spring washers.
③ Angkat pompa submersible rada, copot clamp ing mburi ndhuwur pump banyu, dasi kabel kuwat menyang pipa banyu karo plastik tape, lan alon dasi mudhun nganti Clamp diselehake ing wellhead.
④Gunakake cara sing padha kanggo naleni kabeh pipa banyu menyang sumur.
⑤Sawise kabel timbal-metu disambungake menyang saklar kontrol, disambungake menyang sumber daya telung fase.


(4) Bab sing kudu digatekake sajrone instalasi:
1. Yen ana fenomena jamming nalika proses pumping, nguripake utawa narik pipa banyu kanggo ngatasi titik jamming. Yen macem-macem langkah isih ora bisa, please Aja meksa kumpa mudhun kanggo ngindhari karusakan ing pompa listrik submersible lan sumur.
2. Sajrone instalasi, pad karet kudu diselehake ing flange saben pipa lan tightened roto-roto.
3. Nalika pompa banyu diturunake menyang sumur, kudu diselehake ing tengah pipa sumur supaya pompa ora mlaku ing tembok sumur nganti suwe, nyebabake pompa kedher lan motor nyapu lan diobong. .
4. Nemtokake ambane pompa banyu ing ngisor sumur miturut kondisi pasir lan lempung sing mili. Aja ngubur pompa ing lendhut. Jarak saka pompa banyu menyang dhasar sumur umume ora kurang saka 3 meter (pirsani Gambar 2).
5. Ambane entri banyu saka pompa banyu kudu ora kurang saka 1-1,5 meter saka tingkat banyu dinamis menyang simpul inlet banyu (pirsani Gambar 2). Yen ora, bantalan pompa banyu bisa gampang rusak.
6. Angkat pompa banyu ora bisa sithik banget. Yen ora, katup gapura kudu dipasang ing pipa banyu sumur kanggo ngontrol aliran pompa ing titik aliran sing dirating kanggo nyegah motor kakehan lan kobong amarga tingkat aliran gedhe.
7. Nalika pompa banyu mlaku, output banyu kudu terus-terusan lan malah, arus kudu stabil (ing kondisi kerja sing dirating, umume ora luwih saka 10% saka arus sing dirating), lan ora ana getaran utawa gangguan. Yen ana kelainan, mesin kudu mandheg kanggo ngerteni sababe lan ngilangi.
8. Nalika nginstal, mbayar manungsa waé menyang setelan saka kabel grounding motor (ndeleng Figure 2). Nalika pipa banyu minangka pipa baja, mimpin saka clamp wellhead; nalika pipa banyu minangka pipa plastik, mimpin saka tandha grounding pompa listrik.

 

 
Maintenance lan Maintenance
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.

 

1 In the rated condition, the current exceeds 20%.

 2 Tingkat banyu dinamis mudhun menyang bagean mlebu banyu, nyebabake banyu intermiten.

 3 Pompa submersible duwe geter utawa swara sing abot.

 4 Tegangan suplai luwih murah tinimbang 340 volt.

 5 Sekring mati.

 6 Pipa pasokan banyu rusak.

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

  1.  
  2. (5)Unit disassembly:

 1 Untie the cable tie, remove the pipeline part, and remove the wire plate.

 2 meneng mudhun bolt banyu, sijine banyu ing kamar motor.

 3 mbusak Filter, ngeculke meneng tetep ing kopling kanggo ndandani batang motor.

 4 meneng mudhun bolt nyambungake bagean welingan banyu karo motor, lan misahake kumpa saka motor (mbayar manungsa waé kanggo bantal unit nalika misahake, kanggo nyegah mlengkung saka batang pump)

 5 urutan pembongkaran pompa yaiku: (pirsani gambar 1) bagean inlet banyu, impeller, cangkang pangalihan, impeller...... mriksa awak tutup, nalika njabut impeller, gunakake alat khusus kanggo ngeculake lengen kerucut sing tetep. impeller pisanan, lan supaya mlengkung lan bruising batang pump ing proses disassembly.

 6 proses disassembly motor punika: (ndeleng tokoh 1) nyeleh motor ing platform, lan copot perkakas, basa, nut ngunci sirah poros, piring tikaman, tombol, jog prewangan guide ngisor lan bolt sirah pindho saka ngisor. motor ing siji, lan banjur njupuk metu rotor (pay manungsa waé ora kanggo ngrusak paket kabel) lan pungkasanipun mbusak bagean nyambungake lan guide ndhuwur prewangan jog.

 7 unit perakitan: sadurunge perakitan, teyeng lan rereget saka bagean kudu di resiki, lan lumahing kawin lan fasteners ditutupi karo sealant, lan banjur nglumpuk ing urutan ngelawan saka disassembly (poros motor gerakane munggah lan mudhun sawise perakitan kanggo bab siji. millimeter), sawise perakitan, kopling kudu fleksibel, banjur mesin tes layar Filter. Pompa submersible kudu dijupuk metu saka sumur kanggo dismantling lan pangopènan miturut Artikel 5 sawise taun operasi, utawa kurang saka setahun operasi nanging rong taun wektu nyilem, lan bagean worn bakal diganti.

 

 
Panyimpenan lan Kustodian

In order to ensure long-term use of your submersible pump, we strongly recommend that you drain the water in all motor cavities especially in winter to prevent the motor from freezing; at the same time, roll up the cable and tie it well. Store the equipment in a room without corrosive substances and gases, with the temperature below 40 °C. In addition, if you do not use the submersible pump for a long time, be sure to pay attention to rust prevention measures. These simple steps will help you maintain the performance of the equipment and extend its service life.

 

 
Nganggo Parts
  • Impeller
  • Lengan poros
  • Lengan poros karet
  • Ring segel

 
Skenario Aplikasi

01 Intake banyu sumur jero

02 Sumber banyu dhuwur

03 banyu gunung 

04 banyu menara

05 Irigasi Pertanian

06 irigasi kebon

07 intake banyu kali

08 banyu omah

 

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


Tulis pesen ing kene lan kirimake menyang kita

Yen sampeyan kasengsem ing produk kita, sampeyan bisa milih ninggalake informasi kene, lan kita bakal ing tutul karo sampeyan sakcepete.


jvJavanese