Pompë zhytëse 175QJP Peep Well

Ndërmerrni përpunimin OEM! Sipas kërkesave të përdoruesit, projektimi dhe prodhimi i llojeve të ndryshme të kërkesave të veçanta të motorit dhe pompës zhytëse jo standarde. Standardet e zbatimit të produktit: GB/T2816-2014 "pompë e zhytur pusi", GB/T2818-2014 "Motor asinkron i zhytur pusi". WhatsApp: 17855846335
PDF DOWNLOAD
Detajet
Etiketat
 
Përmbledhja e artikullit

QJP series fountain pump is a special pump for fountain developed by our factory.The pump motor core is made of high quality cold rolled silicon steel, which makes the pump more efficient, good magnetic conductivity, and frequent start will not fever.Both ends of the motor rotor use water as lubricant alloy copper sleeve.Stainless steel sleeve instead of ball bearings, to avoid the problem of easy rust ball bearings and lack of oil wear and tear the motor.The most suitable for music fountain use, all models can be used.

 

 
Kushtet e Perdorimit

This product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply system. Applicable water quality conditions include water temperature not exceeding 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value (pH) is 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor is a closed or water-filled wet structure. Before use, it must be filled with clean water to prevent false filling, and then tighten the water injection and exhaust bolts, otherwise it is not allowed to use. The submersible pump must be completely immersed in water, and the penetration depth shall not exceed 70m. The distance between the submersible pump base and the bottom of the well shall not be less than 3m. The well flow shall be able to meet the water output and continuous operation of the submersible pump. The water output of the submersible pump shall be controlled at 0.7-1.2 times of the rated flow. The well shall be vertical, and the submersible pump can not be used horizontally or upside down, but only vertically. The submersible pump shall be equipped with cables and external overload protection devices as required. The pump is strictly prohibited from no-load test without water.

 

 
Kuptimi i modelit

175QJP Peep Well Submersible Pump

 
Referenca e pjesshme e modelit
Model Rrjedha (m3/h) kokë
(m)

Shpejtësia e rrotullimit

(ndryshim/pikë)

Pompë uji(%)  Prizë
diametri
(mm)
E zbatueshme mirë
diametri (mm) 
 Vlerësuar
power(KW)
Vlerësuar
tension (V)
Vlerësuar
aktuale(A)
Efikasiteti motorik (%) power factorcosφ   Njësia
Madhësia maksimale radiale (mm)
175QJ10-42 10 42 2850 53 50  175sipër 3 380 7.8 74.0 0.79 168
175QJ10-56 56 4 10.1 76.0 0.79
175QJ10-70 70 4 10.1 76.0 0.79
175QJ10-84 84 5.5 13.6 77.0 0.8
175QJ10-112 112 7.5 18.4 77.5 0.8
175QJ10-126 126 7.5 18.4 77.5 0.8
175QJ10-140 140 9.2 22.1 78.0 0.81
175QJ15-42 15 42 2850 58 50  175sipër 4 380 10.1 76.0 0.79 168
175QJ15-55 55 5.5 13.6 77.0 0.8
175QJ15-65 65 5.5 13.6 77.0 0.8
175QJ15-85 85 7.5 18.4 77.5 0.8
175QJ15-112 112 9.2 22.1 78.0 0.81
175QJ20-26 20 26 2850 64 50  175sipër 3 380 7.8 74.0 0.79 168
175QJ20-39 39 4 10.1 76.0 0.79
175QJ20-52 52 5.5 13.6 77.0 0.8
175QJ20-78 78 7.5 18.4 77.5 0.8
175QJ20-91 91 9.2 22.1 78.0 0.81
175QJ20-104 104 11 26.1 79.0 0.81
175QJ20-130 130 13 30.1 80.0 0.82
175QJ20-156 156 15 34.7 80.0 0.82
175QJ20-182 187 18.5 42.6 80.5 0.82
175QJ20-208 208 22 49.7 81.0 0.83
175QJ20-247 247 25 56.5 81.0 0.83
175QJ20-273 273 30 66.6 81.5 0.84
175QJ20-299 299 30 66.6 81.5 0.84
175QJ20-325 325 32 71.0 81.5 0.84
175QJ20-364 364 37 82.1 81.5 0.84
175QJ25-26 25 26 2850 66 65  175sipër 3 380 7.8 74.0 0.79 168
175QJ25-39 39 5.5 13.6 77.0 0.8
175QJ25-65 25 65 2850 66 65  175sipër 7.5 380 18.4 77.5 0.8 168
175QJ25-78 78 9.2 22.1 78.0 0.81
175QJ25-91 91 11 26.1 79.0 0.81
175QJ25-104 104 13 30.1 80.0 0.82
175QJ25-130 130 15 34.7 80.0 0.82
175QJ25-156 156 18.5 42.6 80.5 0.82
175QJ25-182 182 22 49.7 81.0 0.83
175QJ25-208 208 25 56.5 81.0 0.83
175QJ25-221 221 30 66.6 81.5 0.84
175QJ25-247 247 30 66.6 81.5 0.84
175QJ25-260 260 32 71.0 81.5 0.84
175QJ25-299 299 37 82.1 81.5 0.84
175QJ30-30 30 30 2850 67 80  175sipër 4 380 10.1 76.0 0.79 168
175QJ30-40 40 5.5 13.6 77.0 0.8
175QJ32-24 32 24 2850 67 80  175sipër 4 380 10.1 76.0 0.79 168
175QJ32-36 36 5.5 13.6 77.0 0.8
175QJ32-48 48 7.5 18.4 77.5 0.8
175QJ32-60 60 9.2 22.1 78.0 0.81
175QJ32-72 72 11 26.1 79.0 0.81
175QJ32-84 84 13 30.1 80.0 0.82
175QJ32-96 96 15 34.7 80.0 0.82
175QJ32-120 120 18.5 42.6 80.5 0.82
175QJ32-144 144 22 49.7 81.0 0.83
175QJ32-168 168 25 56.5 81.0 0.83
175QJ32-180 180 30 66.6 81.5 0.84
175QJ32-192 192 30 66.6 81.5 0.84
175QJ32-204 204 32 71.0 81.5 0.84
175QJ32-240 240 37 82.1 81.5 0.84
175QJ35-60 35 60 2850 67 80  175sipër 10 380 25.0 78.0 0.78 168
175QJ35-75 75 13 30.1 80.0 0.82
175QJ35-100 100 17 40.9 80.0 0.79
175QJ40-24 40 24 2850 70 80  175sipër 5.5 380 13.6 77.0 0.8 168
175QJ40-30 30 5.5 13.6 77.0 0.8
175QJ40-36 36 7.5 18.4 77.5 0.8
175QJ40-48 48 9.2 22.1 78.0 0.81
175QJ40-60 60 11 26.1 79.0 0.81
175QJ40-72 72 13 30.1 80.0 0.82
175QJ40-84 84 15 34.7 80.0 0.82
175QJ40-96 96 18.5 42.6 80.5 0.82
175QJ40-120 120 22 49.7 81.0 0.83
175QJ40-132 132 25 56.5 81.0 0.83
175QJ40-144 144 30 66.6 81.5 0.84
175QJ40-156 156 30 66.6 81.5 0.84
175QJ40-168 168 32 71.0 81.5 0.84
175QJ40-192 192 37 82.1 81.5 0.84
175QJ50-24 50 24 2850 72 80  175sipër 5.5 380 13.6 77.0 0.8 168
175QJ50-36 36 9.2 22.1 78.0 0.81
175QJ50-48 48 11 26.1 79.0 0.81
175QJ50-60 60 13 30.1 80.0 0.82
175QJ50-70 70 17 40.9 80.0 0.79
175QJ50-84 84 18.5 42.6 80.5 0.82
175QJ50-96 96 22 49.7 81.0 0.83
175QJ50-108 108 25 56.5 81.0 0.83
175QJ50-120 120 30 66.6 81.5 0.84
175QJ50-132 132 30 66.6 81.5 0.84
175QJ50-144 144 32 71.0 81.5 0.84
175QJ50-156 156 37 82.1 81.5 0.84
175QJ63-22 63 22 2850 72 80  175sipër 7.5 380 18.4 77.5 0.8 168
175QJ63-44 44 13 30.1 80.0 0.82
175QJ63-55 55 15 34.7 80.0 0.82
175QJ63-66 66 18.5 42.6 80.5 0.82
175QJ63-77 77 22 49.7 81.0 0.83
175QJ63-88 88 25 56.5 81.0 0.83
175QJ63-99 63 99 2850 72 80  175sipër 30 380 66.6 81.5 0.84 168
175QJ63-110 110 32 71.0 81.5 0.84
175QJ63-132 132 37 82.1 81.5 0.84
175QJ80-9 80 9 2850 73 100  175sipër 4 380 10.1 76.0 0.79 168
175QJ80-18 18 7.5 18.4 77.5 0.8
175QJ80-27 27 11 26.1 79.0 0.81
175QJ80-36 36 15 34.7 80.0 0.82
175QJ80-45 45 18.5 42.6 80.5 0.82
175QJ80-54 54 22 49.7 81.0 0.83
175QJ80-63 63 25 56.5 81.0 0.83
175QJ80-72 72 25 56.5 81.0 0.83
175QJ80-81 81 30 66.6 81.5 0.84
175QJ80-90 90 32 71.0 81.5 0.84
175QJ80-98 98 37 82.1 81.5 0.84

 

 
Masat e sigurise

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, rreptësisht në përputhje me dispozitat e ashensorit të pompës, diapazoni i rrjedhës së përdorimit, për të parandaluar rrjedhën e ulët ose forcën e pompimit të lartë të ngritjes, kushinetën e shtytjes dhe pjesët e tjera të konsumit, mbingarkesa motorike e djegur

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Hyrje në Strukturë

The pump part is mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor part mainly includes base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand ring, water inlet section, lead cable and other components. The main features of the product include: the motor is a water immersed wet three-phase asynchronous motor, the motor cavity is full of water, used to cool the motor and lubricate the bearing; the pressure regulating film at the bottom of the motor is used to adjust the expansion and contraction pressure difference of the internal water caused by the change of temperature; in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand control structure is formed by installing the sand ring; in order to prevent the pump shaft from jumping at startup, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed under the motor; the lubrication of the motor and the pump bearing is water lubrication; the stator winding of the motor is made of high quality submersible motor winding, with high insulation performance; the pump is designed by computer CAD, with simple structure and excellent technical performance.

175QJP Peep Well Submersible Pump
 
Instaloni

(1) Përgatitja para instalimit:
1. Kontrolloni nëse pompa zhytëse plotëson kushtet e përdorimit dhe shtrirjen e specifikuar në manual.
2. Duke përdorur një objekt të rëndë me një diametër të barabartë me diametrin maksimal të jashtëm të pompës zhytëse, matni nëse diametri i brendshëm i gropës së pusit mund të përshtatet me pompën zhytëse dhe mat nëse thellësia e pusit plotëson kërkesat e instalimit.
3. Kontrolloni nëse pusi është i pastër dhe nëse uji i pusit është i turbullt. Asnjëherë mos përdorni një pompë elektrike zhytëse për të larë baltën e pompës dhe ujin me rërë për të shmangur dëmtimin e parakohshëm të pompës elektrike zhytëse.
4. Kontrolloni nëse pozicioni i kapëses së instalimit të ballinës është i përshtatshëm dhe nëse mund të përballojë cilësinë e të gjithë njësisë
5. Kontrolloni nëse komponentët e pompës zhytëse janë të plotë dhe të instaluar siç duhet sipas diagramit të montimit në manual Hiqni ekranin e filtrit dhe rrotulloni bashkimin për të parë nëse rrotullohet në mënyrë fleksibël
6. Zhvidhosni vidën e ujit dhe mbushni zgavrën e motorit me ujë të pastër dhe jo gërryes (vini re. sigurohuni që ta mbushni lart), më pas shtrëngoni vidën e ujit. Pas 12 orësh injektim uji, rezistenca e izolimit të motorit nuk duhet të jetë më e vogël se 150 M Q kur matet me një tavolinë tundëse 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagrami i bashkangjitur i procesit të lidhjes së kabllove është si më poshtë:
175QJP Peep Well Submersible Pump

 

8. Përdorni një multimetër për të kontrolluar nëse telat trefazorë janë të lidhur dhe nëse rezistenca DC është afërsisht e balancuar.
9. Kontrolloni nëse qarku dhe kapaciteti i transformatorit janë të mbingarkuar dhe më pas lidhni çelësin e mbrojtjes nga mbingarkesa ose pajisjet e ndezjes. Shih Tabelën 2 për modele specifike dhe më pas Hidhni një kovë me ujë në pompën e ujit nga dalja e pompës së ujit për të lubrifikuar kushinetat e gomës në pompë dhe më pas vendoseni pompën elektrike zhytëse drejt dhe të qëndrueshme. Filloni (jo më shumë se një sekondë) dhe kontrolloni nëse drejtimi i drejtimit është në përputhje me shenjën e drejtimit. Nëse jo, ndërroni çdo dy lidhës të kabllit trefazor. Më pas instaloni filtrin dhe përgatituni të zbrisni në pus. Nëse përdoret në raste të veçanta (të tilla si kanale, kanale, lumenj, pellgje, pellgje, etj.), pompa elektrike duhet të jetë e tokëzuar në mënyrë të besueshme.

 

(2) Pajisjet dhe mjetet e instalimit:
1. Një palë zinxhirë ngritës për më shumë se dy tonë.
2. Trekëmbësh me lartësi vertikale jo më pak se katër metra.
3. Dy litarë të varur (litarë teli) që mund të mbajnë një peshë më shumë se një ton (mund të mbajnë peshën e një grupi të plotë pompash uji).
4. Instaloni dy palë kapëse (shanga).
5. Çelësat, çekiçët, kaçavidat, veglat dhe instrumentet elektrike etj.

 

(3) Instalimi i pompës elektrike:
1. Diagrami i instalimit të pompës elektrike zhytëse është paraqitur në figurën 2. Dimensionet specifike të instalimit janë paraqitur në tabelën 3 "Lista e dimensioneve të instalimit të pompës elektrike zhytëse".

 

2. Pompat elektrike zhytëse me kokë më pak se 30 metra mund të ngrihen direkt në pus duke përdorur zorrë dhe litarë teli ose litarë të tjerë kërpi që mund të mbajnë peshën e plotë të të gjithë makinës, tubacioneve të ujit dhe ujit në tuba.

 

3. Pompat me kokë më shumë se 30 metra përdorin tuba çeliku dhe sekuenca e instalimit është si më poshtë:
①Përdorni një kapëse për të mbërthyer skajin e sipërm të pjesës së pompës së ujit (motori dhe pompa e ujit janë lidhur në këtë moment), ngrijeni atë me një zinxhir të varur dhe lidheni ngadalë në pus derisa Vendoseni kapësin në krye të pusit dhe hiqni zinxhir i varur.
② Përdorni një palë tjetër kapëse për të mbërthyer një tub, ngrijeni atë me një zinxhir të varur 15 cm larg nga fllanxha dhe uleni ngadalë. Midis fllanxhës së tubit dhe fllanxhës së pompës Vendosni mbulesën e gomës në vend dhe shtrëngoni tubin dhe pomponi në mënyrë të barabartë me bulona, ​​dado dhe rondele me susta.
③ Ngrini pak pompën zhytëse, hiqni kapësen në skajin e sipërm të pompës së ujit, lidhni kabllon fort në tubin e ujit me një shirit plastik dhe lidheni ngadalë derisa kapësja të vendoset në grykën e pusit.
④Përdorni të njëjtën metodë për të lidhur të gjithë tubat e ujit në pus.
⑤Pasi kablloja dalëse lidhet me çelësin e kontrollit, lidhet me furnizimin me energji trefazore.


(4) Gjërat që duhen mbajtur parasysh gjatë instalimit:
1. Nëse zbulohet një fenomen bllokimi gjatë procesit të pompimit, kthejeni ose tërhiqni tubin e ujit për të kapërcyer pikën e bllokimit. Nëse masat e ndryshme ende nuk funksionojnë, ju lutemi, mos e detyroni pompën të ulet për të shmangur dëmtimin e pompës elektrike zhytëse dhe të pusit.
2. Gjatë instalimit, një jastëk gome duhet të vendoset në fllanxhën e çdo tubi dhe të shtrëngohet në mënyrë të barabartë.
3. Kur pompa e ujit ulet në pus, ajo duhet të vendoset në mes të tubit të pusit për të parandaluar që pompa të funksionojë kundër murit të pusit për një kohë të gjatë, duke shkaktuar që pompa të dridhet dhe motori të fshihet dhe digjet. .
4. Përcaktoni thellësinë e pompës së ujit në fund të pusit sipas kushteve të rrjedhjes së rërës dhe baltës së pusit. Mos e varrosni pompën në baltë. Distanca nga pompa e ujit në fund të pusit në përgjithësi nuk është më pak se 3 metra (shih Figurën 2).
5. Thellësia e hyrjes së ujit të pompës së ujit duhet të jetë jo më pak se 1-1,5 metra nga niveli dinamik i ujit në nyjen e hyrjes së ujit (shih Figurën 2). Përndryshe, kushinetat e pompës së ujit mund të dëmtohen lehtësisht.
6. Ngritja e pompës së ujit nuk mund të jetë shumë e ulët. Përndryshe, një valvul porta duhet të instalohet në tubacionin e ujit në krye të pusit për të kontrolluar rrjedhën e pompës në pikën e vlerësuar të rrjedhës për të parandaluar mbingarkimin dhe djegien e motorit për shkak të shpejtësive të mëdha të rrjedhës.
7. Kur pompa e ujit është në punë, dalja e ujit duhet të jetë e vazhdueshme dhe e barabartë, rryma duhet të jetë e qëndrueshme (në kushte të vlerësuara të punës, përgjithësisht jo më shumë se 10% e rrymës së vlerësuar), dhe nuk duhet të ketë dridhje ose zhurmë. Nëse ka ndonjë anomali, makina duhet të ndalet për të zbuluar shkakun dhe për ta eliminuar atë.
8. Gjatë instalimit, kushtojini vëmendje cilësimit të telit të tokëzimit të motorit (shih Figurën 2). Kur tubi i ujit është një tub çeliku, nxirreni atë nga kapësja e kokës së pusit; kur tubi i ujit është një tub plastik, nxirreni atë nga shenja e tokëzimit të pompës elektrike.

 
Mirëmbajtja dhe Mirëmbajtja
  • 1.After installing the submersible pump, recheck the insulation resistance and the three-phase continuity at the switch, and check whether there are errors in the connection of the instrument and the starting equipment.If there are no problems, you can start to test the machine. After starting, observe whether the indication readings of each instrument are correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump emits any noise or vibration. If everything is normal, it can be put into operation.
  • 2. After the pump runs for the first four hours, the thermal insulation resistance of the motor should be closed and tested quickly.Its value should not be less than 0.5 megaohm.After the pump stops, it should be restarted after an interval of five minutes to prevent the water column in the pipeline from completely reversing and burning the motor due to excessive current.
  • 3. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be stopped immediately to troubleshoot.
  •  
  • 1 Në gjendjen e vlerësuar të punës, rryma kalon 20%.
  • 2 Niveli dinamik i ujit bie në pjesën e hyrjes së ujit, duke shkaktuar ujë me ndërprerje.
  • 3 Pompa zhytëse ka dridhje ose zhurmë të fortë.
  • 4 Tensioni i furnizimit është më i ulët se 340 volt.
  • 5 Një siguresë është djegur.
  • 6 Tubi i furnizimit me ujë është i dëmtuar.
  • 7 Rezistenca e izolimit të motorit ndaj gjendjes gjeotermale është më e ulët se 0,5 megaohm.
  •  
  • Unit disassembly:
  • 1.untie cable rope, remove the pipeline part, remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the inlet junction with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) inlet junction, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising of the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the reverse order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Magazinimi dhe ruajtja

This product adopts advanced design and provides advanced storage suggestions to ensure long-term use effect.First of all, in winter, it is necessary to exhaust all the water to prevent freezing. In addition, the wire rolls should be placed well and tied up.Secondly, when storing, the environment without corrosive action and gas should be selected and the temperature should be kept below 40 °C. Finally, when not used for a long time, attention should be paid to prevent rust of submersible pump.These storage requirements will ensure that the product can maintain its performance status and prolong its service life for a long time.

 

 
Pjesë të veshura
  • Shtytës
  • Mëngë bosht
  • Mëngë e boshtit të gomës
  • Unaza mbyllëse

 
Skenarët e aplikimit

01 Marrja e ujit në pus të thellë

02 Furnizimi me ujë të lartë

03 Ujësjellësi malor 

04 uji i kullës

05 Ujitje bujqësore

06 ujitje kopshti

07 marrja e ujit të lumit

08 ujë shtëpiak

 

Nëse jeni të interesuar për produktet tona, mund të zgjidhni të lini informacionin tuaj këtu dhe ne do t'ju kontaktojmë së shpejti.


Shkruani mesazhin tuaj këtu dhe na dërgoni

Nëse jeni të interesuar për produktet tona, mund të zgjidhni të lini informacionin tuaj këtu dhe ne do t'ju kontaktojmë së shpejti.


sqAlbanian