QJ series submersible pump is a kind of lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small footprint, compact structure, simple installation, easy maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy projects, urban water supply and drainage and industrial and mining enterprises, drought relief and drainage, etc. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This submersible pump can efficiently lift and transport water, providing reliable water supply for various fields. Its stable performance and solid structure make it an indispensable machine and equipment for various water conservancy projects.
The power supply of this product is three-phase AC 380V (tolerance ± 5%), 50HZ (tolerance ± 1%).
The water quality shall meet the following requirements:
(1) the water temperature shall not be higher than 20 °C;
(2) the content of solid impurities (mass ratio) shall not exceed 0.01%;
(3) the PH value (acidity and alkalinity) is 6.5-8.5;
(4) the content of hydrogen sulfide shall not exceed 1.5mg/L;
(5) the content of chloride ions shall not be higher than 400mg/L.
The motor is a closed or water-immersed wet structure. Before use, the inner cavity of the submersible motor shall be filled with water to prevent empty, and then the water injection and air exhaust bolts shall be tightened, otherwise it shall not be used. The submersible pump must be completely immersed in water to work, and the immersion depth shall not exceed 70 meters, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3 meters. The well water inflow shall meet the water output and continuous operation requirements of the submersible pump, and the output water shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump shall not be used horizontally or inclined, but only vertically. The submersible pump shall be equipped with cables as required, and equipped with external overload protection devices. It is strictly prohibited to conduct no-water no-load test on the pump.
Modail | Sruth (m3/h) | Ceann (m) |
Luas rothlach (atharrachadh/puing) |
Pumpa uisge (%) | Ar-a-mach trast-thomhas (mm) |
Gu math iomchaidh trast-thomhas (mm) |
Rangaichte cumhachd (KW) |
Rangaichte bholtaids (V) |
Rangaichte sruth (A) |
Èifeachdas motair (%) | power factorcosφ | Aonad Meud radial (mm) |
Facal | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135gu h-àrd | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135gu h-àrd | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135gu h-àrd | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135gu h-àrd | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135gu h-àrd | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135gu h-àrd | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135gu h-àrd | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, pumpa gu math submersible airson pumpa uisge glan, a’ toirmeasg an tobar ùr, a’ pumpadh grùid agus uisge eabarach,
2, ìre bholtachd pumpa uisge tobar 380/50HZ, feumar cleachdadh ìrean bholtachd eile de motaran fon uisge a ghnàthachadh. Feumaidh an càball fon talamh càball dìon-uisge a chleachdadh, feumaidh e a bhith uidheamaichte le uidheamachd tòiseachaidh, leithid bogsa cuairteachaidh, tòiseachadh gun a bhith deiseil bu chòir gnìomh dìon coileanta motair a bhith air a chleachdadh gu cumanta, leithid dìon cus luchdan cuairt ghoirid, dìon ìre, dìon undervoltage, dìon talmhainn, dìon idling , ann an cùis suidheachaidhean neo-àbhaisteach, bu chòir don inneal dìon a bhith ann an turas gnìomh ùineail.
3, feumaidh stàladh agus cleachdadh a’ phump a bhith stèidhichte gu h-earbsach, a’ toirmeasg suidse putadh is slaodadh nuair a tha na làmhan agus na casan fliuch, feumar an solar cumhachd a ghearradh dheth mus tèid am pumpa a chuir a-steach agus a chumail suas, àite cleachdadh a’ phump airson a stèidheachadh " gus casg a chuir air clisgeadh dealain" comharran follaiseach:
4, sìos an tobar no mus tèid a chuir a-steach, feumaidh an cuas motair a bhith air a lìonadh le uisge grùide no uisge goileach fuar glan neo-chreimneach, teannachadh am bolt / uisge, feumaidh am pumpa air an raon deuchainn talmhainn, a bhith don t-seòmar pumpa rubair lubrication uisge Bearings, tòiseachadh sa bhad gun a bhith nas fhaide na diog, faic a bheil an stiùireadh co-ionann ris an stiùireadh stiùiridh. Nuair a tha am pumpa dìreach, thoir aire do shàbhailteachd, cuir casg air dochann.
5, gu teann a rèir ullachaidhean an lioft pumpaidh, raon cleachdaidh sruthadh, gus casg a chuir air sruthadh ìosal no feachd pumpaidh àrdachaidh, giùlan smeòrach agus pàirtean eile den chaitheamh, loisg an cus motair
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.
1.Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components. The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand throwing ring, water inlet node, cable and other components
2.The main feature of this product is the use of water-cooled wet submersible three-phase asynchronous motor. The motor chamber is filled with water, used to cool the motor and lubricate the bearing. The voltage regulating film at the bottom is used to adjust the pressure difference caused by the temperature rise of the motor. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the top of the motor shaft extension end, and a sand throwing ring is installed to form a sand control structure. This design ensures the long-term reliability and stability of the motor, which is an ideal choice for pump users.
3. In order to prevent the pump shaft from running up when starting, the pump shaft and the motor shaft are connected by a coupling, and an upper thrust bearing is installed under the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.he motor stator winding is made of high quality submersible motor winding wire, with high insulation performance.
6. The pump is designed by computer CAD, with simple structure and good technical performance.

(1) Ag ullachadh mus stàladh:
1. Dèan cinnteach a bheil am pumpa fon uisge a’ coinneachadh ris na cumhaichean cleachdaidh agus an raon a tha air a shònrachadh san leabhar-làimhe.
2. A’ cleachdadh inneal trom le trast-thomhas co-ionann ris an trast-thomhas a-muigh as àirde den phump a tha fon uisge, tomhais an urrainn dha trast-thomhas a-staigh an tobair a bhith a’ freagairt air a’ phumpa fon uisge, agus tomhas a bheil doimhneachd an tobair a’ coinneachadh ri riatanasan an stàlaidh.
3. Dèan cinnteach a bheil toll an tobair glan agus a bheil uisge an tobair turbid. Na cleachd pumpa dealain fon uisge gu bràth gus poll pumpa welor agus uisge gainmhich a nighe gus milleadh ro-luath air a’ phump dealain fon uisge a sheachnadh.
4. Dèan cinnteach a bheil suidheachadh a’ chlamp stàlaidh welhead freagarrach agus an urrainn dha seasamh ri càileachd an aonaid gu lèir
5. Dèan cinnteach a bheil na pàirtean pumpa fon uisge coileanta agus air an stàladh ceart a rèir an diagram cruinneachaidh san leabhar-làimhe Thoir air falbh an scrion sìoltachain agus cuairteachadh a’ chàraid gus faicinn a bheil e a ’tionndadh gu sùbailte
6. Unscrew an sgriubha uisge agus lìon a’ chuas motair le uisge glan, neo-chreimneach (nota. bi cinnteach gun cuir thu a-steach e), agus an uairsin teannachadh an sgriubha uisge. Às deidh 12 uair de in-stealladh uisge, cha bu chòir an aghaidh insulation an motair a bhith nas ìsle na 150M Q nuair a thèid a thomhas le clàr crathadh 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Tha an diagram pròiseas sreangadh càball ceangailte mar a leanas:
8. Cleachd multimeter gus dèanamh cinnteach a bheil na h-uèirichean trì-ìrean ceangailte agus a bheil an aghaidh DC timcheall air cothromach.
9. Dèan cinnteach a bheil cus luchd air a’ chuairt agus comas an cruth-atharrachaidh, agus an uairsin ceangail an tionndadh dìon cus cuideim no an uidheamachd tòiseachaidh. Faic Clàr 2 airson modalan sònraichte, agus an uairsin dòirt bucaid uisge a-steach don phump uisge bhon ionad pumpa uisge gus na giùlan rubair a lubricadh anns a’ phump, agus an uairsin cuir am pumpa dealain fon uisge gu dìreach agus gu seasmhach.Start (gun a bhith nas fhaide na aon diog). agus dèan cinnteach a bheil an stiùireadh stiùiridh co-chòrdail ris an t-soidhne stiùiridh. Mura h-eil, suaip dà cheangail den chàball trì-ìre.Then stàlaich an criathrag agus ullaich airson a dhol sìos an tobar. Ma thèid a chleachdadh aig amannan sònraichte (leithid dìgean, dìgean, aibhnichean, lochan, lòin, msaa), feumaidh am pumpa dealain a bhith air a chuir air bhonn gu h-earbsach.
(2) Uidheam agus innealan stàlaidh:
1. Aon phaidhir de shlabhraidhean togail airson barrachd air dà thunna.
2. Tripod le àirde dìreach nach eil nas lugha na ceithir meatairean.
3. Dà ròp crochte (ròpaichean uèir) as urrainn cuideam nas motha na aon tunna a ghiùlan (faodaidh cuideam seata iomlan de phumpaichean uisge a ghiùlan).
4. Stàlaich dà phaidhir de clamps (splints).
5. Wrenches, ùird, screwdrivers, innealan dealain agus ionnstramaidean, msaa.
(3) Stàladh pumpa dealain:
1. Tha an diagram stàlaidh den phump dealain submersible air a shealltainn ann am Figear 2. Tha na tomhasan stàlaidh sònraichte air an sealltainn ann an Clàr 3 "Liosta de mheudan stàlaidh a' phump dealain fon uisge".
2. Faodar pumpaichean dealain fon uisge le ceann nas lugha na 30 meatair a thogail gu dìreach a-steach don tobar le bhith a’ cleachdadh phìoban agus ròpaichean uèir no ròpannan hemp eile as urrainn làn chuideam an inneil gu lèir, pìoban uisge, agus uisge anns na pìoban a ghiùlan.
3. Bidh pumpaichean le ceann nas motha na 30 meatair a 'cleachdadh pìoban stàilinn, agus tha an sreath stàlaidh mar a leanas:
① Cleachd clamp gus ceann shuas pàirt a’ phump uisge a chlampadh (tha am pumpa motair is uisge air a cheangal aig an àm seo), tog e le slabhraidh crochte, agus ceangail gu slaodach a-steach don tobar gus an cuir thu an clamp air ceann an tobair agus thoir air falbh an slabhraidh crochte.
② Cleachd paidhir clamps eile gus pìob a chlampadh, tog e le slabhraidh crochte 15 cm air falbh bhon flange, agus lughdaich e gu slaodach. Eadar flange pìoba agus flange pumpa Cuir am pasgan rubair na àite agus teannachadh a’ phìob agus am pumpa gu cothromach le boltaichean, cnothan agus nigheadairean earraich.
③ Tog beagan am pumpa fon uisge, thoir air falbh an clamp air ceann shuas a’ phump uisge, ceangail an càball gu daingeann ris a’ phìob uisge le teip plastaig, agus ceangail sìos e gu slaodach gus an tèid an clamp a chuir aig ceann an tobair.
④ Cleachd an aon dòigh airson a h-uile pìob uisge a cheangal a-steach don tobar.
⑤ Às deidh don chàball luaidhe a bhith ceangailte ris an suidse smachd, tha e ceangailte ris an t-solar cumhachd trì ìrean.
(4) Rudan ri thoirt fa-near aig àm an stàlaidh:
1. Ma lorgar iongantas jamming tron phròiseas pumpaidh, tionndaidh no tarraing am pìob uisge gus faighinn thairis air a’ phuing jamming. Mura h-eil grunn cheumannan ag obair fhathast, feuch nach toir thu air a’ phump sìos gus milleadh a sheachnadh air a’ phump dealain fon uisge agus an tobar.
2. Rè an stàladh, bu chòir ceap rubair a chuir aig flange gach pìoba agus a theannachadh gu cothromach.
3. Nuair a thèid am pumpa uisge a leigeil a-steach don tobar, bu chòir a chuir ann am meadhan pìob an tobair gus casg a chuir air a ’phump bho bhith a’ ruith an-aghaidh balla an tobair airson ùine mhòr, ag adhbhrachadh gum bi am pumpa a ’crith agus an motair a’ sguabadh agus a losgadh .
4. Obraich a-mach doimhneachd a' phump uisge gu bonn an tobair a rèir suidheachadh gainmhich is eabar an tobair. Na cuir a-steach am pumpa san eabar. Mar as trice chan eil an astar bhon phump uisge gu bonn an tobair nas lugha na 3 meatairean (faic Figear 2).
5. Cha bu chòir doimhneachd inntrigidh uisge a’ phump uisge a bhith nas lugha na 1-1.5 meatairean bhon ìre uisge fiùghantach chun nód uisge a-steach (faic Figear 2). Rud eile, dh ’fhaodadh na giùlan pumpa uisge a bhith air am milleadh gu furasta.
6. Chan urrainn togail a' phump uisge a bhith ro ìosal. Rud eile, feumar bhalbhaichean geata a chuir a-steach air loidhne-phìoban uisge ceann an tobair gus smachd a chumail air sruthadh a’ phump aig a’ phuing sruthadh ìre gus casg a chuir air a’ motair a bhith air a luchdachadh cus agus a losgadh a-mach air sgàth ìrean sruth mòr.
7. Nuair a bhios am pumpa uisge a 'ruith, bu chòir an toradh uisge a bhith leantainneach agus eadhon, bu chòir an sruth a bhith seasmhach (fo chumhachan obrach comharraichte, mar as trice gun a bhith nas fhaide na 10% den t-sruth), agus cha bu chòir crith no fuaim a bhith ann. Ma tha ana-cainnt sam bith ann, bu chòir stad a chuir air an inneal gus faighinn a-mach an adhbhar agus cuir às dha.
8. Nuair a bhios tu a’ stàladh, thoir aire do shuidheachadh an uèir talmhainn motair (faic Figear 2). Nuair a tha am pìob uisge na phìob stàilinn, stiùir e bhon chlamp ceann tobair; nuair a tha am pìob uisge na phìob plastaig, stiùir e bho chomharra bunaiteach a’ phump dealain.
- (1)After installing the submersible pump, it is necessary to recheck the insulation resistance and three-phase continuity of the switch, and check whether there are errors in the connection between the instrument and the starting equipment. If there is no problem, the test machine can be started. After starting, observe whether the indication readings of the instruments exceed the rated voltage and current specified on the nameplate, and observe whether the pump has noise and vibration. If everything is normal, it can be put into operation.
- (2)After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- (3)After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing excessive motor current and burnout.
- (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check whether the supply voltage, working current and insulation resistance are normal regularly. If the following conditions are found, the pump should be shut down immediately to troubleshoot.
1 In the rated condition, the current exceeds 20%.
2 Bidh an ìre uisge fiùghantach a’ tuiteam chun roinn uisge a-steach, ag adhbhrachadh uisge eadar-amail.
3 Tha fìor chrith no fuaim aig a’ phump a tha fon uisge.
4 Tha an bholtadh solair nas ìsle na 340 volts.
5 Tha fiùs air a losgadh a mach.
6 Tha am pìob solarachaidh uisge air a mhilleadh.
7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
- (5)Unit disassembly:
- 1 fuasgail ròp càball, thoir air falbh am pàirt loidhne-phìoban, thoir air falbh am plàta uèir.
2 sgriubha sìos am bolt uisge, cuir an uisge anns an t-seòmar motair.
3 thoir air falbh an criathrag, leig às an sgriubha stèidhichte air a’ chàraid gus an inneal motair a chàradh.
4 sgriubha sìos am bolt a ’ceangal an t-snaim a-steach leis a’ motair, agus dealaich am pumpa bhon motair (thoir aire do chluasag an aonaid nuair a bhios tu a ’sgaradh, gus casg a chuir air lùbadh a’ chrann pumpaidh)
5 is e sreath disassembly a’ phump: (faic figear 1) snaim inlet, impeller, slige tar-chuir, impeller ...... thoir sùil air a’ bhodhaig bhalbhaichean, nuair a bheir thu air falbh an impeller, cleachd innealan sònraichte gus caol bideanach an impeller stèidhichte a leigeil ma sgaoil an-toiseach, agus seachain lùbadh is bruiseadh a’ chrann-pumpaidh fhad ‘s a tha e air a chuir às a chèile.
6 is e pròiseas disassembly an motair: (faic figear 1) cuir an motair air an àrd-ùrlar, agus thoir air falbh na cnothan, bonn, cnò glasaidh ceann shailean, plàta smeòrach, iuchair, cathair giùlain iùil nas ìsle agus bolt ceann dùbailte bho bhonn na an motair an uair sin, agus an uairsin thoir a-mach an rotor (thoir an aire gun a bhith a’ dèanamh cron air a ’phacaid uèir) agus mu dheireadh thoir air falbh an earrann ceangail agus an t-suidheachan stiùiridh àrd.
7 unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners should be coated with sealant, and then assembled in the opposite order of disassembly (the momentum of the motor shaft is about one millimeter after assembly), after assembly, the coupling should be flexible, and then the filter screen test machine. 6. The submersible pump is known for its durability and efficiency, providing you with a lasting pumping solution. When the operating time is more than one year per year, or if the operating time is less than one year, but the immersion time is up to two years, it must be disassembled and inspected in accordance with Article 5 to replace the worn parts. This pump is well designed to ensure efficient operation and reliability, so that you can rest assured. Whether it is used for pumping water from a family pond or pumping water for agricultural irrigation systems, this product can meet your needs. Choose this high-quality pump to keep your pump system in the best condition at all times, ensuring smooth operation and extending its service life.
1, cuir a-mach an uisge anns a’ chuas motair (gu sònraichte sa gheamhradh gus casg a chuir air an motair bho reothadh), agus ceangail an càball gu math.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, bu chòir cleachdadh fad-ùine aire a thoirt do chasg meirge bho phumpaichean fon uisge.
- Impeller
- Muinchille shaft
- Muinchill rubair
-
Cearcall ròin
01 Tobar uisge domhainn
02 Solar uisge àrd
03 solar uisge beinne
04 tùr uisge
05 Uisgeachadh àiteachais
06 uisgeachadh gàrraidh
07 toirt a-steach uisge aibhne
08 uisge dachaigheil