150QJ Pompa Sommersibbli Tajjeb Fond

Iwettaq l-ipproċessar OEM! Skont ir-rekwiżiti tal-utent, id-disinn u l-manifattura ta 'diversi tipi ta' rekwiżiti speċjali ta 'mutur u pompa sommerġibbli mhux standard. L-istandards tal-implimentazzjoni tal-prodott: GB/T2816-2014 "pompa sommerġibbli sew", GB/T2818-2014 "mutur asinkroniku sommerġibbli tajjeb". WhatsApp: 17855846335
PDF DOWNLOAD
Dettalji
Tikketti
 
Ħarsa ġenerali tal-prodott

QJ series submersible electric pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy, urban water supply and drainage, as well as industrial and mining enterprises, disaster relief drainage and other fields. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible electric pump can efficiently lift and transport water, providing reliable water supply protection for various fields. Its stable performance and solid structure make it an indispensable machine in various water conservancy projects.

 

 
Kundizzjonijiet ta' Użu

This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply pump, is designed for water requirements of strict occasions. The product is suitable for water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality environment. The pump adopts closed or water-filled wet structure motor, the inner cavity must be filled with clean water before use to prevent virtual filling, and then tighten the water injection and pressure relief bolts. The product shall be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water source required by the pump shall be able to meet its output demand and continuous operation, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the horizontal or inclined use shall be prohibited, and the cable shall be matched according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no water test on the electric pump.

 

 
Tifsira tal-Mudell

Read More About deep water well pump

 
Referenza tal-Mudell Parzjali
Mudell Fluss (m3/h) Kap
(m)

Rotatingspeed

(bidla/punt)

Pompa tal-ilma (%)  Żbokk
dijametru
(mm)
Applikabbli sew
dijametru (mm) 
 Rated
qawwa (KW)
Rated
vultaġġ (V)
Rated
kurrenti (A)
Effiċjenza tal-mutur (%) power factorcosφ   Unità
Daqs massimu radjali (mm)
Rimarka
150QJ5-100 5 100 2850 58 40 150 3 380 7.9 74.0 0.78 143  
150QJ5-150 5 150 2850 58 40  150 hawn fuq 4 380 10.25 75.0 0.79 143  
150QJ5-200 200 5.5 13.74 76.0 0.8  
150QJ5-250 250 7.5 18.5 77.0 0.8  
150QJ5-300 300 9.2 22.12 78.0 0.81  
150QJ10-50 10 50 2850 63 50  150hawn fuq 3 380 7.9 74.0 0.78 143  
150QJ10-66 66 4 10.25 75.0 0.79  
150QJ10-78 78 4 10.25 75.0 0.79  
150QJ10-84 84 5.5 13.74 76.0 0.8  
150QJ10-91 91 5.5 13.74 76.0 0.8  
150QJ10-100 100 5.5 13.74 76.0 0.8  
150QJ10-128 128 7.5 18.5 77.0 0.8  
150QJ10-150 150 7.5 18.5 77.0 0.8  
150QJ10-200 200 11 26.28 78.5 0.81  
150QJ10-250 250 13 30.87 79.0 0.81  
150QJ10-300 300 15 35.62 79.0 0.81  
150QJ15-33 15 33 2850 63 50  150hawn fuq 3 380 7.9 74.0 0.78 143  
150QJ15-42 42 4 10.25 75.0 0.79  
150QJ15-50 50 4 10.25 75.0 0.79  
150QJ15-60 60 5.5 13.74 76 0.8  
150QJ15-65 65 5.5 13.74 76.0 0.8  
150QJ15-72 72 5.5 13.74 76.0 0.8  
150QJ15-81 81 7.5 18.5 77.0 0.8  
150QJ15-90 90 7.5 18.5 77.0 0.8  
150QJ15-98 98 7.5 18.5 77.0 0.8  
150QJ15-106 106 9.2 22.12 78.0 0.81  
150QJ15-114 114 9.2 22.12 78.0 0.81  
150QJ15-130 130 11 26.28 78.5 0.81  
150QJ15-146 146 13 30.87 79.0 0.81  
150QJ15-162 162 13 30.87 79.0 0.81  
150QJ15-180 180 15 35.62 79.0 0.81  
150QJ20-26 20 26 2850 64 50  150hawn fuq 3 380 7.9 74.0 0.78 143  
150QJ20-33 33 3 7.9 74.0 0.78  
150QJ20-39 20 39 2850 64 50  150hawn fuq 4 380 10.25 75.0 0.79 143  
150QJ20-52 52 5.5 13.74 76.0 0.8  
150QJ20-65 65 7.5 18.5 77.0 0.8  
150QJ20-78 78 7.5 18.5 77.0 0.8  
150QJ20-91 91 9.2 22.12 78.0 0.81  
150QJ20-98 98 9.2 22.12 78.0 0.81  
150QJ20-104 104 11 26.28 78.5 0.81  
150QJ20-111 111 11 26.28 78.5 0.81  
150QJ20-130 130 13 30.87 79.0 0.81  
150QJ20-143 143 13 30.87 79.0 0.81  
150QJ20-156 156 15 35.62 79.0 0.81  
150QJ20-182 182 18.5 43.12 79.5 0.82  
150QJ25-24 25 24 2850 64 65  150hawn fuq 3 380 7.9 74.0 0.78 143  
150QJ25-32 32 4 10.25 75.0 0.79  
150QJ25-40 40 5.5 13.74 76.0 0.8  
150QJ25-48 48 5.5 13.74 76.0 0.8  
150QJ25-56 56 7.5 18.5 77.0 0.8  
150QJ25-64 64 7.5 18.5 77.0 0.8  
150QJ25-72 72 9.2 22.12 78.0 0.81  
150QJ25-77 77 9.2 22.12 78.0 0.81  
150QJ25-84 84 11 26.28 78.5 0.81  
150QJ25-96 96 11 26.28 78.5 0.81  
150QJ25-104 104 13 30.87 79.0 0.81  
150QJ25-110 110 13 30.87 79.0 0.81  
150QJ25-120 120 15 35.62 79.0 0.81  
150QJ25-128 128 15 35.62 79.0 0.81  
150QJ25-136 136 18.5 43.12 79.5 0.82  
150QJ25-154 154 18.5 43.12 79.5 0.82  
150QJ32-18 32 18 2850 66 80  150hawn fuq 3 380 7.9 74.0 0.78 143  
150QJ32-24 24 4 10.25 75.0 0.79  
150QJ32-30 30 5.5 13.74 76.0 0.8  
150QJ32-36 36 5.5 13.74 76.0 0.8  
150QJ32-42 32 42 2850 66 80  150hawn fuq 7.5 380 18.5 77.0 0.8 143  
150QJ32-54 54 9.2 22.12 78.0 0.81  
150QJ32-66 66 11 26.28 78.5 0.81  
150QJ32-72 72 13 30.87 79.0 0.81  
150QJ32-84 84 13 30.87 79.0 0.81  
150QJ32-90 90 15 35.62 79.0 0.81  
150QJ32-96 96 15 35.62 79.0 0.81  
150QJ32-114 114 18.5 43.12 79.5 0.82  
150QJ40-16 40 16 2850 66 80  150hawn fuq 3 380 7.9 74.0 0.78 143  
150QJ40-24 24 5.5 13.74 76.0 0.8  
150QJ40-30 30 5.5 13.74 76.0 0.8  
150QJ40-40 40 7.5 18.5 77.0 0.8  
150QJ40-48 48 9.2 22.12 78.0 0.81  
150QJ40-56 56 11 26.28 78.5 0.81  
150QJ40-64 64 13 30.87 79.0 0.81  
150QJ40-72 72 13 30.87 79.0 0.81  
150QJ40-80 80 15 35.62 79.0 0.81  
150QJ40-96 96 18.5 43.12 79.5 0.82  
150QJ50-16 50 16 2850 65 80  150hawn fuq 4 380 10.25 75.0 0.79 143  
150QJ50-22 22 5.5 13.74 76.0 0.8  
150QJ50-28 28 7.5 18.5 77.0 0.8  
150QJ50-34 34 9.2 22.12 78.0 0.81  
150QJ50-40 40 9.2 22.12 78.0 0.81  
150QJ50-46 46 11 26.28 78.5 0.81  
150QJ50-52 52 13 30.87 79.0 0.81  
150QJ50-57 57 15 35.62 79.0 0.81  
150QJ50-74 74 18.5 43.12 79.5 0.82  
150QJ50-80 80 18.5 43.12 79.5 0.82  
150QJ63-12 63 12 2850 60 80  150hawn fuq 4 380 10.25 75.0 0.79 143  
150QJ63-18 18 7.5 18.5 77.0 0.8  
150QJ63-30 30 9.2 22.12 78.0 0.81  
150QJ63-36 36 11 26.28 78.5 0.81  
150QJ63-42 63 42 2850 60 80  150hawn fuq 13 380 30.87 79.0 0.81 143  
150QJ63-48 48 15 35.62 79.0 0.81  
150QJ63-54 54 18.5 43.12 79.5 0.82  
150QJ15-220 15 220 2850   50  150hawn fuq 18.5 380 43.12     143  
150QJ15-260 260 20 49.7      
150QJ15-300 300 25 56.5      
150QJ20-210 20 210 2850   50  150hawn fuq 20 380 49.7     143  
150QJ20-240 240 25 56.5      
150QJ20-290 290 30 66.6      
150QJ25-175 25 175 2850   65  150hawn fuq 20   49.7     143  
150QJ25-200 200 30 66.6      
150QJ25-290 290 37 82.1      
150QJ32-120 32 120 2850   80  150hawn fuq 20 380 49.7     143  
150QJ32-132 132 25 56.5      
150QJ32-156 156 30 66.6      
150QJ32-190 190 37 82.1      
150QJ32-240 240 45 96.9      
150QJ40-110 40 110 2850   80  150hawn fuq 20 380 49.7     143  
150QJ40-121 121 25 56.5      
150QJ40-143 143 30 66.6      
150QJ40-176 176 37 82.1      
150QJ40-220 220 45 96.9      
150QJ50-100 50 100 2850   80  150hawn fuq 20 380 49.7     143  
150QJ50-110 110 25 56.5      
150QJ50-130 130 30 66.6      
150QJ50-160 160 37 82.1      
150QJ50-200 200 45 96.9      

 

 
Prekawzjonijiet tas-Sigurtà

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade 380/50HZ, the use of other voltage grades of submersible motors need to be customized.The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious sign:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering and steering instructions are the same.When the pump is upright, pay attention to safety, prevent overturning injury.

5, this pump has won wide acclaim for its efficiency and reliability. It is used in strict accordance with the applicable lift and flow range stipulated by the electric pump to avoid excessive wear of thrust bearings and other parts caused by large flow at low lift or excessive pumping force at high lift, resulting in motor overload and burnout. After being put into the well, the insulation resistance to the ground of the electric pump shall be measured and shall not be less than 100MΩ. After starting, the voltage and current shall be observed regularly, and the insulation of the motor winding shall be checked to meet the specified requirements. If the storage temperature is below freezing, the water in the pump shall be dried to avoid damage to the motor due to low temperature freezing in the motor cavity. This electric pump is your reliable choice, which can provide stable and reliable power support for your work.

 

 
Introduzzjoni għall-Istruttura

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet joint, lead cable and other components.


Il-karatteristiċi ewlenin tal-prodott jinkludu:

  1. 1.The motor is a water-sealed wet submersible three-phase asynchronous motor.The motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The voltage regulating film at the bottom of the motor is used to regulate the temperature rise caused by the motor.The expansion and contraction pressure difference of the body water caused by the change.
  2. 2. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand ring is installed to form a sand prevention structure.
  3. 3. In order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor.
  4. 4. The lubrication of the motor and pump bearing is water lubrication.
  5. 5. The motor stator winding is made of high-quality submersible motor winding wire, with excellent insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
Read More About deep well pump installation
 
Installa

(1) Tħejjija qabel l-installazzjoni:
1. Iċċekkja jekk il-pompa sommerġibbli tissodisfax il-kundizzjonijiet tal-użu u l-ambitu speċifikati fil-manwal.
2. billi tuża object tqil b'dijametru ugwali għad-dijametru massimu ta 'barra tal-pompa sommerġibbli, kejjel jekk il-inneldiameter tal-wellbore jistax joqgħod mal-pompa sommerġibbli, u kejjel jekk il-fond tal-bir jissodisfax ir-rekwiżiti tal-installazzjoni.
3. Iċċekkja jekk il-bore huwiex nadif u jekk l-ilma tal-bir huwiex imdardra. Qatt tuża pompa elettrika sommerġibbli biex taħsel it-tajn tal-pompa welor u l-ilma tar-ramel biex tevita ħsara prematura lill-pompa elettrika sommerġibbli.
4. Iċċekkja jekk il-pożizzjoni tal-morsa tal-installazzjoni tal-welhead hijiex adattata u jekk tistax tiflaħ il-kwalità tal-unità kollha
5. Iċċekkja jekk il-komponenti tal-pompa sommerġibbli humiex kompluti u installati kif suppost skont id-dijagramma tal-assemblaġġ fil-manwal Neħħi l-iskrin tal-filtru u dawwar l-akkoppjar biex tara jekk idurx b'mod flessibbli
6. Ħoll il-kamin tal-ilma u fillthe kavità tal-mutur b'ilma nadif, mhux korrużiv (nota. kun żgur li fil it up), imbagħad issikka l-kamin tal-ilma. Wara 12-il siegħa ta 'injezzjoni ta' l-ilma, ir-reżistenza ta 'insulazzjoni tal-mutur m'għandhiex tkun inqas minn 150M Q meta titkejjel b'tabella li tħawwad 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Id-dijagramma tal-proċess tal-wiring tal-kejbil mehmuża hija kif ġej:
Read More About deep well pump installation diagram

 

8. Uża multimeter biex tivverifika jekk il-wajers bi tliet fażijiet humiex konnessi u jekk ir-reżistenza DC hijiex bejn wieħed u ieħor bilanċjata.
9. Iċċekkja jekk iċ-ċirkwit u l-kapaċità tat-transformer humiex mgħobbija żżejjed, u mbagħad qabbad is-swiċċ tal-protezzjoni ta 'tagħbija żejda jew it-tagħmir tal-bidu. Ara Tabella 2 għal mudelli speċifiċi, and thenPour barmil ilma fil-pompa tal-ilma mill-iżbokk tal-pompa tal-ilma biex tillubrikha l-berings tal-gomma fil-pompa, u mbagħad poġġi l-pompa elettrika sommerġibbli wieqfa u stabbli.Ibda (mhux aktar minn sekonda) u iċċekkja jekk id-direzzjoni ta 'l-istering hijiex konsistenti mas-sinjal ta' l-istering. Jekk le, tbiddel kwalunkwe żewġ konnetturi tal-kejbil bi tliet fażijiet. Imbagħad installa l-filtru u pprepara biex tinżel fil-bir. Jekk tintuża f'okkażjonijiet speċjali (bħal fosos, fosos, xmajjar, għadajjar, għadajjar, eċċ.), Il-pompa elettrika għandha tkun ertjata b'mod affidabbli.

 

(2) Tagħmir u għodda ta' installazzjoni:
1. Par wieħed ta 'ktajjen ta' rfigħ għal aktar minn żewġ tunnellati.
2. Tripod b'għoli vertikali ta' mhux inqas minn erba' metri.
3. Żewġ ħbula mdendlin (ħbula tal-wajer) li jistgħu jġorru piż ta 'aktar minn tunnellata (jistgħu iġorru l-piż ta' sett komplut ta 'pompi tal-ilma).
4. Installa żewġ pari ta 'klampi (splints).
5. Wrenches, imrietel, tornaviti, għodod u strumenti elettriċi, eċċ.

 

(3) Installazzjoni ta 'pompa elettrika:
1. Id-dijagramma tal-installazzjoni tal-pompa elettrika sommerġibbli hija murija fil-Figura 2. Id-dimensjonijiet tal-installazzjoni speċifiċi huma murija fit-Tabella 3 "Lista tad-Dimensjonijiet tal-Installazzjoni tal-Pompa Elettrika Sommerġibbli".

2. Pompi elettriċi sommerġibbli b'ras ta 'inqas minn 30 metru jistgħu jittellgħu direttament fil-bir bl-użu ta' pajpijiet u ħbula tal-wajer jew ħbula oħra tal-qanneb li jistgħu jġorru l-piż sħiħ tal-magna kollha, pajpijiet tal-ilma, u ilma fil-pajpijiet.

3. Pompi b'ras ta 'aktar minn 30 metru jużaw pajpijiet ta' l-azzar, u s-sekwenza ta 'installazzjoni hija kif ġej:
①Uża morsa biex tikklampja t-tarf ta 'fuq tal-parti tal-pompa ta' l-ilma (il-mutur u l-pompa ta 'l-ilma ġew imqabbda f'dan il-ħin), erfaha b'katina mdendla, u orbotha bil-mod fil-bir sakemm Poġġi l-morsa fuq ir-ras u neħħi l- katina mdendlin.
② Uża par klampi ieħor biex tikklampja pajp, erfah b'katina mdendla 15 ċm 'il bogħod mill-flanġ, u niżżlu bil-mod. Bejn il-flanġ tal-pajp u l-flanġ tal-pompa Poġġi l-kuxxinett tal-gomma f'postu u issikka l-pajp u l-pompa b'mod uniformi b'boltijiet, ġewż u woxers tar-rebbiegħa.
③ Neħħi ftit il-pompa sommerġibbli, neħħi l-morsa fuq it-tarf ta 'fuq tal-pompa ta' l-ilma, torbot il-kejbil sew mal-pajp ta 'l-ilma b'tejp tal-plastik, u orbotha bil-mod sakemm Il-morsa titqiegħed fil-bir.
④Uża l-istess metodu biex torbot il-pajpijiet tal-ilma kollha fil-bir.
⑤Wara li l-kejbil tal-ħruġ ikun imqabbad mal-iswiċċ tal-kontroll, huwa konness mal-provvista tal-enerġija bi tliet fażijiet.


(4) Affarijiet li għandek tinnota waqt l-installazzjoni:
1. Jekk jinstab fenomenu ta 'iġġammjar waqt il-proċess ta' l-ippumpjar, dawwar jew iġbed il-pajp ta 'l-ilma biex tegħleb il-punt ta' iġġamjar. Jekk il-miżuri varji għadhom ma jaħdmux, jekk jogħġbokMa jġiegħelx il-pompa 'l isfel biex tevita ħsara lill-pompa elettrika sommerġibbli u l-bir.
2. Waqt l-installazzjoni, kuxxinett tal-gomma għandu jitqiegħed fil-ħanek ta 'kull pajp u ssikkat indaqs.
3. Meta l-pompa tal-ilma titbaxxa fil-bir, għandha titqiegħed fin-nofs tal-pajp tal-bir biex tevita li l-pompa taħdem kontra l-ħajt tal-bir għal żmien twil, u tikkawża li l-pompa tivvibra u l-mutur jiknes u jinħaraq .
4. Iddetermina l-fond tal-pompa ta 'l-ilma sal-qiegħ tal-bir skond il-kundizzjonijiet ta' ramel u ħama li jirriżultaw tal-bir. Tidfenx il-pompa fit-tajn. Id-distanza mill-pompa tal-ilma sal-qiegħ tal-bir hija ġeneralment mhux inqas minn 3 metri (ara Figura 2).
5. Il-fond tad-dħul ta 'l-ilma tal-pompa ta' l-ilma m'għandux ikun inqas minn 1-1.5 metri mil-livell dinamiku ta 'l-ilma għan-nodu tad-dħul ta' l-ilma (ara l-Figura 2). Inkella, il-bearings tal-pompa tal-ilma jistgħu jiġu mħassra faċilment.
6. Il-lift tal-pompa tal-ilma ma jistax ikun baxx wisq. Inkella, valv gate jeħtieġ li jiġi installat fuq il-pipeline ta 'l-ilma tar-ras biex jikkontrolla l-fluss tal-pompa fil-punt tal-fluss nominali biex jipprevjeni li l-mutur jiġi mgħobbi żżejjed u jinħaraq minħabba rati ta' fluss kbar.
7. Meta l-pompa ta 'l-ilma tkun qed taħdem, l-output ta' l-ilma għandu jkun kontinwu u saħansitra, il-kurrent għandu jkun stabbli (taħt kundizzjonijiet tax-xogħol ratati, ġeneralment mhux aktar minn 10% tal-kurrent nominali), u m'għandux ikun hemm vibrazzjoni jew storbju. Jekk ikun hemm xi anormalità, il-magna għandha titwaqqaf biex issir taf il-kawża u teliminaha.
8. Meta tinstalla, oqgħod attent għall-issettjar tal-wajer tal-ert tal-mutur (ara l-Figura 2). Meta l-pajp ta 'l-ilma jkun pajp ta' l-azzar, wassalha mill-morsa tal-ħofor; meta l-pajp ta 'l-ilma huwa pajp tal-plastik, wassalha mill-marka ta' l-ert tal-pompa elettrika.

 

 
Manutenzjoni u Manutenzjoni
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.

 

1 In the rated condition, the current exceeds 20%.

 2 Il-livell tal-ilma dinamiku jinżel fis-sezzjoni tad-daħla tal-ilma, u jikkawża ilma intermittenti.

 3 Il-pompa sommerġibbli għandha vibrazzjoni jew storbju severi.

 4 Il-vultaġġ tal-provvista huwa inqas minn 340 volt.

 5 Fjus jinħaraq.

 6 Il-pajp tal-provvista tal-ilma huwa bil-ħsara.

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

  1.  
  2. (5)Unit disassembly:

 1 Untie the cable tie, remove the pipeline part, and remove the wire plate.

 2 kamin il-bolt tal-ilma, poġġi l-ilma fil-kamra tal-mutur.

 3 neħħi l-filtru, ħoll il-kamin fiss fuq l-akkoppjar biex tiffissa x-xaft tal-mutur.

 4 kamin il-bolt li jgħaqqad is-sezzjoni tad-daħla tal-ilma mal-mutur, u issepara l-pompa mill-mutur (oqgħod attent għall-kuxxin tal-unità meta tissepara, biex tevita l-liwja tax-xaft tal-pompa)

 5 is-sekwenza taż-żarmar tal-pompa hija: (ara l-figura 1) sezzjoni tad-daħla tal-ilma, impeller, qoxra tad-devjazzjoni, impeller ...... korp tal-valv tal-kontroll, meta tneħħi l-impeller, uża għodda speċjali biex tħoll il-kmiem koniku tal-fiss impeller l-ewwel, u tevita li tgħawweġ u tbenġil ix-xaft tal-pompa fil-proċess taż-żarmar.

 6 il-proċess taż-żarmar tal-mutur huwa: (ara l-figura 1) poġġi l-mutur fuq il-pjattaforma, u neħħi l-ġewż, bażi, ġewż tal-qfil tar-ras tax-xaft, pjanċa tal-ispinta, ċavetta, sedil li jġorr il-gwida t'isfel u bolt tar-ras doppju mill-qiegħ ta ' il-mutur min-naħa tiegħu, u mbagħad oħroġ ir-rotor (oqgħod attent li ma tagħmilx ħsara lill-pakkett tal-wajer) u fl-aħħar neħħi s-sezzjoni tal-konnessjoni u s-sedil li jġorr il-gwida ta 'fuq.

 7 assemblaġġ ta 'unità: qabel l-assemblaġġ, is-sadid u l-ħmieġ tal-partijiet għandhom jitnaddfu, u l-wiċċ tat-tgħammir u l-qfieli miksija b'siġillant, u mbagħad immuntati fl-ordni oppost taż-żarmar (ix-xaft tal-mutur jimxi 'l fuq u' l isfel wara l-assemblaġġ għal madwar wieħed millimetru), wara l-assemblaġġ, l-akkoppjar għandu jkun flessibbli, u mbagħad il-magna tat-test tal-iskrin tal-filtru. Pompi sommerġibbli għandhom jinħarġu mill-bir għaż-żarmar u l-manutenzjoni skond l-Artikolu 5 wara sena ta 'tħaddim, jew inqas minn sena ta' tħaddim iżda sentejn ta 'ħin ta' għadis, u l-partijiet li jintlibsu għandhom jiġu sostitwiti.

 

 
Ħażna u Kustodja

In order to ensure long-term use of your submersible pump, we strongly recommend that you drain the water in all motor cavities especially in winter to prevent the motor from freezing; at the same time, roll up the cable and tie it well. Store the equipment in a room without corrosive substances and gases, with the temperature below 40 °C. In addition, if you do not use the submersible pump for a long time, be sure to pay attention to rust prevention measures. These simple steps will help you maintain the performance of the equipment and extend its service life.

 

 
Partijiet li jilbsu
  • Impeller
  • Kmiem tax-xaft
  • Kmiem tax-xaft tal-gomma
  • Ċirku tas-siġillar

 
Xenarji ta' Applikazzjoni

01 Intake ta 'ilma fil-fond

02 Provvista ta' ilma għoli

03 provvista ta 'ilma fil-muntanji 

04 torri ilma

05 Tisqija agrikola

06 tisqija tal-ġnien

07 teħid ta 'ilma tax-xmara

08 ilma domestiku

 

Jekk inti interessat fil-prodotti tagħna, tista 'tagħżel li tħalli l-informazzjoni tiegħek hawn, u aħna ser inkunu f'kuntatt miegħek dalwaqt.


Ikteb il-messaġġ tiegħek hawn u ibgħatilna

Jekk inti interessat fil-prodotti tagħna, tista 'tagħżel li tħalli l-informazzjoni tiegħek hawn, u aħna ser inkunu f'kuntatt miegħek dalwaqt.


mtMaltese