300QJP Peep Well Submersible Pump

ດໍາເນີນການປຸງແຕ່ງ OEM! ອີງຕາມຄວາມຕ້ອງການຂອງຜູ້ໃຊ້, ການອອກແບບແລະການຜະລິດປະເພດຕ່າງໆຂອງຄວາມຕ້ອງການພິເສດຂອງມໍເຕີ submersible ແລະປັ໊ມທີ່ບໍ່ແມ່ນມາດຕະຖານ. ມາດຕະຖານການປະຕິບັດຜະລິດຕະພັນ: GB / T2816-2014 "ສູບ submersible ດີ", GB / T2818-2014 "ມໍເຕີ asynchronous submersible ດີ". WhatsApp: 17855846335
PDF DOWNLOAD
ລາຍລະອຽດ
ປ້າຍກຳກັບ
 
ພາບລວມຂອງຜະລິດຕະພັນ

QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeves as lubricant. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and burnout caused by motor lack of oil wear. Most suitable for music fountains, all models can be used flat.

 

 
ເງື່ອນໄຂການນໍາໃຊ້

The product is powered by three-phase AC 380V power supply, 50HZ pump, suitable for water temperature is not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality conditions. The product adopts closed or water-filled wet structure of the motor, before use the submersible motor chamber filled with clean water to prevent the occurrence of virtual filling. The submersible pump must be completely immersed in water operation, penetration depth shall not exceed 70 meters, to the bottom of the well distance shall not be less than 3 meters. The water flow in the well must meet the water requirements of the submersible pump and continuous operation, and the water output of the pump is controlled between 0.7-1.2 times the rated flow. The well should be vertical and the submersible pump can only be placed vertically, not horizontal or upside down. The submersible pump must be equipped with cables and external overload protection devices as required. It is strictly prohibited to conduct no-load test of the pump without water.

 

 
ຄວາມຫມາຍຂອງຕົວແບບ

300QJP Peep Well Submersible Pump

 

 
ການອ້າງອີງແບບຈໍາລອງບາງສ່ວນ
ຕົວແບບ

ກະແສ

(m3/h)

ຫົວ
(ມ)

ຄວາມໄວຫມຸນ

(ປ່ຽນ/ຈຸດ)

Waterpump

(%)

 ຂາອອກ
ເສັ້ນຜ່າສູນກາງ
(ມມ)
ນຳໃຊ້ໄດ້ດີ
ເສັ້ນຜ່າສູນກາງ(ມມ) 
 ໃຫ້ຄະແນນ
power(KW)
ໃຫ້ຄະແນນ
ແຮງດັນ(V)
ໃຫ້ຄະແນນ
ປັດຈຸບັນ(A)
ປະສິດທິພາບລົດຈັກ (%) power factorcosφ   ໜ່ວຍ
Radial Maximu ຂະໜາດ(ມມ)
ຂໍ້ສັງເກດ
300QJ200-40 200 40 2900 76 150  300ຂ້າງເທິງ 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300ຂ້າງເທິງ 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
ຂໍ້ຄວນລະວັງຄວາມປອດໄພ

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, ຢ່າງເຂັ້ມງວດອີງຕາມການສະຫນອງການຍົກ pump, ລະດັບການໄຫຼຂອງການນໍາໃຊ້, ເພື່ອປ້ອງກັນການໄຫຼຕ່ໍາຫຼືແຮງສູບຍົກສູງ, ຮັບຜິດຊອບ thrust ແລະພາກສ່ວນອື່ນໆຂອງການສວມໃສ່, ການ overload motor ໄດ້ຖືກໄຟໄຫມ້.

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ, after the start to observe the voltage and current, check the motor winding insulation, whether it meets the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature motor

 

 
Introduction to Structure

The pump parts of this product are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The product adopts water immersion wet three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm set at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the temperature rise of the motor. In order to prevent the sand particles from entering the motor, the upper end of the motor shaft extension is installed with two oil seals, and the sand ring is set to form a sand blocking structure. At the same time, in order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the bottom of the motor is equipped with a thrust bearing. The motor and pump bearing are lubricated by water. The stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump design adopts computer CAD, with simple structure and good technical performance.

300QJP Peep Well Submersible Pump
 
ຕິດຕັ້ງ

(1​) ການ​ກະ​ກຽມ​ກ່ອນ​ການ​ຕິດ​ຕັ້ງ​:
1. ກວດເບິ່ງວ່າປັ໊ມ submersible ຕອບສະຫນອງເງື່ອນໄຂການນໍາໃຊ້ແລະຂອບເຂດທີ່ລະບຸໄວ້ໃນຄູ່ມື.
2. ການນໍາໃຊ້ obiect ຫນັກທີ່ມີເສັ້ນຜ່າກາງເທົ່າກັບເສັ້ນຜ່າກາງນອກສູງສຸດຂອງປັ໊ມ submersible, ວັດແທກວ່າ inneldiameter ຂອງ wellbore ສາມາດເຫມາະກັບ pump submersible ໄດ້, ແລະວັດແທກວ່າຄວາມເລິກຂອງດີຕອບສະຫນອງຄວາມຕ້ອງການການຕິດຕັ້ງ.
3. ກວດເບິ່ງວ່າອ່າງນ້ຳນັ້ນສະອາດບໍ່ ແລະ ນ້ຳຂອງນ້ຳກໍ່ມີຄວາມຂຸ່ນຫຼືບໍ່. ຢ່າໃຊ້ປັ໊ມໄຟຟ້າ submersible ເພື່ອລ້າງຂີ້ຕົມແລະນ້ໍາຊາຍຂອງ welor pump ເພື່ອຫຼີກເວັ້ນຄວາມເສຍຫາຍກ່ອນໄວອັນຄວນຂອງປັ໊ມໄຟຟ້າ submersible.
4. ກວດເບິ່ງວ່າຕໍາແໜ່ງຂອງຕົວຍຶດຕິດສະຫວັດແມ່ນເຫມາະສົມຫຼືບໍ່ ແລະ ມັນສາມາດທົນກັບຄຸນນະພາບຂອງເຄື່ອງທັງໝົດໄດ້ຫຼືບໍ່.
5. ກວດເບິ່ງວ່າອົງປະກອບຂອງປັ໊ມ submersible ຄົບຖ້ວນສົມບູນແລະຕິດຕັ້ງຢ່າງຖືກຕ້ອງຕາມແຜນຜັງການປະກອບໃນຄູ່ມື, ເອົາຫນ້າຈໍການກັ່ນຕອງອອກແລະຫມຸນທໍ່ເຊື່ອມຕໍ່ເພື່ອເບິ່ງວ່າມັນ rotates ຍືດຫຍຸ່ນ.
6. ຖອດສະກູນ້ຳອອກ ແລະ ຕື່ມນ້ຳທີ່ສະອາດ, ບໍ່ມີສານກັດກ່ອນ (ໝາຍເຫດ, ໝຸນມັນອອກ), ຈາກນັ້ນບີບອັດສະກູໃຫ້ແໜ້ນ. ຫຼັງຈາກ 12 ຊົ່ວໂມງຂອງການສີດນ້ໍາ, ຄວາມຕ້ານທານ insulation ຂອງມໍເຕີບໍ່ຄວນຫນ້ອຍກ່ວາ 150M Q ເມື່ອວັດແທກກັບຕາຕະລາງສັ່ນ 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

ແຜນວາດຂະບວນການສາຍສາຍໄຟທີ່ຕິດຄັດມາມີດັ່ງນີ້:
300QJP Peep Well Submersible Pump

 

8. ໃຊ້ມັນຕິມິເຕີເພື່ອກວດເບິ່ງວ່າສາຍໄຟສາມເຟດຖືກເຊື່ອມຕໍ່ຫຼືບໍ່ແລະວ່າຄວາມຕ້ານທານ DC ແມ່ນປະມານສົມດູນຫຼືບໍ່.
9. ກວດເບິ່ງວ່າວົງຈອນແລະຄວາມອາດສາມາດຂອງຫມໍ້ແປງແມ່ນ overloaded, ແລະຫຼັງຈາກນັ້ນເຊື່ອມຕໍ່ສະຫຼັບປ້ອງກັນ overload ຫຼືອຸປະກອນເລີ່ມຕົ້ນ. ເບິ່ງຕາຕະລາງ 2 ສໍາລັບແບບຈໍາລອງສະເພາະ, ແລະຫຼັງຈາກນັ້ນເອົາຖັງນ້ໍາເຂົ້າໄປໃນປັ໊ມນ້ໍາຈາກປ່ຽງປ່ຽງນ້ໍາເພື່ອຫລໍ່ລື່ນລູກປືນຢາງໃນປັ໊ມ, ແລະຫຼັງຈາກນັ້ນວາງປັ໊ມໄຟຟ້າ submersible ຕັ້ງຊື່ແລະສະຫມໍ່າສະເຫມີ. ເລີ່ມຕົ້ນ (ບໍ່ເກີນຫນຶ່ງວິນາທີ). ແລະກວດເບິ່ງວ່າທິດທາງການຊີ້ນໍາແມ່ນສອດຄ່ອງກັບເຄື່ອງຫມາຍການຊີ້ນໍາຫຼືບໍ່. ຖ້າບໍ່ແມ່ນ, ແລກປ່ຽນສອງຕົວເຊື່ອມຕໍ່ຂອງສາຍໄຟສາມເຟດ. ຫຼັງຈາກນັ້ນ, ຕິດຕັ້ງຕົວກອງແລະກະກຽມທີ່ຈະລົງໄປໃນນ້ໍາດີ. ຖ້າໃຊ້ໃນໂອກາດພິເສດ (ເຊັ່ນ: ຮ່ອງ, ຄອງ, ແມ່ນໍ້າ, ໜອງ, ໜອງ, ແລະອື່ນໆ), ປັ໊ມໄຟຟ້າຕ້ອງມີພື້ນຖານທີ່ເຊື່ອຖືໄດ້.

 

(2​) ອຸ​ປະ​ກອນ​ການ​ຕິດ​ຕັ້ງ​ແລະ​ເຄື່ອງ​ມື​:
1. ຄູ່ຂອງຕ່ອງໂສ້ຍົກສໍາລັບຫຼາຍກ່ວາສອງໂຕນ.
2. Tripod ທີ່ມີຄວາມສູງຕັ້ງບໍ່ຫນ້ອຍກວ່າສີ່ແມັດ.
3. ເຊືອກຫ້ອຍສອງອັນ (ສາຍເຊືອກ) ທີ່ສາມາດຮັບນ້ຳໜັກໄດ້ຫຼາຍກວ່າໜຶ່ງໂຕນ (ສາມາດຮັບນ້ຳໜັກໄດ້ຂອງປ້ຳນ້ຳຄົບຊຸດ).
4. ຕິດຕັ້ງສອງຄູ່ຂອງ clamps (splint).
5. wrenches, hammers, screwdrivers, ເຄື່ອງມືໄຟຟ້າແລະເຄື່ອງມື, ແລະອື່ນໆ.

 

(3) ການຕິດຕັ້ງປໍ້າໄຟຟ້າ:
1. ແຜນວາດການຕິດຕັ້ງຂອງປັ໊ມໄຟຟ້າ submersible ແມ່ນສະແດງຢູ່ໃນຮູບ 2. ຂະຫນາດການຕິດຕັ້ງສະເພາະແມ່ນສະແດງຢູ່ໃນຕາຕະລາງ 3 "ລາຍການຂະຫນາດການຕິດຕັ້ງຂອງປັ໊ມໄຟຟ້າ Submersible".

 

2. ປັ໊ມໄຟຟ້າໃຕ້ນໍ້າທີ່ມີຫົວບໍ່ເກີນ 30 ແມັດ ສາມາດຍົກນໍ້າໃສ່ນໍ້າສ້າງໄດ້ໂດຍກົງ ໂດຍໃຊ້ສາຍທໍ່ ແລະສາຍເຊືອກ ຫຼືເຊືອກເຊືອກອື່ນໆ ທີ່ສາມາດຮັບນໍ້າໜັກໄດ້ທັງໝົດຂອງເຄື່ອງຈັກ, ທໍ່ນໍ້າ ແລະນໍ້າໃນທໍ່.

 

3. ປໍ້າທີ່ມີຫົວຫຼາຍກວ່າ 30 ແມັດ ໃຊ້ທໍ່ເຫຼັກ, ແລະ ລຳດັບການຕິດຕັ້ງມີດັ່ງນີ້:
①​ໃຊ້​ຕົວ​ຍຶດ​ເພື່ອ​ມັດ​ສ່ວນ​ເທິງ​ຂອງ​ປ້ຳ​ນ້ຳ (ມໍ​ເຕີ​ແລະ​ປ້ຳ​ນ້ຳ​ໄດ້​ເຊື່ອມ​ຕໍ່​ກັນ​ແລ້ວ​ໃນ​ເວລາ​ນີ້), ຍົກ​ມັນ​ດ້ວຍ​ຕ່ອງ​ໂສ້​ຫ້ອຍ, ແລະ​ຄ່ອຍໆ​ມັດ​ມັນ​ເຂົ້າ​ໄປ​ໃນ​ນ້ຳ​ສ້າງ​ຈົນ​ກວ່າ​ເອົາ​ຕົວ​ຍຶດ​ໃສ່​ຫົວ​ນ້ຳ​ສ້າງ ແລະ​ເອົາ​ສາຍ​ຮັດ​ອອກ. ຕ່ອງໂສ້ຫ້ອຍ.
② ໃຊ້ຕົວຍຶດອີກຄູ່ເພື່ອຍຶດທໍ່, ຍົກມັນດ້ວຍຕ່ອງໂສ້ຫ້ອຍ 15 ຊຕມຈາກຫນ້າແປນ, ແລະຫຼຸດລົງຊ້າໆ. ລະຫວ່າງປ່ຽງທໍ່ ແລະປ່ຽງປ່ຽງ ວາງແຜ່ນຢາງໃສ່ບ່ອນ ແລະຮັດທໍ່ ແລະປ້ຳໃຫ້ສະເໝີກັນດ້ວຍບານປະຕູ, ແກ່ນໝາກໄມ້ ແລະເຄື່ອງຊັກພາກຮຽນ spring.
③ ຍົກປັ໊ມ submersible ເລັກນ້ອຍ, ເອົາ clamp ຢູ່ເທິງສຸດຂອງປັ໊ມນ້ໍາ, ມັດສາຍກັບທໍ່ນ້ໍາຢ່າງແຫນ້ນຫນາດ້ວຍ tape ພາດສະຕິກ, ແລະຄ່ອຍໆມັດມັນລົງຈົນກ່ວາ clamp ໄດ້ຖືກວາງໄວ້ທີ່ຫົວ wellhead.
④ ໃຊ້ວິທີດຽວກັນເພື່ອມັດທໍ່ນ້ຳທັງໝົດໃສ່ໃນນ້ຳສ້າງ.
⑤ຫຼັງຈາກສາຍໄຟສາຍອອກໄດ້ເຊື່ອມຕໍ່ກັບສະວິດຄວບຄຸມ, ມັນເຊື່ອມຕໍ່ກັບການສະຫນອງພະລັງງານສາມເຟດ.


(4​) ສິ່ງ​ທີ່​ຄວນ​ສັງ​ເກດ​ໃນ​ລະ​ຫວ່າງ​ການ​ຕິດ​ຕັ້ງ​:
1. ຖ້າພົບເຫັນປະກົດການຕິດຂັດໃນລະຫວ່າງຂະບວນການສູບນ້ໍາ, ໃຫ້ຫັນຫຼືດຶງທໍ່ນ້ໍາເພື່ອເອົາຊະນະຈຸດຕິດຂັດ. ຖ້າມາດຕະການຕ່າງໆຍັງບໍ່ໄດ້ຜົນ, ກະລຸນາຢ່າບັງຄັບປັ໊ມລົງເພື່ອຫຼີກເວັ້ນການເສຍຫາຍຂອງປັ໊ມໄຟຟ້າ submersible ແລະນ້ໍາດີ.
2. ໃນລະຫວ່າງການຕິດຕັ້ງ, ຄວນວາງແຜ່ນຢາງຢູ່ຫນ້າແປນຂອງທໍ່ແຕ່ລະອັນແລະແຫນ້ນແຫນ້ນຢ່າງເທົ່າທຽມກັນ.
3. ເມື່ອປ້ຳນ້ຳລົງໃນນ້ຳສ້າງຄວນວາງໄວ້ກາງທໍ່ນ້ຳດີ ເພື່ອບໍ່ໃຫ້ປ້ຳແລ່ນໄປຕຳກັບຝານ້ຳສ້າງເປັນເວລາດົນ ເຮັດໃຫ້ປ້ຳສັ່ນສະເທືອນ ແລະ ມໍເຕີຈະກວາດ ແລະໄໝ້ໄດ້. .
4. ກໍານົດຄວາມເລິກຂອງປັ໊ມນ້ໍາລົງລຸ່ມຂອງດີອີງຕາມການໄຫຼຂອງດິນຊາຍແລະ silt ຂອງດີ. ຢ່າຝັງປັ໊ມໃນຕົມ. ໄລຍະຫ່າງຈາກປັ໊ມນ້ໍາໄປຫາລຸ່ມຂອງນ້ໍາໂດຍທົ່ວໄປແມ່ນບໍ່ຫນ້ອຍກວ່າ 3 ແມັດ (ເບິ່ງຮູບ 2).
5. ຄວາມເລິກຂອງນໍ້າເຂົ້າຂອງປໍ້ານໍ້າຄວນຈະບໍ່ຫນ້ອຍກວ່າ 1-1.5 ແມັດຈາກລະດັບນໍ້າແບບເຄື່ອນໄຫວໄປຫາທໍ່ນໍ້າເຂົ້າ (ເບິ່ງຮູບ 2). ຖ້າ​ບໍ່​ດັ່ງ​ນັ້ນ​, bearings pump ນ​້​ໍ​າ​ອາດ​ຈະ​ໄດ້​ຮັບ​ຄວາມ​ເສຍ​ຫາຍ​ໄດ້​ຢ່າງ​ງ່າຍ​ດາຍ​.
6. ການຍົກຂອງປັ໊ມນ້ໍາບໍ່ສາມາດຕ່ໍາເກີນໄປ. ຖ້າບໍ່ດັ່ງນັ້ນ, ປ່ຽງປະຕູຕ້ອງໄດ້ຮັບການຕິດຕັ້ງໃສ່ທໍ່ນ້ໍາ wellhead ເພື່ອຄວບຄຸມການໄຫຼຂອງປັ໊ມຢູ່ທີ່ຈຸດການໄຫຼທີ່ຖືກຈັດອັນດັບເພື່ອປ້ອງກັນບໍ່ໃຫ້ມໍເຕີໂຫລດເກີນແລະໄຟໄຫມ້ເນື່ອງຈາກອັດຕາການໄຫຼຂະຫນາດໃຫຍ່.
7. ໃນເວລາທີ່ປັ໊ມນ້ໍາກໍາລັງແລ່ນ, ຜົນຜະລິດນ້ໍາຄວນຈະຢ່າງຕໍ່ເນື່ອງແລະແມ້ກະທັ້ງ, ປະຈຸບັນຄວນຈະມີຄວາມຫມັ້ນຄົງ (ພາຍໃຕ້ເງື່ອນໄຂການເຮັດວຽກທີ່ມີການຈັດອັນດັບ, ໂດຍທົ່ວໄປແລ້ວບໍ່ເກີນ 10% ຂອງກະແສໄຟຟ້າທີ່ຖືກຈັດອັນດັບ), ແລະບໍ່ຄວນມີການສັ່ນສະເທືອນຫຼືສຽງລົບກວນ. ຖ້າມີຄວາມຜິດປົກກະຕິ, ຄວນຢຸດເຄື່ອງເພື່ອຫາສາເຫດແລະລົບລ້າງມັນ.
8. ເມື່ອຕິດຕັ້ງ, ໃຫ້ເອົາໃຈໃສ່ກັບການຕັ້ງຄ່າຂອງສາຍດິນມໍເຕີ (ເບິ່ງຮູບ 2). ເມື່ອທໍ່ນ້ໍາເປັນທໍ່ເຫລໍກ, ນໍາພາມັນອອກຈາກທໍ່ນ້ໍາດີ; ໃນເວລາທີ່ທໍ່ນ້ໍາເປັນທໍ່ພາດສະຕິກ, ນໍາພາມັນຈາກເຄື່ອງຫມາຍພື້ນດິນຂອງປັ໊ມໄຟຟ້າ.

 

 
ບໍາລຸງຮັກສາແລະບໍາລຸງຮັກສາ
  1. 1 submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
  2. 2 ການດໍາເນີນງານຂອງປັ໊ມສໍາລັບສີ່ຊົ່ວໂມງທໍາອິດ, ຄວນຈະປິດຢ່າງໄວວາການທົດສອບຄວາມຕ້ານທານຂອງ insulation ຄວາມຮ້ອນຂອງມໍເຕີ, ມູນຄ່າບໍ່ຄວນຕ່ໍາກວ່າ 0.5 megaohm.
  3. 3 pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
  4. 4 ປັ໊ມເຂົ້າໄປໃນການດໍາເນີນງານປົກກະຕິ, ເພື່ອຍືດອາຍຸການບໍລິການ, ການກວດສອບແຮງດັນໄຟຟ້າ, ການເຮັດວຽກແລະການຕໍ່ຕ້ານ insulation ແມ່ນປົກກະຕິ, ຖ້າພົບສະຖານະການຕໍ່ໄປນີ້, ຄວນປິດການແກ້ໄຂບັນຫາທັນທີ.
  5.  
  6. 1 ໃນເງື່ອນໄຂການຈັດອັນດັບ, ປະຈຸບັນແມ່ນຫຼາຍກ່ວາ 20%.
  7. 2 ລະດັບນ້ໍາແບບເຄື່ອນໄຫວໄປຫາພາກສ່ວນນ້ໍາ inlet, ເຮັດໃຫ້ນ້ໍາ intermittent.
  8. 3 ສູບ submersible ການສັ່ນສະເທືອນຮຸນແຮງຫຼືສຽງລົບກວນ.
  9. 4 ແຮງດັນການສະຫນອງແມ່ນຕ່ໍາກວ່າ 340 volts.
  10. 5 fuse ໄຟໄຫມ້ອອກໄລຍະຫນຶ່ງ.
  11. 6 ທໍ່ນ້ໍາເສຍຫາຍ.
  12. 7 motor ກັບຄວາມຕ້ານທານ insulation ຄວາມຮ້ອນແມ່ນຫນ້ອຍກ່ວາ 0.5 megaohm.
  13.  
  14. 5. This product is a high-quality submersible pump, in addition to the efficient pumping function, but also easy to maintain and clean. The disassembly process is simple and clear, just follow the steps to untie the cable, remove the pipeline part, take off the line protection plate, loosen the water discharge bolt, remove the filter and loosen the fixing screw, separate the pump and the motor, and then remove the parts of the pump and the motor, pay attention to avoid damage. When assembling, thoroughly clean the components, apply sealant on the mating surface and fasteners, and then assemble in the opposite order. Every year or two years after immersion, check in accordance with the steps, replace the worn parts. This product has a reasonable structure, easy to operate, and is suitable for various occasions for pump needs.

 

 
ການເກັບຮັກສາແລະການເກັບຮັກສາ

 1, ເອົານ້ໍາອອກໃນຊ່ອງ motor (ໂດຍສະເພາະໃນລະດູຫນາວເພື່ອປ້ອງກັນບໍ່ໃຫ້ motor ຈາກ freezing), ແລະມັດສາຍໄດ້ດີ.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, ການນໍາໃຊ້ໃນໄລຍະຍາວຄວນເອົາໃຈໃສ່ກັບການປ້ອງກັນ rust ຂອງປັ໊ມ submersible.

 

 
ພາກສ່ວນສວມໃສ່
  • ແຮງດັນ
  • ແຂນ Shaft
  • ເສອແຂນຢາງ
  • ວົງການຜະນຶກ

 
ສະຖານະການຄໍາຮ້ອງສະຫມັກ

01 ການດູດນ້ໍາດີ

02 ນ້ຳປະປາສູງ

03 ນ້ຳປະປາພູເຂົາ 

04 ຫໍນ້ຳ

05 ຊົນລະປະທານກະສິກຳ

06 ຊົນລະປະທານສວນ

07 ການ​ນໍາ​ໃຊ້​ນ​້​ໍ​າ​

08 ນ້ໍາພາຍໃນ

 

ຖ້າຫາກວ່າທ່ານມີຄວາມສົນໃຈໃນຜະລິດຕະພັນຂອງພວກເຮົາ, ທ່ານສາມາດເລືອກທີ່ຈະອອກຈາກຂໍ້ມູນຂອງທ່ານທີ່ນີ້, ແລະພວກເຮົາຈະຕິດຕໍ່ກັບທ່ານໃນໄວໆນີ້.


ຂຽນຂໍ້ຄວາມຂອງທ່ານທີ່ນີ້ແລະສົ່ງໃຫ້ພວກເຮົາ

ຖ້າຫາກວ່າທ່ານມີຄວາມສົນໃຈໃນຜະລິດຕະພັນຂອງພວກເຮົາ, ທ່ານສາມາດເລືອກທີ່ຈະອອກຈາກຂໍ້ມູນຂອງທ່ານທີ່ນີ້, ແລະພວກເຮົາຈະຕິດຕໍ່ກັບທ່ານໃນໄວໆນີ້.


loLao