Pompa Submersible Sumur Intip 300QJP

Lakukan pemrosesan OEM! Sesuai dengan kebutuhan pengguna, desain dan pembuatan berbagai jenis persyaratan khusus motor dan pompa submersible non-standar. Standar penerapan produk: GB/T2816-2014 "pompa submersible sumur", GB/T2818-2014 "motor asinkron submersible sumur". WhatsApp:17855846335
PDF DOWNLOAD
Detail
Tag
 
Ikhtisar Produk

QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeves as lubricant. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and burnout caused by motor lack of oil wear. Most suitable for music fountains, all models can be used flat.

 

 
Ketentuan Penggunaan

The product is powered by three-phase AC 380V power supply, 50HZ pump, suitable for water temperature is not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality conditions. The product adopts closed or water-filled wet structure of the motor, before use the submersible motor chamber filled with clean water to prevent the occurrence of virtual filling. The submersible pump must be completely immersed in water operation, penetration depth shall not exceed 70 meters, to the bottom of the well distance shall not be less than 3 meters. The water flow in the well must meet the water requirements of the submersible pump and continuous operation, and the water output of the pump is controlled between 0.7-1.2 times the rated flow. The well should be vertical and the submersible pump can only be placed vertically, not horizontal or upside down. The submersible pump must be equipped with cables and external overload protection devices as required. It is strictly prohibited to conduct no-load test of the pump without water.

 

 
Arti Model

300QJP Peep Well Submersible Pump

 

 
Referensi Model Parsial
Model

Mengalir

(m3/h)

Kepala
(M)

Kecepatan putar

(perubahan/titik)

Waterpump

(%)

 Toko
diameter
(mm)
Dapat diterapkan dengan baik
diameter (mm) 
 Dinilai
power(KW)
Dinilai
tegangan (V)
Dinilai
saat ini (A)
Efisiensi motorik (%) power factorcosφ   Satuan
Ukuran Radial Maksimum (mm)
Komentar
300QJ200-40 200 40 2900 76 150  300di atas 37 380 77.8 85.0 0.85 281  
300QJ200-60 60 55 115 85.5 0.85  
300QJ200-80 80 75 154.1 86.0 0.86  
300QJ200-100 100 90 183.8 86.5 0.86  
300QJ200-120 120 100 204.3 86.5 0.86  
300QJ200-140 140 125 249.5 87.5 0.87  
300QJ200-160 160 140 277.8 88.0 0.87  
300QJ200-180 180 160 317.5 88.0 0.87  
300QJ200-200 200 185 367.2 88.0 0.87  
300QJ200-240 240 220 436.6 88.0 0.87  
300QJ320-30 320 30 2900 77 200  300di atas 45 380 94.6 85.0 0.85 281  
300QJ320-60 60 90 183.8 86.5 0.86  
300QJ320-90 90 125 249.5 87.5 0.87  
300QJ320-120 120 160 317.5 88.0 0.87  

 

 
Tindakan pengamanan

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, secara ketat sesuai dengan ketentuan angkat pompa, rentang penggunaan aliran, untuk mencegah gaya pemompaan aliran rendah atau angkat tinggi, bantalan dorong dan bagian lain dari keausan, beban berlebih motor terbakar

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ, after the start to observe the voltage and current, check the motor winding insulation, whether it meets the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature motor

 

 
Introduction to Structure

The pump parts of this product are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The product adopts water immersion wet three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm set at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the temperature rise of the motor. In order to prevent the sand particles from entering the motor, the upper end of the motor shaft extension is installed with two oil seals, and the sand ring is set to form a sand blocking structure. At the same time, in order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the bottom of the motor is equipped with a thrust bearing. The motor and pump bearing are lubricated by water. The stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump design adopts computer CAD, with simple structure and good technical performance.

300QJP Peep Well Submersible Pump
 
Install

(1) Persiapan sebelum pemasangan:
1. Periksa apakah pompa submersible memenuhi kondisi penggunaan dan cakupan yang ditentukan dalam manual.
2. Dengan menggunakan benda berat dengan diameter sama dengan diameter luar maksimum pompa submersible, ukur apakah diameter dalam lubang sumur dapat memuat pompa submersible, dan ukur apakah kedalaman sumur memenuhi persyaratan pemasangan.
3. Periksa apakah lubang sumur bersih dan air sumur keruh. Jangan sekali-kali menggunakan pompa listrik submersible untuk mencuci air lumpur dan pasir pompa welor untuk menghindari kerusakan dini pada pompa listrik submersible.
4. Periksa apakah posisi klem pemasangan kepala las sudah sesuai dan apakah dapat menahan kualitas seluruh unit
5. Periksa apakah komponen pompa submersible sudah lengkap dan terpasang dengan benar sesuai diagram perakitan di manual. Lepaskan layar filter dan putar kopling untuk melihat apakah berputar secara fleksibel
6. Buka sekrup air dan isi rongga motor dengan air bersih yang tidak korosif (catatan, pastikan untuk mengisinya), kemudian kencangkan sekrup air. Setelah 12 jam injeksi air, resistansi isolasi motor tidak boleh kurang dari 150M Q bila diukur dengan meja goyang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagram proses pengkabelan kabel terlampir adalah sebagai berikut:
300QJP Peep Well Submersible Pump

 

8. Gunakan multimeter untuk memeriksa apakah kabel tiga fasa tersambung dan apakah resistansi DC kira-kira seimbang.
9. Periksa apakah rangkaian dan kapasitas trafo kelebihan beban, lalu sambungkan sakelar proteksi kelebihan beban atau peralatan starter. Lihat Tabel 2 untuk model tertentu, laluTuangkan seember air ke dalam pompa air dari stopkontak pompa air untuk melumasi bantalan karet di pompa, lalu letakkan pompa listrik submersible dengan tegak dan stabil.Mulai (tidak lebih dari satu detik) dan periksa apakah arah kemudi sesuai dengan tanda kemudi. Jika tidak, tukar dua konektor kabel tiga fasa. Kemudian pasang filter dan bersiap untuk turun ke sumur. Jika digunakan pada acara-acara khusus (seperti parit, parit, sungai, kolam, kolam, dll.), pompa listrik harus diarde dengan baik.

 

(2) Peralatan dan perkakas instalasi:
1. Sepasang rantai pengangkat lebih dari dua ton.
2. Tripod dengan tinggi vertikal minimal empat meter.
3. Dua buah tali gantung (tali kawat) yang mampu menahan beban lebih dari satu ton (dapat menahan beban satu set pompa air lengkap).
4. Pasang dua pasang klem (belat).
5. Kunci pas, palu, obeng, perkakas dan instrumen listrik, dll.

 

(3) Instalasi pompa listrik:
1. Diagram pemasangan pompa listrik submersible ditunjukkan pada Gambar 2. Dimensi pemasangan spesifik ditunjukkan pada Tabel 3 “Daftar Dimensi Pemasangan Pompa Listrik Submersible”.

 

2. Pompa listrik submersible dengan head kurang dari 30 meter dapat diangkat langsung ke dalam sumur dengan menggunakan selang dan tali kawat atau tali rami lainnya yang dapat menahan seluruh beban mesin, pipa air, dan air di dalam pipa.

 

3. Pompa dengan head lebih dari 30 meter menggunakan pipa baja, dan urutan pemasangannya sebagai berikut:
①Gunakan penjepit untuk menjepit ujung atas bagian pompa air (saat ini motor dan pompa air sudah tersambung), angkat dengan rantai gantung, dan ikat perlahan ke dalam sumur hingga Pasang penjepit di kepala sumur dan lepaskan rantai gantung.
② Gunakan klem lain untuk menjepit pipa, angkat dengan rantai gantung sejauh 15 cm dari flensa, dan turunkan perlahan. Antara flensa pipa dan flensa pompaPasang bantalan karet pada tempatnya dan kencangkan pipa dan pompa secara merata dengan baut, mur, dan ring pegas.
③ Angkat sedikit pompa submersible, lepaskan klem di ujung atas pompa air, ikat kuat kabel ke pipa air dengan selotip plastik, dan ikat perlahan hingga klem dipasang di kepala sumur.
④Gunakan cara yang sama untuk mengikat semua pipa air ke dalam sumur.
⑤Setelah kabel keluar dihubungkan ke sakelar kontrol, kabel dihubungkan ke catu daya tiga fase.


(4) Hal-hal yang perlu diperhatikan selama instalasi:
1. Jika ditemukan fenomena kemacetan pada saat proses pemompaan, putar atau tarik pipa air untuk mengatasi titik kemacetan tersebut. Jika berbagai tindakan masih tidak berhasil, mohonJangan paksa pompa turun untuk menghindari kerusakan pada pompa listrik submersible dan sumur.
2. Selama pemasangan, bantalan karet harus ditempatkan pada flensa setiap pipa dan dikencangkan secara merata.
3. Pada saat pompa air diturunkan ke dalam sumur, sebaiknya ditempatkan di tengah-tengah pipa sumur agar pompa tidak bekerja terlalu lama pada dinding sumur sehingga menyebabkan pompa bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pompa air sampai ke dasar sumur sesuai dengan kondisi aliran pasir dan lanau sumur. Jangan mengubur pompa di dalam lumpur. Jarak pompa air ke dasar sumur umumnya tidak kurang dari 3 meter (lihat Gambar 2).
5. Kedalaman masuknya air dari pompa air harus setidaknya 1-1,5 meter dari ketinggian air dinamis ke simpul saluran masuk air (lihat Gambar 2). Jika tidak, bantalan pompa air akan mudah rusak.
6. Daya angkat pompa air tidak boleh terlalu rendah. Jika tidak, katup gerbang perlu dipasang pada pipa air kepala sumur untuk mengontrol aliran pompa pada titik aliran terukur guna mencegah motor kelebihan beban dan terbakar karena laju aliran yang besar.
7. Saat pompa air bekerja, keluaran air harus terus menerus dan merata, arus harus stabil (dalam kondisi kerja terukur, umumnya tidak lebih dari 10% arus terukur), dan tidak boleh ada getaran atau kebisingan. Jika terdapat kelainan, sebaiknya mesin dihentikan untuk mengetahui penyebabnya dan menghilangkannya.
8. Saat memasang, perhatikan pengaturan kabel ground motor (lihat Gambar 2). Jika pipa air berupa pipa baja, arahkan dari klem kepala sumur; bila pipa air berupa pipa plastik, arahkan dari tanda grounding pompa listrik.

 

 
Pemeliharaan dan Pemeliharaan
  1. 1 submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
  2. 2 pengoperasian pompa selama empat jam pertama, harus segera dimatikan, uji resistansi isolasi termal motor, nilainya tidak boleh kurang dari 0,5 megaohm.
  3. 3 pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
  4. 4 pompa ke dalam operasi normal, untuk memperpanjang masa pakainya, untuk memeriksa tegangan suplai, arus kerja dan resistansi isolasi normal, jika ditemukan situasi berikut, harus segera mematikan pemecahan masalah.
  5.  
  6. 1 dalam kondisi pengenal, arusnya lebih dari 20%.
  7. 2 ketinggian air dinamis ke bagian saluran masuk air, menyebabkan air terputus-putus.
  8. 3 pompa submersible getaran atau kebisingan yang parah.
  9. 4 tegangan suplai lebih rendah dari 340 volt.
  10. 5 sekering terbakar satu fasa.
  11. 6 kerusakan pipa air.
  12. 7 motor dengan resistansi isolasi termal kurang dari 0,5 megaohm.
  13.  
  14. 5. This product is a high-quality submersible pump, in addition to the efficient pumping function, but also easy to maintain and clean. The disassembly process is simple and clear, just follow the steps to untie the cable, remove the pipeline part, take off the line protection plate, loosen the water discharge bolt, remove the filter and loosen the fixing screw, separate the pump and the motor, and then remove the parts of the pump and the motor, pay attention to avoid damage. When assembling, thoroughly clean the components, apply sealant on the mating surface and fasteners, and then assemble in the opposite order. Every year or two years after immersion, check in accordance with the steps, replace the worn parts. This product has a reasonable structure, easy to operate, and is suitable for various occasions for pump needs.

 

 
Penyimpanan dan Penitipan

 1, keluarkan air di rongga motor (terutama di musim dingin untuk mencegah motor membeku), dan ikat kabel dengan baik.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, penggunaan jangka panjang harus memperhatikan pencegahan karat pada pompa submersible.

 

 
Memakai Suku Cadang
  • pendorong
  • Lengan poros
  • Lengan poros karet
  • Cincin penyegel

 
Skenario Aplikasi

01 Asupan air sumur dalam

02 Pasokan air bertingkat tinggi

03 persediaan air pegunungan 

04 menara air

05 Irigasi pertanian

06 irigasi taman

07 pengambilan air sungai

08 air rumah tangga

 

Jika Anda tertarik dengan produk kami, Anda dapat memilih untuk meninggalkan informasi Anda di sini, dan kami akan segera menghubungi Anda.


Tulis pesan Anda di sini dan kirimkan kepada kami

Jika Anda tertarik dengan produk kami, Anda dapat memilih untuk meninggalkan informasi Anda di sini, dan kami akan segera menghubungi Anda.


id_IDIndonesian