QJ series submersible pump is a kind of water lifting equipment directly connected to the submersible motor and pump to work in the water. This series of pumps are vertical, with small use area, compact structure, simple installation, convenient maintenance and repair. It is widely used in agricultural irrigation, municipal engineering, water conservancy engineering, urban water supply and drainage, industrial and mining enterprises water supply and drainage, drought relief and flood relief and so on. The flow range is 5-500m3/h, the head is 4-800m, and the power is 3-315KW. This product has stable and reliable performance, can meet the needs of various different uses of pumps, and is one of the excellent choices in the market.
This product is a three-phase AC 380V electric pump, suitable for various pump applications. The power supply requirements for ± 5% of the three-phase AC 380V voltage, 50HZ frequency fluctuation range of ± 1%. Water quality requirements include water temperature not higher than 20 °C, solid impurities content (mass ratio) is not greater than 0.01%, PH value of 6.5-8.5, hydrogen sulfide content is not greater than 1.5mg/L, chloride ion content is not greater than 400mg/L. The motor adopts a closed or water injection wet structure, before use must be submersible motor inner cavity filled with clean water to prevent empty, while fastening the water injection and pressure relief bolts, otherwise not to use. Submersible pump must be completely immersed in water work, immersion depth shall not exceed 70 meters, the distance from the bottom of the pump to the bottom of the well shall not be less than 3 meters. Well water inflow shall meet the water output and continuous operation requirements of submersible pump, pump output shall be controlled at 0.7-1.2 times the rated flow. The well must be vertical, submersible pump can not be used horizontally or tilted, only vertical use. Submersible pump must be equipped with cables as required, and equipped with external overload protection device. It is strictly prohibited to do no-load test without water.
Model | Aliran (m3/jam) | Kepala (M) |
Rotatingspeed(change/point) | Pompa air(%) | Toko diameter (mm) |
Dapat diterapkan dengan baik diameter (mm) |
Dinilai power(KW) |
Dinilai tegangan (V) |
Dinilai saat ini (A) |
Efisiensi motorik (%) | faktor dayacosφ | Satuan Ukuran Radial Maksimum (mm) |
|||||||||
175QJ10-42 | 10 | 42 | 2850 | 53 | 50 | 175di atas | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ10-56 | 56 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-70 | 70 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ10-84 | 84 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ10-112 | 112 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-126 | 126 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ10-140 | 140 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ15-42 | 15 | 42 | 2850 | 58 | 50 | 175di atas | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ15-55 | 55 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-65 | 65 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ15-85 | 85 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ15-112 | 112 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 175di atas | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ20-39 | 39 | 4 | 10.1 | 76.0 | 0.79 | ||||||||||||||||
175QJ20-52 | 52 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ20-78 | 78 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ20-91 | 91 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ20-104 | 104 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ20-130 | 130 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-156 | 156 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ20-182 | 187 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ20-208 | 208 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-247 | 247 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ20-273 | 273 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-299 | 299 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-325 | 325 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ20-364 | 364 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-26 | 25 | 26 | 2850 | 66 | 65 | 175di atas | 3 | 380 | 7.8 | 74.0 | 0.79 | 168 | |||||||||
175QJ25-39 | 39 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ25-65 | 25 | 65 | 2850 | 66 | 65 | 175di atas | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ25-78 | 78 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ25-91 | 91 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ25-104 | 104 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-130 | 130 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ25-156 | 156 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ25-182 | 182 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-208 | 208 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ25-221 | 221 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-247 | 247 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-260 | 260 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ25-299 | 299 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ30-30 | 30 | 30 | 2850 | 67 | 80 | 175di atas | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ30-40 | 40 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-24 | 32 | 24 | 2850 | 67 | 80 | 175di atas | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ32-36 | 36 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ32-48 | 48 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ32-60 | 60 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ32-72 | 72 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ32-84 | 84 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-96 | 96 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ32-120 | 120 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ32-144 | 144 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-168 | 168 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ32-180 | 180 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-192 | 192 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-204 | 204 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ32-240 | 240 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ35-60 | 35 | 60 | 2850 | 67 | 80 | 175di atas | 10 | 380 | 25.0 | 78.0 | 0.78 | 168 | |||||||||
175QJ35-75 | 75 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ35-100 | 100 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ40-24 | 40 | 24 | 2850 | 70 | 80 | 175di atas | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ40-30 | 30 | 5.5 | 13.6 | 77.0 | 0.8 | ||||||||||||||||
175QJ40-36 | 36 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ40-48 | 48 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ40-60 | 60 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ40-72 | 72 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-84 | 84 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ40-96 | 96 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ40-120 | 120 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-132 | 132 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ40-144 | 144 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-156 | 156 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-168 | 168 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ40-192 | 192 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-24 | 50 | 24 | 2850 | 72 | 80 | 175di atas | 5.5 | 380 | 13.6 | 77.0 | 0.8 | 168 | |||||||||
175QJ50-36 | 36 | 9.2 | 22.1 | 78.0 | 0.81 | ||||||||||||||||
175QJ50-48 | 48 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ50-60 | 60 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ50-70 | 70 | 17 | 40.9 | 80.0 | 0.79 | ||||||||||||||||
175QJ50-84 | 84 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ50-96 | 96 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-108 | 108 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ50-120 | 120 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-132 | 132 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-144 | 144 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ50-156 | 156 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-22 | 63 | 22 | 2850 | 72 | 80 | 175di atas | 7.5 | 380 | 18.4 | 77.5 | 0.8 | 168 | |||||||||
175QJ63-44 | 44 | 13 | 30.1 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-55 | 55 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ63-66 | 66 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ63-77 | 77 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-88 | 88 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ63-99 | 63 | 99 | 2850 | 72 | 80 | 175di atas | 30 | 380 | 66.6 | 81.5 | 0.84 | 168 | |||||||||
175QJ63-110 | 110 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ63-132 | 132 | 37 | 82.1 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-9 | 80 | 9 | 2850 | 73 | 100 | 175di atas | 4 | 380 | 10.1 | 76.0 | 0.79 | 168 | |||||||||
175QJ80-18 | 18 | 7.5 | 18.4 | 77.5 | 0.8 | ||||||||||||||||
175QJ80-27 | 27 | 11 | 26.1 | 79.0 | 0.81 | ||||||||||||||||
175QJ80-36 | 36 | 15 | 34.7 | 80.0 | 0.82 | ||||||||||||||||
175QJ80-45 | 45 | 18.5 | 42.6 | 80.5 | 0.82 | ||||||||||||||||
175QJ80-54 | 54 | 22 | 49.7 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-63 | 63 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-72 | 72 | 25 | 56.5 | 81.0 | 0.83 | ||||||||||||||||
175QJ80-81 | 81 | 30 | 66.6 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-90 | 90 | 32 | 71.0 | 81.5 | 0.84 | ||||||||||||||||
175QJ80-98 | 98 | 37 | 82.1 | 81.5 | 0.84 |
1, pompa submersible sumur untuk pompa air bersih, melarang mencuci sumur baru, memompa sedimen dan air berlumpur,
2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have common motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.
3, the pump must be reliably grounded in the process of installation and use. Prohibit push and pull switch in the case of wet hands and feet. Must cut off the power supply before installation and maintenance of electric pumps. Must install "electric shock prevention" obvious mark in the place where the pump is used. Before going down the well or installation, the motor cavity must be filled with distilled water or non-corrosive clean cold water, and must tighten the water inlet / outlet bolts.
4, when the pump is tested on the ground, water must be added to the pump cavity to lubricate the rubber bearing. The instantaneous start can not exceed one second, check whether the direction is the same as the direction indicated. When the pump is placed vertically, pay attention to safety to prevent overturning and injury.
5, secara ketat sesuai dengan ketentuan angkat pompa, rentang penggunaan aliran, untuk mencegah gaya pemompaan aliran rendah atau angkat tinggi, bantalan dorong dan bagian lain dari keausan, beban berlebih motor terbakar
6, setelah pompa turun ke sumur, pengukuran resistansi insulasi motor ke tanah tidak boleh kurang dari 100M, setelah mulai mengamati tegangan dan arus, periksa insulasi belitan motor, apakah sesuai dengan persyaratan; Jika suhu lokasi penyimpanan pompa kurang dari titik beku, sebaiknya keringkan air di rongga motor, cegah kerusakan es air rongga motor akibat suhu rendah.
The pump part is mainly composed of pump shaft, impeller, guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts.
Fitur utama produk ini meliputi:
- 1.The motor is a water-immersed wet three-phase asynchronous motor, and the motor cavity is filled with water to cool the motor and lubricate the bearing. The pressure regulating diaphragm at the bottom of the motor is used to adjust the expansion-contraction pressure difference inside and outside the body caused by the change of the motor's temperature rise.
- 2. In order to prevent the sand in the well water from entering the motor, two oil seals are installed on the upper end of the motor shaft extension, and a sand discharging ring is installed to form a sand discharging structure.
- 3. In order to prevent the pump shaft from jumping when starting, the pump shaft and the motor shaft are connected together through a coupling, and a thrust bearing is installed under the motor.
- 4. The motor and pump bearing are lubricated by water.
- 5. The motor stator winding is made of high-quality submersible motor winding wire, with high insulation performance.
- 6. The pump is designed by computer CAD, with simple structure and excellent technical performance.

(1) Persiapan sebelum pemasangan:
1. Periksa apakah pompa submersible memenuhi kondisi penggunaan dan cakupan yang ditentukan dalam manual.
2. Dengan menggunakan benda berat dengan diameter sama dengan diameter luar maksimum pompa submersible, ukur apakah diameter dalam lubang sumur dapat memuat pompa submersible, dan ukur apakah kedalaman sumur memenuhi persyaratan pemasangan.
3. Periksa apakah lubang sumur bersih dan air sumur keruh. Jangan sekali-kali menggunakan pompa listrik submersible untuk mencuci air lumpur dan pasir pompa welor untuk menghindari kerusakan dini pada pompa listrik submersible.
4. Periksa apakah posisi klem pemasangan kepala las sudah sesuai dan apakah dapat menahan kualitas seluruh unit
5. Periksa apakah komponen pompa submersible sudah lengkap dan terpasang dengan benar sesuai diagram perakitan di manual. Lepaskan layar filter dan putar kopling untuk melihat apakah berputar secara fleksibel
6. Buka sekrup air dan isi rongga motor dengan air bersih yang tidak korosif (catatan, pastikan untuk mengisinya), kemudian kencangkan sekrup air. Setelah 12 jam injeksi air, resistansi isolasi motor tidak boleh kurang dari 150M Q bila diukur dengan meja goyang 500V.
7. Sambungan kabel, potong selongsong karet 120mm dari salah satu ujung kabel keluar dan kabel yang cocok dengan pisau listrik, lalu goyangkan panjang ketiga kabel inti dalam bentuk berundak, kupas inti tembaga 20mm, kikis oksidanya Lapisi bagian luar kawat tembaga dengan pisau atau kain pasir, lalu masukkan kedua ujung kawat yang tersambung ke dalam palir. Setelah lapisan diikat erat dengan kawat tembaga halus, solder secara menyeluruh dan kuat, lalu pasir apa saja. gerinda di permukaan. Kemudian untuk ketiga sambungan tersebut, gunakan isolasi polyvester untuk membungkusnya secara setengah bertumpuk untuk tiga lavers. Lilitkan kedua ujung lapisan pembungkus rapat-rapat dengan benang nyion, kemudian gunakan cara setengah tumpuk untuk membungkus selotip sebanyak tiga lapis. Bungkus lapisan luar dengan pita insulasi bertekanan tinggi sebanyak tiga lapis. Terakhir, lipat ketiga helai menjadi satu dan bungkus berulang kali menjadi lima lapisan dengan pita bertekanan tinggi. Setiap lapisan harus terikat erat, dan sambungan antar lapisan harus rapat dan kokoh untuk mencegah air masuk dan merusak isolasi. Setelah dibungkus, rendam dalam air pada suhu kamar 20'c selama 12 jam, dan ukur ketahanan isolasi dengan meja pengocok. , yang tidak boleh kurang dari 100M Ω
Diagram proses pengkabelan kabel terlampir adalah sebagai berikut:
8. Gunakan multimeter untuk memeriksa apakah kabel tiga fasa tersambung dan apakah resistansi DC kira-kira seimbang.
9. Periksa apakah rangkaian dan kapasitas trafo kelebihan beban, lalu sambungkan sakelar proteksi kelebihan beban atau peralatan starter. Lihat Tabel 2 untuk model tertentu, laluTuangkan seember air ke dalam pompa air dari stopkontak pompa air untuk melumasi bantalan karet di pompa, lalu letakkan pompa listrik submersible dengan tegak dan stabil.Mulai (tidak lebih dari satu detik) dan periksa apakah arah kemudi sesuai dengan tanda kemudi. Jika tidak, tukar dua konektor kabel tiga fasa. Kemudian pasang filter dan bersiap untuk turun ke sumur. Jika digunakan pada acara-acara khusus (seperti parit, parit, sungai, kolam, kolam, dll.), pompa listrik harus diarde dengan baik.
(2) Peralatan dan perkakas instalasi:
1. Sepasang rantai pengangkat lebih dari dua ton.
2. Tripod dengan tinggi vertikal minimal empat meter.
3. Dua buah tali gantung (tali kawat) yang mampu menahan beban lebih dari satu ton (dapat menahan beban satu set pompa air lengkap).
4. Pasang dua pasang klem (belat).
5. Kunci pas, palu, obeng, perkakas dan instrumen listrik, dll.
(3) Instalasi pompa listrik:
1. Diagram pemasangan pompa listrik submersible ditunjukkan pada Gambar 2. Dimensi pemasangan spesifik ditunjukkan pada Tabel 3 “Daftar Dimensi Pemasangan Pompa Listrik Submersible”.
2. Pompa listrik submersible dengan head kurang dari 30 meter dapat diangkat langsung ke dalam sumur dengan menggunakan selang dan tali kawat atau tali rami lainnya yang dapat menahan seluruh beban mesin, pipa air, dan air di dalam pipa.
3. Pompa dengan head lebih dari 30 meter menggunakan pipa baja, dan urutan pemasangannya sebagai berikut:
①Gunakan penjepit untuk menjepit ujung atas bagian pompa air (saat ini motor dan pompa air sudah tersambung), angkat dengan rantai gantung, dan ikat perlahan ke dalam sumur hingga Pasang penjepit di kepala sumur dan lepaskan rantai gantung.
② Gunakan klem lain untuk menjepit pipa, angkat dengan rantai gantung sejauh 15 cm dari flensa, dan turunkan perlahan. Antara flensa pipa dan flensa pompaPasang bantalan karet pada tempatnya dan kencangkan pipa dan pompa secara merata dengan baut, mur, dan ring pegas.
③ Angkat sedikit pompa submersible, lepaskan klem di ujung atas pompa air, ikat kuat kabel ke pipa air dengan selotip plastik, dan ikat perlahan hingga klem dipasang di kepala sumur.
④Gunakan cara yang sama untuk mengikat semua pipa air ke dalam sumur.
⑤Setelah kabel keluar dihubungkan ke sakelar kontrol, kabel dihubungkan ke catu daya tiga fase.
(4) Hal-hal yang perlu diperhatikan selama instalasi:
1. Jika ditemukan fenomena kemacetan pada saat proses pemompaan, putar atau tarik pipa air untuk mengatasi titik kemacetan tersebut. Jika berbagai tindakan masih tidak berhasil, mohonJangan paksa pompa turun untuk menghindari kerusakan pada pompa listrik submersible dan sumur.
2. Selama pemasangan, bantalan karet harus ditempatkan pada flensa setiap pipa dan dikencangkan secara merata.
3. Pada saat pompa air diturunkan ke dalam sumur, sebaiknya ditempatkan di tengah-tengah pipa sumur agar pompa tidak bekerja terlalu lama pada dinding sumur sehingga menyebabkan pompa bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pompa air sampai ke dasar sumur sesuai dengan kondisi aliran pasir dan lanau sumur. Jangan mengubur pompa di dalam lumpur. Jarak pompa air ke dasar sumur umumnya tidak kurang dari 3 meter (lihat Gambar 2).
5. Kedalaman masuknya air dari pompa air harus setidaknya 1-1,5 meter dari ketinggian air dinamis ke simpul saluran masuk air (lihat Gambar 2). Jika tidak, bantalan pompa air akan mudah rusak.
6. Daya angkat pompa air tidak boleh terlalu rendah. Jika tidak, katup gerbang perlu dipasang pada pipa air kepala sumur untuk mengontrol aliran pompa pada titik aliran terukur guna mencegah motor kelebihan beban dan terbakar karena laju aliran yang besar.
7. Saat pompa air bekerja, keluaran air harus terus menerus dan merata, arus harus stabil (dalam kondisi kerja terukur, umumnya tidak lebih dari 10% arus terukur), dan tidak boleh ada getaran atau kebisingan. Jika terdapat kelainan, sebaiknya mesin dihentikan untuk mengetahui penyebabnya dan menghilangkannya.
8. Saat memasang, perhatikan pengaturan kabel ground motor (lihat Gambar 2). Jika pipa air berupa pipa baja, arahkan dari klem kepala sumur; bila pipa air berupa pipa plastik, arahkan dari tanda grounding pompa listrik.
(1)submersible pump installation is complete, re-check the insulation resistance and three-phase conduction from the switch, check the instrument and start the equipment connection error, if there is no problem, can start the trial, after the start of the instrument indicating readings whether more than the nameplate stipulated rated voltage and current, observe the pump noise and vibration phenomenon, everything is normal can be put into operation.
(2)pump operation for the first four hours, should be shut down quickly test the thermal insulation resistance of the motor, the value should not be less than 0.5 megaohm.
(3)pump shutdown, should be started after an interval of five minutes, to prevent the water column in the pipe has not completely reflux caused by excessive motor current and burnout.
(4)pump into normal operation,in order to prolong its service life, to check the supply voltage, working current and insulation resistance is normal, if found the following situation, should immediately shut down troubleshooting.
1 dalam kondisi pengenal, arusnya lebih dari 20%.
2 ketinggian air dinamis ke bagian saluran masuk air, menyebabkan air terputus-putus.
3 pompa submersible getaran atau kebisingan yang parah.
4 tegangan suplai lebih rendah dari 340 volt.
5 sekering terbakar satu fasa.
6 kerusakan pipa air.
7 motor dengan resistansi isolasi termal kurang dari 0,5 megaohm.
(5)This product is a portable water pump, with the characteristics of easy disassembly, the user can disassemble and clean the various components according to the following steps to maintain the normal operation of the pump. First of all to untie the cable tie, remove the pipeline part and take off the line protection plate. Then unscrew the drain bolt, discharge all the water in the motor chamber. Then take off the filter, loosen the fixing screw on the coupling fixed motor shaft. Then unscrew the bolt connecting the water inlet section and the motor, the pump and the motor separation (pay attention to the device leveling when separating, to prevent the bending of the pump shaft). The sequence of disassembly of the pump is: water inlet section, impeller, guide housing, impeller, check valve body. When disassembling the impeller, use special tools to loosen the cone sleeve fixed the impeller. In the whole disassembly process, pay attention to avoid bending the pump shaft and damage various parts. The steps of motor disassembly are: put the motor on the platform, remove the nut, seat, shaft head lock nut, thrust plate, key, lower guide rail from the bottom in order (tie rod bolt), then remove the rotor (pay attention not to damage the wire packet), and finally remove the connecting section and the upper guide bearing seat. Before assembly, the rust and dirt of each part should be cleaned, and sealant should be applied to each mating surface and fastener, and then the assembly should be carried out in the opposite order of disassembly (the movement of the motor shaft after assembly is about 1 mm). After assembly, the coupling should be flexible, and then the filter should be put on for machine test. 6. Submersible electric pump should be taken out of the well for dismantling and maintenance according to Article 5 after operating for one year, or less than one year, but the diving time has reached two years, and the worn parts should be replaced.
1, keluarkan air di rongga motor (terutama di musim dingin untuk mencegah motor membeku), dan ikat kabel dengan baik.
2, simpan di ruangan dalam ruangan tanpa zat dan gas korosif, dengan suhu di bawah 40 °C.
3, penggunaan jangka panjang harus memperhatikan pencegahan karat pada pompa submersible.
- pendorong
- Lengan poros
- Lengan poros karet
-
Cincin penyegel
01 Asupan air sumur dalam
02 Pasokan air bertingkat tinggi
03 persediaan air pegunungan
04 menara air
05 Irigasi pertanian
06 irigasi taman
07 pengambilan air sungai
08 air rumah tangga