QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeves as lubricant. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and burnout caused by motor lack of oil wear. Most suitable for music fountains, all models can be used flat.
The product is powered by three-phase AC 380V power supply, 50HZ pump, suitable for water temperature is not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality conditions. The product adopts closed or water-filled wet structure of the motor, before use the submersible motor chamber filled with clean water to prevent the occurrence of virtual filling. The submersible pump must be completely immersed in water operation, penetration depth shall not exceed 70 meters, to the bottom of the well distance shall not be less than 3 meters. The water flow in the well must meet the water requirements of the submersible pump and continuous operation, and the water output of the pump is controlled between 0.7-1.2 times the rated flow. The well should be vertical and the submersible pump can only be placed vertically, not horizontal or upside down. The submersible pump must be equipped with cables and external overload protection devices as required. It is strictly prohibited to conduct no-load test of the pump without water.
Modelo |
Fluir (m3/h) |
Cabeza (metro) |
Velocidad de rotación (punto de cambio) |
Waterpump (%) |
Salida diámetro (mm) |
Aplicable bien diámetro (mm) |
Clasificado power(KW) |
Clasificado voltaje(V) |
Clasificado corriente(A) |
Eficiencia motora (%) | power factorcosφ | Unidad Tamaño máximo radial (mm) |
Observación | |||||||||
300QJ200-40 | 200 | 40 | 2900 | 76 | 150 | 300arriba | 37 | 380 | 77.8 | 85.0 | 0.85 | 281 | ||||||||||
300QJ200-60 | 60 | 55 | 115 | 85.5 | 0.85 | |||||||||||||||||
300QJ200-80 | 80 | 75 | 154.1 | 86.0 | 0.86 | |||||||||||||||||
300QJ200-100 | 100 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-120 | 120 | 100 | 204.3 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ200-160 | 160 | 140 | 277.8 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-180 | 180 | 160 | 317.5 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-200 | 200 | 185 | 367.2 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-240 | 240 | 220 | 436.6 | 88.0 | 0.87 | |||||||||||||||||
300QJ320-30 | 320 | 30 | 2900 | 77 | 200 | 300arriba | 45 | 380 | 94.6 | 85.0 | 0.85 | 281 | ||||||||||
300QJ320-60 | 60 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ320-90 | 90 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ320-120 | 120 | 160 | 317.5 | 88.0 | 0.87 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, estrictamente de acuerdo con las disposiciones de elevación de la bomba, rango de uso del flujo, para evitar un flujo bajo o una fuerza de bombeo de elevación alta, el cojinete de empuje y otras partes del desgaste, la sobrecarga del motor se quemó
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ, after the start to observe the voltage and current, check the motor winding insulation, whether it meets the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature motor
The pump parts of this product are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The product adopts water immersion wet three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm set at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the temperature rise of the motor. In order to prevent the sand particles from entering the motor, the upper end of the motor shaft extension is installed with two oil seals, and the sand ring is set to form a sand blocking structure. At the same time, in order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the bottom of the motor is equipped with a thrust bearing. The motor and pump bearing are lubricated by water. The stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump design adopts computer CAD, with simple structure and good technical performance.

(1)Preparación antes de la instalación:
1. Verifique si la bomba sumergible cumple con las condiciones de uso y el alcance especificado en el manual.
2. Utilizando un objeto pesado con un diámetro igual al diámetro exterior máximo de la bomba sumergible, mida si el diámetro interior del pozo puede adaptarse a la bomba sumergible y mida si la profundidad del pozo cumple con los requisitos de instalación.
3. Verifique si el pozo está limpio y si el agua del pozo está turbia. Nunca utilice una bomba eléctrica sumergible para lavar el agua de lodo y arena de la bomba welor para evitar daños prematuros a la bomba eléctrica sumergible.
4. Compruebe si la posición de la abrazadera de instalación del cabezal de pozo es adecuada y si puede soportar la calidad de toda la unidad.
5. Verifique si los componentes de la bomba sumergible están completos e instalados correctamente de acuerdo con el diagrama de ensamblaje en el manual. Retire la pantalla del filtro y gire el acoplamiento para ver si gira con flexibilidad.
6. Desenrosque el tornillo de agua y llene la cavidad del motor con agua limpia y no corrosiva (nota: asegúrese de llenarla), luego apriete el tornillo de agua. Después de 12 horas de inyección de agua, la resistencia de aislamiento del motor no debe ser inferior a 150 M Q cuando se mide con una mesa vibratoria de 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
El diagrama del proceso de cableado del cable adjunto es el siguiente:
8. Utilice un multímetro para comprobar si los cables trifásicos están conectados y si la resistencia de CC está aproximadamente equilibrada.
9. Verifique si el circuito y la capacidad del transformador están sobrecargados y luego conecte el interruptor de protección contra sobrecarga o el equipo de arranque. Consulte la Tabla 2 para conocer modelos específicos y luego vierta un balde de agua en la bomba de agua desde la salida de la bomba de agua para lubricar los cojinetes de goma de la bomba y luego coloque la bomba eléctrica sumergible en posición vertical y estable. Inicio (no más de un segundo) y compruebe si la dirección de dirección es consistente con la señal de dirección. De lo contrario, cambie los dos conectores del cable trifásico. Luego instale el filtro y prepárese para bajar al pozo. Si se utiliza en ocasiones especiales (como zanjas, acequias, ríos, estanques, estanques, etc.), la bomba eléctrica debe estar conectada a tierra de manera confiable.
(2) Equipos y herramientas de instalación:
1. Un par de cadenas de elevación para más de dos toneladas.
2. Un trípode con una altura vertical no inferior a cuatro metros.
3. Dos cuerdas para colgar (cables de alambre) que pueden soportar un peso de más de una tonelada (pueden soportar el peso de un juego completo de bombas de agua).
4. Instale dos pares de abrazaderas (férulas).
5. Llaves, martillos, destornilladores, herramientas e instrumentos eléctricos, etc.
(3)Instalación de bomba eléctrica:
1. El diagrama de instalación de la bomba eléctrica sumergible se muestra en la Figura 2. Las dimensiones de instalación específicas se muestran en la Tabla 3 "Lista de dimensiones de instalación de la bomba eléctrica sumergible".
2. Las bombas eléctricas sumergibles con una altura inferior a 30 metros se pueden izar directamente al pozo utilizando mangueras y cables metálicos u otros cables de cáñamo que puedan soportar todo el peso de toda la máquina, las tuberías de agua y el agua en las tuberías.
3. Las bombas con una altura de más de 30 metros utilizan tuberías de acero y la secuencia de instalación es la siguiente:
①Utilice una abrazadera para sujetar el extremo superior de la parte de la bomba de agua (el motor y la bomba de agua se han conectado en este momento), levántelo con una cadena colgante y átelo lentamente al pozo hasta que coloque la abrazadera en la boca del pozo y retire la cadena colgante.
② Utilice otro par de abrazaderas para sujetar un tubo, levántelo con una cadena colgante a 15 cm de la brida y bájelo lentamente. Entre la brida de la tubería y la brida de la bomba Coloque la almohadilla de goma en su lugar y apriete la tubería y la bomba de manera uniforme con pernos, tuercas y arandelas de resorte.
③ Levante ligeramente la bomba sumergible, retire la abrazadera en el extremo superior de la bomba de agua, ate el cable firmemente a la tubería de agua con una cinta plástica y átelo lentamente hasta que la abrazadera quede colocada en la boca del pozo.
④Utilice el mismo método para conectar todas las tuberías de agua al pozo.
⑤Después de conectar el cable de salida al interruptor de control, se conecta a la fuente de alimentación trifásica.
(4) Cosas a tener en cuenta durante la instalación:
1. Si se encuentra un fenómeno de atasco durante el proceso de bombeo, gire o tire de la tubería de agua para superar el punto de atasco. Si varias medidas aún no funcionan, no fuerce la bomba hacia abajo para evitar daños a la bomba eléctrica sumergible y al pozo.
2. Durante la instalación, se debe colocar una almohadilla de goma en la brida de cada tubería y apretarla uniformemente.
3. Cuando la bomba de agua se baja al pozo, debe colocarse en el medio de la tubería del pozo para evitar que la bomba funcione contra la pared del pozo durante mucho tiempo, lo que hace que la bomba vibre y el motor barre y quema. .
4. Determine la profundidad de la bomba de agua hasta el fondo del pozo de acuerdo con las condiciones del flujo de arena y limo del pozo. No entierre la bomba en el barro. La distancia desde la bomba de agua hasta el fondo del pozo generalmente no es inferior a 3 metros (ver Figura 2).
5. La profundidad de entrada de agua de la bomba de agua no debe ser inferior a 1-1,5 metros desde el nivel dinámico del agua hasta el nodo de entrada de agua (consulte la Figura 2). De lo contrario, los cojinetes de la bomba de agua podrían dañarse fácilmente.
6. La elevación de la bomba de agua no puede ser demasiado baja. De lo contrario, se debe instalar una válvula de compuerta en la tubería de agua de la boca del pozo para controlar el flujo de la bomba en el punto de flujo nominal y evitar que el motor se sobrecargue y se queme debido a grandes caudales.
7. Cuando la bomba de agua está funcionando, la salida de agua debe ser continua y uniforme, la corriente debe ser estable (en condiciones de trabajo nominales, generalmente no más del 10% de la corriente nominal) y no debe haber vibraciones ni ruidos. Si hay alguna anomalía, se debe detener la máquina para descubrir la causa y eliminarla.
8. Al realizar la instalación, preste atención a la configuración del cable de tierra del motor (consulte la Figura 2). Cuando la tubería de agua sea de acero, condúzcala desde la abrazadera del cabezal del pozo; Cuando la tubería de agua sea de plástico, condúzcala desde la marca de conexión a tierra de la bomba eléctrica.
- 1 submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
- 2 bombas de funcionamiento durante las primeras cuatro horas, se deben apagar rápidamente y probar la resistencia de aislamiento térmico del motor, el valor no debe ser inferior a 0,5 megaohmios.
- 3 pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
- 4 bomba en funcionamiento normal, para prolongar su vida útil, para verificar que el voltaje de suministro, la corriente de trabajo y la resistencia de aislamiento sean normales, si se encuentra la siguiente situación, se debe cerrar inmediatamente la solución de problemas.
- 1 en la condición nominal, la corriente es más del 20%.
- 2 nivel de agua dinámico a la sección de entrada de agua, provocando agua intermitente.
- 3 bomba sumergible vibraciones o ruidos severos.
- 4 el voltaje de suministro es inferior a 340 voltios.
- 5 fusibles quemaron una fase.
- 6 daños en tuberías de agua.
- 7 motor a la resistencia del aislamiento térmico es inferior a 0,5 megaohmios.
- 5. This product is a high-quality submersible pump, in addition to the efficient pumping function, but also easy to maintain and clean. The disassembly process is simple and clear, just follow the steps to untie the cable, remove the pipeline part, take off the line protection plate, loosen the water discharge bolt, remove the filter and loosen the fixing screw, separate the pump and the motor, and then remove the parts of the pump and the motor, pay attention to avoid damage. When assembling, thoroughly clean the components, apply sealant on the mating surface and fasteners, and then assemble in the opposite order. Every year or two years after immersion, check in accordance with the steps, replace the worn parts. This product has a reasonable structure, easy to operate, and is suitable for various occasions for pump needs.
1, saque el agua de la cavidad del motor (especialmente en invierno para evitar que el motor se congele) y ate bien el cable.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3. El uso prolongado debe prestar atención a la prevención de la oxidación de las bombas sumergibles.
- Impulso
- Camisa del eje
- Manguito de eje de goma
-
anillo de sellado
01 Toma de agua de pozo profundo
02 Suministro de agua en altura
03 suministro de agua de montaña
04 torre de agua
05 Riego agrícola
06 riego de jardines
07 toma de agua del río
08 agua sanitaria