Pumpa uisge domhainn domhainn 150QJ

Dèan làimhseachadh OEM! A rèir riatanasan luchd-cleachdaidh, dealbhadh agus dèanamh diofar sheòrsaichean de riatanasan sònraichte de motair agus pumpa submersible neo-àbhaisteach. Inbhean buileachaidh toraidh: GB / T2816-2014 "pump gu math fon uisge", GB / T2818-2014 "motair asyncronach fon uisge". WhatsApp: 17855846335
PDF DOWNLOAD
Mion-fhiosrachadh
Tagaichean
 
Ro-shealladh toraidh

QJ series submersible electric pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy, urban water supply and drainage, as well as industrial and mining enterprises, disaster relief drainage and other fields. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible electric pump can efficiently lift and transport water, providing reliable water supply protection for various fields. Its stable performance and solid structure make it an indispensable machine in various water conservancy projects.

 

 
Cùmhnantan-cleachdaidh

This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply pump, is designed for water requirements of strict occasions. The product is suitable for water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality environment. The pump adopts closed or water-filled wet structure motor, the inner cavity must be filled with clean water before use to prevent virtual filling, and then tighten the water injection and pressure relief bolts. The product shall be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water source required by the pump shall be able to meet its output demand and continuous operation, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the horizontal or inclined use shall be prohibited, and the cable shall be matched according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no water test on the electric pump.

 

 
Modail Ciall

Read More About deep water well pump

 
Iomradh Modail Pàirteach
Modail Sruth (m3/h) Ceann
(m)

Luas rothlach

(atharrachadh/puing)

Pumpa uisge (%)  Ar-a-mach
trast-thomhas
(mm)
Gu math iomchaidh
trast-thomhas (mm) 
 Rangaichte
cumhachd (KW)
Rangaichte
bholtaids (V)
Rangaichte
sruth (A)
Èifeachdas motair (%) power factorcosφ   Aonad
Meud radial (mm)
Facal
150QJ5-100 5 100 2850 58 40 150 3 380 7.9 74.0 0.78 143  
150QJ5-150 5 150 2850 58 40  150 gu h-àrd 4 380 10.25 75.0 0.79 143  
150QJ5-200 200 5.5 13.74 76.0 0.8  
150QJ5-250 250 7.5 18.5 77.0 0.8  
150QJ5-300 300 9.2 22.12 78.0 0.81  
150QJ10-50 10 50 2850 63 50  150gu h-àrd 3 380 7.9 74.0 0.78 143  
150QJ10-66 66 4 10.25 75.0 0.79  
150QJ10-78 78 4 10.25 75.0 0.79  
150QJ10-84 84 5.5 13.74 76.0 0.8  
150QJ10-91 91 5.5 13.74 76.0 0.8  
150QJ10-100 100 5.5 13.74 76.0 0.8  
150QJ10-128 128 7.5 18.5 77.0 0.8  
150QJ10-150 150 7.5 18.5 77.0 0.8  
150QJ10-200 200 11 26.28 78.5 0.81  
150QJ10-250 250 13 30.87 79.0 0.81  
150QJ10-300 300 15 35.62 79.0 0.81  
150QJ15-33 15 33 2850 63 50  150gu h-àrd 3 380 7.9 74.0 0.78 143  
150QJ15-42 42 4 10.25 75.0 0.79  
150QJ15-50 50 4 10.25 75.0 0.79  
150QJ15-60 60 5.5 13.74 76 0.8  
150QJ15-65 65 5.5 13.74 76.0 0.8  
150QJ15-72 72 5.5 13.74 76.0 0.8  
150QJ15-81 81 7.5 18.5 77.0 0.8  
150QJ15-90 90 7.5 18.5 77.0 0.8  
150QJ15-98 98 7.5 18.5 77.0 0.8  
150QJ15-106 106 9.2 22.12 78.0 0.81  
150QJ15-114 114 9.2 22.12 78.0 0.81  
150QJ15-130 130 11 26.28 78.5 0.81  
150QJ15-146 146 13 30.87 79.0 0.81  
150QJ15-162 162 13 30.87 79.0 0.81  
150QJ15-180 180 15 35.62 79.0 0.81  
150QJ20-26 20 26 2850 64 50  150gu h-àrd 3 380 7.9 74.0 0.78 143  
150QJ20-33 33 3 7.9 74.0 0.78  
150QJ20-39 20 39 2850 64 50  150gu h-àrd 4 380 10.25 75.0 0.79 143  
150QJ20-52 52 5.5 13.74 76.0 0.8  
150QJ20-65 65 7.5 18.5 77.0 0.8  
150QJ20-78 78 7.5 18.5 77.0 0.8  
150QJ20-91 91 9.2 22.12 78.0 0.81  
150QJ20-98 98 9.2 22.12 78.0 0.81  
150QJ20-104 104 11 26.28 78.5 0.81  
150QJ20-111 111 11 26.28 78.5 0.81  
150QJ20-130 130 13 30.87 79.0 0.81  
150QJ20-143 143 13 30.87 79.0 0.81  
150QJ20-156 156 15 35.62 79.0 0.81  
150QJ20-182 182 18.5 43.12 79.5 0.82  
150QJ25-24 25 24 2850 64 65  150gu h-àrd 3 380 7.9 74.0 0.78 143  
150QJ25-32 32 4 10.25 75.0 0.79  
150QJ25-40 40 5.5 13.74 76.0 0.8  
150QJ25-48 48 5.5 13.74 76.0 0.8  
150QJ25-56 56 7.5 18.5 77.0 0.8  
150QJ25-64 64 7.5 18.5 77.0 0.8  
150QJ25-72 72 9.2 22.12 78.0 0.81  
150QJ25-77 77 9.2 22.12 78.0 0.81  
150QJ25-84 84 11 26.28 78.5 0.81  
150QJ25-96 96 11 26.28 78.5 0.81  
150QJ25-104 104 13 30.87 79.0 0.81  
150QJ25-110 110 13 30.87 79.0 0.81  
150QJ25-120 120 15 35.62 79.0 0.81  
150QJ25-128 128 15 35.62 79.0 0.81  
150QJ25-136 136 18.5 43.12 79.5 0.82  
150QJ25-154 154 18.5 43.12 79.5 0.82  
150QJ32-18 32 18 2850 66 80  150gu h-àrd 3 380 7.9 74.0 0.78 143  
150QJ32-24 24 4 10.25 75.0 0.79  
150QJ32-30 30 5.5 13.74 76.0 0.8  
150QJ32-36 36 5.5 13.74 76.0 0.8  
150QJ32-42 32 42 2850 66 80  150gu h-àrd 7.5 380 18.5 77.0 0.8 143  
150QJ32-54 54 9.2 22.12 78.0 0.81  
150QJ32-66 66 11 26.28 78.5 0.81  
150QJ32-72 72 13 30.87 79.0 0.81  
150QJ32-84 84 13 30.87 79.0 0.81  
150QJ32-90 90 15 35.62 79.0 0.81  
150QJ32-96 96 15 35.62 79.0 0.81  
150QJ32-114 114 18.5 43.12 79.5 0.82  
150QJ40-16 40 16 2850 66 80  150gu h-àrd 3 380 7.9 74.0 0.78 143  
150QJ40-24 24 5.5 13.74 76.0 0.8  
150QJ40-30 30 5.5 13.74 76.0 0.8  
150QJ40-40 40 7.5 18.5 77.0 0.8  
150QJ40-48 48 9.2 22.12 78.0 0.81  
150QJ40-56 56 11 26.28 78.5 0.81  
150QJ40-64 64 13 30.87 79.0 0.81  
150QJ40-72 72 13 30.87 79.0 0.81  
150QJ40-80 80 15 35.62 79.0 0.81  
150QJ40-96 96 18.5 43.12 79.5 0.82  
150QJ50-16 50 16 2850 65 80  150gu h-àrd 4 380 10.25 75.0 0.79 143  
150QJ50-22 22 5.5 13.74 76.0 0.8  
150QJ50-28 28 7.5 18.5 77.0 0.8  
150QJ50-34 34 9.2 22.12 78.0 0.81  
150QJ50-40 40 9.2 22.12 78.0 0.81  
150QJ50-46 46 11 26.28 78.5 0.81  
150QJ50-52 52 13 30.87 79.0 0.81  
150QJ50-57 57 15 35.62 79.0 0.81  
150QJ50-74 74 18.5 43.12 79.5 0.82  
150QJ50-80 80 18.5 43.12 79.5 0.82  
150QJ63-12 63 12 2850 60 80  150gu h-àrd 4 380 10.25 75.0 0.79 143  
150QJ63-18 18 7.5 18.5 77.0 0.8  
150QJ63-30 30 9.2 22.12 78.0 0.81  
150QJ63-36 36 11 26.28 78.5 0.81  
150QJ63-42 63 42 2850 60 80  150gu h-àrd 13 380 30.87 79.0 0.81 143  
150QJ63-48 48 15 35.62 79.0 0.81  
150QJ63-54 54 18.5 43.12 79.5 0.82  
150QJ15-220 15 220 2850   50  150gu h-àrd 18.5 380 43.12     143  
150QJ15-260 260 20 49.7      
150QJ15-300 300 25 56.5      
150QJ20-210 20 210 2850   50  150gu h-àrd 20 380 49.7     143  
150QJ20-240 240 25 56.5      
150QJ20-290 290 30 66.6      
150QJ25-175 25 175 2850   65  150gu h-àrd 20   49.7     143  
150QJ25-200 200 30 66.6      
150QJ25-290 290 37 82.1      
150QJ32-120 32 120 2850   80  150gu h-àrd 20 380 49.7     143  
150QJ32-132 132 25 56.5      
150QJ32-156 156 30 66.6      
150QJ32-190 190 37 82.1      
150QJ32-240 240 45 96.9      
150QJ40-110 40 110 2850   80  150gu h-àrd 20 380 49.7     143  
150QJ40-121 121 25 56.5      
150QJ40-143 143 30 66.6      
150QJ40-176 176 37 82.1      
150QJ40-220 220 45 96.9      
150QJ50-100 50 100 2850   80  150gu h-àrd 20 380 49.7     143  
150QJ50-110 110 25 56.5      
150QJ50-130 130 30 66.6      
150QJ50-160 160 37 82.1      
150QJ50-200 200 45 96.9      

 

 
Ceumannan Sàbhailteachd

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade 380/50HZ, the use of other voltage grades of submersible motors need to be customized.The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious sign:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering and steering instructions are the same.When the pump is upright, pay attention to safety, prevent overturning injury.

5, this pump has won wide acclaim for its efficiency and reliability. It is used in strict accordance with the applicable lift and flow range stipulated by the electric pump to avoid excessive wear of thrust bearings and other parts caused by large flow at low lift or excessive pumping force at high lift, resulting in motor overload and burnout. After being put into the well, the insulation resistance to the ground of the electric pump shall be measured and shall not be less than 100MΩ. After starting, the voltage and current shall be observed regularly, and the insulation of the motor winding shall be checked to meet the specified requirements. If the storage temperature is below freezing, the water in the pump shall be dried to avoid damage to the motor due to low temperature freezing in the motor cavity. This electric pump is your reliable choice, which can provide stable and reliable power support for your work.

 

 
Ro-ràdh don Structar

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet joint, lead cable and other components.


Am measg prìomh fheartan an toraidh tha:

  1. 1.The motor is a water-sealed wet submersible three-phase asynchronous motor.The motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The voltage regulating film at the bottom of the motor is used to regulate the temperature rise caused by the motor.The expansion and contraction pressure difference of the body water caused by the change.
  2. 2. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand ring is installed to form a sand prevention structure.
  3. 3. In order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor.
  4. 4. The lubrication of the motor and pump bearing is water lubrication.
  5. 5. The motor stator winding is made of high-quality submersible motor winding wire, with excellent insulation performance.
  6. 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.
Read More About deep well pump installation
 
Stàladh

(1) Ag ullachadh mus stàladh:
1. Dèan cinnteach a bheil am pumpa fon uisge a’ coinneachadh ris na cumhaichean cleachdaidh agus an raon a tha air a shònrachadh san leabhar-làimhe.
2. A’ cleachdadh inneal trom le trast-thomhas co-ionann ris an trast-thomhas a-muigh as àirde den phump a tha fon uisge, tomhais an urrainn dha trast-thomhas a-staigh an tobair a bhith a’ freagairt air a’ phumpa fon uisge, agus tomhas a bheil doimhneachd an tobair a’ coinneachadh ri riatanasan an stàlaidh.
3. Dèan cinnteach a bheil toll an tobair glan agus a bheil uisge an tobair turbid. Na cleachd pumpa dealain fon uisge gu bràth gus poll pumpa welor agus uisge gainmhich a nighe gus milleadh ro-luath air a’ phump dealain fon uisge a sheachnadh.
4. Dèan cinnteach a bheil suidheachadh a’ chlamp stàlaidh welhead freagarrach agus an urrainn dha seasamh ri càileachd an aonaid gu lèir
5. Dèan cinnteach a bheil na pàirtean pumpa fon uisge coileanta agus air an stàladh ceart a rèir an diagram cruinneachaidh san leabhar-làimhe Thoir air falbh an scrion sìoltachain agus cuairteachadh a’ chàraid gus faicinn a bheil e a ’tionndadh gu sùbailte
6. Unscrew an sgriubha uisge agus lìon a’ chuas motair le uisge glan, neo-chreimneach (nota. bi cinnteach gun cuir thu a-steach e), agus an uairsin teannachadh an sgriubha uisge. Às deidh 12 uair de in-stealladh uisge, cha bu chòir an aghaidh insulation an motair a bhith nas ìsle na 150M Q nuair a thèid a thomhas le clàr crathadh 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Tha an diagram pròiseas sreangadh càball ceangailte mar a leanas:
Read More About deep well pump installation diagram

 

8. Cleachd multimeter gus dèanamh cinnteach a bheil na h-uèirichean trì-ìrean ceangailte agus a bheil an aghaidh DC timcheall air cothromach.
9. Dèan cinnteach a bheil cus luchd air a’ chuairt agus comas an cruth-atharrachaidh, agus an uairsin ceangail an tionndadh dìon cus cuideim no an uidheamachd tòiseachaidh. Faic Clàr 2 airson modalan sònraichte, agus an uairsin dòirt bucaid uisge a-steach don phump uisge bhon ionad pumpa uisge gus na giùlan rubair a lubricadh anns a’ phump, agus an uairsin cuir am pumpa dealain fon uisge gu dìreach agus gu seasmhach.Start (gun a bhith nas fhaide na aon diog). agus dèan cinnteach a bheil an stiùireadh stiùiridh co-chòrdail ris an t-soidhne stiùiridh. Mura h-eil, suaip dà cheangail den chàball trì-ìre.Then stàlaich an criathrag agus ullaich airson a dhol sìos an tobar. Ma thèid a chleachdadh aig amannan sònraichte (leithid dìgean, dìgean, aibhnichean, lochan, lòin, msaa), feumaidh am pumpa dealain a bhith air a chuir air bhonn gu h-earbsach.

 

(2) Uidheam agus innealan stàlaidh:
1. Aon phaidhir de shlabhraidhean togail airson barrachd air dà thunna.
2. Tripod le àirde dìreach nach eil nas lugha na ceithir meatairean.
3. Dà ròp crochte (ròpaichean uèir) as urrainn cuideam nas motha na aon tunna a ghiùlan (faodaidh cuideam seata iomlan de phumpaichean uisge a ghiùlan).
4. Stàlaich dà phaidhir de clamps (splints).
5. Wrenches, ùird, screwdrivers, innealan dealain agus ionnstramaidean, msaa.

 

(3) Stàladh pumpa dealain:
1. Tha an diagram stàlaidh den phump dealain submersible air a shealltainn ann am Figear 2. Tha na tomhasan stàlaidh sònraichte air an sealltainn ann an Clàr 3 "Liosta de mheudan stàlaidh a' phump dealain fon uisge".

2. Faodar pumpaichean dealain fon uisge le ceann nas lugha na 30 meatair a thogail gu dìreach a-steach don tobar le bhith a’ cleachdadh phìoban agus ròpaichean uèir no ròpannan hemp eile as urrainn làn chuideam an inneil gu lèir, pìoban uisge, agus uisge anns na pìoban a ghiùlan.

3. Bidh pumpaichean le ceann nas motha na 30 meatair a 'cleachdadh pìoban stàilinn, agus tha an sreath stàlaidh mar a leanas:
① Cleachd clamp gus ceann shuas pàirt a’ phump uisge a chlampadh (tha am pumpa motair is uisge air a cheangal aig an àm seo), tog e le slabhraidh crochte, agus ceangail gu slaodach a-steach don tobar gus an cuir thu an clamp air ceann an tobair agus thoir air falbh an slabhraidh crochte.
② Cleachd paidhir clamps eile gus pìob a chlampadh, tog e le slabhraidh crochte 15 cm air falbh bhon flange, agus lughdaich e gu slaodach. Eadar flange pìoba agus flange pumpa Cuir am pasgan rubair na àite agus teannachadh a’ phìob agus am pumpa gu cothromach le boltaichean, cnothan agus nigheadairean earraich.
③ Tog beagan am pumpa fon uisge, thoir air falbh an clamp air ceann shuas a’ phump uisge, ceangail an càball gu daingeann ris a’ phìob uisge le teip plastaig, agus ceangail sìos e gu slaodach gus an tèid an clamp a chuir aig ceann an tobair.
④ Cleachd an aon dòigh airson a h-uile pìob uisge a cheangal a-steach don tobar.
⑤ Às deidh don chàball luaidhe a bhith ceangailte ris an suidse smachd, tha e ceangailte ris an t-solar cumhachd trì ìrean.


(4) Rudan ri thoirt fa-near aig àm an stàlaidh:
1. Ma lorgar iongantas jamming tron ​​​​phròiseas pumpaidh, tionndaidh no tarraing am pìob uisge gus faighinn thairis air a’ phuing jamming. Mura h-eil grunn cheumannan ag obair fhathast, feuch nach toir thu air a’ phump sìos gus milleadh a sheachnadh air a’ phump dealain fon uisge agus an tobar.
2. Rè an stàladh, bu chòir ceap rubair a chuir aig flange gach pìoba agus a theannachadh gu cothromach.
3. Nuair a thèid am pumpa uisge a leigeil a-steach don tobar, bu chòir a chuir ann am meadhan pìob an tobair gus casg a chuir air a ’phump bho bhith a’ ruith an-aghaidh balla an tobair airson ùine mhòr, ag adhbhrachadh gum bi am pumpa a ’crith agus an motair a’ sguabadh agus a losgadh .
4. Obraich a-mach doimhneachd a' phump uisge gu bonn an tobair a rèir suidheachadh gainmhich is eabar an tobair. Na cuir a-steach am pumpa san eabar. Mar as trice chan eil an astar bhon phump uisge gu bonn an tobair nas lugha na 3 meatairean (faic Figear 2).
5. Cha bu chòir doimhneachd inntrigidh uisge a’ phump uisge a bhith nas lugha na 1-1.5 meatairean bhon ìre uisge fiùghantach chun nód uisge a-steach (faic Figear 2). Rud eile, dh ’fhaodadh na giùlan pumpa uisge a bhith air am milleadh gu furasta.
6. Chan urrainn togail a' phump uisge a bhith ro ìosal. Rud eile, feumar bhalbhaichean geata a chuir a-steach air loidhne-phìoban uisge ceann an tobair gus smachd a chumail air sruthadh a’ phump aig a’ phuing sruthadh ìre gus casg a chuir air a’ motair a bhith air a luchdachadh cus agus a losgadh a-mach air sgàth ìrean sruth mòr.
7. Nuair a bhios am pumpa uisge a 'ruith, bu chòir an toradh uisge a bhith leantainneach agus eadhon, bu chòir an sruth a bhith seasmhach (fo chumhachan obrach comharraichte, mar as trice gun a bhith nas fhaide na 10% den t-sruth), agus cha bu chòir crith no fuaim a bhith ann. Ma tha ana-cainnt sam bith ann, bu chòir stad a chuir air an inneal gus faighinn a-mach an adhbhar agus cuir às dha.
8. Nuair a bhios tu a’ stàladh, thoir aire do shuidheachadh an uèir talmhainn motair (faic Figear 2). Nuair a tha am pìob uisge na phìob stàilinn, stiùir e bhon chlamp ceann tobair; nuair a tha am pìob uisge na phìob plastaig, stiùir e bho chomharra bunaiteach a’ phump dealain.

 

 
Cumail suas agus cumail suas
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
  2. (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.

 

1 In the rated condition, the current exceeds 20%.

 2 Bidh an ìre uisge fiùghantach a’ tuiteam chun roinn uisge a-steach, ag adhbhrachadh uisge eadar-amail.

 3 Tha fìor chrith no fuaim aig a’ phump a tha fon uisge.

 4 Tha an bholtadh solair nas ìsle na 340 volts.

 5 Tha fiùs air a losgadh a mach.

 6 Tha am pìob solarachaidh uisge air a mhilleadh.

 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.

  1.  
  2. (5)Unit disassembly:

 1 Untie the cable tie, remove the pipeline part, and remove the wire plate.

 2 sgriubha sìos am bolt uisge, cuir an uisge anns an t-seòmar motair.

 3 thoir air falbh an criathrag, leig às an sgriubha stèidhichte air a’ chàraid gus an inneal motair a chàradh.

 4 sgriubha sìos am bolt a ’ceangal an roinn uisge a-steach leis a’ motair, agus dealaich am pumpa bhon motair (thoir aire do chuisean an aonaid nuair a bhios tu a ’sgaradh, gus casg a chuir air lùbadh a’ chrann pumpaidh)

 5 is e an t-sreath disassembly a’ phump: (faic figear 1) earrann in-ghabhail uisge, impeller, slige tar-chuir, impeller ...... thoir sùil air a’ bhodhaig bhalbhaichean, nuair a bheir thu air falbh an impeller, cleachd innealan sònraichte gus sleagh bideanach an inneal stèidhichte a leigeil ma sgaoil. impeller an toiseach, agus seachain lùbadh agus bruiseadh a’ chrann pumpa nuair a thèid a chuir às a chèile.

 6 is e pròiseas disassembly an motair: (faic figear 1) cuir an motair air an àrd-ùrlar, agus thoir air falbh na cnothan, bonn, cnò glasaidh ceann shailean, plàta smeòrach, iuchair, cathair giùlain iùil nas ìsle agus bolt ceann dùbailte bho bhonn na an motair an uair sin, agus an uairsin thoir a-mach an rotor (thoir an aire gun a bhith a’ dèanamh cron air a ’phacaid uèir) agus mu dheireadh thoir air falbh an earrann ceangail agus an t-suidheachan stiùiridh àrd.

 7 aonad co-chruinneachadh: ron cho-chruinneachadh, bu chòir meirge is salachar nam pàirtean a ghlanadh, agus an uachdar suirghe agus na fasteners air an còmhdach le sealant, agus an uairsin air an cruinneachadh san òrdugh disassembly mu choinneamh (bidh an inneal motair a’ gluasad suas is sìos às deidh co-chruinneachadh airson timcheall air aon). millimeter), às deidh co-chruinneachadh, bu chòir gum biodh an ceangal sùbailte, agus an uairsin an inneal deuchainn sgrion sìoltachain. Thèid pumpaichean fon uisge a thoirt a-mach às an tobar airson an toirt às agus an cumail suas a rèir Artaigil 5 às deidh bliadhna obrachaidh, no nas lugha na bliadhna obrach ach dà bhliadhna de ùine dàibhidh, agus thèid na pàirtean caithte a chuir nan àite.

 

 
Stòradh agus cumail suas

In order to ensure long-term use of your submersible pump, we strongly recommend that you drain the water in all motor cavities especially in winter to prevent the motor from freezing; at the same time, roll up the cable and tie it well. Store the equipment in a room without corrosive substances and gases, with the temperature below 40 °C. In addition, if you do not use the submersible pump for a long time, be sure to pay attention to rust prevention measures. These simple steps will help you maintain the performance of the equipment and extend its service life.

 

 
A 'caitheamh pàirtean
  • Impeller
  • Muinchille shaft
  • Muinchill rubair
  • Cearcall ròin

 
Scenarios Iarrtas

01 Tobar uisge domhainn

02 Solar uisge àrd

03 solar uisge beinne 

04 tùr uisge

05 Uisgeachadh àiteachais

06 uisgeachadh gàrraidh

07 toirt a-steach uisge aibhne

08 uisge dachaigheil

 

Ma tha ùidh agad anns na stuthan againn, faodaidh tu roghnachadh d’ fhiosrachadh fhàgail an seo, agus bidh sinn ann an conaltradh riut a dh’ aithghearr.


Sgrìobh do theachdaireachd an seo agus cuir thugainn e

Ma tha ùidh agad anns na stuthan againn, faodaidh tu roghnachadh d’ fhiosrachadh fhàgail an seo, agus bidh sinn ann an conaltradh riut a dh’ aithghearr.


gdScottish Gaelic