The variable frequency winding design ensures the motor's long-term smooth conversion operation between 1HZ-50HZ, energy saving and longer service life. This product stands out for its advanced technology and efficient performance, which can achieve energy-saving and environmentally friendly operation, while ensuring the stability and reliability of the motor for long-term use. Not only that, its design makes the product with a longer life, bringing more value to users. Whether in home applications or industrial fields, this motor can provide you with excellent performance to meet a variety of needs.
1,Power supply: three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%).
2, cilësia e ujit:
(1) water temperature is not higher than 20 °C;
(2) përmbajtja e papastërtive të ngurta (raporti i masës) nuk është më i madh se 0,01%;
(3) Vlera e PH (pH) 6,5-8,5;
(4) përmbajtja e sulfurit të hidrogjenit nuk është më e madhe se 1.5 mg/L;
(5) përmbajtja e joneve të klorurit nuk është më e madhe se 400 mg/L.
3, the motor is a closed or water-filled wet structure, before use the submersible motor cavity must be full of clean water, to prevent false full, and then tighten the water injection, air release bolts, otherwise not allowed to use
4, the submersible pump must be completely submerged in the water, the diving depth is not greater than 70m, the bottom of the submersible pump from the bottom of the well is not less than 3m.
5, rrjedha e ujit të pusit duhet të jetë në gjendje të përmbushë prodhimin e ujit të pompës zhytëse dhe funksionimin e vazhdueshëm, prodhimi i ujit të pompës zhytëse duhet të kontrollohet në 0,7 - 1,2 herë më shumë se rrjedha e vlerësuar.
6, pusi duhet të jetë i drejtë, pompa zhytëse nuk mund të përdoret ose të hidhet, vetëm përdorimi vertikal.
7, pompa zhytëse duhet të përputhet me kabllon sipas kërkesave dhe pajisjen e jashtme të mbrojtjes nga mbingarkesa.
8, the pump is strictly prohibited without water no-load test machine.
Model | Rrjedha (m3/h) | kokë (m) |
Shpejtësia e rrotullimit (ndryshim/pikë) |
Pompë uji(%) | Prizë diametri (mm) |
E zbatueshme mirë diametri (mm) |
Vlerësuar fuqi (KW) |
Vlerësuar tension (V) |
Vlerësuar aktuale(A) |
Efikasiteti motorik (%) | power factorcosφ | Njësia Madhësia maksimale radiale (mm) |
Vërejtje | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135sipër | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135sipër | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135sipër | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135sipër | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135sipër | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135sipër | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135sipër | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:
4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.
5, rreptësisht në përputhje me dispozitat e ashensorit të pompës, diapazoni i përdorimit të rrjedhës, për të parandaluar rrjedhën e ulët ose forcën e pompimit të ngritjes së lartë, kushinetat e shtytjes dhe pjesët e tjera të konsumit, mbingarkesa e motorit u dogj 6, pas pompës poshtë pusit, matja e motorit ndaj rezistencës së izolimit të tokës nuk duhet të jetë më pak se 100M, pas fillimit për të vëzhguar tensionin dhe rrymën, kontrolloni izolimin e mbështjelljes së motorit, nëse është në përputhje me kërkesat; Temperatura e magazinimit të pompës nëse është më pak se pika e ngrirjes, duhet të thahet uji i zgavrës së motorit, parandalimi i dëmtimit të akullit të ujit në zgavrën e motorit të shkaktuar nga temperatura e ulët.
The pump parts are mainly composed of pump shaft, impeller, shunt shell, rubber bearing, check valve body (optional) and other components. The motor parts are mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, and lead cable.
Karakteristikat kryesore të produktit përfshijnë:
The main characteristic of the product is that the pump is a water-immersed three-phase asynchronous motor, and the motor cavity is full of water for cooling the motor and lubricating the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference of the water inside the body caused by the change of temperature. At the same time, in order to prevent the sand particles in the well water from entering the motor, two oil seals are installed at the end of the motor shaft, and the sand discharging ring is installed to form a sand control structure. In order to prevent the pump shaft from beating when starting up, the pump shaft and the motor shaft are connected by a coupling, and the thrust bearing is installed at the bottom of the motor. In addition, the motor and the pump bearing are water-lubricated, and the stator winding of the motor uses high-quality submersible motor winding to ensure high insulation performance. The overall design is made of computer CAD, with simple structure and superior technical performance.

(1) Përgatitja para instalimit:
1. Kontrolloni nëse pompa zhytëse plotëson kushtet e përdorimit dhe shtrirjen e specifikuar në manual.
2. Duke përdorur një objekt të rëndë me një diametër të barabartë me diametrin maksimal të jashtëm të pompës zhytëse, matni nëse diametri i brendshëm i gropës së pusit mund të përshtatet me pompën zhytëse dhe mat nëse thellësia e pusit plotëson kërkesat e instalimit.
3. Kontrolloni nëse pusi është i pastër dhe nëse uji i pusit është i turbullt. Asnjëherë mos përdorni një pompë elektrike zhytëse për të larë baltën e pompës dhe ujin me rërë për të shmangur dëmtimin e parakohshëm të pompës elektrike zhytëse.
4. Kontrolloni nëse pozicioni i kapëses së instalimit të ballinës është i përshtatshëm dhe nëse mund të përballojë cilësinë e të gjithë njësisë
5. Kontrolloni nëse komponentët e pompës zhytëse janë të plotë dhe të instaluar siç duhet sipas diagramit të montimit në manual Hiqni ekranin e filtrit dhe rrotulloni bashkimin për të parë nëse rrotullohet në mënyrë fleksibël
6. Zhvidhosni vidën e ujit dhe mbushni zgavrën e motorit me ujë të pastër dhe jo gërryes (vini re. sigurohuni që ta mbushni lart), më pas shtrëngoni vidën e ujit. Pas 12 orësh injektim uji, rezistenca e izolimit të motorit nuk duhet të jetë më e vogël se 150 M Q kur matet me një tavolinë tundëse 500 V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Diagrami i bashkangjitur i procesit të lidhjes së kabllove është si më poshtë:
8. Përdorni një multimetër për të kontrolluar nëse telat trefazorë janë të lidhur dhe nëse rezistenca DC është afërsisht e balancuar.
9. Kontrolloni nëse qarku dhe kapaciteti i transformatorit janë të mbingarkuar dhe më pas lidhni çelësin e mbrojtjes nga mbingarkesa ose pajisjet e ndezjes. Shih Tabelën 2 për modele specifike dhe më pas Hidhni një kovë me ujë në pompën e ujit nga dalja e pompës së ujit për të lubrifikuar kushinetat e gomës në pompë dhe më pas vendoseni pompën elektrike zhytëse drejt dhe të qëndrueshme. Filloni (jo më shumë se një sekondë) dhe kontrolloni nëse drejtimi i drejtimit është në përputhje me shenjën e drejtimit. Nëse jo, ndërroni çdo dy lidhës të kabllit trefazor. Më pas instaloni filtrin dhe përgatituni të zbrisni në pus. Nëse përdoret në raste të veçanta (të tilla si kanale, kanale, lumenj, pellgje, pellgje, etj.), pompa elektrike duhet të jetë e tokëzuar në mënyrë të besueshme.
(2) Pajisjet dhe mjetet e instalimit:
1. Një palë zinxhirë ngritës për më shumë se dy tonë.
2. Trekëmbësh me lartësi vertikale jo më pak se katër metra.
3. Dy litarë të varur (litarë teli) që mund të mbajnë një peshë më shumë se një ton (mund të mbajnë peshën e një grupi të plotë pompash uji).
4. Instaloni dy palë kapëse (shanga).
5. Çelësat, çekiçët, kaçavidat, veglat dhe instrumentet elektrike etj.
(3) Instalimi i pompës elektrike:
1. Diagrami i instalimit të pompës elektrike zhytëse është paraqitur në figurën 2. Dimensionet specifike të instalimit janë paraqitur në tabelën 3 "Lista e dimensioneve të instalimit të pompës elektrike zhytëse".
2. Pompat elektrike zhytëse me kokë më pak se 30 metra mund të ngrihen direkt në pus duke përdorur zorrë dhe litarë teli ose litarë të tjerë kërpi që mund të mbajnë peshën e plotë të të gjithë makinës, tubacioneve të ujit dhe ujit në tuba.
3. Pompat me kokë më shumë se 30 metra përdorin tuba çeliku dhe sekuenca e instalimit është si më poshtë:
①Përdorni një kapëse për të mbërthyer skajin e sipërm të pjesës së pompës së ujit (motori dhe pompa e ujit janë lidhur në këtë moment), ngrijeni atë me një zinxhir të varur dhe lidheni ngadalë në pus derisa Vendoseni kapësin në krye të pusit dhe hiqni zinxhir i varur.
② Përdorni një palë tjetër kapëse për të mbërthyer një tub, ngrijeni atë me një zinxhir të varur 15 cm larg nga fllanxha dhe uleni ngadalë. Midis fllanxhës së tubit dhe fllanxhës së pompës Vendosni mbulesën e gomës në vend dhe shtrëngoni tubin dhe pomponi në mënyrë të barabartë me bulona, dado dhe rondele me susta.
③ Ngrini pak pompën zhytëse, hiqni kapësen në skajin e sipërm të pompës së ujit, lidhni kabllon fort në tubin e ujit me një shirit plastik dhe lidheni ngadalë derisa kapësja të vendoset në grykën e pusit.
④Përdorni të njëjtën metodë për të lidhur të gjithë tubat e ujit në pus.
⑤Pasi kablloja dalëse lidhet me çelësin e kontrollit, lidhet me furnizimin me energji trefazore.
(4) Gjërat që duhen mbajtur parasysh gjatë instalimit:
1. Nëse zbulohet një fenomen bllokimi gjatë procesit të pompimit, kthejeni ose tërhiqni tubin e ujit për të kapërcyer pikën e bllokimit. Nëse masat e ndryshme ende nuk funksionojnë, ju lutemi, mos e detyroni pompën të ulet për të shmangur dëmtimin e pompës elektrike zhytëse dhe të pusit.
2. Gjatë instalimit, një jastëk gome duhet të vendoset në fllanxhën e çdo tubi dhe të shtrëngohet në mënyrë të barabartë.
3. Kur pompa e ujit ulet në pus, ajo duhet të vendoset në mes të tubit të pusit për të parandaluar që pompa të funksionojë kundër murit të pusit për një kohë të gjatë, duke shkaktuar që pompa të dridhet dhe motori të fshihet dhe digjet. .
4. Përcaktoni thellësinë e pompës së ujit në fund të pusit sipas kushteve të rrjedhjes së rërës dhe baltës së pusit. Mos e varrosni pompën në baltë. Distanca nga pompa e ujit në fund të pusit në përgjithësi nuk është më pak se 3 metra (shih Figurën 2).
5. Thellësia e hyrjes së ujit të pompës së ujit duhet të jetë jo më pak se 1-1,5 metra nga niveli dinamik i ujit në nyjen e hyrjes së ujit (shih Figurën 2). Përndryshe, kushinetat e pompës së ujit mund të dëmtohen lehtësisht.
6. Ngritja e pompës së ujit nuk mund të jetë shumë e ulët. Përndryshe, një valvul porta duhet të instalohet në tubacionin e ujit në krye të pusit për të kontrolluar rrjedhën e pompës në pikën e vlerësuar të rrjedhës për të parandaluar mbingarkimin dhe djegien e motorit për shkak të shpejtësive të mëdha të rrjedhës.
7. Kur pompa e ujit është në punë, dalja e ujit duhet të jetë e vazhdueshme dhe e barabartë, rryma duhet të jetë e qëndrueshme (në kushte të vlerësuara të punës, përgjithësisht jo më shumë se 10% e rrymës së vlerësuar), dhe nuk duhet të ketë dridhje ose zhurmë. Nëse ka ndonjë anomali, makina duhet të ndalet për të zbuluar shkakun dhe për ta eliminuar atë.
8. Gjatë instalimit, kushtojini vëmendje cilësimit të telit të tokëzimit të motorit (shih Figurën 2). Kur tubi i ujit është një tub çeliku, nxirreni atë nga kapësja e kokës së pusit; kur tubi i ujit është një tub plastik, nxirreni atë nga shenja e tokëzimit të pompës elektrike.
- 1.After the submersible pump is installed, check the insulation resistance and three-phase conduction from the switch again, check whether the instrument and the connection of the start equipment are wrong, if there is no problem, the trial machine can be started, and after the start, observe whether the indicator readings of the instrument exceed the rated voltage and current specified on the nameplate, observe whether the pump has noise and vibration phenomenon, and put into operation if everything is normal.
- 2. After the first operation of the pump for four hours, the motor should be stopped to test the thermal insulation resistance quickly, and its value should not be less than 0.5 megaohm.
- 3. After the pump is stopped, it should be started after five minutes to prevent the water column in the pipe from being completely reflowed and causing the motor to burn out due to excessive current.
- 4. Our pump is designed to provide efficient, reliable and lasting pumping solutions.After normal operation, in order to prolong the service life of the pump, it is necessary to check the power supply voltage, running current and insulation resistance regularly to ensure that they are normal.
- If the following conditions are found, the machine should be shut down immediately to eliminate the fault:
- - the current exceeds 20% under the rated working conditions;
- - the dynamic water level drops to the inlet section, resulting in intermittent drainage;
- - the submersible pump vibrates violently or emits noisy sounds;
- - the power supply voltage is lower than 340 volts;
- - one phase of a fuse is blown out;
- - the water pipe is damaged;
- - the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
- The steps of disassembling the unit include unlocking the cable holder, taking off the pipe part, removing the line protection plate, rotating the drain screw and emptying all the water in the motor chamber, taking out the filter and loosening the screw of the coupling fixed to the motor shaft.Unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (note that the unit should be placed horizontally when separating to prevent the bending of the pump shaft).
- 5. The disassembly sequence of the pump includes: water inlet part, impeller, shunt shell, impeller, check valve body.When removing the impeller, use a special tool to loosen the cone sleeve fixing the impeller.During the disassembly process, avoid bending the pump shaft and damaging various parts.The disassembly process of the motor includes: placing the motor on the platform, and then removing the nuts on the studs, base, shaft head lock nut, thrust plate, key, lower guide rail, bearing seat and bolt from the bottom of the motor, then removing the rotor (be careful not to damage the winding), and finally removing the connecting parts and upper guide bearing seat. Before assembling the unit, it is necessary to clean the rust and dirt of each part, and apply sealant on each mating surface and fastener, and then assemble it in the opposite order of disassembly.After assembly, the coupling should be flexibly rotated, and then the filter should be put on to test the machine. Our pump products are designed to provide superior performance and reliability to meet your pumping needs.
- 6. Submersible pumps operating every year, or less than a year of operation but the submersible time has reached two years, should be taken out of the well according to the 5th dismantled maintenance, replacement of worn parts.
1, fikeni ujin në zgavrën e motorit (veçanërisht në dimër për të parandaluar ngrirjen e motorit) dhe lidheni mirë kabllon.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, përdorimi afatgjatë duhet t'i kushtojë vëmendje parandalimit të ndryshkut të pompave zhytëse.
- Shtytës
- Mëngë bosht
- Mëngë e boshtit të gomës
- Unaza mbyllëse
01 Marrja e ujit në pus të thellë
02 Furnizimi me ujë të lartë
03 Ujësjellësi malor
04 uji i kullës
05 Ujitje bujqësore
06 ujitje kopshti
07 marrja e ujit të lumit
08 ujë shtëpiak