125QJB Deep Well Submersible Pump

Lakukan pemrosesan OEM! Sesuai dengan kebutuhan pengguna, desain dan pembuatan berbagai jenis persyaratan khusus motor dan pompa submersible non-standar. Standar penerapan produk: GB/T2816-2014 "pompa submersible sumur", GB/T2818-2014 "motor asinkron submersible sumur". WhatsApp:17855846335
PDF DOWNLOAD
Detail
Tag
 
Ikhtisar Produk

Frequency conversion winding design, ensure the motor in 1HZ-50HZ long-term stable conversion operation. Energy saving, longer service life.

 

 
Ketentuan Penggunaan

1, catu daya: AC tiga fase 380V (toleransi + / - 5%), 50HZ (toleransi + / - 1%).

2, kualitas air:

(1) water temperature is not higher than 20 °C;

(2) kandungan pengotor padat (rasio massa) tidak lebih besar dari 0,01%;

(3) Nilai PH (pH) 6,5-8,5;

(4) kandungan hidrogen sulfida tidak lebih besar dari 1,5mg/L;

(5) kandungan ion klorida tidak lebih besar dari 400mg/L.

3, motor tertutup atau struktur basah berisi air, sebelum digunakan rongga motor submersible harus penuh dengan air bersih, untuk mencegah salah penuh, lalu kencangkan injeksi air, baut pelepas udara, jika tidak, tidak diperbolehkan menggunakan

4, pompa submersible harus benar-benar terendam air, kedalaman penyelaman tidak lebih dari 70m, bagian bawah pompa submersible dari dasar sumur tidak kurang dari 3m.

5, aliran air sumur harus mampu memenuhi keluaran air pompa submersible dan pengoperasian terus menerus, keluaran air pompa submersible harus dikontrol pada 0,7 - 1,2 kali aliran pengenal.

6, sumur harus lurus, pompa submersible tidak dapat digunakan atau dibuang, hanya penggunaan vertikal.

7, pompa submersible harus disesuaikan dengan kabel sesuai dengan persyaratan, dan perangkat perlindungan kelebihan beban eksternal. 8, pompa dilarang keras tanpa mesin uji tanpa beban air

 

 
Arti Model

125QJB Deep Well Submersible Pump

 
Referensi Model Parsial
Model Aliran (m3/jam)  Kepala
(M)
 Rotating speed(change/point)  Pompa air(%)  Toko
diameter
(mm)
Dapat diterapkan dengan baik
diameter (mm) 
Dinilai
daya (KW)
Rated voltage(V) Ratedcurrent(A)  Efisiensi motorik (%)  power factorcosφ  Satuan
Ukuran Radial Maksimum (mm)
Komentar
125QJ5-34 5 34 2850 53 40  125di atas 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125di atas 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125di atas 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125di atas 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125di atas 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125di atas 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125di atas 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125di atas 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125di atas 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125di atas 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125di atas 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125di atas 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125di atas 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125di atas 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      
 
Tindakan pengamanan

 The well submersible pump is a pump suitable for clear water. It is strictly prohibited to dig new wells and pump out mud and sand. The voltage grade of the well pump is 380V/50HZ, and other voltage grades of the submersible motor need to be customized. Underground cables must be waterproof cables and must be equipped with starting equipment, such as distribution box, etc. The starting equipment should have common motor comprehensive protection functions, such as short circuit overload protection, phase loss protection, undervoltage protection, grounding protection and idling protection, etc. In abnormal cases, the protective device should be tripped in time. When installing and using the pump, it must be firmly grounded. It is prohibited to push and pull the switch when the hands and feet are wet. The power supply must be cut off before installing and maintaining the pump. An obvious "anti-electric shock" sign must be set up where the pump is used. Before going down the well or installing the motor, the inner cavity must be filled with distilled water or non-corrosive clean cold water, and the water injection/drainage bolts must be tightened. Fill the pump with water for ground test to lubricate the rubber bearings. The instant start time shall not exceed one second to check whether the direction is correct and consistent with the direction indication. Be sure to pay attention to safety when placing the pump upright to prevent overturning and causing injury. Strictly in accordance with the provisions of the pump lift and flow range of use, to prevent the pump flow at low lift or excessive pull at high lift, resulting in extreme wear of thrust bearings and other components, resulting in motor overload burn. After the pump into the well, the insulation resistance between the motor and the ground shall be measured, which shall not be less than 100MΩ. After the start, observe the voltage and current regularly, and check the motor winding insulation, to see if it meets the requirements; if the pump storage temperature is below the freezing point, the water in the motor cavity should be discharged, so as to avoid the water in the motor cavity freezing and damaging the motor due to low temperature.

 

 
Pengantar Struktur
The pump part is mainly composed of pump shaft,impeller,diversion shell,rubber bearing,check valve body(optional)and other components.The motor part is mainly composed of base,pressure regulating diaphragm,thrust bearing,thrust plate,lower guide bearing seat,stator,rotor,upper guide bearing seat,sand ring,water inlet section,lead cable and other components.

Fitur utama produk ini meliputi:

1.The motor is a water-loaded wet submersible three-phase asynchronous motor,and the motor cavity is filled with clean water for cooling the motor and lubricating the bearing.The regulating diaphragm at the bottom of the motor is used to adjust the expansion and contraction pressure difference inside and outside the body caused by the temperature rise of the motor.
2.In order to prevent the sand particles in the well water from entering the motor,two oil seals are installed at the extension end of the motor shaft,and the sand ring is installed to form a sand prevention structure.
3.In order to prevent the pump shaft from jumping when starting,the pump shaft is connected with the motor shaft through a coupling,and the thrust bearing is installed at the bottom of the motor.
4.The lubrication of the motor and the pump bearing is water lubrication.
5.The stator winding of the motor adopts high-quality submersible motor winding wire,with excellent insulation performance.
6.The pump is designed by computer CAD,with simple structure and excellent technical performance.

125QJB Deep Well Submersible Pump

 

 
Install

(1) Persiapan sebelum pemasangan:
1. Periksa apakah pompa submersible memenuhi kondisi penggunaan dan cakupan yang ditentukan dalam manual.
2. Dengan menggunakan benda berat dengan diameter sama dengan diameter luar maksimum pompa submersible, ukur apakah diameter dalam lubang sumur dapat memuat pompa submersible, dan ukur apakah kedalaman sumur memenuhi persyaratan pemasangan.

3. Periksa apakah lubang sumur bersih dan air sumur keruh. Jangan sekali-kali menggunakan pompa listrik submersible untuk mencuci air lumpur dan pasir pompa welor untuk menghindari kerusakan dini pada pompa listrik submersible.

4. Periksa apakah posisi klem pemasangan kepala las sudah sesuai dan apakah dapat menahan kualitas seluruh unit

5. Periksa apakah komponen pompa submersible sudah lengkap dan terpasang dengan benar sesuai diagram perakitan di manual. Lepaskan layar filter dan putar kopling untuk melihat apakah berputar secara fleksibel

6. Buka sekrup air dan isi rongga motor dengan air bersih yang tidak korosif (catatan, pastikan untuk mengisinya), kemudian kencangkan sekrup air. Setelah 12 jam injeksi air, resistansi isolasi motor tidak boleh kurang dari 150M Q bila diukur dengan meja goyang 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.

After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

Diagram proses pengkabelan kabel terlampir adalah sebagai berikut:

125QJB Deep Well Submersible Pump

8. Gunakan multimeter untuk memeriksa apakah kabel tiga fasa tersambung dan apakah resistansi DC kira-kira seimbang.
9. Check whether the circuit and transformer capacity are overloaded, and then connect the overload protection switch or starting equipment. See Table 2 for specific models, and then
Pour a bucket of water into the water pump from the water pump outlet to lubricate the rubber bearings in the pump, and then place the submersible electric pump upright and steady.
Start (no more than one second) and check whether the steering direction is consistent with the steering sign. If not, swap any two connectors of the three-phase cable.
Then install the filter and prepare to go down the well. If used in special occasions (such as ditches, ditches, rivers, ponds, ponds, etc.), the electric pump must be reliably grounded.

 

(2) Peralatan dan perkakas instalasi:
1. Sepasang rantai pengangkat lebih dari dua ton.
2. Tripod dengan tinggi vertikal minimal empat meter.
3. Dua buah tali gantung (tali kawat) yang mampu menahan beban lebih dari satu ton (dapat menahan beban satu set pompa air lengkap).
4. Pasang dua pasang klem (belat).
5. Kunci pas, palu, obeng, perkakas dan instrumen listrik, dll.

 

(3) Instalasi pompa listrik:
1. Diagram pemasangan pompa listrik submersible ditunjukkan pada Gambar 2. Dimensi pemasangan spesifik ditunjukkan pada Tabel 3 “Daftar Dimensi Pemasangan Pompa Listrik Submersible”.


2. Pompa listrik submersible dengan head kurang dari 30 meter dapat diangkat langsung ke dalam sumur dengan menggunakan selang dan tali kawat atau tali rami lainnya yang dapat menahan seluruh beban mesin, pipa air, dan air di dalam pipa.

3. Pompa dengan head lebih dari 30 meter menggunakan pipa baja, dan urutan pemasangannya sebagai berikut:
①Use a clamp to clamp the upper end of the water pump part (the motor and water pump have been connected at this time), lift it with a hanging chain, and slowly tie it into the well until
Put the clamp on the wellhead and remove the hanging chain.
② Use another pair of clamps to clamp a pipe, lift it with a hanging chain 15 cm away from the flange, and lower it slowly. Between pipe flange and pump flange
Put the rubber pad in place and tighten the pipe and pump evenly with bolts, nuts and spring washers.
③ Angkat sedikit pompa submersible, lepaskan klem di ujung atas pompa air, ikat kuat kabel ke pipa air dengan selotip plastik, dan ikat perlahan hingga klem dipasang di kepala sumur.
④Gunakan cara yang sama untuk mengikat semua pipa air ke dalam sumur.
⑤Setelah kabel keluar dihubungkan ke sakelar kontrol, kabel dihubungkan ke catu daya tiga fase.

 

(4) Hal-hal yang perlu diperhatikan selama instalasi:
1. If a jamming phenomenon is found during the pumping process, turn or pull the water pipe to overcome the jamming point. If various measures still do not work, please
Do not force the pump down to avoid damage to the submersible electric pump and the well.
2. Selama pemasangan, bantalan karet harus ditempatkan pada flensa setiap pipa dan dikencangkan secara merata.
3. Pada saat pompa air diturunkan ke dalam sumur, sebaiknya ditempatkan di tengah-tengah pipa sumur agar pompa tidak bekerja terlalu lama pada dinding sumur sehingga menyebabkan pompa bergetar dan motor menyapu dan terbakar. .
4. Tentukan kedalaman pompa air sampai ke dasar sumur sesuai dengan kondisi aliran pasir dan lanau sumur. Jangan mengubur pompa di dalam lumpur. Jarak pompa air ke dasar sumur umumnya tidak kurang dari 3 meter (lihat Gambar 2).
5. Kedalaman masuknya air dari pompa air harus setidaknya 1-1,5 meter dari ketinggian air dinamis ke simpul saluran masuk air (lihat Gambar 2). Jika tidak, bantalan pompa air akan mudah rusak.
6. Daya angkat pompa air tidak boleh terlalu rendah. Jika tidak, katup gerbang perlu dipasang pada pipa air kepala sumur untuk mengontrol aliran pompa pada titik aliran terukur guna mencegah motor kelebihan beban dan terbakar karena laju aliran yang besar.
7. Saat pompa air bekerja, keluaran air harus terus menerus dan merata, arus harus stabil (dalam kondisi kerja terukur, umumnya tidak lebih dari 10% arus terukur), dan tidak boleh ada getaran atau kebisingan. Jika terdapat kelainan, sebaiknya mesin dihentikan untuk mengetahui penyebabnya dan menghilangkannya.
8. Saat memasang, perhatikan pengaturan kabel ground motor (lihat Gambar 2). Jika pipa air berupa pipa baja, arahkan dari klem kepala sumur; bila pipa air berupa pipa plastik, arahkan dari tanda grounding pompa listrik.

 

 
Pemeliharaan dan Pemeliharaan
  • 1.Setelah pompa submersible dipasang, periksa kembali resistansi isolasi dan konduksi tiga fasa dari sakelar, periksa apakah instrumen dan sambungan peralatan start salah, jika tidak ada masalah, mesin uji dapat dihidupkan, dan amati apakah pembacaan indikator instrumen melebihi tegangan dan arus pengenal yang ditentukan pada pelat nama setelah start, dan amati apakah pompa mengalami fenomena kebisingan dan getaran, dan dioperasikan jika semuanya normal.
  • 2.Setelah pengoperasian pertama pompa selama empat jam, motor harus dimatikan untuk menguji resistansi isolasi termal dengan cepat, dan nilainya tidak boleh kurang dari 0,5 megaohm.
  • 3.Setelah pompa dimatikan, pompa harus dihidupkan setelah lima menit untuk mencegah kolom air di dalam pipa mengalir kembali sepenuhnya dan menyebabkan arus motor yang berlebihan dan terbakar.
  • 4.Setelah pompa dioperasikan secara normal, untuk memperpanjang masa pakainya, perlu untuk memeriksa apakah tegangan suplai, arus kerja, dan resistansi isolasi normal secara teratur. Jika ditemukan kondisi berikut, pompa harus segera dimatikan untuk mengatasi masalah.
  •  
  • 1 In the rated condition, the current exceeds 20%.
  • 2 Ketinggian air dinamis turun ke bagian saluran masuk air, menyebabkan air terputus-putus.
  • 3 Pompa submersible mempunyai getaran atau kebisingan yang parah.
  • 4 Tegangan suplai lebih rendah dari 340 volt.
  • 5 Sekring terbakar.
  • 6 Pipa penyedia air rusak.
  • 7 The motor's thermal insulation resistance is lower than 0.5 megaohm.
  •  
  • Unit disassembly:
  • 1.Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • 2.screw down the water bolt, put the water in the motor chamber.
  • 3.remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • 4.screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • 5.the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • 6.the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • 7.unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.

 

 
Penyimpanan dan Penitipan

This product is an efficient and durable submersible electric pump, suitable for a variety of environments and applications.In order to ensure the long-term use and stable performance of the product, we suggest that users pay special attention to drying the water in the motor cavity in winter to avoid freezing; in addition, the cable is coiled and tied, and properly stored in an environment without corrosive substances and gases, with a temperature below 40 °C. If the product is not used for a long time, attention should be paid to rust prevention treatment to ensure the life cycle and performance of the product.Whether for industrial use or for home use, this submersible electric pump can provide you with reliable pump service.

 

 
Memakai Suku Cadang
    • pendorong
    • Lengan poros
    • Lengan poros karet
    •  Cincin penyegel

 
Skenario Aplikasi

01 Asupan air sumur dalam

02 Pasokan air bertingkat tinggi

03 persediaan air pegunungan 

04 menara air

05 Irigasi pertanian

06 irigasi taman

07 pengambilan air sungai

08 air rumah tangga

 

Jika Anda tertarik dengan produk kami, Anda dapat memilih untuk meninggalkan informasi Anda di sini, dan kami akan segera menghubungi Anda.


Tulis pesan Anda di sini dan kirimkan kepada kami

Jika Anda tertarik dengan produk kami, Anda dapat memilih untuk meninggalkan informasi Anda di sini, dan kami akan segera menghubungi Anda.


id_IDIndonesian