QJ series submersible electric pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy, urban water supply and drainage, as well as industrial and mining enterprises, disaster relief drainage and other fields. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible electric pump can efficiently lift and transport water, providing reliable water supply protection for various fields. Its stable performance and solid structure make it an indispensable machine in various water conservancy projects.
This product is a three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%) power supply pump, is designed for water requirements of strict occasions. The product is suitable for water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality environment. The pump adopts closed or water-filled wet structure motor, the inner cavity must be filled with clean water before use to prevent virtual filling, and then tighten the water injection and pressure relief bolts. The product shall be completely immersed in water, the penetration depth shall not exceed 70m, and the distance from the bottom of the well shall not be less than 3m. The water source required by the pump shall be able to meet its output demand and continuous operation, and the output of the pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the horizontal or inclined use shall be prohibited, and the cable shall be matched according to the requirements and equipped with external overload protection device. It is strictly prohibited to conduct no water test on the electric pump.
Cins | Herikîn (m3/h) | Ser (m) |
Rotatingspeed (guhertin / xal) |
Pompa avê(%) | Outlet çap (mm) |
Baş tê sepandin diameter (mm) |
Rated hêz (KW) |
Rated voltaja (V) |
Rated niha(A) |
Hêza motorê (%) | power factorcosφ | Yekbûn Mezinahiya Radyal Maximu (mm) |
Bingotin | |||||||||
150QJ5-100 | 5 | 100 | 2850 | 58 | 40 | 150 | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ5-150 | 5 | 150 | 2850 | 58 | 40 | 150 jorîn | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ5-200 | 200 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ5-250 | 250 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ5-300 | 300 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ10-50 | 10 | 50 | 2850 | 63 | 50 | 150ser | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ10-66 | 66 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-78 | 78 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-84 | 84 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-91 | 91 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-100 | 100 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-128 | 128 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-150 | 150 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-200 | 200 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ10-250 | 250 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ10-300 | 300 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-33 | 15 | 33 | 2850 | 63 | 50 | 150ser | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ15-42 | 42 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-50 | 50 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-60 | 60 | 5.5 | 13.74 | 76 | 0.8 | |||||||||||||||||
150QJ15-65 | 65 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-72 | 72 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-81 | 81 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-90 | 90 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-98 | 98 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-106 | 106 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-114 | 114 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-130 | 130 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ15-146 | 146 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-162 | 162 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-180 | 180 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 150ser | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ20-33 | 33 | 3 | 7.9 | 74.0 | 0.78 | |||||||||||||||||
150QJ20-39 | 20 | 39 | 2850 | 64 | 50 | 150ser | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ20-52 | 52 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ20-65 | 65 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-78 | 78 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-91 | 91 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-98 | 98 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-104 | 104 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-111 | 111 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-130 | 130 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-143 | 143 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-156 | 156 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-182 | 182 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-24 | 25 | 24 | 2850 | 64 | 65 | 150ser | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ25-32 | 32 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ25-40 | 40 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-48 | 48 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-56 | 56 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-64 | 64 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-72 | 72 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-77 | 77 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-84 | 84 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-96 | 96 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-104 | 104 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-110 | 110 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-120 | 120 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-128 | 128 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-136 | 136 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-154 | 154 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ32-18 | 32 | 18 | 2850 | 66 | 80 | 150ser | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ32-24 | 24 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ32-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-36 | 36 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-42 | 32 | 42 | 2850 | 66 | 80 | 150ser | 7.5 | 380 | 18.5 | 77.0 | 0.8 | 143 | ||||||||||
150QJ32-54 | 54 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ32-66 | 66 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ32-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-84 | 84 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-90 | 90 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-96 | 96 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-114 | 114 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ40-16 | 40 | 16 | 2850 | 66 | 80 | 150ser | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ40-24 | 24 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-40 | 40 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ40-48 | 48 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ40-56 | 56 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ40-64 | 64 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-80 | 80 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-96 | 96 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-16 | 50 | 16 | 2850 | 65 | 80 | 150ser | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ50-22 | 22 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ50-28 | 28 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ50-34 | 34 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-40 | 40 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-46 | 46 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ50-52 | 52 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-57 | 57 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-74 | 74 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-80 | 80 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ63-12 | 63 | 12 | 2850 | 60 | 80 | 150ser | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ63-18 | 18 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ63-30 | 30 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ63-36 | 36 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ63-42 | 63 | 42 | 2850 | 60 | 80 | 150ser | 13 | 380 | 30.87 | 79.0 | 0.81 | 143 | ||||||||||
150QJ63-48 | 48 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ63-54 | 54 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ15-220 | 15 | 220 | 2850 | 50 | 150ser | 18.5 | 380 | 43.12 | 143 | |||||||||||||
150QJ15-260 | 260 | 20 | 49.7 | |||||||||||||||||||
150QJ15-300 | 300 | 25 | 56.5 | |||||||||||||||||||
150QJ20-210 | 20 | 210 | 2850 | 50 | 150ser | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ20-240 | 240 | 25 | 56.5 | |||||||||||||||||||
150QJ20-290 | 290 | 30 | 66.6 | |||||||||||||||||||
150QJ25-175 | 25 | 175 | 2850 | 65 | 150ser | 20 | 49.7 | 143 | ||||||||||||||
150QJ25-200 | 200 | 30 | 66.6 | |||||||||||||||||||
150QJ25-290 | 290 | 37 | 82.1 | |||||||||||||||||||
150QJ32-120 | 32 | 120 | 2850 | 80 | 150ser | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ32-132 | 132 | 25 | 56.5 | |||||||||||||||||||
150QJ32-156 | 156 | 30 | 66.6 | |||||||||||||||||||
150QJ32-190 | 190 | 37 | 82.1 | |||||||||||||||||||
150QJ32-240 | 240 | 45 | 96.9 | |||||||||||||||||||
150QJ40-110 | 40 | 110 | 2850 | 80 | 150ser | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ40-121 | 121 | 25 | 56.5 | |||||||||||||||||||
150QJ40-143 | 143 | 30 | 66.6 | |||||||||||||||||||
150QJ40-176 | 176 | 37 | 82.1 | |||||||||||||||||||
150QJ40-220 | 220 | 45 | 96.9 | |||||||||||||||||||
150QJ50-100 | 50 | 100 | 2850 | 80 | 150ser | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ50-110 | 110 | 25 | 56.5 | |||||||||||||||||||
150QJ50-130 | 130 | 30 | 66.6 | |||||||||||||||||||
150QJ50-160 | 160 | 37 | 82.1 | |||||||||||||||||||
150QJ50-200 | 200 | 45 | 96.9 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade 380/50HZ, the use of other voltage grades of submersible motors need to be customized.The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious sign:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering and steering instructions are the same.When the pump is upright, pay attention to safety, prevent overturning injury.
5, this pump has won wide acclaim for its efficiency and reliability. It is used in strict accordance with the applicable lift and flow range stipulated by the electric pump to avoid excessive wear of thrust bearings and other parts caused by large flow at low lift or excessive pumping force at high lift, resulting in motor overload and burnout. After being put into the well, the insulation resistance to the ground of the electric pump shall be measured and shall not be less than 100MΩ. After starting, the voltage and current shall be observed regularly, and the insulation of the motor winding shall be checked to meet the specified requirements. If the storage temperature is below freezing, the water in the pump shall be dried to avoid damage to the motor due to low temperature freezing in the motor cavity. This electric pump is your reliable choice, which can provide stable and reliable power support for your work.
Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet joint, lead cable and other components.
Taybetmendiyên sereke yên hilberê hene:
- 1.The motor is a water-sealed wet submersible three-phase asynchronous motor.The motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The voltage regulating film at the bottom of the motor is used to regulate the temperature rise caused by the motor.The expansion and contraction pressure difference of the body water caused by the change.
- 2. In order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the upper end of the motor shaft extension, and a sand ring is installed to form a sand prevention structure.
- 3. In order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and a thrust bearing is installed at the lower part of the motor.
- 4. The lubrication of the motor and pump bearing is water lubrication.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with excellent insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Amadekirina berî sazkirinê:
1. Kontrol bikin ka pompeya binavbûyî şert û mercên karanîna ku di manualê de hatine destnîşan kirin pêk tîne.
2. Bikaranîna obiekek giran a bi pîvana ku bi qasî pîvana derveyî ya herî zêde ya pompeya binavkirî ye, bipîvin ka gelo inneldiameter ya kaniyê dikare pompeya binavbûyî bicîh bike, û bipîve ka kûrahiya baş hewcedariyên sazkirinê pêk tîne.
3. Kontrol bikin ka kaniya bîrê paqij e û ava bîrê gemar e. Tu carî pompeya elektrîkê ya binavbûyî bikar neynin da ku pompeya welor xwelî û ava qûmê bişon da ku ji zûde zirarê nede pompeya elektrîkê ya binavbûyî.
4. Kontrol bikin ka pozîsyona kemîna sazkirinê ya welhead guncan e û gelo ew dikare qalîteya tevahiya yekîneyê bisekine
5. Kontrol bikin ka hêmanên pompeya binavbûyî temam in û bi rêkûpêk hatine saz kirin li gorî nexşeya kombûnê ya di destanê de Perçeya parzûnê rakin û hevgirêdanê bizivirînin da ku bibînin ka ew bi nermî dizivire.
6. Pîra avê vekin û valahiya motorê bi ava paqij û ne-xirab tije bikin (binihêrin. Birastî ku wê tije bikin), dûv re şûşa avê zexm bikin. Piştî 12 demjimêran ji derzîlêdana avê, dema ku bi tabloya hejandina 500V were pîvandin divê berxwedana însulasyona motorê ji 150M Q kêmtir nebe.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Diagrama pêvajoya têlkirina kabloya pêvekirî wiha ye:
8. Multimeterek bikar bînin da ku kontrol bikin ka têlên sê-qonaxê girêdayî ne û gelo berxwedana DC bi qasî hevseng e.
9. Kontrol bikin ka kapasîteya danûstendinê û veguherîner zêde barkirî ne, û dûv re guheztina parastina zêde barkirinê an alavên destpêkirinê girêdin. Ji bo modelên taybetî li Tabloya 2-ê binêre, û dûv re ji dergeha pompa avê satilek av birijîne nav pompa avê da ku çîçekên gomî yên di pompê de rûn bike, û dûv re pompeya elektrîkê ya binavbûyî rast û domdar bi cîh bike. Dest pê bike (ji saniyeyekê bêtir) û kontrol bikin ka arastekirina rêveberiyê bi nîşana rêvekirinê re hevaheng e. Ger na, her du girêdanên kabloya sê-qonaxê biguhezînin. Dûv re parzûnê saz bikin û xwe amade bikin ku dakevin binê bîrê. Ger di rewşên taybetî de (wek xendek, xendek, çem, hewz, hewz, hwd.) were bikar anîn, pêdivî ye ku pompeya elektrîkê bi pêbawer were zexm kirin.
(2) Amûr û amûrên sazkirinê:
1. Yek cotek zincîra hilgirtinê ji du ton zêdetir.
2. Tripod bi bilindahiya vertical ji çar metre ne kêmtir.
3. Du xelekên daleqandî (telên têl) ku dikarin giraniya ji yek ton zêdetir hilgirin (dikarin giraniya komek tevahî pompeyên avê hilgirin).
4. Du cot kelemçeyan (pişkan) saz bikin.
5. Wrenches, çakûç, screwdrivers, alav û amûrên elektrîkê, hwd.
(3) Sazkirina pompeya elektrîkê:
1. Diyagrama sazkirinê ya pompeya elektrîkê ya binavbûyî di jimar 2 de tê nîşandan. Pîvanên sazkirinê yên taybetî di Tabloya 3 "Lîsteya Pîvana Sazkirinê ya Pompeya Elektrîkê ya Binavbûyî" de hatine nîşandan.
2. Pompeyên elektrîkê yên binavkirî yên ku serê wan ji 30 metreyan kêmtir e, dikarin rasterast di nav bîrê de bi karanîna çîp û têl an jî têlên din ên hempê ku dikarin giraniya tevahî ya makîneyê, lûleyên avê û avê di lûleyan de hilgirin werin hilgirtin.
3. Pompeyên bi serê wan ji 30 metreyan lûleyên pola bikar tînin, û rêza sazkirinê wiha ye:
① Ji bo ku dawiya jorîn a beşa pompeya avê girêbide (motor û pompeya avê di vê demê de bi hev ve girêdaye) kelemek bikar bînin, bi zincîreka daleqandî hildin û hêdî hêdî bi bîrê ve girêdin heta ku girêkê deynin ser serê bîrê û jêkin. zencîra daleqandî.
② Ji bo ku boriyekê girêbide, cotek din girêk bikar bînin, wê bi zincîreyek daleqandî 15 cm ji felekê dûr rakin, û hêdî hêdî dakêşin. Di navbera flangeya boriyê û flangeya pompê de Paçika lastîkî têxin cihê xwe û boriyê hişk bikin û bi kulm, gwîz û şûşeyên biharê bi hevûdu pomp bikin.
③ Pompeya binavbûyî hinekî bilind bikin, kefenê li dawiya jorîn a pompeya avê derxînin, kabloyê bi tîrêjek plastîk bi lûleya avê ve girê bidin û hêdî hêdî pê ve girêdin heya ku kelem li serê bîrê were danîn.
④ Heman rêbazê bikar bînin da ku hemî boriyên avê bi bîrê ve girêdin.
⑤Piştî ku kabloya derçûyê bi guheztina kontrolê ve girêdayî ye, ew bi dabînkirina hêza sê-qonaxê ve girêdayî ye.
(4) Tiştên ku di dema sazkirinê de bala xwe bidin:
1. Ger di pêvajoya pompkirinê de diyardeyek tevlihevkirinê were dîtin, lûleya avê bizivirînin an bikişînin da ku xala tevlihevkirinê derbas bike. Ger tedbîrên cûrbecûr hîn jî nexebitin, ji kerema xwe pompê bi zorê nexin xwarê da ku zirarê nedin pompeya elektrîkê ya binavbûyî û bîrê.
2. Di dema sazkirinê de, pêdivî ye ku pêlek gomîkî li ser flangeya her lûleyê were danîn û bi rengek wekhev were hişk kirin.
3. Dema ku pompeya avê di nav bîrê de tê daxistin, divê ew di nîvê lûleya bîrê de were danîn da ku nehêle pomp ji bo demek dirêj li hember dîwarê bîrê bixebite, bibe sedema ku pomp bilerize û motor bişewite û bişewite. .
4. Kûrahiya pompeya avê heta binê bîrê li gorî şert û mercên qûmê û siltê yên ku diherike diyar bikin. Pompê di nav heriyê de nehêlin. Dûrahiya ji pompeya avê heya binê bîrê bi gelemperî ne kêmî 3 metre ye (binihêre Figure 2).
5. Kûrahiya ketina avê ya pompeya avê divê ji asta avê ya dînamîk heya girêka ketina avê ne kêmtirî 1-1,5 metre be (binêre Figure 2). Wekî din, dibe ku hilgirên pompeya avê bi hêsanî xera bibin.
6. Hilkişîna pompeya avê nikare pir kêm be. Wekî din, pêdivî ye ku valvek dergehek li ser lûleya avê ya serê bîrê were saz kirin da ku herikîna pompê li xala herikîna binavkirî kontrol bike da ku rê li ber bargiran û şewitandina motor ji ber rêjeyên mezin ên herikînê bigire.
7. Dema ku pompeya avê dimeşe, divê hilberîna avê domdar be û tewra jî, niha divê sabît be (di bin şert û mercên xebatê yên binavkirî de, bi gelemperî ji% 10-a niha ya binavkirî zêdetir nabe), û divê lerzîn û deng tune be. Ger anormaliyek hebe, pêdivî ye ku makîneyê were sekinandin da ku sedem were zanîn û jêbirin.
8. Dema sazkirinê, bala xwe bidin mîhengê têl zemîna motorê (binihêre Figure 2). Dema ku lûleya avê boriyek pola ye, wê ji kefa serê bîrê derxînin; gava ku boriya avê boriyek plastîk be, wê ji nîşana zemînê ya pompeya elektrîkê derxînin.
- (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Asta avê ya dînamîk dadikeve beşa ketina avê, dibe sedema ava navber.
3 Pompeya binavbûyî xwedan lerizîn an dengek dijwar e.
4 Voltaja dabînkirinê ji 340 volt kêmtir e.
5 Fuzeyek şewitî.
6 Boriya avê xera bûye.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
1 Untie the cable tie, remove the pipeline part, and remove the wire plate.
2 çolê avê bixin xwarê, avê têxin odeya motorê.
3 Parzûnê derxînin, pêça sabît a li ser hevgirêdanê vekin da ku mîlî motorê rast bikin.
4 Bişkojka ku beşa ketina avê bi motorê ve girêdide, bixin xwarê, û pompê ji motorê veqetînin (dema ku ji hev vediqetînin, bala xwe bidin pêlava yekîneyê, da ku pêşî li qutbûna mîlê pompê bigirin)
5 rêza veqetandina pompê ev e: (binihêre jimar 1) beşa ketina avê, pêlpîr, şêlê veguheztinê, pêlikê...... laşê valvê kontrol bikin, dema ku pêlavê derdixin, amûrên taybetî bikar bînin da ku qalikê konîkî yê sabît sivik bikin. pêşî pêlker, û di pêvajoya jihevdexistinê de ji çewisandin û birînên mîlî pompê dûr bixin.
6 Pêvajoya veqetandina motorê ev e: (li jimar 1 binêre) motorê li ser platformê bi cîh bikin, û gwîz, bingeh, gwîza qefilandina serê mîlê, pêlava lêdanê, mifteyê, kursiya lingê rêberiya jêrîn û pêla serê ducar ji binê motorê li dora xwe, û dûv re rotorê derxînin (guh bidin ku zirarê nede pakêta têlê) û di dawiyê de beşa girêdanê û kursiya rêberiya jorîn rakin.
Meclisa yekîneya 7: berî kombûnê, gemar û qirêjiya perçeyan divê were paqij kirin, û rûbera hevberdanê û girêk bi sealantê were pêçandin, û dûv re di rêza berevajî de jihevdexistinê were berhev kirin (milê motorê piştî kombûnê bi qasî yekekê ber bi jor û jêr ve diçe. millimeter), piştî kombûnê, pêdivî ye ku pêvek maqûl be, û dûv re jî makîneya ceribandina dîmendera parzûnê. Li gorî Xala 5-an piştî salek xebitandinê, an ji salek kêmtir xebitandinê lê du sal ji dema avjeniyê, ji bo hilweşandin û lênihêrînê divê pompeyên binavbûyî ji bîrê werin derxistin û perçeyên xitimî werin guhertin.
In order to ensure long-term use of your submersible pump, we strongly recommend that you drain the water in all motor cavities especially in winter to prevent the motor from freezing; at the same time, roll up the cable and tie it well. Store the equipment in a room without corrosive substances and gases, with the temperature below 40 °C. In addition, if you do not use the submersible pump for a long time, be sure to pay attention to rust prevention measures. These simple steps will help you maintain the performance of the equipment and extend its service life.
- Impeller
- Şaft sleeve
- Çîçek mîlî gomî
-
Zengila morkirinê
01 Vegirtina ava bîrê ya kûr
02 Avakirina avê ya bilind
03 ava çiya
04 ava birca
05 Avdaniya çandiniyê
06 avdana baxçe
07 girtina ava çem
08 ava navxweyî