QJP series special fountain pump is a special fountain pump developed by our factory. The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, has good magnetic conductivity, and does not produce heat when starting frequently. The two ends of the motor rotor are covered with alloy copper sleeves as lubricant. Stainless steel sleeves replace ball bearings, avoiding the problem of easy rust of ball bearings and burnout caused by motor lack of oil wear. Most suitable for music fountains, all models can be used flat.
The product is powered by three-phase AC 380V power supply, 50HZ pump, suitable for water temperature is not higher than 20 °C, solid impurities content is not greater than 0.01%, PH value between 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L water quality conditions. The product adopts closed or water-filled wet structure of the motor, before use the submersible motor chamber filled with clean water to prevent the occurrence of virtual filling. The submersible pump must be completely immersed in water operation, penetration depth shall not exceed 70 meters, to the bottom of the well distance shall not be less than 3 meters. The water flow in the well must meet the water requirements of the submersible pump and continuous operation, and the water output of the pump is controlled between 0.7-1.2 times the rated flow. The well should be vertical and the submersible pump can only be placed vertically, not horizontal or upside down. The submersible pump must be equipped with cables and external overload protection devices as required. It is strictly prohibited to conduct no-load test of the pump without water.
Model |
Axın (m3/h) |
Baş (m) |
Fırlanma sürəti (dəyişiklik/nöqtə) |
Waterpump (%) |
Çıxış Diametr (mm) |
Yaxşı tətbiq olunur diametri (mm) |
Qiymətləndirildi power(KW) |
Qiymətləndirildi gərginlik(V) |
Qiymətləndirildi cari (A) |
Motor səmərəliliyi (%) | power factorcosφ | Vahid Radial Maksimum ölçü (mm) |
Qeyd | |||||||||
300QJ200-40 | 200 | 40 | 2900 | 76 | 150 | 300yuxarıda | 37 | 380 | 77.8 | 85.0 | 0.85 | 281 | ||||||||||
300QJ200-60 | 60 | 55 | 115 | 85.5 | 0.85 | |||||||||||||||||
300QJ200-80 | 80 | 75 | 154.1 | 86.0 | 0.86 | |||||||||||||||||
300QJ200-100 | 100 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-120 | 120 | 100 | 204.3 | 86.5 | 0.86 | |||||||||||||||||
300QJ200-140 | 140 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ200-160 | 160 | 140 | 277.8 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-180 | 180 | 160 | 317.5 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-200 | 200 | 185 | 367.2 | 88.0 | 0.87 | |||||||||||||||||
300QJ200-240 | 240 | 220 | 436.6 | 88.0 | 0.87 | |||||||||||||||||
300QJ320-30 | 320 | 30 | 2900 | 77 | 200 | 300yuxarıda | 45 | 380 | 94.6 | 85.0 | 0.85 | 281 | ||||||||||
300QJ320-60 | 60 | 90 | 183.8 | 86.5 | 0.86 | |||||||||||||||||
300QJ320-90 | 90 | 125 | 249.5 | 87.5 | 0.87 | |||||||||||||||||
300QJ320-120 | 120 | 160 | 317.5 | 88.0 | 0.87 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, ciddi şəkildə nasos qaldırıcısının müddəalarına, istifadə axını diapazonuna uyğun olaraq, aşağı axın və ya yüksək qaldırıcı nasos gücünün qarşısını almaq üçün, rulman yatağı və aşınmanın digər hissələri, motorun həddindən artıq yüklənməsi yandı.
6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100MΩ, after the start to observe the voltage and current, check the motor winding insulation, whether it meets the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature motor
The pump parts of this product are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The product adopts water immersion wet three-phase asynchronous motor, the motor cavity is full of clean water, used to cool the motor and lubricate the bearing. The pressure regulating diaphragm set at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the water inside the body caused by the temperature rise of the motor. In order to prevent the sand particles from entering the motor, the upper end of the motor shaft extension is installed with two oil seals, and the sand ring is set to form a sand blocking structure. At the same time, in order to prevent the pump shaft from jumping when starting, the pump shaft is connected with the motor shaft through the coupling, and the bottom of the motor is equipped with a thrust bearing. The motor and pump bearing are lubricated by water. The stator winding of the motor adopts high quality submersible motor winding with high insulation performance. The pump design adopts computer CAD, with simple structure and good technical performance.

(1) Quraşdırmadan əvvəl hazırlıq:
1. Sualtı nasosun təlimatda göstərilən istifadə şərtlərinə və əhatə dairəsinə uyğun olub olmadığını yoxlayın.
2. Diametri sualtı nasosun maksimum xarici diametrinə bərabər olan ağır obyektdən istifadə edərək, quyunun daxili diametrinin sualtı nasosa uyğun olub-olmadığını ölçün və quyu dərinliyinin quraşdırma tələblərinə cavab verib-vermədiyini ölçün.
3. Quyu lüləsinin təmiz olub-olmadığını və quyu suyunun bulanıq olub olmadığını yoxlayın. Dalgıç elektrik nasosunun vaxtından əvvəl zədələnməsinin qarşısını almaq üçün heç vaxt sualtı nasosdan palçıq və qum suyunu yumaq üçün sualtı elektrik nasosundan istifadə etməyin.
4. Quyu başı quraşdırma qısqacının mövqeyinin uyğun olub olmadığını və onun bütün qurğunun keyfiyyətinə tab gətirə biləcəyini yoxlayın.
5. Sualtı nasos komponentlərinin tam olub olmadığını və təlimatdakı montaj diaqramına uyğun olaraq düzgün quraşdırılıb-quraşdırılmadığını yoxlayın. Filtr ekranını çıxarın və muftanın çevik şəkildə fırlandığını görmək üçün fırladın.
6. Su vintini açın və mühərrik boşluğunu təmiz, aşındırıcı olmayan su ilə doldurun (qeyd edin. doldurmağınızdan əmin olun), sonra su vintini sıxın. 12 saatlıq su vurulduqdan sonra, 500V silkələnmə masası ilə ölçüldükdə mühərrikin izolyasiya müqaviməti 150M Q-dan az olmamalıdır.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Əlavə edilmiş kabel naqillərinin diaqramı aşağıdakı kimidir:
8. Üç fazalı naqillərin qoşulub-qoşulmadığını və DC müqavimətinin təxminən balanslaşdırılmış olub olmadığını yoxlamaq üçün multimetrdən istifadə edin.
9. Dövrə və transformator tutumunun həddən artıq yüklənməsini yoxlayın və sonra həddindən artıq yükdən qorunma açarını və ya işə salma avadanlığını birləşdirin. Xüsusi modellər üçün Cədvəl 2-ə baxın, sonra nasosun çıxışından su nasosuna bir vedrə su tökün və nasosdakı rezin podşipnikləri yağlayın və sonra sualtı elektrik nasosunu dik və sabit şəkildə yerləşdirin. Başlayın (bir saniyədən çox olmayaraq) və sükan istiqamətinin sükan işarəsi ilə uyğun olub olmadığını yoxlayın. Əgər belə deyilsə, üç fazalı kabelin hər hansı iki birləşdiricisini dəyişdirin. Sonra filtri quraşdırın və quyuya enməyə hazır olun. Xüsusi hallarda (məsələn, arxlar, arxlar, çaylar, gölməçələr, gölməçələr və s.) istifadə edilərsə, elektrik nasosu etibarlı şəkildə torpaqlanmalıdır.
(2) Quraşdırma avadanlığı və alətləri:
1. İki tondan artıq yük üçün bir cüt qaldırıcı zəncir.
2. Şaquli hündürlüyü dörd metrdən az olmayan ştativ.
3. Bir tondan artıq çəkiyə tab gətirə bilən (su nasoslarının tam dəstinin ağırlığını daşıya bilən) iki asma kəndir (məftil).
4. İki cüt sıxac (spints) quraşdırın.
5. Açarlar, çəkiclər, tornavidalar, elektrik alətləri və alətləri və s.
(3) Elektrik nasosunun quraşdırılması:
1. Sualtı elektrik nasosunun quraşdırma diaqramı Şəkil 2-də göstərilmişdir. Xüsusi quraşdırma ölçüləri Cədvəl 3-də "Sualtı elektrik nasosunun quraşdırma ölçülərinin siyahısı" göstərilmişdir.
2. Başlığı 30 metrdən az olan sualtı elektrik nasosları bütün maşının, su borularının və borulardakı suyun tam çəkisini daşıya bilən şlanqlar və məftil kanatlardan və ya digər çətənə kəndirlərindən istifadə etməklə birbaşa quyuya qaldırıla bilər.
3. Başlığı 30 metrdən çox olan nasoslarda polad borulardan istifadə olunur və quraşdırma ardıcıllığı aşağıdakı kimidir:
①Su nasosu hissəsinin yuxarı ucunu sıxmaq üçün sıxacdan istifadə edin (motor və su nasosu bu zaman birləşdirilib), onu asma zəncirlə qaldırın və sıxacı quyunun ağzına taxana qədər yavaş-yavaş quyuya bağlayın. asma zəncir.
② Boru sıxmaq üçün başqa bir cüt sıxacdan istifadə edin, onu asma zəncirlə flanşdan 15 sm uzaqda qaldırın və yavaş-yavaş endirin. Boru flanşı ilə nasos flanşı arasında Rezin yastığı yerinə qoyun və boruyu sıxın və boltlar, qoz-fındıq və yay yuyucuları ilə bərabər şəkildə pompalayın.
③ Sualtı nasosu yüngülcə qaldırın, su nasosunun yuxarı ucundakı qısqacını çıxarın, kabeli plastik lentlə su borusuna möhkəm bağlayın və sıxac quyu ağzına yerləşdirilənə qədər yavaş-yavaş bağlayın.
④Bütün su borularını quyuya bağlamaq üçün eyni üsuldan istifadə edin.
⑤Çıxış kabeli idarəetmə açarına qoşulduqdan sonra o, üç fazalı enerji təchizatına qoşulur.
(4) Quraşdırma zamanı nəzərə alınmalı olanlar:
1. Nasos prosesi zamanı tıxanma hadisəsi aşkar edilərsə, tıxanma nöqtəsini aradan qaldırmaq üçün su borusunu döndərin və ya çəkin. Əgər müxtəlif tədbirlər hələ də nəticə vermirsə, sualtı elektrik nasosuna və quyuya zərər verməmək üçün nasosu məcbur etməyin.
2. Quraşdırma zamanı hər bir borunun flanşına rezin yastıq qoyulmalı və bərabər şəkildə sıxılmalıdır.
3. Su nasosu quyuya endirildikdə, nasosun uzun müddət quyu divarına qarşı işləməsinin, nasosun titrəməsinə və mühərrikin süpürülməsinə və yanmasına səbəb olmasının qarşısını almaq üçün onu quyu borusunun ortasına qoymaq lazımdır. .
4. Quyunun axan qum və lil şəraitinə uyğun olaraq su nasosunun quyunun dibinə qədər dərinliyini təyin edin. Pompanı palçığa basdırmayın. Su nasosundan quyunun dibinə qədər olan məsafə ümumiyyətlə 3 metrdən az deyil (Şəkil 2-ə baxın).
5. Su nasosunun suyun daxil olma dərinliyi dinamik su səviyyəsindən su giriş qovşağına qədər 1-1,5 metrdən az olmamalıdır (bax Şəkil 2). Əks halda, su nasosunun rulmanları asanlıqla zədələnə bilər.
6. Su nasosunun qaldırıcısı çox aşağı ola bilməz. Əks halda, böyük axın sürətlərinə görə mühərrikin həddindən artıq yüklənməsinin və yanmasının qarşısını almaq üçün nominal axın nöqtəsində nasos axınına nəzarət etmək üçün quyu ağzı su boru kəmərində qapı klapanının quraşdırılması lazımdır.
7. Su nasosu işləyərkən su çıxışı davamlı və bərabər olmalı, cərəyan sabit olmalıdır (nominal iş şəraitində, ümumiyyətlə nominal cərəyanın 10%-dən çox olmamalıdır), vibrasiya və səs-küy olmamalıdır. Hər hansı bir anormallıq varsa, səbəbi tapmaq və aradan qaldırmaq üçün maşın dayandırılmalıdır.
8. Quraşdırarkən, mühərrikin torpaqlama naqilinin quraşdırılmasına diqqət yetirin (Şəkil 2-ə baxın). Su borusu polad boru olduqda, onu quyu ağzı sıxacından aparın; su borusu plastik boru olduqda, onu elektrik nasosunun torpaqlama işarəsindən aparın.
- 1 submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
- İlk dörd saat ərzində 2 nasosun işləməsi, mühərrikin istilik izolyasiya müqavimətini tez bir zamanda bağlamaq lazımdır, dəyəri 0,5 meqaohm-dan az olmamalıdır.
- 3 pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
- 4 nasosu normal işə salın, xidmət müddətini uzatmaq, təchizatı gərginliyini, iş cərəyanını və izolyasiya müqavimətini yoxlamaq üçün normaldır, aşağıdakı vəziyyət aşkar edilərsə, problemlərin aradan qaldırılmasını dərhal dayandırmalıdır.
- Nominal vəziyyətdə 1, cərəyan 20% -dən çoxdur.
- 2 dinamik su səviyyəsi su giriş hissəsinə, fasilələrlə suya səbəb olur.
- 3 sualtı nasos güclü vibrasiya və ya səs-küy.
- 4 təchizatı gərginliyi 340 voltdan aşağıdır.
- 5 qoruyucu bir faza yandı.
- 6 su borusunun zədələnməsi.
- 7 motorun istilik izolyasiya müqaviməti 0,5 meqaohmdan azdır.
- 5. This product is a high-quality submersible pump, in addition to the efficient pumping function, but also easy to maintain and clean. The disassembly process is simple and clear, just follow the steps to untie the cable, remove the pipeline part, take off the line protection plate, loosen the water discharge bolt, remove the filter and loosen the fixing screw, separate the pump and the motor, and then remove the parts of the pump and the motor, pay attention to avoid damage. When assembling, thoroughly clean the components, apply sealant on the mating surface and fasteners, and then assemble in the opposite order. Every year or two years after immersion, check in accordance with the steps, replace the worn parts. This product has a reasonable structure, easy to operate, and is suitable for various occasions for pump needs.
1, motor boşluğundakı suyu söndürün (xüsusilə qışda motorun donmasının qarşısını almaq üçün) və kabeli yaxşı bağlayın.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, uzunmüddətli istifadə dalgıç nasosların pas qarşısının alınmasına diqqət yetirməlidir.
- Pervane
- Mil qolu
- Rezin şaft qolu
-
Sızdırmazlıq halqası
01 Dərin quyu suyunun qəbulu
02 Hündür mərtəbəli su təchizatı
03 dağ su təchizatı
04 qüllə suyu
05 Kənd təsərrüfatının suvarılması
06 bağçanın suvarılması
07 çay suqəbuledici
08 məişət suyu