QJ series submersible electric pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy, urban water supply and drainage, as well as industrial and mining enterprises, disaster relief drainage and other fields. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible electric pump can efficiently lift and transport water, providing reliable water supply protection for various fields. Its stable performance and solid structure make it an indispensable machine in various water conservancy projects.
This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply pump, is designed for water requirements of strict occasions. The product is suitable for water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality environment. The pump adopts closed or water-filled wet structure motor, the inner cavity must be filled with clean water before use to prevent virtual filling, and then tighten the water injection and pressure relief bolts. The product shall be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water source required by the pump shall be able to meet its output demand and continuous operation, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the horizontal or inclined use shall be prohibited, and the cable shall be matched according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no water test on the electric pump.
Model | Przepływ (m3/h) | Głowa (M) |
Prędkość obrotowa (zmiana/punkt) |
Pompa wodna(%) | Wylot średnica (mm) |
Dobrze się sprawdza średnica (mm) |
Oceniono moc (KW) |
Oceniono napięcie (V) |
Oceniono prąd (A) |
Sprawność motoryczna (%) | współczynnik mocycosφ | Jednostka Maksymalny rozmiar promieniowy (mm) |
Uwaga | |||||||||
150QJ5-100 | 5 | 100 | 2850 | 58 | 40 | 150 | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ5-150 | 5 | 150 | 2850 | 58 | 40 | 150 powyżej | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ5-200 | 200 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ5-250 | 250 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ5-300 | 300 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ10-50 | 10 | 50 | 2850 | 63 | 50 | 150powyżej | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ10-66 | 66 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-78 | 78 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-84 | 84 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-91 | 91 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-100 | 100 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-128 | 128 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-150 | 150 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-200 | 200 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ10-250 | 250 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ10-300 | 300 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-33 | 15 | 33 | 2850 | 63 | 50 | 150powyżej | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ15-42 | 42 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-50 | 50 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-60 | 60 | 5.5 | 13.74 | 76 | 0.8 | |||||||||||||||||
150QJ15-65 | 65 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-72 | 72 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-81 | 81 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-90 | 90 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-98 | 98 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-106 | 106 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-114 | 114 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-130 | 130 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ15-146 | 146 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-162 | 162 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-180 | 180 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 150powyżej | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ20-33 | 33 | 3 | 7.9 | 74.0 | 0.78 | |||||||||||||||||
150QJ20-39 | 20 | 39 | 2850 | 64 | 50 | 150powyżej | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ20-52 | 52 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ20-65 | 65 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-78 | 78 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-91 | 91 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-98 | 98 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-104 | 104 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-111 | 111 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-130 | 130 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-143 | 143 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-156 | 156 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-182 | 182 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-24 | 25 | 24 | 2850 | 64 | 65 | 150powyżej | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ25-32 | 32 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ25-40 | 40 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-48 | 48 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-56 | 56 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-64 | 64 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-72 | 72 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-77 | 77 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-84 | 84 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-96 | 96 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-104 | 104 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-110 | 110 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-120 | 120 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-128 | 128 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-136 | 136 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-154 | 154 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ32-18 | 32 | 18 | 2850 | 66 | 80 | 150powyżej | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ32-24 | 24 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ32-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-36 | 36 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-42 | 32 | 42 | 2850 | 66 | 80 | 150powyżej | 7.5 | 380 | 18.5 | 77.0 | 0.8 | 143 | ||||||||||
150QJ32-54 | 54 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ32-66 | 66 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ32-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-84 | 84 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-90 | 90 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-96 | 96 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-114 | 114 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ40-16 | 40 | 16 | 2850 | 66 | 80 | 150powyżej | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ40-24 | 24 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-40 | 40 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ40-48 | 48 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ40-56 | 56 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ40-64 | 64 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-80 | 80 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-96 | 96 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-16 | 50 | 16 | 2850 | 65 | 80 | 150powyżej | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ50-22 | 22 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ50-28 | 28 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ50-34 | 34 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-40 | 40 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-46 | 46 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ50-52 | 52 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-57 | 57 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-74 | 74 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-80 | 80 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ63-12 | 63 | 12 | 2850 | 60 | 80 | 150powyżej | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ63-18 | 18 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ63-30 | 30 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ63-36 | 36 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ63-42 | 63 | 42 | 2850 | 60 | 80 | 150powyżej | 13 | 380 | 30.87 | 79.0 | 0.81 | 143 | ||||||||||
150QJ63-48 | 48 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ63-54 | 54 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ15-220 | 15 | 220 | 2850 | 50 | 150powyżej | 18.5 | 380 | 43.12 | 143 | |||||||||||||
150QJ15-260 | 260 | 20 | 49.7 | |||||||||||||||||||
150QJ15-300 | 300 | 25 | 56.5 | |||||||||||||||||||
150QJ20-210 | 20 | 210 | 2850 | 50 | 150powyżej | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ20-240 | 240 | 25 | 56.5 | |||||||||||||||||||
150QJ20-290 | 290 | 30 | 66.6 | |||||||||||||||||||
150QJ25-175 | 25 | 175 | 2850 | 65 | 150powyżej | 20 | 49.7 | 143 | ||||||||||||||
150QJ25-200 | 200 | 30 | 66.6 | |||||||||||||||||||
150QJ25-290 | 290 | 37 | 82.1 | |||||||||||||||||||
150QJ32-120 | 32 | 120 | 2850 | 80 | 150powyżej | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ32-132 | 132 | 25 | 56.5 | |||||||||||||||||||
150QJ32-156 | 156 | 30 | 66.6 | |||||||||||||||||||
150QJ32-190 | 190 | 37 | 82.1 | |||||||||||||||||||
150QJ32-240 | 240 | 45 | 96.9 | |||||||||||||||||||
150QJ40-110 | 40 | 110 | 2850 | 80 | 150powyżej | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ40-121 | 121 | 25 | 56.5 | |||||||||||||||||||
150QJ40-143 | 143 | 30 | 66.6 | |||||||||||||||||||
150QJ40-176 | 176 | 37 | 82.1 | |||||||||||||||||||
150QJ40-220 | 220 | 45 | 96.9 | |||||||||||||||||||
150QJ50-100 | 50 | 100 | 2850 | 80 | 150powyżej | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ50-110 | 110 | 25 | 56.5 | |||||||||||||||||||
150QJ50-130 | 130 | 30 | 66.6 | |||||||||||||||||||
150QJ50-160 | 160 | 37 | 82.1 | |||||||||||||||||||
150QJ50-200 | 200 | 45 | 96.9 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade 380/50HZ, the use of other voltage grades of submersible motors need to be customized.The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious sign:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering and steering instructions are the same.When the pump is upright, pay attention to safety, prevent overturning injury.
5, this pump has won wide acclaim for its efficiency and reliability. It is used in strict accordance with the applicable lift and flow range stipulated by the electric pump to avoid excessive wear of thrust bearings and other parts caused by large flow at low lift or excessive pumping force at high lift, resulting in motor overload and burnout. After being put into the well, the insulation resistance to the ground of the electric pump shall be measured and shall not be less than 100MΩ. After starting, the voltage and current shall be observed regularly, and the insulation of the motor winding shall be checked to meet the specified requirements. If the storage temperature is below freezing, the water in the pump shall be dried to avoid damage to the motor due to low temperature freezing in the motor cavity. This electric pump is your reliable choice, which can provide stable and reliable power support for your work.
Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet joint, lead cable and other components.
Główne cechy produktu to:
- 1.The motor is a water-sealed wet submersible three-phase asynchronous motor.The motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The voltage regulating film at the bottom of the motor is used to regulate the temperature rise caused by the motor.The expansion and contraction pressure difference of the body water caused by the change.
- 2. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand ring is installed to form a sand prevention structure.
- 3. In order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor.
- 4. The lubrication of the motor and pump bearing is water lubrication.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with excellent insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Przygotowanie przed instalacją:
1. Sprawdź, czy pompa głębinowa spełnia warunki użytkowania i zakres określony w instrukcji.
2. Za pomocą ciężkiego przedmiotu o średnicy równej maksymalnej średnicy zewnętrznej pompy głębinowej zmierzyć, czy średnica wewnętrzna odwiertu zmieści się w pompie głębinowej oraz zmierzyć, czy głębokość studni spełnia wymagania montażowe.
3. Sprawdź, czy odwiert jest czysty i czy woda w studni jest mętna. Nigdy nie używaj elektrycznej pompy głębinowej do mycia błota i piasku z pompy Welor, aby uniknąć przedwczesnego uszkodzenia pompy elektrycznej.
4. Sprawdź, czy pozycja zacisku montażowego głowicy spawalniczej jest odpowiednia i czy wytrzyma jakość całego urządzenia
5. Sprawdź czy elementy pompy głębinowej są kompletne i prawidłowo zamontowane zgodnie ze schematem montażu zawartym w instrukcji. Zdejmij sito filtra i obróć sprzęgło, aby sprawdzić, czy obraca się elastycznie
6. Odkręć śrubę wodną i napełnij komorę silnika czystą, niekorozyjną wodą (pamiętaj o jej napełnieniu), a następnie dokręć śrubę wodną. Po 12 godzinach wtrysku wody rezystancja izolacji silnika nie powinna być mniejsza niż 150M Q, mierzona za pomocą stołu wibracyjnego 500V.
7. Złącze kablowe, odetnij gumową tulejkę 120 mm z jednego końca kabla wychodzącego i pasującego kabla za pomocą noża elektryka, następnie ułóż trzy żyły w sposób schodkowy, zdejmij miedziany rdzeń 20 mm, zeskrob tlenek Nałóż warstwę na zewnętrzną stronę drutu miedzianego za pomocą noża lub ściereczki piaskowej i włóż dwa połączone końce drutu w paliry. Po szczelnym związaniu warstwy cienkim drutem miedzianym przylutuj go dokładnie i mocno, a następnie przeszlifuj. zadziory na powierzchni. Następnie, w przypadku trzech połączeń, użyj poliestrowej taśmy izolacyjnej i owiń je w sposób półułożony, tworząc trzy warstwy. Owiń ciasno dwa końce warstwy owijającej nitką nylonową, a następnie owiń taśmę trzema warstwami metodą półpiętra. Owiń warstwę zewnętrzną wysokociśnieniową taśmą izolacyjną w trzech warstwach. Na koniec złóż trzy pasma razem i wielokrotnie owiń je pięciowarstwową taśmą wysokociśnieniową. Każda warstwa musi być ściśle związana, a połączenia międzywarstwowe muszą być szczelne i cienkie, aby zapobiec wnikaniu wody i uszkodzeniu izolacji. Po owinięciu namoczyć w wodzie o temperaturze pokojowej 20°C na 12 godzin i zmierzyć rezystancję izolacji za pomocą stołu wytrząsającego , która nie powinna być mniejsza niż 100M Ω
Załączony schemat procesu okablowania kabla jest następujący:
8. Za pomocą multimetru sprawdź, czy przewody trójfazowe są podłączone i czy rezystancja prądu stałego jest w przybliżeniu zrównoważona.
9. Sprawdź, czy obwód i moc transformatora nie są przeciążone, a następnie podłącz wyłącznik zabezpieczający przed przeciążeniem lub sprzęt rozruchowy. Aby zapoznać się z konkretnymi modelami, patrz Tabela 2, a następnie wlej wiadro wody do pompy wodnej z wylotu pompy wodnej, aby nasmarować gumowe łożyska pompy, a następnie umieść elektryczną pompę głębinową pionowo i stabilnie. Uruchomienie (nie dłużej niż jedna sekunda) i sprawdź, czy kierunek skrętu jest zgodny ze znakiem skrętu. Jeśli nie, zamień dowolne dwie wtyczki kabla trójfazowego. Następnie zainstaluj filtr i przygotuj się do zejścia do studni. W przypadku używania pompy elektrycznej do specjalnych celów (takich jak rowy, rowy, rzeki, stawy, stawy itp.) pompa elektryczna musi być niezawodnie uziemiona.
(2) Sprzęt i narzędzia instalacyjne:
1. Jedna para łańcuchów do podnoszenia na ponad dwie tony.
2. Statyw o wysokości pionowej nie mniejszej niż cztery metry.
3. Dwie wiszące liny (liny stalowe) o wytrzymałości większej niż jedna tona (mogą udźwignąć ciężar kompletnego zestawu pomp wodnych).
4. Zamontuj dwie pary zacisków (szyn).
5. Klucze, młotki, śrubokręty, narzędzia i przyrządy elektryczne itp.
(3) Instalacja pompy elektrycznej:
1. Schemat instalacji elektrycznej pompy głębinowej pokazano na rysunku 2. Konkretne wymiary montażowe pokazano w Tabeli 3 „Wykaz wymiarów montażowych pompy elektrycznej głębinowej”.
2. Zatapialne pompy elektryczne o wysokości podnoszenia mniejszej niż 30 metrów można wciągać bezpośrednio do studni za pomocą węży i lin stalowych lub innych lin konopnych, które są w stanie unieść cały ciężar całej maszyny, rur wodociągowych i wody w rurach.
3. W pompach o wysokości podnoszenia większej niż 30 metrów stosuje się rury stalowe, a kolejność montażu jest następująca:
①Użyj zacisku, aby zacisnąć górny koniec części pompy wodnej (silnik i pompa wodna zostały w tym czasie połączone), podnieś ją za pomocą wiszącego łańcucha i powoli przymocuj do studni, aż założysz zacisk na głowicę odwiertu i zdemontujesz wiszący łańcuch.
② Użyj kolejnej pary zacisków, aby zacisnąć rurę, podnieś ją za pomocą wiszącego łańcucha w odległości 15 cm od kołnierza i powoli opuść. Pomiędzy kołnierzem rury a kołnierzem pompy Załóż gumową podkładkę i równomiernie dokręć rurę i pompę za pomocą śrub, nakrętek i podkładek sprężystych.
③ Lekko podnieś pompę głębinową, zdejmij zacisk na górnym końcu pompy wodnej, mocno przymocuj kabel do rury wodnej za pomocą plastikowej taśmy i powoli zamocuj, aż zacisk zostanie umieszczony na głowicy odwiertu.
④Użyj tej samej metody, aby podłączyć wszystkie rury wodociągowe do studni.
⑤Po podłączeniu kabla wyjściowego do przełącznika sterującego, należy go podłączyć do trójfazowego źródła zasilania.
(4) Rzeczy, na które należy zwrócić uwagę podczas instalacji:
1. Jeśli podczas pompowania zostanie stwierdzone zjawisko zakleszczenia, obróć lub pociągnij rurę wodną, aby pokonać punkt zakleszczenia. Jeśli różne środki nadal nie pomagają, nie należy opuszczać pompy na siłę, aby uniknąć uszkodzenia elektrycznej pompy głębinowej i studni.
2. Podczas montażu należy na kołnierz każdej rury założyć podkładkę gumową i równomiernie ją dokręcić.
3. Po opuszczeniu pompy wodnej do studni należy ją umieścić na środku rury studni, aby zapobiec długotrwałemu uderzaniu pompy o ścianę studni, powodując wibrację pompy oraz zamiatanie i spalanie silnika .
4. Określ głębokość pompy wodnej do dna studni, zgodnie z warunkami przepływu piasku i mułu w studni. Nie zakopuj pompy w błocie. Odległość pompy wodnej od dna studni na ogół nie jest mniejsza niż 3 metry (patrz rysunek 2).
5. Głębokość wejścia wody do pompy wodnej nie powinna być mniejsza niż 1-1,5 metra od dynamicznego poziomu wody do węzła wlotu wody (patrz rysunek 2). W przeciwnym razie łożyska pompy wodnej mogą łatwo ulec uszkodzeniu.
6. Podnoszenie pompy wodnej nie może być zbyt niskie. W przeciwnym razie na rurociągu wody głowicy odwiertu należy zainstalować zasuwę, aby kontrolować przepływ pompy w znamionowym punkcie przepływu, aby zapobiec przeciążeniu i spaleniu silnika z powodu dużych prędkości przepływu.
7. Gdy pompa wodna pracuje, wydatek wody powinien być ciągły i równy, prąd powinien być stabilny (w znamionowych warunkach pracy, na ogół nie więcej niż 10% prądu znamionowego), nie powinno być żadnych wibracji ani hałasu. Jeśli wystąpią jakiekolwiek nieprawidłowości, należy zatrzymać maszynę, aby znaleźć przyczynę i ją wyeliminować.
8. Podczas montażu należy zwrócić uwagę na ustawienie przewodu uziemiającego silnik (patrz rysunek 2). Jeżeli rura wodna jest rurą stalową, należy ją poprowadzić od obejmy głowicy odwiertu; jeśli rura wodna jest rurą z tworzywa sztucznego, poprowadź ją od znaku uziemienia pompy elektrycznej.
- (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Dynamiczny poziom wody spada do sekcji wlotu wody, powodując okresowe pojawianie się wody.
3 W pompie głębinowej występują silne wibracje lub hałas.
4 Napięcie zasilania jest niższe niż 340 woltów.
5 Przepalony bezpiecznik.
6 Rura doprowadzająca wodę jest uszkodzona.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
1 Untie the cable tie, remove the pipeline part, and remove the wire plate.
2 przykręć śrubę wodną, wlej wodę do komory silnika.
3 wyjmij filtr, poluzuj stałą śrubę na sprzęgle, aby zamocować wał silnika.
4 przykręcić śrubę łączącą sekcję wlotową wody z silnikiem i oddzielić pompę od silnika (przy demontażu zwrócić uwagę na poduszkę zespołu, aby zapobiec wygięciu wału pompy)
5 kolejność demontażu pompy jest następująca: (patrz rysunek 1) sekcja wlotu wody, wirnik, osłona zwrotna, wirnik...... korpus zaworu zwrotnego, podczas demontażu wirnika należy użyć specjalnych narzędzi, aby poluzować tuleję stożkową nieruchomego najpierw wirnik i unikać zginania i obijania wału pompy podczas demontażu.
6 proces demontażu silnika obejmuje: (patrz rysunek 1) umieść silnik na platformie i wyjmij nakrętki, podstawę, nakrętkę zabezpieczającą łeb wału, płytkę oporową, wpust, dolne gniazdo łożyska prowadzącego i śrubę z podwójnym łbem od spodu silnik po kolei, a następnie wyjmij wirnik (zwróć uwagę, aby nie uszkodzić wiązki przewodów) i na koniec wyjmij sekcję łączącą i górne gniazdo łożyska prowadzącego.
7 montaż zespołu: przed montażem należy oczyścić części z rdzy i brudu, a powierzchnię współpracującą i elementy złączne pokryć uszczelniaczem, a następnie zmontować w odwrotnej kolejności do demontażu (wał silnika po montażu porusza się w górę i w dół przez około jedną milimetr), po zmontowaniu sprzęgło powinno być elastyczne, a następnie przystąpić do maszyny do badania sit filtrujących. Pompy głębinowe należy wyjąć ze studni w celu demontażu i konserwacji zgodnie z art. 5 po roku eksploatacji lub krócej niż rok pracy, ale dwa lata nurkowania, a zużyte części należy wymienić.
In order to ensure long-term use of your submersible pump, we strongly recommend that you drain the water in all motor cavities especially in winter to prevent the motor from freezing; at the same time, roll up the cable and tie it well. Store the equipment in a room without corrosive substances and gases, with the temperature below 40 °C. In addition, if you do not use the submersible pump for a long time, be sure to pay attention to rust prevention measures. These simple steps will help you maintain the performance of the equipment and extend its service life.
- Wirnik
- Tuleja wału
- Gumowa tuleja wału
-
Uszczelka
01 Ujęcie wody ze studni głębinowej
02 Wysokie źródło wody
03 zaopatrzenie w wodę w górach
04 wieża wodna
05 Nawadnianie rolnictwa
06 nawadnianie ogrodu
07 ujęcie wody rzecznej
08 woda użytkowa