QJP series special fountain pump is a fountain pump with higher efficiency developed by our factory. The motor core of the pump is made of high quality cold rolled silicon steel, which makes the pump have good magnetic permeability and will not produce heat when starting frequently. The two ends of the motor rotor are equipped with water-lubricated alloy copper sleeves instead of ball bearings, thus avoiding the problem of easy rust of ball bearings and burnout of motor due to lack of oil. 0JP series pump is also equipped with a variety of intelligent functions, such as over-temperature protection, anti-dry burning protection, etc., to ensure the safe operation of the pump. The pump is suitable for fountain decoration in landscape engineering, square, garden and other different occasions, providing users with efficient and reliable pumping solutions.
1, fonte de alimentação: CA trifásica 380V (tolerância +/- 5%), 50HZ (tolerância +/- 1%).
2, qualidade da água:
(1) water temperature is not higher than 20 °C;
(2) o teor de impurezas sólidas (proporção de massa) não é superior a 0,01%;
(3) valor de PH (pH) 6,5-8,5;
(4) o teor de sulfeto de hidrogênio não é superior a 1,5mg/L;
(5) o conteúdo de íons cloreto não é superior a 400mg/L.
3, o motor está fechado ou com estrutura úmida cheia de água, antes de usar a cavidade do motor submersível deve estar cheia de água limpa, para evitar falso enchimento e, em seguida, aperte a injeção de água, parafusos de liberação de ar, caso contrário não é permitido usar
4, a bomba submersível deve estar completamente submersa na água, a profundidade de mergulho não é superior a 70m, o fundo da bomba submersível do fundo do poço não é inferior a 3m.
5, o fluxo de água do poço deve ser capaz de atender à saída de água da bomba submersível e operação contínua, a saída de água da bomba submersível deve ser controlada em 0,7 - 1,2 vezes o fluxo nominal.
6, o poço deve ser reto, a bomba submersível não pode ser usada ou despejada, apenas uso vertical.
7, a bomba submersível deve ser combinada com o cabo de acordo com os requisitos e o dispositivo de proteção contra sobrecarga externa.
8, a bomba é estritamente proibida sem máquina de teste sem carga de água
Modelo | Fluxo (m3/h) | Cabeça (m) |
Velocidade de rotação (mudança/ponto) |
Bomba d'água (%) | Tomada diâmetro (milímetros) |
Bem aplicável diâmetro (mm) |
Avaliado potência (KW) |
Avaliado tensão (V) |
Avaliado corrente (A) |
Eficiência motora (%) | power factorcosφ | Unidade Tamanho máximo radial (mm) |
Observação | |||||||||
150QJ5-100 | 5 | 100 | 2850 | 58 | 40 | 150 | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ5-150 | 5 | 150 | 2850 | 58 | 40 | 150 acima | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ5-200 | 200 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ5-250 | 250 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ5-300 | 300 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ10-50 | 10 | 50 | 2850 | 63 | 50 | 150acima | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ10-66 | 66 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-78 | 78 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ10-84 | 84 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-91 | 91 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-100 | 100 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ10-128 | 128 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-150 | 150 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ10-200 | 200 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ10-250 | 250 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ10-300 | 300 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-33 | 15 | 33 | 2850 | 63 | 50 | 150acima | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ15-42 | 42 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-50 | 50 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ15-60 | 60 | 5.5 | 13.74 | 76 | 0.8 | |||||||||||||||||
150QJ15-65 | 65 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-72 | 72 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ15-81 | 81 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-90 | 90 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-98 | 98 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ15-106 | 106 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-114 | 114 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ15-130 | 130 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ15-146 | 146 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-162 | 162 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ15-180 | 180 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-26 | 20 | 26 | 2850 | 64 | 50 | 150acima | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ20-33 | 33 | 3 | 7.9 | 74.0 | 0.78 | |||||||||||||||||
150QJ20-39 | 20 | 39 | 2850 | 64 | 50 | 150acima | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ20-52 | 52 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ20-65 | 65 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-78 | 78 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ20-91 | 91 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-98 | 98 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ20-104 | 104 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-111 | 111 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ20-130 | 130 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-143 | 143 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-156 | 156 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ20-182 | 182 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-24 | 25 | 24 | 2850 | 64 | 65 | 150acima | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ25-32 | 32 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ25-40 | 40 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-48 | 48 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ25-56 | 56 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-64 | 64 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ25-72 | 72 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-77 | 77 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ25-84 | 84 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-96 | 96 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ25-104 | 104 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-110 | 110 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-120 | 120 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-128 | 128 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ25-136 | 136 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ25-154 | 154 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ32-18 | 32 | 18 | 2850 | 66 | 80 | 150acima | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ32-24 | 24 | 4 | 10.25 | 75.0 | 0.79 | |||||||||||||||||
150QJ32-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-36 | 36 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ32-42 | 32 | 42 | 2850 | 66 | 80 | 150acima | 7.5 | 380 | 18.5 | 77.0 | 0.8 | 143 | ||||||||||
150QJ32-54 | 54 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ32-66 | 66 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ32-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-84 | 84 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-90 | 90 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-96 | 96 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ32-114 | 114 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ40-16 | 40 | 16 | 2850 | 66 | 80 | 150acima | 3 | 380 | 7.9 | 74.0 | 0.78 | 143 | ||||||||||
150QJ40-24 | 24 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-30 | 30 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ40-40 | 40 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ40-48 | 48 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ40-56 | 56 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ40-64 | 64 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-72 | 72 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-80 | 80 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ40-96 | 96 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-16 | 50 | 16 | 2850 | 65 | 80 | 150acima | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ50-22 | 22 | 5.5 | 13.74 | 76.0 | 0.8 | |||||||||||||||||
150QJ50-28 | 28 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ50-34 | 34 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-40 | 40 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ50-46 | 46 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ50-52 | 52 | 13 | 30.87 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-57 | 57 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ50-74 | 74 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ50-80 | 80 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ63-12 | 63 | 12 | 2850 | 60 | 80 | 150acima | 4 | 380 | 10.25 | 75.0 | 0.79 | 143 | ||||||||||
150QJ63-18 | 18 | 7.5 | 18.5 | 77.0 | 0.8 | |||||||||||||||||
150QJ63-30 | 30 | 9.2 | 22.12 | 78.0 | 0.81 | |||||||||||||||||
150QJ63-36 | 36 | 11 | 26.28 | 78.5 | 0.81 | |||||||||||||||||
150QJ63-42 | 63 | 42 | 2850 | 60 | 80 | 150acima | 13 | 380 | 30.87 | 79.0 | 0.81 | 143 | ||||||||||
150QJ63-48 | 48 | 15 | 35.62 | 79.0 | 0.81 | |||||||||||||||||
150QJ63-54 | 54 | 18.5 | 43.12 | 79.5 | 0.82 | |||||||||||||||||
150QJ15-220 | 15 | 220 | 2850 | 50 | 150acima | 18.5 | 380 | 43.12 | 143 | |||||||||||||
150QJ15-260 | 260 | 20 | 49.7 | |||||||||||||||||||
150QJ15-300 | 300 | 25 | 56.5 | |||||||||||||||||||
150QJ20-210 | 20 | 210 | 2850 | 50 | 150acima | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ20-240 | 240 | 25 | 56.5 | |||||||||||||||||||
150QJ20-290 | 290 | 30 | 66.6 | |||||||||||||||||||
150QJ25-175 | 25 | 175 | 2850 | 65 | 150acima | 20 | 49.7 | 143 | ||||||||||||||
150QJ25-200 | 200 | 30 | 66.6 | |||||||||||||||||||
150QJ25-290 | 290 | 37 | 82.1 | |||||||||||||||||||
150QJ32-120 | 32 | 120 | 2850 | 80 | 150acima | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ32-132 | 132 | 25 | 56.5 | |||||||||||||||||||
150QJ32-156 | 156 | 30 | 66.6 | |||||||||||||||||||
150QJ32-190 | 190 | 37 | 82.1 | |||||||||||||||||||
150QJ32-240 | 240 | 45 | 96.9 | |||||||||||||||||||
150QJ40-110 | 40 | 110 | 2850 | 80 | 150acima | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ40-121 | 121 | 25 | 56.5 | |||||||||||||||||||
150QJ40-143 | 143 | 30 | 66.6 | |||||||||||||||||||
150QJ40-176 | 176 | 37 | 82.1 | |||||||||||||||||||
150QJ40-220 | 220 | 45 | 96.9 | |||||||||||||||||||
150QJ50-100 | 50 | 100 | 2850 | 80 | 150acima | 20 | 380 | 49.7 | 143 | |||||||||||||
150QJ50-110 | 110 | 25 | 56.5 | |||||||||||||||||||
150QJ50-130 | 130 | 30 | 66.6 | |||||||||||||||||||
150QJ50-160 | 160 | 37 | 82.1 | |||||||||||||||||||
150QJ50-200 | 200 | 45 | 96.9 |
1, bomba submersível de poço para bomba de água limpa, proíbe o novo poço, bombeando sedimentos e água lamacenta,
2, grau de tensão da bomba de água de poço 380/50 Hz, o uso de outros graus de tensão de motores submersíveis precisa ser personalizado. O cabo subterrâneo deve usar cabo à prova d'água, deve ser equipado com equipamento de partida, como caixa de distribuição, partida não pronta deve ter função de proteção abrangente do motor comumente usada, como proteção contra sobrecarga de curto-circuito, proteção de fase, proteção de subtensão, proteção de aterramento, proteção de marcha lenta , em caso de condições anormais, o dispositivo de proteção deve ser acionado em tempo hábil.
3, a instalação e o uso da bomba devem ser aterrados de forma confiável, proíbe o interruptor push and pull quando as mãos e os pés estão molhados, deve cortar a fonte de alimentação antes da instalação e manutenção da bomba, o local de uso da bomba para configurar " para evitar choque elétrico" sinais óbvios:
4, no poço ou antes da instalação, a cavidade do motor deve ser preenchida com água destilada ou água fervente limpa não corrosiva, aperte o parafuso / água, a bomba no teste de solo, deve ser para a borracha de lubrificação de água da câmara da bomba rolamentos, partida instantânea não mais que um segundo, veja se a direção é igual às instruções de direção. Quando a bomba estiver na vertical, preste atenção à segurança, evite ferimentos por capotamento.
5, estritamente de acordo com as disposições do elevador da bomba, faixa de fluxo de uso, para evitar baixo fluxo ou força de bombeamento de alta elevação, o rolamento axial e outras partes do desgaste, a sobrecarga do motor queimada 6, após a bomba descer o poço, a medição do motor à resistência de isolamento do solo não deve ser inferior a 100M, após o início da observação da tensão e corrente, verifique o isolamento do enrolamento do motor, se está de acordo com os requisitos; A temperatura do local de armazenamento da bomba, se for inferior ao ponto de congelamento, deve secar a água da cavidade do motor, evitando danos ao gelo da água da cavidade do motor causados pela baixa temperatura.
The pump part is mainly composed of pump shaft, impeller, flow guide housing, rubber bearing, check valve body (optional) and other parts. The motor part is mainly composed of base, pressure regulating diaphragm, thrust bearing, thrust plate, lower guide bearing seat, stator, rotor, upper guide bearing seat, sand discharging ring, water inlet section, lead cable and other parts. The main features of the product include: the motor is a water-filled wet submersible three-phase asynchronous motor, the motor cavity is filled with clear water for cooling the motor and lubricating the bearing, the pressure regulating diaphragm at the bottom of the motor is used to adjust the pressure difference caused by the heating of the motor. In order to prevent the sand in the well water from entering the motor, the upper end of the motor shaft extension is installed with two oil seals, and the sand discharging ring is installed to form a sand prevention structure. In order to avoid the pump shaft jumping when starting, the pump shaft is connected with the motor shaft through a coupling, and the thrust bearing is installed at the bottom of the motor. The lubrication of the motor and the pump bearing is water lubrication, and the stator winding of the motor uses high quality submersible motor wire with high insulation performance. The pump is designed by computer CAD, with simple structure and superior technical performance.

(1)Preparação antes da instalação:
1. Verifique se a bomba submersível atende às condições de uso e escopo especificados no manual.
2. Usando um objeto pesado com diâmetro igual ao diâmetro externo máximo da bomba submersível, meça se o diâmetro interno do poço pode caber na bomba submersível e meça se a profundidade do poço atende aos requisitos de instalação.
3. Verifique se o poço está limpo e se a água do poço está turva. Nunca use uma bomba elétrica submersível para lavar a lama da bomba Welor e água de areia para evitar danos prematuros à bomba elétrica submersível.
4. Verifique se a posição da braçadeira de instalação da cabeça de poço é adequada e se ela pode suportar a qualidade de toda a unidade
5. Verifique se os componentes da bomba submersível estão completos e instalados corretamente de acordo com o diagrama de montagem no manualRemova a tela do filtro e gire o acoplamento para ver se ele gira de forma flexível
6. Desaparafuse o parafuso de água e encha a cavidade do motor com água limpa e não corrosiva (nota: certifique-se de enchê-la) e, em seguida, aperte o parafuso de água. Após 12 horas de injeção de água, a resistência de isolamento do motor não deve ser inferior a 150M Q quando medida com uma mesa vibratória de 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω
O diagrama do processo de fiação do cabo anexado é o seguinte:
8. Use um multímetro para verificar se os fios trifásicos estão conectados e se a resistência CC está aproximadamente equilibrada.
9. Verifique se o circuito e a capacidade do transformador estão sobrecarregados e, em seguida, conecte a chave de proteção contra sobrecarga ou o equipamento de partida. Consulte a Tabela 2 para modelos específicos e, em seguida, despeje um balde de água na bomba d'água a partir da saída da bomba d'água para lubrificar os rolamentos de borracha da bomba e, em seguida, coloque a bomba elétrica submersível na posição vertical e estável.Inicie (não mais que um segundo) e verifique se a direção da direção é consistente com o sinal de direção. Caso contrário, troque quaisquer dois conectores do cabo trifásico. Em seguida, instale o filtro e prepare-se para descer no poço. Se utilizada em ocasiões especiais (como valas, valas, rios, lagoas, lagoas, etc.), a bomba elétrica deve ser aterrada de forma confiável.
(2) Equipamentos e ferramentas de instalação:
1. Um par de correntes de elevação para mais de duas toneladas.
2. Um tripé com altura vertical não inferior a quatro metros.
3. Duas cordas suspensas (cabos de aço) que podem suportar um peso de mais de uma tonelada (podem suportar o peso de um conjunto completo de bombas d'água).
4. Instale dois pares de grampos (talas).
5. Chaves, martelos, chaves de fenda, ferramentas e instrumentos elétricos, etc.
(3)Instalação da bomba elétrica:
1. O diagrama de instalação da bomba elétrica submersível é mostrado na Figura 2. As dimensões específicas de instalação são mostradas na Tabela 3 “Lista de Dimensões de Instalação da Bomba Elétrica Submersível”.
2. Bombas elétricas submersíveis com altura manométrica inferior a 30 metros podem ser içadas diretamente para o poço usando mangueiras e cabos de aço ou outras cordas de cânhamo que possam suportar o peso total de toda a máquina, canos de água e água nos canos.
3. As bombas com altura manométrica superior a 30 metros utilizam tubos de aço e a sequência de instalação é a seguinte:
①Use uma braçadeira para prender a extremidade superior da parte da bomba de água (o motor e a bomba de água foram conectados neste momento), levante-a com uma corrente suspensa e amarre-a lentamente no poço atéColoque a braçadeira na cabeça do poço e remova o corrente pendurada.
② Use outro par de braçadeiras para prender um tubo, levante-o com uma corrente suspensa a 15 cm de distância do flange e abaixe-o lentamente. Entre o flange do tubo e o flange da bombaColoque a almofada de borracha no lugar e aperte o tubo e a bomba uniformemente com parafusos, porcas e arruelas de pressão.
③ Levante ligeiramente a bomba submersível, remova a braçadeira na extremidade superior da bomba d'água, amarre o cabo firmemente ao tubo de água com uma fita plástica e amarre-o lentamente até que a braçadeira seja colocada na cabeça do poço.
④Use o mesmo método para amarrar todos os canos de água ao poço.
⑤Depois que o cabo de saída é conectado à chave de controle, ele é conectado à fonte de alimentação trifásica.
(4)Observações durante a instalação:
1. Se for encontrado um fenômeno de travamento durante o processo de bombeamento, gire ou puxe o tubo de água para superar o ponto de travamento. Se várias medidas ainda não funcionarem, não force a bomba para baixo para evitar danos à bomba elétrica submersível e ao poço.
2. Durante a instalação, uma almofada de borracha deve ser colocada no flange de cada tubo e apertada uniformemente.
3. Quando a bomba de água é abaixada no poço, ela deve ser colocada no meio do tubo do poço para evitar que a bomba funcione contra a parede do poço por um longo tempo, fazendo com que a bomba vibre e o motor varra e queime .
4. Determine a profundidade da bomba d'água até o fundo do poço de acordo com o fluxo de areia e lodo do poço. Não enterre a bomba na lama. A distância da bomba de água ao fundo do poço geralmente não é inferior a 3 metros (ver Figura 2).
5. A profundidade de entrada de água da bomba de água não deve ser inferior a 1-1,5 metros do nível dinâmico de água até o nó de entrada de água (ver Figura 2). Caso contrário, os rolamentos da bomba de água podem ser facilmente danificados.
6. A elevação da bomba d'água não pode ser muito baixa. Caso contrário, uma válvula gaveta precisa ser instalada na tubulação de água da cabeça do poço para controlar o fluxo da bomba no ponto de fluxo nominal para evitar que o motor fique sobrecarregado e queime devido a grandes vazões.
7. Quando a bomba de água está funcionando, a saída de água deve ser contínua e uniforme, a corrente deve ser estável (sob condições nominais de trabalho, geralmente não mais que 10% da corrente nominal) e não deve haver vibração ou ruído. Se houver alguma anormalidade, a máquina deve ser parada para descobrir a causa e eliminá-la.
8. Ao instalar preste atenção ao ajuste do fio terra do motor (ver Figura 2). Quando o cano de água for de aço, conduza-o pela braçadeira da cabeça do poço; quando a tubulação de água for de plástico, conduza-a a partir da marca de aterramento da bomba elétrica.
When the submersible pump is installed, recheck the insulation resistance and three-phase connectivity of the switch, and check whether there is any error in the connection between the instrument and the starting equipment. If there is no problem, you can start the test machine. After starting, observe whether the indication reading of each instrument is correct. If the rated voltage and current specified on the nameplate are exceeded, observe whether the pump has any noise or vibration. If everything is normal, you can put into operation. After the first start of the pump for four hours, it should be closed and the thermal insulation resistance of the motor should be quickly tested. Its value should not be less than 0.5 megaohm. After stopping the pump, it should be restarted after a five-minute interval to prevent the water column in the pipeline from completely reversing, resulting in the motor burning due to excessive current. After the pump is put into normal operation, in order to prolong its service life, it is necessary to check regularly whether the supply voltage, working current and insulation resistance are normal. If the following conditions are found, the machine should be shut down immediately to eliminate the fault:
1.the current exceeds 20% under the rated working conditions.
2.the dynamic water level drops to the inlet section, resulting in intermittent drainage.
3.the submersible pump vibrates violently or emits huge noise.
4.the supply voltage is lower than 340 volts.
5.a fuse is blown out.
6.the water pipe is damaged.
7.the thermal insulation resistance of the motor to the ground is less than 0.5 megaohm.
When disassembling the unit:
1.lock the cable, take off the pipeline part, and remove the line protection plate.
2.unscrew the drain bolt, empty all the water in the motor chamber.
3.remove the filter, loosen the screw on the coupling fixed motor shaft.
4.unscrew the bolt connecting the water inlet section and the motor, and separate the pump and the motor (pay attention to the leveling unit when separating to prevent the bending of the pump shaft).
5.the disassembly sequence of the pump is: (see Figure 1) water inlet section, impeller, guide housing, rotor, impeller. Check the valve body. When removing the impeller, use special tools to loosen the conical sleeve fixed on the impeller. In the process of disassembly and assembly, avoid bending the pump shaft and damaging various parts.
6.the disassembly process of the motor is: (see Figure 1) put the motor on the platform, remove the nut, base, shaft head lock nut, thrust plate, key, lower guide rail, support seat, and tie rod bolt from the bottom of the motor in order, and then take out the rotor (be careful not to damage the wiring harness), and finally remove the connecting part and the upper guide rail bearing seat. When assembling the unit: before assembly, rust and dirt on each part should be cleaned and sealant coated on each mating surface and fastener, then assembled in reverse order of disassembly (motor shaft movement after assembly is about 1 mm), after assembly, coupling should be flexible, then put on the filter for testing. Each submersible pump running for one year, or if the running time is less than one year but has been immersed for two years, it must be disassembled and inspected according to Article 5 to replace worn parts.
1, retire a água da cavidade do motor (principalmente no inverno para evitar que o motor congele) e amarre bem o cabo.
2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.
3, o uso a longo prazo deve prestar atenção à prevenção da ferrugem das bombas submersíveis.
- Impulsor
- Manga do eixo
- Luva do eixo de borracha
-
Anel de vedação
01 Tomada de água de poço profundo
02 Abastecimento de água em arranha-céus
03 abastecimento de água na montanha
04 torre de água
05 Irrigação agrícola
06 irrigação de jardim
07 captação de água do rio
08 água doméstica