Pompë zhytëse në pus të thellë 200QJ

Ndërmerrni përpunimin OEM! Sipas kërkesave të përdoruesit, projektimi dhe prodhimi i llojeve të ndryshme të kërkesave të veçanta të motorit dhe pompës zhytëse jo standarde. Standardet e zbatimit të produktit: GB/T2816-2014 "pompë e zhytur pusi", GB/T2818-2014 "Motor asinkron i zhytur pusi". WhatsApp: 17855846335
PDF DOWNLOAD
Detajet
Etiketat
 
Përmbledhja e artikullit

QJ series submersible pump is a kind of water lifting machine directly connected to the submersible motor and pump to work in the water. This series of pumps is vertical, small use area, compact structure, easy installation, easy maintenance and repair. Widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage and industrial and mining enterprises, drought relief and flood drainage and other fields. Flow range of 5-500m3/h, lift of 4-800m, power 3-315KW. The QJ series submersible pump has stable and reliable performance, suitable for various needs of pump applications.

 
Kushtet e Perdorimit

1, furnizimi me energji elektrike: AC trefazor 380V (toleranca + / - 5%), 50HZ (toleranca + / - 1%).

2, cilësia e ujit:

(1) water temperature is not higher than 20 °C;

(2) përmbajtja e papastërtive të ngurta (raporti i masës) nuk është më i madh se 0,01%;

(3) Vlera e PH (pH) 6,5-8,5;

(4) përmbajtja e sulfurit të hidrogjenit nuk është më e madhe se 1.5 mg/L;

(5) përmbajtja e joneve të klorurit nuk është më e madhe se 400 mg/L.

3, the motor is closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use.

4, pompa zhytëse duhet të zhytet plotësisht në ujë, thellësia e zhytjes nuk është më e madhe se 70 m, fundi i pompës zhytëse nga fundi i pusit nuk është më pak se 3 m.

5, rrjedha e ujit të pusit duhet të jetë në gjendje të përmbushë prodhimin e ujit të pompës zhytëse dhe funksionimin e vazhdueshëm, prodhimi i ujit të pompës zhytëse duhet të kontrollohet në 0,7 - 1,2 herë më shumë se rrjedha e vlerësuar.

6, pusi duhet të jetë i drejtë, pompa zhytëse nuk mund të përdoret ose të hidhet, vetëm përdorimi vertikal.

7, pompa zhytëse duhet të përputhet me kabllon sipas kërkesave dhe pajisjen e jashtme të mbrojtjes nga mbingarkesa.

8, the pump is strictly prohibited without water no-load test machine.

 

 
Kuptimi i modelit

200QJ Deep Well Submersible Pump

 
Referenca e pjesshme e modelit
Model Rrjedha (m3/h) kokë
(m)

Shpejtësia e rrotullimit

(ndryshim/pikë)

Pompë uji(%)  Prizë
diametri
(mm)
E zbatueshme mirë
diametri (mm) 
 Vlerësuar
power(KW)
Vlerësuar
tension (V)
Vlerësuar
aktuale(A)
Efikasiteti motorik (%) power factorcosφ   Njësia
Madhësia maksimale radiale (mm)
Vërejtje
200QJ20-40 20 40 2850 66 50  200sipër 4 380 10.1 76.0 0.79 184  
200QJ20-54 54 5.5 13.6 77.0 0.8  
200QJ20-81 81 7.5 18.0 78.0 0.81  
200QJ20-93 93 9.2 21.7 78.5 0.82  
200QJ20-108 108 11 25.8 79.0 0.82  
200QJ20-121 121 13 29.8 80.0 0.83  
200QJ20-148 148 15 33.9 81.0 0.83  
200QJ20-175 175 18.5 41.6 81.5 0.83  
200QJ20-202 202 22 48.2 82.5 0.84  
200QJ20-243 243 25 54.5 83.0 0.84  
200QJ20-270 270 30 65.4 83.0 0.84  
200QJ20-360 360 37 79.7 84.0 0.84  
200QJ20-442 442 45 96.9 84.0 0.84  
200QJ25-28 25 28 2850 68 65  200sipër 4 380 10.1 76.0 0.79 184  
200QJ25-42 42 5.5 13.6 77.0 0.8  
200QJ25-56 56 7.5 18.0 78.0 0.81  
200QJ25-70 70 9.2 21.7 78.5 0.82  
200QJ25-98 98 11 25.8 79.0 0.82  
200QJ25-112 25 112 2850 68 65  200sipër 13 380 29.8 80.0 0.83 184  
200QJ25-126 126 15 33.9 81.0 0.83  
200QJ25-154 154 18.5 41.6 81.5 0.83  
200QJ25-182 182 22 48.2 82.5 0.84  
200QJ25-210 210 25 54.5 83.0 0.84  
200QJ25-252 252 30 65.4 83.0 0.84  
200QJ25-308 308 37 79.7 84.0 0.84  
200QJ25-378 378 45 96.9 84.0 0.84  
200QJ32-26 32 26 2850 70 80  200sipër 4 380 10.1 76.0 0.79 184  
200QJ32-39 39 5.5 13.6 77.0 0.8  
200QJ32-52 52 7.5 18.0 78.0 0.81  
200QJ32-65 65 9.2 21.7 78.5 0.82  
200QJ32-78 78 11 25.8 79.0 0.82  
200QJ32-91 91 13 29.8 80.0 0.83  
200QJ32-104 104 15 33.9 81.0 0.83  
200QJ32-130 130 18.5 41.6 81.5 0.83  
200QJ32-143 143 22 48.2 82.5 0.84  
200QJ32-169 169 25 54.5 83.0 0.84  
200QJ32-195 195 30 65.4 83.0 0.84  
200QJ32-247 247 37 79.7 84.0 0.84  
200QJ32-299 299 45 96.9 84.0 0.84  
200QJ40-26 40 26 2850 72 80  200sipër 5.5 380 13.6 77.0 0.8 184  
200QJ40-39 39 7.5 18.0 78.0 0.81  
200QJ40-52 52 9.2 21.7 78.5 0.82  
200QJ40-65 65 11 25.8 79.0 0.82  
200QJ40-78 78 15 33.9 81.0 0.83  
200QJ40-104 104 18.5 41.6 81.5 0.83  
200QJ40-117 117 22 48.2 82.5 0.84  
200QJ40-143 143 25 54.5 83.0 0.84  
200QJ40-169 169 30 65.4 83.0 0.84  
200QJ40-208 208 37 79.7 84.0 0.84  
200QJ40-247 247 45 96.9 84.0 0.84  
200QJ50-26 50 26 2850 74 80  200sipër 5.5 380 13.6 77.0 0.8 184  
200QJ50-39 39 9.2 21.7 78.5 0.82  
200QJ50-52 52 11 25.8 79.0 0.82  
200QJ50-65 65 15 33.9 81.0 0.83  
200QJ50-78 78 18.5 41.6 81.5 0.83  
200QJ50-91 91 22 48.2 82.5 0.84  
200QJ50-104 104 25 54.5 83.0 0.84  
200QJ50-130 130 30 65.4 83.0 0.84  
200QJ50-156 156 37 79.7 84.0 0.84  
200QJ50-208 208 45 96.9 84.0 0.84  
200QJ63-24 63 24 2850 74 80  200sipër 7.5 380 18.0 78.0 0.81 184  
200QJ63-36 36 11 25.8 79.0 0.82  
200QJ63-60 60 18.5 41.6 81.5 0.83  
200QJ63-72 72 22 48.2 82.5 0.84  
200QJ63-84 84 25 54.5 83.0 0.84  
200QJ63-96 96 30 65.4 83.0 0.84  
200QJ63-120 120 37 79.7 84.0 0.84  
200QJ63-144 144 45 96.9 84.0 0.84  
200QJ80-22 80 22 2850 75 100  200sipër 7.5 380 18.0 78.0 0.81 184  
200QJ80-33 33 11 25.8 79.0 0.82  
200QJ80-44 44 15 33.9 81.0 0.83  
200QJ80-55 55 18.5 41.6 81.5 0.83  
200QJ80-66 66 22 48.2 82.5 0.84  
200QJ80-88 88 30 65.4 83.0 0.84  
200QJ80-99 99 37 79.7 84.0 0.84  
200QJ80-121 121 45 96.9 84.0 0.84  
200QJ100-18 100 18 2850 75 100  200sipër 9.2 380 21.7 78.5 0.82 184  
200QJ100-27 27 13 29.8 80.0 0.83  
200QJ100-36 36 18.5 41.6 81.5 0.83  
200QJ100-45 45 22 48.2 82.5 0.84  
200QJ100-54 54 25 54.5 83.0 0.84  
200QJ100-63 63 30 65.4 83.0 0.84  
200QJ100-72 100 72 2850 75 100  200sipër 37 380 79.7 84.0 0.84 184  
200QJ100-90 90 45 96.9 84.0 0.84  

 

 

 
Masat e sigurise

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, rreptësisht në përputhje me dispozitat e ashensorit të pompës, diapazoni i përdorimit të rrjedhës, për të parandaluar rrjedhën e ulët ose forcën e pompimit të ngritjes së lartë, kushinetat e shtytjes dhe pjesët e tjera të konsumit, mbingarkesa e motorit u dogj 6, pas pompës poshtë pusit, matja e motorit ndaj rezistencës së izolimit të tokës nuk duhet të jetë më pak se 100M, pas fillimit për të vëzhguar tensionin dhe rrymën, kontrolloni izolimin e mbështjelljes së motorit, nëse është në përputhje me kërkesat; Temperatura e magazinimit të pompës nëse është më pak se pika e ngrirjes, duhet të thahet uji i zgavrës së motorit, parandalimi i dëmtimit të akullit të ujit në zgavrën e motorit të shkaktuar nga temperatura e ulët.

 

 
Hyrje në Strukturë

Structure brief: pump part is mainly composed of pump shaft, impeller, diversion shell, rubber bearing, check valve body (optional parts) and other components.The motor part is mainly composed of base, pressure regulating film, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, cable and other components.


Karakteristikat kryesore të produktit përfshijnë:

 1, Motori është një motor asinkron trefazor zhytës i lagësht i mbushur me ujë, zgavra e motorit është plot me ujë të pastër, përdoret për të ftohur motorin dhe lubrifikimin e kushinetës, filmi rregullues i presionit në fund të motorit përdoret për të rregulluar diferenca e presionit të zgjerimit dhe tkurrjes së ujit brenda trupit të shkaktuar nga ndryshimi i rritjes së temperaturës së motorit.

 2, Për të parandaluar që rëra në ujin e pusit të hyjë në motor, fundi i sipërm i boshtit të motorit është i pajisur me dy vula vaji dhe është instaluar një unazë rëre për të formuar një strukturë parandaluese të rërës.

 3, Për të parandaluar që boshti i pompës të funksionojë gjatë fillimit, boshti i pompës dhe boshti i motorit janë të lidhur me një bashkim, dhe një kushinetë e sipërme shtytëse është instaluar në pjesën e poshtme të motorit.

 4, Lubrifikimi i motorit dhe kushinetës së pompës është lubrifikimi i ujit.

 5, Dredha-dredha e statorit të motorit është bërë nga tela mbështjellëse motorike zhytëse me cilësi të lartë, me performancë të lartë izolimi.

 6, Pompa është projektuar nga kompjuteri CAD, me strukturë të thjeshtë dhe performancë të mirë teknike.

200QJ Deep Well Submersible Pump
 
Instaloni

(1) Përgatitja para instalimit:
1. Kontrolloni nëse pompa zhytëse plotëson kushtet e përdorimit dhe shtrirjen e specifikuar në manual.
2. Duke përdorur një objekt të rëndë me një diametër të barabartë me diametrin maksimal të jashtëm të pompës zhytëse, matni nëse diametri i brendshëm i gropës së pusit mund të përshtatet me pompën zhytëse dhe mat nëse thellësia e pusit plotëson kërkesat e instalimit.
3. Kontrolloni nëse pusi është i pastër dhe nëse uji i pusit është i turbullt. Asnjëherë mos përdorni një pompë elektrike zhytëse për të larë baltën e pompës dhe ujin me rërë për të shmangur dëmtimin e parakohshëm të pompës elektrike zhytëse.
4. Kontrolloni nëse pozicioni i kapëses së instalimit të ballinës është i përshtatshëm dhe nëse mund të përballojë cilësinë e të gjithë njësisë
5. Kontrolloni nëse komponentët e pompës zhytëse janë të plotë dhe të instaluar siç duhet sipas diagramit të montimit në manual Hiqni ekranin e filtrit dhe rrotulloni bashkimin për të parë nëse rrotullohet në mënyrë fleksibël
6. Zhvidhosni vidën e ujit dhe mbushni zgavrën e motorit me ujë të pastër dhe jo gërryes (vini re. sigurohuni që ta mbushni lart), më pas shtrëngoni vidën e ujit. Pas 12 orësh injektim uji, rezistenca e izolimit të motorit nuk duhet të jetë më e vogël se 150 M Q kur matet me një tavolinë tundëse 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagrami i bashkangjitur i procesit të lidhjes së kabllove është si më poshtë:
200QJ Deep Well Submersible Pump

 

8. Përdorni një multimetër për të kontrolluar nëse telat trefazorë janë të lidhur dhe nëse rezistenca DC është afërsisht e balancuar.
9. Kontrolloni nëse qarku dhe kapaciteti i transformatorit janë të mbingarkuar dhe më pas lidhni çelësin e mbrojtjes nga mbingarkesa ose pajisjet e ndezjes. Shih Tabelën 2 për modele specifike dhe më pas Hidhni një kovë me ujë në pompën e ujit nga dalja e pompës së ujit për të lubrifikuar kushinetat e gomës në pompë dhe më pas vendoseni pompën elektrike zhytëse drejt dhe të qëndrueshme. Filloni (jo më shumë se një sekondë) dhe kontrolloni nëse drejtimi i drejtimit është në përputhje me shenjën e drejtimit. Nëse jo, ndërroni çdo dy lidhës të kabllit trefazor. Më pas instaloni filtrin dhe përgatituni të zbrisni në pus. Nëse përdoret në raste të veçanta (të tilla si kanale, kanale, lumenj, pellgje, pellgje, etj.), pompa elektrike duhet të jetë e tokëzuar në mënyrë të besueshme.

 

(2) Pajisjet dhe mjetet e instalimit:
1. Një palë zinxhirë ngritës për më shumë se dy tonë.
2. Trekëmbësh me lartësi vertikale jo më pak se katër metra.
3. Dy litarë të varur (litarë teli) që mund të mbajnë një peshë më shumë se një ton (mund të mbajnë peshën e një grupi të plotë pompash uji).
4. Instaloni dy palë kapëse (shanga).
5. Çelësat, çekiçët, kaçavidat, veglat dhe instrumentet elektrike etj.

 

(3) Instalimi i pompës elektrike:
1. Diagrami i instalimit të pompës elektrike zhytëse është paraqitur në figurën 2. Dimensionet specifike të instalimit janë paraqitur në tabelën 3 "Lista e dimensioneve të instalimit të pompës elektrike zhytëse".

 

2. Pompat elektrike zhytëse me kokë më pak se 30 metra mund të ngrihen direkt në pus duke përdorur zorrë dhe litarë teli ose litarë të tjerë kërpi që mund të mbajnë peshën e plotë të të gjithë makinës, tubacioneve të ujit dhe ujit në tuba.

 

3. Pompat me kokë më shumë se 30 metra përdorin tuba çeliku dhe sekuenca e instalimit është si më poshtë:
①Përdorni një kapëse për të mbërthyer skajin e sipërm të pjesës së pompës së ujit (motori dhe pompa e ujit janë lidhur në këtë moment), ngrijeni atë me një zinxhir të varur dhe lidheni ngadalë në pus derisa Vendoseni kapësin në krye të pusit dhe hiqni zinxhir i varur.
② Përdorni një palë tjetër kapëse për të mbërthyer një tub, ngrijeni atë me një zinxhir të varur 15 cm larg nga fllanxha dhe uleni ngadalë. Midis fllanxhës së tubit dhe fllanxhës së pompës Vendosni mbulesën e gomës në vend dhe shtrëngoni tubin dhe pomponi në mënyrë të barabartë me bulona, ​​dado dhe rondele me susta.
③ Ngrini pak pompën zhytëse, hiqni kapësen në skajin e sipërm të pompës së ujit, lidhni kabllon fort në tubin e ujit me një shirit plastik dhe lidheni ngadalë derisa kapësja të vendoset në grykën e pusit.
④Përdorni të njëjtën metodë për të lidhur të gjithë tubat e ujit në pus.
⑤Pasi kablloja dalëse lidhet me çelësin e kontrollit, lidhet me furnizimin me energji trefazore.


(4) Gjërat që duhen mbajtur parasysh gjatë instalimit:
1. Nëse zbulohet një fenomen bllokimi gjatë procesit të pompimit, kthejeni ose tërhiqni tubin e ujit për të kapërcyer pikën e bllokimit. Nëse masat e ndryshme ende nuk funksionojnë, ju lutemi, mos e detyroni pompën të ulet për të shmangur dëmtimin e pompës elektrike zhytëse dhe të pusit.
2. Gjatë instalimit, një jastëk gome duhet të vendoset në fllanxhën e çdo tubi dhe të shtrëngohet në mënyrë të barabartë.
3. Kur pompa e ujit ulet në pus, ajo duhet të vendoset në mes të tubit të pusit për të parandaluar që pompa të funksionojë kundër murit të pusit për një kohë të gjatë, duke shkaktuar që pompa të dridhet dhe motori të fshihet dhe digjet. .
4. Përcaktoni thellësinë e pompës së ujit në fund të pusit sipas kushteve të rrjedhjes së rërës dhe baltës së pusit. Mos e varrosni pompën në baltë. Distanca nga pompa e ujit në fund të pusit në përgjithësi nuk është më pak se 3 metra (shih Figurën 2).
5. Thellësia e hyrjes së ujit të pompës së ujit duhet të jetë jo më pak se 1-1,5 metra nga niveli dinamik i ujit në nyjen e hyrjes së ujit (shih Figurën 2). Përndryshe, kushinetat e pompës së ujit mund të dëmtohen lehtësisht.
6. Ngritja e pompës së ujit nuk mund të jetë shumë e ulët. Përndryshe, një valvul porta duhet të instalohet në tubacionin e ujit në krye të pusit për të kontrolluar rrjedhën e pompës në pikën e vlerësuar të rrjedhës për të parandaluar mbingarkimin dhe djegien e motorit për shkak të shpejtësive të mëdha të rrjedhës.
7. Kur pompa e ujit është në punë, dalja e ujit duhet të jetë e vazhdueshme dhe e barabartë, rryma duhet të jetë e qëndrueshme (në kushte të vlerësuara të punës, përgjithësisht jo më shumë se 10% e rrymës së vlerësuar), dhe nuk duhet të ketë dridhje ose zhurmë. Nëse ka ndonjë anomali, makina duhet të ndalet për të zbuluar shkakun dhe për ta eliminuar atë.
8. Gjatë instalimit, kushtojini vëmendje cilësimit të telit të tokëzimit të motorit (shih Figurën 2). Kur tubi i ujit është një tub çeliku, nxirreni atë nga kapësja e kokës së pusit; kur tubi i ujit është një tub plastik, nxirreni atë nga shenja e tokëzimit të pompës elektrike.

 

 
Mirëmbajtja dhe Mirëmbajtja
  1. (1)After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate after the start, and observe whether the pump has noise and vibration phenomenon. If everything is normal, it can be put into operation.
  2. (2) After the first operation of the pump for four hours, the motor should be shut down to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
  3. (3) After the pump is shut down, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
  4. (4)After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, running current and insulation resistance are normal.If the following conditions are found, the pump should be shut down immediately to eliminate the fault:
  5. 1 under the rated working conditions, the current exceeds 20%;
  6. 2 the dynamic water level drops to the water inlet part, resulting in intermittent drainage;
  7. 3 the submersible pump vibrates seriously or emits huge noise;
  8. 4 the supply voltage is lower than 340 volts;
  9. 5 a fuse is blown out;
  10. 6 the water pipe is damaged;
  11. 7 the thermal insulation resistance between the motor and the ground is less than 0.5 megaohm. The discovery of these problems need to be handled in time to ensure the normal operation of the pump, improve its reliability, so as to ensure the stable operation of the equipment for a long time.

 

(5)unit disassembly:

 1 untie the cable tie, remove the pipeline part, remove the wire plate.

 2 vidhosni bulonën e ujit, vendosni ujin në dhomën e motorit.

 3 remove the filter, loose the fixing screw on the coupling to fix the motor shaft.

 4 screw down the bolt connecting the water inlet section with the motor, separate the pump and the motor (pay attention to the unit cushion when separating, prevent the bending of the pump shaft)

 5 pump disassembly sequence is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, avoid bending the pump shaft and each part in the disassembly process.

 6 motor disassembly process is: (see figure 1) place the motor on the platform, and remove the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt from the bottom of the motor in turn. Then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and the upper guide bearing seat.

 7 unit assembly: Before assembly, the rust and dirt of the parts should be cleaned, and the mating surfaces and fasteners should be coated with sealant. Then they should be assembled in the reverse order of disassembly (the up and down momentum of the motor shaft is about 1 mm after assembly). After assembly, the coupling should be flexible, and then the filter screen test machine.

  1. The submersible pump should be dismantled and repaired according to Article 5 for each operation year, or less than one year, but the submersible time has reached two years, and the worn parts should be replaced.

 

 
Magazinimi dhe ruajtja

 1, fikeni ujin në zgavrën e motorit (veçanërisht në dimër për të parandaluar ngrirjen e motorit) dhe lidheni mirë kabllon.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, përdorimi afatgjatë duhet t'i kushtojë vëmendje parandalimit të ndryshkut të pompave zhytëse.

 

 
Pjesë të veshura
  • Shtytës
  • Mëngë bosht
  • Mëngë e boshtit të gomës
  • Unaza mbyllëse

 
Skenarët e aplikimit

01 Marrja e ujit në pus të thellë

02 Furnizimi me ujë të lartë

03 Ujësjellësi malor 

04 uji i kullës

05 Ujitje bujqësore

06 ujitje kopshti

07 marrja e ujit të lumit

08 ujë shtëpiak

 

Nëse jeni të interesuar për produktet tona, mund të zgjidhni të lini informacionin tuaj këtu dhe ne do t'ju kontaktojmë së shpejti.


Shkruani mesazhin tuaj këtu dhe na dërgoni

Nëse jeni të interesuar për produktet tona, mund të zgjidhni të lini informacionin tuaj këtu dhe ne do t'ju kontaktojmë së shpejti.


sqAlbanian