Bomba submersível 125QJP Peep Well

Realize o processamento OEM! De acordo com as necessidades do usuário, projeto e fabricação de vários tipos de requisitos especiais de motores e bombas submersíveis não padronizados. Os padrões de implementação do produto: GB/T2816-2014 "bomba submersível de poço", GB/T2818-2014 "motor assíncrono bem submersível". WhatsApp: 17855846335
PDF DOWNLOAD
Detalhes
Tag
 
Resumo do Produto

QJP series fountain pump is a fountain pump with higher efficiency developed and researched by our factory. The pump motor core adopts high quality cold rolled silicon steel, which makes the pump have good magnetic conductivity and frequent start without heating.

The motor rotor ends use water as lubricant alloy copper sleeve instead of ball bearings, avoiding the problem of easy rust, rust and lack of oil wear and tear of the motor.

 

 
Condições de Uso

1, fonte de alimentação: CA trifásica 380V (tolerância +/- 5%), 50HZ (tolerância +/- 1%).

2, qualidade da água:

(1) water temperature is not higher than 20 °C;

(2) o teor de impurezas sólidas (proporção de massa) não é superior a 0,01%;

(3) valor de PH (pH) 6,5-8,5;

(4) o teor de sulfeto de hidrogênio não é superior a 1,5mg/L;

(5) o conteúdo de íons cloreto não é superior a 400mg/L.

3, o motor está fechado ou com estrutura úmida cheia de água, antes de usar a cavidade do motor submersível deve estar cheia de água limpa, para evitar falso enchimento e, em seguida, aperte a injeção de água, parafusos de liberação de ar, caso contrário não é permitido usar

4, a bomba submersível deve estar completamente submersa na água, a profundidade de mergulho não é superior a 70m, o fundo da bomba submersível do fundo do poço não é inferior a 3m.

5, o fluxo de água do poço deve ser capaz de atender à saída de água da bomba submersível e operação contínua, a saída de água da bomba submersível deve ser controlada em 0,7 - 1,2 vezes o fluxo nominal.

6, o poço deve ser reto, a bomba submersível não pode ser usada ou despejada, apenas uso vertical.

7, a bomba submersível deve ser combinada com o cabo de acordo com os requisitos e o dispositivo de proteção contra sobrecarga externa.

8, a bomba é estritamente proibida sem máquina de teste sem carga de água

 

 
Significado do modelo

125QJP Peep Well Submersible Pump

 
Referência parcial do modelo
Modelo Fluxo (m3/h) Cabeça
(m)

Velocidade de rotação

(mudança/ponto)

Bomba d'água (%) Tomada
diâmetro
(milímetros)
Bem aplicável
diâmetro (mm) 
Avaliado
potência (KW)
Avaliado
tensão (V)
Avaliado
corrente (A)
 Eficiência motora (%)  power factorcosφ  Unidade
Tamanho máximo radial (mm)
Observação
125QJ5-34 5 34 2850 53 40  125acima 1.5 380 4.23 70.0 0.77 118  
125QJ5-51 51 2.2 6.03 72.0 0.77  
125QJ5-68 68 3 8.01 73.0 0.78  
125QJ5-85 85 4 10.53 74.0 0.78  
125QJ5-102 102 5.5 14.1 75.0 0.79  
125QJ5-119 119 5.5 14.1 75.0 0.79  
125QJ10-24 10 24 2850 60 50  125acima 1.5 380 4.23 70.0 0.77 118  
125QJ10-32 32 2.2 6.03 72.0 0.77  
125QJ10-48 48 3 8.01 73.0 0.78  
125QJ10-56 56 4 10.53 74.0 0.78  
125QJ10-72 72 5.5 14.1 75.0 0.79  
125QJ10-80 80 5.5 14.1 75.0 0.79  
125QJ10-104 104 7.5 19.0 76.0 0.79  
125QJ10-120 10 120 2850 60 50  125acima 7.5 380 19.0 76.0 0.79 118  
125QJ10-136 136 9.2 22.7 77.0 0.8  
125QJ15-36 15 36 2850 63 50  125acima 2.2 380 6.03 72.0 0.77 118  
125QJ15-39 39 3 8.01 73.0 0.78  
125QJ15-46 46 4 10.53 74.0 0.78  
125QJ15-52 52 4 10.53 74.0 0.78  
125QJ15-59 59 5.5 14.1 75.0 0.79  
125QJ15-65 65 5.5 14.1 75.0 0.79  
125QJ15-78 78 7.5 19.0 76.0 0.79  
125QJ15-91 91 7.5 19.0 76.0 0.79  
125QJ15-104 104 9.2 22.7 77.0 0.8  
125QJ20-16 20 16 2850 64 50  125acima 2.2 380 6.03 72.0 0.77 118  
125QJ20-24 24 3 8.01 73.0 0.78  
125QJ20-32 32 4 10.53 74.0 0.78  
125QJ20-40 40 4 10.53 74.0 0.78  
125QJ20-48 48 5.5 14.1 75.0 0.79  
125QJ20-56 56 5.5 14.1 75.0 0.79  
125QJ20-64 64 7.5 19.0 76.0 0.79  
125QJ20-72 72 7.5 19.0 76.0 0.79  
125QJ20-80 80 9.2 22.7 77.0 0.8  
125QJ25-12 25 12 2850 64 65  125acima 2.2 380 6.03 72.0 0.77 118  
125QJ25-18 18 3 8.01 73.0 0.78  
125QJ25-24 24 4 10.53 74.0 0.78  
125QJ25-30 30 4 10.53 74.0 0.78  
125QJ25-36 36 5.5 14.1 75.0 0.79  
125QJ25-48 48 7.5 19.0 76.0 0.79  
125QJ25-60 60 9.2 22.7 77.0 0.8  
125QJ32-24 32 24 2850 64 80  125acima 4 380 10.53 74.0 0.78 118  
125QJ32-30 30 5.5 14.1 75.0 0.79  
125QJ32-42 42 7.5 19.0 76.0 0.79  
125QJ32-54 54 9.2 22.7 77.0 0.8  
125QJ5-240 5 240 2850   40  125acima 11 380 26.28     118  
125QJ5-280 280 13 30.87      
125QJ5-320 320 15 35.62      
125QJ10-180 10 180 2850   50  125acima 11 380 26.28     118  
125QJ10-210 210 13 30.87      
125QJ10-240 240 15 35.62      
125QJ15-120 15 120 2850   50  125acima 11 380 26.28     118  
125QJ15-142 142 13 30.87      
125QJ15-162 162 15 35.62      
125QJ20-100 20 100 2850   50  125acima 11 380 26.28     118  
125QJ20-120 120 13 30.87      
125QJ20-136 136 15 35.62      
125QJ25-82 25 82 2850   65  125acima 11 380 26.28     118  
125QJ25-97 97 13 30.87      
125QJ25-110 110 15 35.62      
125QJ32-68 32 68 2850   80  125acima 11 380 26.28     118  
125QJ32-80 80 13 30.87      
125QJ32-92 92 15 35.62      
125QJ40-46 40 46 2850   80  125acima 11 380 26.28     118  
125QJ40-54 54 13 30.87      
125QJ40-62 62 15 35.62      

 

 
Precauções de segurança

1, well submersible pump for clean water pump, prohibit the new well, pumping sediment and muddy water,

2, well water pump voltage grade of 380/50HZ, the use of other voltage grades of submersible motors need to be customized. The underground cable must use waterproof cable, must be equipped with starting equipment, such as distribution box, start not ready should have commonly used motor comprehensive protection function, such as short circuit overload protection, phase protection, undervoltage protection, grounding protection, idling protection, in case of abnormal conditions, the protection device should be timely action trip.

3, the installation and use of the pump must be reliably grounded, prohibit the push and pull switch when the hands and feet are wet, the installation and maintenance of the pump must be cut off the power supply, the use of the pump place to set up "to prevent electric shock" obvious signs:

4, down the well or before installation, the motor cavity must be filled with distilled water or non-corrosive clean cold boiling water, tighten the / water bolt, the pump on the ground test run, must be to the pump chamber water lubrication rubber bearings, instant start not more than a second, see whether the steering is the same as the steering instructions. When the pump is upright, pay attention to safety, prevent overturning injury.

5, estritamente de acordo com as disposições do elevador da bomba, faixa de fluxo de uso, para evitar baixo fluxo ou força de bombeamento de alta elevação, o rolamento axial e outras partes do desgaste, a sobrecarga do motor queimada

6, after the pump down the well, the measurement of the motor to the ground insulation resistance should not be less than 100M, after the start to observe the voltage and current, check the motor winding insulation, whether in line with the requirements; pump storage location temperature if less than freezing point, should be dry the motor cavity water, prevent the motor cavity water ice damage caused by low temperature.

 

 
Introdução à Estrutura

Breve introdução à estrutura: a peça da bomba é composta principalmente pelo eixo da bomba, impulsor, carcaça de desvio, rolamento de borracha, corpo da válvula de retenção (peças opcionais) e outros componentes. A peça do motor é composta principalmente de base, filme regulador de pressão, rolamento axial, placa axial, assento do rolamento guia inferior, estator, rotor, assento do rolamento guia superior, anel de areia, seção de entrada de água, cabo e outros componentes.


As principais características do produto incluem:

 1, o motor é um motor assíncrono trifásico submersível úmido cheio de água, a cavidade do motor está cheia de água limpa, usada para resfriar o motor e lubrificar o rolamento, o filme regulador de pressão na parte inferior do motor é usado para ajustar a diferença de pressão de expansão e contração da água dentro do corpo causada pela mudança no aumento de temperatura do motor.

 2, Para evitar que a areia da água do poço entre no motor, a extremidade superior do eixo do motor é equipada com duas vedações de óleo e um anel de areia é instalado para formar uma estrutura de prevenção de areia.

 3, Para evitar que o eixo da bomba suba durante a partida, o eixo da bomba e o eixo do motor são conectados por um acoplamento, e um rolamento de impulso superior é instalado na parte inferior do motor.

 4, A lubrificação do motor e do rolamento da bomba é lubrificação com água.

 5, o enrolamento do estator do motor é feito de fio de enrolamento de motor submersível de alta qualidade, com alto desempenho de isolamento.

 6, a bomba é projetada por computador CAD, com estrutura simples e bom desempenho técnico.

125QJP Peep Well Submersible Pump
 
Instalar

(1)Preparação antes da instalação:
1. Verifique se a bomba submersível atende às condições de uso e escopo especificados no manual.
2. Usando um objeto pesado com diâmetro igual ao diâmetro externo máximo da bomba submersível, meça se o diâmetro interno do poço pode caber na bomba submersível e meça se a profundidade do poço atende aos requisitos de instalação.
3. Verifique se o poço está limpo e se a água do poço está turva. Nunca use uma bomba elétrica submersível para lavar a lama da bomba Welor e água de areia para evitar danos prematuros à bomba elétrica submersível.
4. Verifique se a posição da braçadeira de instalação da cabeça de poço é adequada e se ela pode suportar a qualidade de toda a unidade
5. Verifique se os componentes da bomba submersível estão completos e instalados corretamente de acordo com o diagrama de montagem no manualRemova a tela do filtro e gire o acoplamento para ver se ele gira de forma flexível
6. Desaparafuse o parafuso de água e encha a cavidade do motor com água limpa e não corrosiva (nota: certifique-se de enchê-la) e, em seguida, aperte o parafuso de água. Após 12 horas de injeção de água, a resistência de isolamento do motor não deve ser inferior a 150M Q quando medida com uma mesa vibratória de 500V.
7. Cable joint, cut off a 120mm rubber sleeve from one end of the outgoing cable and the matching cable with an electrician's knifethen stagger the length of the three core wires in a stepped shape, peel off a 20mm copper core, scrape of the oxide layer on theoutside of the copper wire with a knife or sand cloth, and insert the two connected wire ends in palirs.After tying the layer tightly with fine copper wire, solder it thoroughly and firmly, and sand of any. burrs on the surface. Then, forthe three joints, use polyvester insulation tape to wrap them in a semi stacked manner for three lavers. Wrap the two ends of thewrapping layer tightywith nyion thread,and then use a semi stacked method to wrap the tape for three layers. Wrap the outellayer with high-pressure insulation tape for three layers. Finally, fold the threestrands together and repeatedly wrap them for fivelayers with high-pressure tape. Each layer must be tightly tied, and the interlayer joints must be tight and fimm to prevent water frompenetrating and damaging the insulation, After wrapping, soak in water at room temperature of 20 ’c for 12 hours, and measurethe insulation resistance with a shaking table, which should not be less than 100M Ω

 

O diagrama do processo de fiação do cabo anexado é o seguinte:

125QJP Peep Well Submersible Pump

 

8. Use um multímetro para verificar se os fios trifásicos estão conectados e se a resistência CC está aproximadamente equilibrada.
9. Verifique se o circuito e a capacidade do transformador estão sobrecarregados e, em seguida, conecte a chave de proteção contra sobrecarga ou o equipamento de partida. Consulte a Tabela 2 para modelos específicos e, em seguida, despeje um balde de água na bomba d'água a partir da saída da bomba d'água para lubrificar os rolamentos de borracha da bomba e, em seguida, coloque a bomba elétrica submersível na posição vertical e estável.Inicie (não mais que um segundo) e verifique se a direção da direção é consistente com o sinal de direção. Caso contrário, troque quaisquer dois conectores do cabo trifásico. Em seguida, instale o filtro e prepare-se para descer no poço. Se utilizada em ocasiões especiais (como valas, valas, rios, lagoas, lagoas, etc.), a bomba elétrica deve ser aterrada de forma confiável.

 

(2) Equipamentos e ferramentas de instalação:
1. Um par de correntes de elevação para mais de duas toneladas.
2. Um tripé com altura vertical não inferior a quatro metros.
3. Duas cordas suspensas (cabos de aço) que podem suportar um peso de mais de uma tonelada (podem suportar o peso de um conjunto completo de bombas d'água).
4. Instale dois pares de grampos (talas).
5. Chaves, martelos, chaves de fenda, ferramentas e instrumentos elétricos, etc.

 

(3)Instalação da bomba elétrica:
1. O diagrama de instalação da bomba elétrica submersível é mostrado na Figura 2. As dimensões específicas de instalação são mostradas na Tabela 3 “Lista de Dimensões de Instalação da Bomba Elétrica Submersível”.

 

2. Bombas elétricas submersíveis com altura manométrica inferior a 30 metros podem ser içadas diretamente para o poço usando mangueiras e cabos de aço ou outras cordas de cânhamo que possam suportar o peso total de toda a máquina, canos de água e água nos canos.

 

3. As bombas com altura manométrica superior a 30 metros utilizam tubos de aço e a sequência de instalação é a seguinte:
①Use uma braçadeira para prender a extremidade superior da parte da bomba de água (o motor e a bomba de água foram conectados neste momento), levante-a com uma corrente suspensa e amarre-a lentamente no poço atéColoque a braçadeira na cabeça do poço e remova o corrente pendurada.
② Use outro par de braçadeiras para prender um tubo, levante-o com uma corrente suspensa a 15 cm de distância do flange e abaixe-o lentamente. Entre o flange do tubo e o flange da bombaColoque a almofada de borracha no lugar e aperte o tubo e a bomba uniformemente com parafusos, porcas e arruelas de pressão.
③ Levante ligeiramente a bomba submersível, remova a braçadeira na extremidade superior da bomba d'água, amarre o cabo firmemente ao tubo de água com uma fita plástica e amarre-o lentamente até que a braçadeira seja colocada na cabeça do poço.
④Use o mesmo método para amarrar todos os canos de água ao poço.
⑤Depois que o cabo de saída é conectado à chave de controle, ele é conectado à fonte de alimentação trifásica.


(4)Observações durante a instalação:
1. Se for encontrado um fenômeno de travamento durante o processo de bombeamento, gire ou puxe o tubo de água para superar o ponto de travamento. Se várias medidas ainda não funcionarem, não force a bomba para baixo para evitar danos à bomba elétrica submersível e ao poço.
2. Durante a instalação, uma almofada de borracha deve ser colocada no flange de cada tubo e apertada uniformemente.
3. Quando a bomba de água é abaixada no poço, ela deve ser colocada no meio do tubo do poço para evitar que a bomba funcione contra a parede do poço por um longo tempo, fazendo com que a bomba vibre e o motor varra e queime .
4. Determine a profundidade da bomba d'água até o fundo do poço de acordo com o fluxo de areia e lodo do poço. Não enterre a bomba na lama. A distância da bomba de água ao fundo do poço geralmente não é inferior a 3 metros (ver Figura 2).
5. A profundidade de entrada de água da bomba de água não deve ser inferior a 1-1,5 metros do nível dinâmico de água até o nó de entrada de água (ver Figura 2). Caso contrário, os rolamentos da bomba de água podem ser facilmente danificados.
6. A elevação da bomba d'água não pode ser muito baixa. Caso contrário, uma válvula gaveta precisa ser instalada na tubulação de água da cabeça do poço para controlar o fluxo da bomba no ponto de fluxo nominal para evitar que o motor fique sobrecarregado e queime devido a grandes vazões.
7. Quando a bomba de água está funcionando, a saída de água deve ser contínua e uniforme, a corrente deve ser estável (sob condições nominais de trabalho, geralmente não mais que 10% da corrente nominal) e não deve haver vibração ou ruído. Se houver alguma anormalidade, a máquina deve ser parada para descobrir a causa e eliminá-la.
8. Ao instalar preste atenção ao ajuste do fio terra do motor (ver Figura 2). Quando o cano de água for de aço, conduza-o pela braçadeira da cabeça do poço; quando a tubulação de água for de plástico, conduza-a a partir da marca de aterramento da bomba elétrica.

 

 
Manutenção e Manutenção
  • 1. Após a instalação da bomba submersível, verifique novamente a resistência de isolamento e a condução trifásica do interruptor, verifique se o instrumento e a conexão do equipamento de partida estão errados, se não houver problema, a máquina de teste pode ser iniciada, e observe se as leituras do indicador do instrumento excedem a tensão e corrente nominais especificadas na placa de identificação após a partida, e observe se a bomba apresenta fenômeno de ruído e vibração, e coloque em operação se tudo estiver normal.
  • 2.Após a primeira operação da bomba por quatro horas, o motor deve ser desligado para testar rapidamente a resistência do isolamento térmico, e seu valor não deve ser inferior a 0,5 megaohm.
  • 3.Depois que a bomba for desligada, ela deve ser iniciada após cinco minutos para evitar que a coluna de água no tubo seja completamente refluída e cause corrente excessiva do motor e queima.
  • 4.Depois que a bomba for colocada em operação normal, para prolongar sua vida útil, é necessário verificar regularmente se a tensão de alimentação, a corrente de trabalho e a resistência de isolamento estão normais. Se as seguintes condições forem encontradas, a bomba deverá ser desligada imediatamente para solução de problemas.
  •  
  • - Na condição nominal, a corrente excede 20%.
  • - O nível dinâmico da água cai para a seção de entrada de água, causando água intermitente.
  • - A bomba submersível apresenta vibrações ou ruídos intensos.
  • - A tensão de alimentação é inferior a 340 volts.
  • - Um fusível está queimado.
  • - O tubo de abastecimento de água está danificado.
  • - A resistência de isolamento térmico do motor é inferior a 0,5 megaohm.
  •  
  • Unit disassembly:
  • (1)Untie the cable tie, remove the pipeline part, and remove the wire plate.
  • (2)screw down the water bolt, put the water in the motor chamber.
  • (3)remove the filter, loose the fixed screw on the coupling to fix the motor shaft.
  • (4)screw down the bolt connecting the water inlet section with the motor, and separate the pump from the motor (pay attention to the unit cushion when separating, to prevent the bending of the pump shaft)
  • (5)the disassembly sequence of the pump is: (see figure 1) water inlet section, impeller, diversion shell, impeller...... check valve body, when removing the impeller, use special tools to loosen the conical sleeve of the fixed impeller first, and avoid bending and bruising the pump shaft in the process of disassembly.
  • (6)the disassembly process of the motor is: (see figure 1) place the motor on the platform, and remove the nuts, base, shaft head locking nut, thrust plate, key, lower guide bearing seat and double head bolt from the bottom of the motor in turn, and then take out the rotor (pay attention not to damage the wire package) and finally remove the connecting section and upper guide bearing seat.
  • (7)unit assembly: before assembly, the rust and dirt of the parts should be cleaned, and the mating surface and fasteners coated with sealant, and then assembled in the opposite order of disassembly (the motor shaft moves up and down after assembly for about one millimeter), after assembly, the coupling should be flexible, and then the filter screen test machine. Submersible pumps shall be taken out of the well for dismantling and maintenance according to Article 5 after a year of operation, or less than a year of operation but two years of diving time, and the worn parts shall be replaced.
  •  
 
Armazenamento e Custódia

 1, retire a água da cavidade do motor (principalmente no inverno para evitar que o motor congele) e amarre bem o cabo.

 2, store in an indoor room without corrosive substances and gases, with a temperature below 40 °C.

 3, o uso a longo prazo deve prestar atenção à prevenção da ferrugem das bombas submersíveis.

 

 
Peças de desgaste
  • Impulsor
  • Manga do eixo
  • Luva do eixo de borracha
  • Anel de vedação

 
Cenários de aplicação

01 Tomada de água de poço profundo

02 Abastecimento de água em arranha-céus

03 abastecimento de água na montanha 

04 torre de água

05 Irrigação agrícola

06 irrigação de jardim

07 captação de água do rio

08 água doméstica

 

Se você está interessado em nossos produtos, pode optar por deixar aqui seus dados, e entraremos em contato com você em breve.


Escreva aqui sua mensagem e envie para nós

Se você está interessado em nossos produtos, pode optar por deixar aqui seus dados, e entraremos em contato com você em breve.


pt_PTPortuguese