Introducing the innovative QJP series fountain pump, a product of superior efficiency meticulously developed and researched by our factory. With a meticulously designed pump motor core crafted from premium cold rolled silicon steel, this fountain pump boasts exceptional magnetic conductivity, enabling seamless and heat-free starts. Unlike traditional fountain pumps, the 0JP series features motor rotor ends that utilize a unique water-lubricated alloy copper sleeve, replacing standard ball bearings. This innovative design not only mitigates issues of rust and wear caused by lack of oil but also ensures longevity and durability for the motor. Upgrade your fountain experience with the cutting-edge technology and superior performance of the QJP series fountain pump.
The product is a three-phase AC 380V (tolerance + / - 5%), 50HZ (tolerance + / - 1%) power supply, and has strict requirements for clean water: water temperature shall not exceed 20 °C; solid impurities content (mass ratio) shall not exceed 0.01%; PH value (pH) is 6.5-8.5; hydrogen sulfide content shall not exceed 1.5mg/L; chloride ion content shall not exceed 400mg/L. The product adopts a closed or water immersion structure motor, the submersible motor must be filled with clean water before use to prevent empty. In addition, the water can be used after filling and tightening the air release bolt. The submersible pump must be completely immersed in water to work, the diving depth shall not exceed 70m, and the distance between the bottom of the pump and the bottom of the well shall not be less than 3m. The well water flow should meet the water output and continuous operation requirements of the submersible pump, and the water output shall be controlled at 0.7-1.2 times of the rated flow. The well must be vertical, and the submersible pump can not be used horizontally, and it must be installed vertically. The submersible pump must match the cable as required and be equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Model | Aliran (m3/jam) | Kepala (M) |
Kecepatan putar (perubahan/titik) |
Pompa air(%) | Toko diameter (mm) |
Dapat diterapkan dengan baik diameter (mm) |
Dinilai daya (KW) |
Dinilai tegangan (V) |
Dinilai saat ini (A) |
Efisiensi motorik (%) | power factorcosφ | Satuan Ukuran Radial Maksimum (mm) |
Komentar | |||||||||
135QJ5-34 | 5 | 34 | 2850 | 40 | 135di atas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ5-51 | 51 | 2.2 | 6.03 | |||||||||||||||||||
135QJ5-68 | 68 | 3 | 8.01 | |||||||||||||||||||
135QJ5-85 | 85 | 4 | 10.53 | |||||||||||||||||||
135QJ5-102 | 102 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-119 | 119 | 5.5 | 14.1 | |||||||||||||||||||
135QJ5-240 | 240 | 11 | 26.28 | |||||||||||||||||||
135QJ5-280 | 5 | 280 | 2850 | 40 | 135di atas | 13 | 380 | 30.87 | 128 | |||||||||||||
135QJ5-320 | 320 | 15 | 35.62 | |||||||||||||||||||
135QJ10-24 | 10 | 24 | 2850 | 50 | 135di atas | 1.5 | 380 | 4.23 | 128 | |||||||||||||
135QJ10-32 | 32 | 2.2 | 6.03 | |||||||||||||||||||
135QJ10-48 | 48 | 3 | 8.01 | |||||||||||||||||||
135QJ10-56 | 56 | 4 | 10.53 | |||||||||||||||||||
135QJ10-72 | 72 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-80 | 80 | 5.5 | 14.1 | |||||||||||||||||||
135QJ10-104 | 104 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-120 | 120 | 7.5 | 19.0 | |||||||||||||||||||
135QJ10-136 | 136 | 9.2 | 22.7 | |||||||||||||||||||
135QJ10-180 | 180 | 11 | 26.28 | |||||||||||||||||||
135QJ10-210 | 210 | 13 | 30.87 | |||||||||||||||||||
135QJ10-240 | 240 | 15 | 35.62 | |||||||||||||||||||
135QJ10-300 | 300 | 18.5 | 43.12 | |||||||||||||||||||
135QJ15-36 | 15 | 36 | 2850 | 50 | 135di atas | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ15-39 | 39 | 3 | 8.01 | |||||||||||||||||||
135QJ15-46 | 46 | 4 | 10.53 | |||||||||||||||||||
135QJ15-52 | 52 | 4 | 10.53 | |||||||||||||||||||
135QJ15-59 | 59 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-65 | 65 | 5.5 | 14.1 | |||||||||||||||||||
135QJ15-78 | 78 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-91 | 91 | 7.5 | 19.0 | |||||||||||||||||||
135QJ15-104 | 104 | 9.2 | 22.7 | |||||||||||||||||||
135QJ15-120 | 120 | 11 | 26.28 | |||||||||||||||||||
135QJ15-142 | 142 | 13 | 30.87 | |||||||||||||||||||
135QJ15-162 | 162 | 15 | 35.62 | |||||||||||||||||||
135QJ15-200 | 200 | 18.5 | 43.12 | |||||||||||||||||||
135QJ20-16 | 20 | 16 | 2850 | 50 | 135above | 2.2 | 380 | 6.03 | 128 | |||||||||||||
135QJ20-24 | 24 | 3 | 8.01 | |||||||||||||||||||
135QJ20-32 | 32 | 4 | 10.53 | |||||||||||||||||||
135QJ20-40 | 40 | 4 | 10.53 | |||||||||||||||||||
135QJ20-48 | 48 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-56 | 56 | 5.5 | 14.1 | |||||||||||||||||||
135QJ20-64 | 64 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-72 | 72 | 7.5 | 19.0 | |||||||||||||||||||
135QJ20-80135QJ20-100 | 80 | 9.2 | 22.7 | |||||||||||||||||||
100 | 11 | 26.28 | ||||||||||||||||||||
135QJ20-120 | 120 | 13 | 30.87 | |||||||||||||||||||
135QJ20-136 | 136 | 15 | 35.62 | |||||||||||||||||||
135QJ20-168135QJ25-12 | 168 | 18.5 | 43.12 | |||||||||||||||||||
25 | 12 | 2850 | 65 | 135di atas | 2.2 | 380 | 6.03 | 128 | ||||||||||||||
135QJ25-18 | 18 | 3 | 8.01 | |||||||||||||||||||
135QJ25-24 | 24 | 4 | 10.53 | |||||||||||||||||||
135QJ25-30 | 30 | 4 | 10.53 | |||||||||||||||||||
135QJ25-36 | 36 | 5.5 | 14.1 | |||||||||||||||||||
135QJ25-48 | 48 | 7.5 | 19.0 | |||||||||||||||||||
135QJ25-60 | 60 | 9.2 | 22.7 | |||||||||||||||||||
135QJ25-82 | 82 | 11 | 26.28 | |||||||||||||||||||
135QJ25-97 | 97 | 13 | 30.87 | |||||||||||||||||||
135QJ25-110 | 110 | 15 | 35.62 | |||||||||||||||||||
135QJ25-130 | 130 | 18.5 | 43.12 | |||||||||||||||||||
135QJ32-24 | 32 | 24 | 2850 | 80 | 135di atas | 4 | 380 | 10.53 | 128 | |||||||||||||
135QJ32-30 | 30 | 5.5 | 14.1 | |||||||||||||||||||
135QJ32-42 | 42 | 7.5 | 19.0 | |||||||||||||||||||
135QJ32-54 | 54 | 9.2 | 22.7 | |||||||||||||||||||
135QJ32-68 | 68 | 11 | 26.28 | |||||||||||||||||||
135QJ32-80 | 80 | 13 | 30.87 | |||||||||||||||||||
135QJ32-92 | 92 | 15 | 35.62 | |||||||||||||||||||
135QJ32-104 | 104 | 18.5 | 43.12 | |||||||||||||||||||
135QJ40-46 | 40 | 46 | 2850 | 80 | 135di atas | 11 | 380 | 26.28 | 128 | |||||||||||||
135QJ40-54 | 54 | 13 | 30.87 | |||||||||||||||||||
135QJ40-62 | 62 | 15 | 35.62 | |||||||||||||||||||
135QJ40-84 | 84 | 18.5 | 43.12 |
Well submersible pump is a clean water pump, it is strictly prohibited to dig a new well to extract mud and silt. The voltage grade of the well pump is 380/50HZ, and the submersible motor with other voltage grades needs to be customized. Underground cables must be waterproof and must be equipped with starting equipment, such as distribution box, etc. Starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protection device should be timely tripping. When installing and using the pump, the pump must be reliably grounded, and it is prohibited to push and pull the switch when the hands and feet are wet. Before installing and maintaining the pump, the power must be cut off, and the place where the pump is used must be clearly marked "anti-electric shock". Before going down the well or installing the pump, the motor must be filled with distilled water or clean cold water without corrosion, and the intake/drain bolts must be tightened. When testing the pump on the ground, water must be poured into the pump chamber to lubricate the rubber bearings. The instant start time should not exceed one second to check whether the direction is correct. When using the pump, the lift and flow range specified by the pump must be strictly followed to prevent the pump from having a large flow at low lift or a large pull at high lift, which will lead to serious wear and tear of the thrust bearing and other parts and components, and cause the motor to overload and burn out. After the pump is put into the well, the insulation resistance between the motor and the ground should be measured, which should not be less than 100MΩ. After the start, the voltage and current should be observed regularly, and the motor winding insulation should be checked to see if it meets the requirements; if the temperature of the pump storage location is below the freezing point, the water in the motor cavity should be drained to prevent the water in the motor cavity from freezing and damaging the motor due to low temperature.
Pengenalan singkat struktur: bagian pompa terutama terdiri dari poros pompa, impeller, cangkang pengalih, bantalan karet, badan katup periksa (bagian opsional) dan komponen lainnya. Bagian motor terutama terdiri dari alas, film pengatur tekanan, bantalan dorong, pelat dorong , dudukan bantalan pemandu bawah, stator, rotor, dudukan bantalan pemandu atas, cincin pasir, bagian saluran masuk air, kabel dan komponen lainnya.
Fitur utama produk ini meliputi:
1, Motor adalah motor asinkron tiga fase submersible basah berisi air, rongga motor penuh dengan air bersih, digunakan untuk mendinginkan motor dan melumasi bantalan, film pengatur tekanan di bagian bawah motor digunakan untuk menyesuaikan perbedaan tekanan muai dan kontraksi air di dalam tubuh yang disebabkan oleh perubahan kenaikan suhu motor.
2, Untuk mencegah pasir di dalam air sumur masuk ke motor, ujung atas poros motor dilengkapi dengan dua segel oli, dan dipasang cincin pasir untuk membentuk struktur pencegah pasir.
3, Untuk mencegah poros pompa berjalan saat start, poros pompa dan poros motor dihubungkan dengan kopling, dan bantalan dorong atas dipasang di bagian bawah motor.
4, Pelumasan motor dan bantalan pompa adalah pelumasan air.
5, Belitan stator motor terbuat dari kawat belitan motor submersible berkualitas tinggi, dengan kinerja insulasi tinggi.
6, Pompa dirancang oleh komputer CAD, dengan struktur sederhana dan kinerja teknis yang baik.

(1) Persiapan sebelum pemasangan:
1. Periksa apakah pompa submersible memenuhi kondisi penggunaan dan cakupan yang ditentukan dalam manual.
2. Dengan menggunakan benda berat dengan diameter sama dengan diameter luar maksimum pompa submersible, ukur apakah diameter dalam lubang sumur dapat memuat pompa submersible, dan ukur apakah kedalaman sumur memenuhi persyaratan pemasangan.
3. Periksa apakah lubang sumur bersih dan air sumur keruh. Jangan sekali-kali menggunakan pompa listrik submersible untuk mencuci air lumpur dan pasir pompa welor untuk menghindari kerusakan dini pada pompa listrik submersible.
4. Periksa apakah posisi klem pemasangan kepala las sudah sesuai dan apakah dapat menahan kualitas seluruh unit
5. Periksa apakah komponen pompa submersible sudah lengkap dan terpasang dengan benar sesuai diagram perakitan di manual. Lepaskan layar filter dan putar kopling untuk melihat apakah berputar secara fleksibel
6. Buka sekrup air dan isi rongga motor dengan air bersih yang tidak korosif (catatan, pastikan untuk mengisinya), kemudian kencangkan sekrup air. Setelah 12 jam injeksi air, resistansi isolasi motor tidak boleh kurang dari 150M Q bila diukur dengan meja goyang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
Diagram proses pengkabelan kabel terlampir adalah sebagai berikut:
8. Gunakan multimeter untuk memeriksa apakah kabel tiga fasa tersambung dan apakah resistansi DC kira-kira seimbang.
9. Periksa apakah rangkaian dan kapasitas trafo kelebihan beban, lalu sambungkan sakelar proteksi kelebihan beban atau peralatan starter. Lihat Tabel 2 untuk model tertentu, laluTuangkan seember air ke dalam pompa air dari stopkontak pompa air untuk melumasi bantalan karet di pompa, lalu letakkan pompa listrik submersible dengan tegak dan stabil.Mulai (tidak lebih dari satu detik) dan periksa apakah arah kemudi sesuai dengan tanda kemudi. Jika tidak, tukar dua konektor kabel tiga fasa. Kemudian pasang filter dan bersiap untuk turun ke sumur. Jika digunakan pada acara-acara khusus (seperti parit, parit, sungai, kolam, kolam, dll.), pompa listrik harus diarde dengan baik.
(2) Peralatan dan perkakas instalasi:
1. Sepasang rantai pengangkat lebih dari dua ton.
2. Tripod dengan tinggi vertikal minimal empat meter.
3. Dua buah tali gantung (tali kawat) yang mampu menahan beban lebih dari satu ton (dapat menahan beban satu set pompa air lengkap).
4. Pasang dua pasang klem (belat).
5. Kunci pas, palu, obeng, perkakas dan instrumen listrik, dll.
(3) Instalasi pompa listrik:
1. Diagram pemasangan pompa listrik submersible ditunjukkan pada Gambar 2. Dimensi pemasangan spesifik ditunjukkan pada Tabel 3 “Daftar Dimensi Pemasangan Pompa Listrik Submersible”.
2. Pompa listrik submersible dengan head kurang dari 30 meter dapat diangkat langsung ke dalam sumur dengan menggunakan selang dan tali kawat atau tali rami lainnya yang dapat menahan seluruh beban mesin, pipa air, dan air di dalam pipa.
3. Pompa dengan head lebih dari 30 meter menggunakan pipa baja, dan urutan pemasangannya sebagai berikut:
①Gunakan penjepit untuk menjepit ujung atas bagian pompa air (saat ini motor dan pompa air sudah tersambung), angkat dengan rantai gantung, dan ikat perlahan ke dalam sumur hingga Pasang penjepit di kepala sumur dan lepaskan rantai gantung.
② Gunakan klem lain untuk menjepit pipa, angkat dengan rantai gantung sejauh 15 cm dari flensa, dan turunkan perlahan. Antara flensa pipa dan flensa pompaPasang bantalan karet pada tempatnya dan kencangkan pipa dan pompa secara merata dengan baut, mur, dan ring pegas.
③ Angkat sedikit pompa submersible, lepaskan klem di ujung atas pompa air, ikat kuat kabel ke pipa air dengan selotip plastik, dan ikat perlahan hingga klem dipasang di kepala sumur.
④Gunakan cara yang sama untuk mengikat semua pipa air ke dalam sumur.
⑤Setelah kabel keluar dihubungkan ke sakelar kontrol, kabel dihubungkan ke catu daya tiga fase.
(4) Hal-hal yang perlu diperhatikan selama instalasi:
1. Jika ditemukan fenomena kemacetan pada saat proses pemompaan, putar atau tarik pipa air untuk mengatasi titik kemacetan tersebut. Jika berbagai tindakan masih tidak berhasil, mohonJangan paksa pompa turun untuk menghindari kerusakan pada pompa listrik submersible dan sumur.
2. Selama pemasangan, bantalan karet harus ditempatkan pada flensa setiap pipa dan dikencangkan secara merata.
3. Pada saat pompa air diturunkan ke dalam sumur, sebaiknya ditempatkan di tengah-tengah pipa sumur agar pompa tidak bekerja terlalu lama pada dinding sumur sehingga menyebabkan pompa bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pompa air sampai ke dasar sumur sesuai dengan kondisi aliran pasir dan lanau sumur. Jangan mengubur pompa di dalam lumpur. Jarak pompa air ke dasar sumur umumnya tidak kurang dari 3 meter (lihat Gambar 2).
5. Kedalaman masuknya air dari pompa air harus setidaknya 1-1,5 meter dari ketinggian air dinamis ke simpul saluran masuk air (lihat Gambar 2). Jika tidak, bantalan pompa air akan mudah rusak.
6. Daya angkat pompa air tidak boleh terlalu rendah. Jika tidak, katup gerbang perlu dipasang pada pipa air kepala sumur untuk mengontrol aliran pompa pada titik aliran terukur guna mencegah motor kelebihan beban dan terbakar karena laju aliran yang besar.
7. Saat pompa air bekerja, keluaran air harus terus menerus dan merata, arus harus stabil (dalam kondisi kerja terukur, umumnya tidak lebih dari 10% arus terukur), dan tidak boleh ada getaran atau kebisingan. Jika terdapat kelainan, sebaiknya mesin dihentikan untuk mengetahui penyebabnya dan menghilangkannya.
8. Saat memasang, perhatikan pengaturan kabel ground motor (lihat Gambar 2). Jika pipa air berupa pipa baja, arahkan dari klem kepala sumur; bila pipa air berupa pipa plastik, arahkan dari tanda grounding pompa listrik.
- 1. Pemasangan pompa submersible selesai, periksa kembali resistansi isolasi dan konduksi tiga fase dari sakelar, periksa instrumen dan mulai kesalahan koneksi peralatan, jika tidak ada masalah, dapat memulai uji coba, setelah dimulainya instrumen menunjukkan pembacaan apakah lebih dari tegangan dan arus pengenal yang ditentukan papan nama, amati fenomena kebisingan dan getaran pompa, semuanya normal dapat dioperasikan.
- 2. Pengoperasian pertama pompa selama empat jam, harus dimatikan dengan cepat, uji resistansi isolasi termal motor, nilainya tidak boleh kurang dari 0,5 megaohm.
- 3.Setelah pompa dimatikan, sebaiknya dihidupkan setelah selang waktu lima menit, untuk mencegah kolom air di dalam pipa belum sepenuhnya mengalami refluks yang disebabkan oleh arus motor yang berlebihan dan terbakar.
- 4.Setelah pompa beroperasi normal, untuk memperpanjang masa pakainya, untuk memeriksa tegangan suplai, arus kerja dan resistansi isolasi normal, jika ditemukan situasi berikut, harus segera mematikan pemecahan masalah.
- - dalam kondisi terukur, arusnya lebih dari 20%.
- - Ketinggian air yang dinamis pada bagian saluran masuk air sehingga menyebabkan air terputus-putus.
- - getaran atau kebisingan yang parah pada pompa submersible.
- - tegangan suplai lebih rendah dari 340 volt.
- - sekering terbakar satu fasa.
- - kerusakan pipa air.
- - Motor dengan resistansi isolasi termal kurang dari 0,5 megaohm.
- 5. Pembongkaran unit:
- (1)untie cable tether, remove the pipeline part, remove the wire plate.
- (2)screw down the water bolt, put out the motor cavity water.
- (3)remove the filter, loosening the coupling fixed motor shaft fixed screw.
- (4)screw down the inlet joint and motor bolt, the pump and motor separate (separation attention will unit mat flat, prevent the pump shaft bending)
- (5)pump disassembly sequence is: (see figure 1) inlet joint, impeller, diversion shell, impeller...... check valve body, dismantle the impeller with special tools will first fix the conical sleeve loosening, the disassembly process to avoid the pump shaft bending and each bump.
- (6)motor disassembly process is: (see figure 1) the motor placed on the platform, from the bottom of the motor in turn removed double head bolt (pull rod bolt) on the nut, base, shaft head lock nut, thrust plate, key, lower guide bearing seat, double head bolt, and then take out the rotor (pay attention not to damage the wire package) finally removed the connecting section and upper guide bearing seat.
- (7)unit assembly: before assembly should be the parts of the rust, dirt clean, each mating surface and fastener coated with sealant, and then in turn according to the reverse sequence of disassembly assembly (after assembly motor shaft up and down momentum is about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine.
- 6.submersible pump every operation for a year, or less than a year of operation but the submersible time has reached two years, should be proposed in accordance with the fifth paragraph of the well to be dismantled and repaired, replace the worn parts.
This product is a brand new submersible pump, suitable for a variety of occasions for pump work needs. In order to ensure the long-term use and stable performance of the product, the user needs to clean the water in the motor cavity of the pump after use (especially in winter to prevent the motor from freezing), coil up and tie the cable, and then store the product in an environment free of corrosive substances and gases, with the temperature kept below 40 °C in the room. In addition, if the submersible pump is not used for a long time, special attention should be paid to prevent rust to protect the service life of the product. This submersible pump will provide users with convenient and efficient pump solutions to ensure the safe and stable operation of the pump equipment.
- pendorong
- Lengan poros
- Lengan poros karet
-
Cincin penyegel
01 Asupan air sumur dalam
02 Pasokan air bertingkat tinggi
03 persediaan air pegunungan
04 menara air
05 Irigasi pertanian
06 irigasi taman
07 pengambilan air sungai
08 air rumah tangga